You are on page 1of 18

DSLNG Project Job No.

: 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 17 OF 62

REPORT No.
INSPECTION REPORT
Job Code
VESSEL (VERTICAL ON GROUND)
Date

ITEM NO. (Service)


(1) POSITION Refer to FDN Report:
INSTALLED HEIGHT
SPECIFIED MEASURED
DIRECTION DIMENSION DIMENSION DIFFERENCE

(2) VERTICALITY
DIRECTION BOTTOM REFERENCE POINT

(1) POSITION & ELEVATION (2) VERTICALITY


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (SW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 18 OF 62

REPORT No.
INSPECTION REPORT
Job Code
VESSEL (VERTICAL ON GROUND)
Date

ITEM NO. (Service)


(3) ANCHOR BOLT
Anchor Bolt Size Quantity
( ) x ( ) pcs

(4) PADDING LOAD

Erection Weight (Kg) = (______) = (______) kg/cm2


Pad Area (cm2) ( ) < 30kg/cm2

(3) ANCHOR BOLT TIGHTNESS (4) PADDING & GROUTING


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 19 OF 62

REPORT No.
INSPECTION REPORT
Job Code
VESSEL (VERTICAL WITH LEGS)
Date

ITEM NO. (Service)


(1) POSITION Refer to FDN Report:
INSTALLED HEIGHT
SPECIFIED MEASURED
DIRECTION DIMENSION DIMENSION DIFFERENCE

(2) VERTICALITY (Tolerance 1/1000)


DIRECTION BOTTOM REFERENCE POINT

(1) POSITION & ELEVATION (2) VERTICALITY


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (SW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 20 OF 62

REPORT No.
INSPECTION REPORT
Job Code
VESSEL (VERTICAL WITH LEGS)
Date

ITEM NO. (Service)


(3) ANCHOR BOLT
Anchor Bolt Size Quantity
( ) x ( ) pcs

(4) PADDING LOAD

Erection Weight (Kg) = (______) = (______) kg/cm2


Pad Area (cm2) ( ) < 30kg/cm2

(3) ANCHOR BOLT TIGHTNESS (4) PADDING & GROUTING


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 21 OF 62

REPORT No.
INSPECTION REPORT
Job Code
VESSEL (HORIZONTAL)
Date

ITEM NO. (Service)


(1) POSITION Refer to FDN Report:
INSTALLED HEIGHT
SPECIFIED MEASURED
DIRECTION DIMENSION DIMENSION DIFFERENCE
C
D
E
F

(2) HORIZONTALY (Longitudinal)


DIRECTION MEASURED INCLINATION
(C – D) / A / / 1000
(C – E) / B / / 1000

(1) POSITION & ELEVATION (2) HORIZONTALY


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 22 OF 62

REPORT No.
INSPECTION REPORT
Job Code
VESSEL (HORIZONTAL)
Date

ITEM NO. (Service)


(3) ANCHOR BOLT
Anchor Bolt Size Quantity
( ) x ( ) pcs

(4) PADDING LOAD

Erection Weight (Kg) = (______) = (______) kg/cm2


Pad Area (cm2) ( ) < 30kg/cm2

(3) ANCHOR BOLT TIGHTNESS (4) PADDING & GROUTING


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 23 OF 62

REPORT No.
INSPECTION REPORT
Job Code
(HEAT EXCHANGER (HORIZONTAL)
Date

ITEM NO. (Service)


(1) POSITION Refer to FDN Report:
INSTALLED HEIGHT
SPECIFIED MEASURED
DIRECTION DIMENSION DIMENSION DIFFERENCE

(2) HORIZONTALLY (Longitudinal)


MEASURED INCLINATION
(C – D) / A / / 1.000
(D – F) / B / / 1.000
(1) POSITION & ELEVATION (2) HORIZONTALY
SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 24 OF 62

REPORT No.
INSPECTION REPORT
Job Code
(HEAT EXCHANGER (HORIZONTAL)
Date

ITEM NO. (Service)


