Panelist’s Page No. Comment/Revision/Recom Action Made
Comment mendations Suggested 8 Asked for the name of the Indicated the name of the Lessor lessor: Mr. Armin I. Yecla 10 Formatting of the Job Put the job descriptions for the Descriptions partners in charge and non- partners in a tabular format 12 Employer’s and Employees’ We moved the employees’ and Contributions should be put employer’s contributions from into schedules in Financial Management Aspect to the Aspect Financial Aspect 19 Questioned about the Gantt We just removed them because Charts’ Building Business we realized they can already be Plan and Determining Legal associated with the Making of Mr. Osler Business Structure Feasibility Study which is Aquino during February to March 44 Asked if the packaging will There will be a supplier for the be made or bought packaging. Name was included in the packaging section Appendix F Suggested to include Included in the appendices multiple designs of the product 70 Asked for the unit of Changed the heading to measurement for demand “demand for jackets” 84-85 Asked for the pricing Added the pricing schedule for schedule the five year projection 86-87 Suggested to expand market Added the consignment ___ in through consignment sales the distribution strategy 108 & 126 Suggested to decrease the Increased the production cost of goods sold to 55% capacity and removing one production staff (seamstress)
Chapter VI Formatting of Financial Changed as noted
Aspect 67 Encircled points in CPM Rating was increased since it Matrix was understated 68 Encircled “strategic store Removed the strategic store Ms.Cecilia location” in SWOT location as part of strengths Asoy 73 Asked for source of demand Added Philippine Statistics Authority as publication source, included the number of barangays (56), and included the name of location (Malate, Manila) Jack & Pack – Summary of Revisions
73 Suggested to include online Included as part of the note in
sales and consignment sales distribution strategy and to avoid the inclusion of channels of distribution repeat buyers in the demand 86-87 Suggested to put kiosk Entry to mall is not easily instead of a store attainable for start up business Cost of putting up kiosk is not cost effective Appendix F Suggested to include Included in the technical multiple designs of the aspect and appendices product 41-42 Suggested to mass produce Rotary cutter was still used the cutting production due to the limited production demand 41-42 Suggested to change Changed production time to 1 Mr. production time hour and 20 mins instead of 2 Manuel hours and 40 minutes Magbuhat 56 Suggested to remove the Delivery is included as part of distribution man the operations in the transport of raw materials from supplier to factory, finished goods from factory to store and consignees and used as service by the partners