Professional Documents
Culture Documents
a. ERW pipes
b. Seamless pipes
c. Electric fusion welded pipes Table 302.3.4 Page 16
d. All types of pipes
---------------------------------------------------------------------------------------------------------------------------
/conversion/tmp/scratch/400083962.doc
10/23/2018/ 6:51:48 AM/ NHA
Professional Training and Consultation
API 570 PREPARATORY
3-8 Sep05, Al-Khobar, Saudi Arabia
Page 2 of 6
a. 40 psig
b. 20 psig
c. 25 psig
d. 80 psig
---------------------------------------------------------------------------------------------------------------------------
/conversion/tmp/scratch/400083962.doc
10/23/2018/ 6:51:48 AM/ NHA
Professional Training and Consultation
API 570 PREPARATORY
3-8 Sep05, Al-Khobar, Saudi Arabia
Page 3 of 6
9. Which of the following ASME Code sections will you adopt for
construction of piping in chemical plants?
a. ASME B31.1
b. ASME B31.4
c. ASME B31.3 Introduction
d. None of above
---------------------------------------------------------------------------------------------------------------------------
/conversion/tmp/scratch/400083962.doc
10/23/2018/ 6:51:48 AM/ NHA
Professional Training and Consultation
API 570 PREPARATORY
3-8 Sep05, Al-Khobar, Saudi Arabia
Page 4 of 6
13. If Two pipes different pre- heat requirements say t1 and t2 are to
be welded, the pre- heat for their joining shall be (t1 and t2 are
in oC)
a. 10%
b. 15%
c. 12½% API 574 table3 page 48 / 31.3 S301.2 page 434
d. None of these
16. Two pipes (A) and (B) of different materials and schedules are to
be welded. The PWHT Required for pipe (A) is 1100 o F min. for 2
hr min. for pipe (B) 1300 oF min for I hr. what will be PWHT
min. temp and min. time for the weld joint of (A) and (B)
---------------------------------------------------------------------------------------------------------------------------
/conversion/tmp/scratch/400083962.doc
10/23/2018/ 6:51:48 AM/ NHA
Professional Training and Consultation
API 570 PREPARATORY
3-8 Sep05, Al-Khobar, Saudi Arabia
Page 5 of 6
18. ASME B 31.3 code is meant for new piping installations in:
a. FCAW
b. GMAW
c. GTAW
d. SAW
a.
Repairs and alteration of metallic and fiber glass-
reinforced plastic (FRP) pipes only
b. Repairs and alteration of metallic & non-metallic pipes.
c. In-service inspection of metallic & non-metallic pipes.
---------------------------------------------------------------------------------------------------------------------------
/conversion/tmp/scratch/400083962.doc
10/23/2018/ 6:51:48 AM/ NHA
Professional Training and Consultation
API 570 PREPARATORY
3-8 Sep05, Al-Khobar, Saudi Arabia
Page 6 of 6
ANSWER KEY
---------------------------------------------------------------------------------------------------------------------------
/conversion/tmp/scratch/400083962.doc
10/23/2018/ 6:51:48 AM/ NHA