(3) ANCHOR BOLT
Anchor Bolt Size Quantity
( ) x ( ) pcs

(4) PADDING LOAD

Erection Weight (Kg) = (______) = (______) kg/cm2


Pad Area (cm2) ( ) < 30kg/cm2

(3) ANCHOR BOLT TIGHTNESS (4) PADDING & GROUTING


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 25 OF 62

REPORT No.
INSPECTION REPORT
Job Code
STACKED HEAT EXCHANGER
Date

ITEM NO. (Service)


(1) POSITION Refer to FDN Report:
INSTALLED HEIGHT
SPECIFIED MEASURED
DIRECTION DIMENSION DIMENSION DIFFERENCE

(2) HORIZONTALLY (Longitudinal)


MEASURED INCLINATION
(C – D) / A / / 1.000
(D – F) / B / / 1.000

(1) POSITION & ELEVATION (2) HORIZONTALY


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 26 OF 62

REPORT No.
INSPECTION REPORT
Job Code
STACKED HEAT EXCHANGER
Date

ITEM NO. (Service)


(3) ANCHOR BOLT
Anchor Bolt Size Quantity
( ) x ( ) pcs

(4) PADDING LOAD

Erection Weight (Kg) = (______) = (______) kg/cm2


Pad Area (cm2) ( ) < 30kg/cm2

(3) ANCHOR BOLT TIGHTNESS (4) PADDING & GROUTING


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 27 OF 62

REPORT No.
INSPECTION REPORT
Job Code
(HEAT EXCHANGER (VERTICAL)
Date

ITEM NO. (Service)


(1) POSITION Refer to FDN Report:
INSTALLED HEIGHT
  SPECIFIED MEASURED
DIRECTION DIMENSION DIMENSION DIFFERENCE

(2) VERTICALITY (Tolerance : 1/1000)


DIRECTION BTM REFERENCE POINT

(1) POSITION & ELEVATION (2) VERTICALITY


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 28 OF 62

REPORT No.
INSPECTION REPORT
Job Code
(HEAT EXCHANGER (VERTICAL)
Date

ITEM NO. (Service)


(3) SETTING BOLT
Bolt Size Quantity
( ) x ( ) pcs

(3) SETTING BOLT TIGHTNESS


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 29 OF 62

REPORT No.
INSPECTION REPORT
Job Code
AIR COOLED HEAT EXCHANGER
Date

ITEM NO. (Service)


(1) STRUCTURE (2) FAN HOOD/ RING LEVEL
1. Level on Top Column (1/1000) (Tolerance : 5 m/m)
c d e f g h BAY a b c d
A
B
m C
2. Verticality (±6 /m) D
Check View from 900 View from 1800
0 0
Column 0 - 180 900 - 2700
c
d
e
f
g
h

(1) STRUCTURE LEVEL & VERTICALITY (2) FAN HOOD / RING LEVEL
SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 30 OF 62

REPORT No.
INSPECTION REPORT
Job Code
AIR COOLED HEAT EXCHANGER
Date

ITEM NO. (Service)


(2) DRIVER & PULLEY
- - 1 Pulley Level
(1) FAN & FAN SHAFT FAN PULLEY DRIVER PULLEY PULLEY
- - 1 Fan Shaft Alignment (0.5/1000) X Y X Y DIFFERENCE

0º - 180º 270º - 90º

- - 2 Belt Tension
Set P = kg
- - 2 Tip Clearance (Set : mm) dept = cm
0º 45º 90º 135º 180º 225º 270º 315º
tension = kg
Result

- - 3 Blade Angle (Set : Degree)


1 2 3 4 5 6

(1) FAN & FAN SHAFT (2) DRIVER & PULLEY


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 31 OF 62

REPORT No.
INSPECTION REPORT
AIR COOLED HEAT EXCHANGER Job Code
Date Date

ITEM NO. (Service)


TUBE BUNDLE ALIGNMENT
m
(1) Line-up of Bundles (Tolerance : ±3 /m)
Bundle No. A B C D
Deviation O O

(2) Elevation of Bundle (Tolerance : 1 / 1000)


Bundle No. A B C D
EL +

(3) Level of Bundle


Bundle No. A B C D
Direction 0º - 180º 270º - 90º 0º - 180º 270º - 90º 0º - 180º 270º - 90º 0º - 180º 270º - 90º
Result

TUBE BUNDLE ALIGNMENT


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 32 OF 62

INSPECTION REPORT REPORT No.


