You are on page 1of 4

@ 3000 psig;

rho 15.60254 lb/ft3


MW 2.755 lb/Nm3

mole 10 Nm3
mass 27.55 lb

V 1.765738 ft3
50000.05 mL
50.00005 L

Basis Perhitungan : Tabung Gas N2 @7Nm3


Kondisi Pipa 10 psig; 38 F
Basis:
N2 Standard Volume
per tube 7 Nm3
Purging Pressure 10 psig INL
Temperature Inside
Pipe 38 F

Calculation Result: Total


Mass Density 0.13 lb/ft3 (@P&T) Pipa ID (m) 0.1524
Pipe Volume 533.144 ft3 (+10% margin) Pipa ID (in) 6
N2 Mass Needed 69.14878 lb Panjang (m) 750
N2 MW 2.755 lb/Nm3 Volume (m3) 13.6811 13.6811
N2 Standard Vol
Needed 25.09938 Nm3 Volume (ft3) 483.144 483.144
Ammount of N2
Gas Tube 4 Tube

Basis Perhitungan :
Tabung Gas N2 @7Nm3
Kondisi Pipa 660 psig; 38 F
Basis:
N2 Standard Volume
per tube 7 Nm3
Leak Test Pressure 726 psig PIER
Temperature Inside
Pipe 38 F

Calculation Result:
Mass Density 3.99 lb/ft3 (@P&T) Pipa ID (m) 0.4064 0.3048
Pipe Volume 267.6614 ft3 (+10% margin) Pipa ID (in) 16 12
N2 Mass Needed 1066.631 lb Panjang (m) 39.864 20.345
N2 MW 2.755 lb/Nm3 Volume (m3) 5.171043 1.484491
N2 Standard Vol
Needed 387.1618 Nm3 Volume (ft3) 182.6138 52.42435
Ammount of N2
Gas Tube 56 Tube
INL

418.72

PIER

Total
0.254 0.2032
10 8
1.193 5.375
0.06045 0.174307 6.890291

2.134781 6.155613 243.3286

You might also like