Job Code
AIR COOLED HEAT EXCHANGER
Date
ITEM NO. (Service)
INSPECTION SUBCONTRACTOR JGC CLIENT REMARKS
ITEM DUTY DATE & SIGN DUTY DATE & SIGN DUTY DATE & SIGN
1 SUPPORT STEEL WORK
- Position (FI/P) (FW) (FW) Confirm on Civil Report
- Base Plate Welded or Base Grouted (FI/P) (FW) (FW)
- Platform and Ladder (FI/P) (FW) (FW)
- Bolt Tight (FI/P) (FW) (FW)
2 FAN FOOD / FAN RING
- Bolt Tight (FI/P) (FW) (SW)
3 FAN & DRIVE ASSEMBLY
- Hub Bolt Torque Confirmation (FI/P) (FW) (FW)
- Greasing System (Tubing Work) (FI/P) (FW) (FW)
4 TUBE BUNDLE
- Transport Clips Removed (FI/P) (FW) (I/R)
- Fin Clean and Damaged (FI/P) (FW) (I/R)
5 FINISHING
- Fan Guard Installed (FI/P) (FW) (SW)
- Air Sealing Strip Installed (FI/P) (FW) (SW)
REMARKS :
SIGNATURE SIGNATURE SIGNATURE
SUB-CONTRACTOR JGC Witnessed by OWNER Witnessed by
Inspected by: JGC Reviewed by CLIENT (NCP) Reviewed by

NAME : NAME : NAME :


DATE : DATE : DATE :

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 33 OF 62

Form 5000-401 REPORT No.


INSPECTION REPORT
Job Code
Skid and Others
Date

ITEM NO. (Service)


(1) POSITION Refer to FDN Report:
INSTALLED HEIGHT
SPECIFIED MEASURED
DIRECTION DIMENSION DIMENSION DIFFERENCE

(2) VERTICALITY or HORIZONTALY


DIRECTION BOTTOM REFERENCE POINT

(1) POSITION & ELEVATION (2) VERTICALITY or HORIZONTALY


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (SW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2
- 2 0 1
DSLNG Project Job No. : 0-5151-20
Doc. No. : S-900-1670-501 <Rev.0>
TEST AND INSPECTION PLAN FOR STATIC EQUIPMENT ERECTION SHEET 34 OF 62

Form 5000-402
REPORT No.
INSPECTION REPORT NFI-SK-MEC'H-0008
Job Code
Skid and Others 0-5151-20-000
Date 15 OKTOBER 2012
ITEM NO. (Service) 061-GTG-1001C
(3) ANCHOR BOLT number of sole
Anchor Bolt Size Quantity
( ) x (
plate required
1.5" 14 ) pcs
14 pcs
(4) PADDING LOAD
95350 95350
Erection Weight (Kg) = (______) = (______) kg/cm2
Pad Area (cm2) (23.00) < 30kg/cm2

(3) ANCHOR BOLT TIGHTNESS (4) PADDING & GROUTING


SUBCONTRACTOR JGC OWNER SUBCONTRACTOR JGC OWNER
ACCEPTANCE (FI/P) (FW) (FW) REMARKS ACCEPTANCE (FI/P) (FW) (FW) REMARKS
Inspected by Witnessed by Witnessed by Inspected by Witnessed by Witnessed by
Reviewed by Reviewed by Reviewed by Reviewed by
Name Name
Signature Signature
Date Date

D R A
N
I 01-SEP 2