Bravo Park
Project Summary: Resurface the basketball courts, replace the
playground with shade, and resurface the walking path.

Investment: $293,400
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
Renovate existing basketball court surface 3
Replace existing playground with shade 3
Renovate existing walking path 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Bristol Park
Project Summary: Resurface the basketball court and add shade and
replace the playground and its shade.

Investment: $398,700
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
Renovate existing basketball court surface 3
New shade over existing basketball court 3
Replace existing playground with shade 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Cherry Avenue Park


Project Summary: Multiple renovations including basketball court
resurfacing, adding a large playground with shade, ramada, and
restrooms.

Investment: $765,771
Phase(s): 1 (2020-2022)
Ward(s): 5

Item Phase
Renovate existing basketball court surface 1
Replace existing playground with shade 1
New ramada 1
New restrooms 1
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Country Club Annex Park


Project Summary: Add shade over the existing playground.

Investment: $48,150
Phase(s): 1 (2020-2022)
Ward(s): 5

Item Phase
New shade over existing playground 1
PARKS + CONNECTIONS
PROP. 407 PROJECTS

CSM Martin R. “Gunny” Barreras Memorial Park


Project Summary: Multiple renovations including sports field lights,
playgrounds, restrooms, walking path, splash pad, and track
resurfacing.

Investment: $4,316,130
Phase(s): 1 (2020-2022)
Ward(s): 5

Item Phase
Renovate existing track surface 1
New splash pad 1
New walking path 1
New LED lights at existing Baseball 1 field 1
Renovate irrigation system 1
Renovate existing parking lot 1
New LED lights on existing soccer field 1
New playground with shade 1
New ramada 1
New restrooms 1
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Desert Shadows Park


Project Summary: Renovate playground with new shade and resurface
the walking path.

Investment: $260,370
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
Replace existing playground with shade 3
Renovate existing walking path 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

El Pueblo Park
Project Summary: Projects include improvements throughout the
entire El Pueblo Complex including the Activity Center, Senior Center,
and Neighborhood Center as well as the pool and the park.

Investment: $2,470,621
Phase(s): 1 (2020-2022) and 2 (2023-2025)
Ward(s): 5

Item Phase
Park: New splash pad 2
Park: New walking path 2
Park: Renovate irrigation system 2
Park: Renovate existing parking lots 2
Park: Replace existing playground with shade 2
Park: New restrooms 2
Park: Renovate directional signage, bollards, and cable 2
Pool: Replace slide flume and stairs 1
Pool: Renovate pool plaster, tile, and deck 2
Activity Center: Renovate roof security 2
Senior Center: Renovate kitchen, paint, and shade sails 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS

James Thomas Park


Project Summary: Renovation of the sports courts surfaces,
renovation of the playground and restroom, and the addition of a
walking path and connection to the Kino Environmental Restoration
Project.

Investment: $636,660
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
New walking path 3
Renovate existing basketball court surface 3
Replace existing playground with shade 3
Renovate 2 tennis court surfaces 3
Renovate existing restrooms 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

La Mariposa Park
Project Summary: Renovation of the playground and shade over the
playground and amphitheater.

Investment: $255,145
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
New shade over existing amphitheater 3
Replace existing playground with shade 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Manuel Herrera Jr. Park


Project Summary: Renovation of the basketball court and the walking
paths surfaces plus a new connection to the Airport Wash Greenway.

Investment: $51,120
Phase(s): 2 (2023-2025)
Ward(s): 5

Item Phase
New walking path connection to the Airport Wash Greenway 2
Renovate existing half basketball court surface 2
Renovate existing walking path 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Mirasol Park
Project Summary: Renovations to the sports courts, playground,
parking lot, and utilities plus a new restroom.

Investment: $492,169
Phase(s): 2 (2023-2025)
Ward(s): 5

Item Phase
New restrooms 2
Renovate existing basketball court surface 2
Renovate existing parking lots 2
Replace existing playground with shade 2
Upgrade electrical system and lighting 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Ochoa Park
Project Summary: New shade over the playground, ramada, and area
lighting.

Investment: $238,150
Phase(s): 1 (2020-2022) and 2 (2023-2025)
Ward(s): 5

Item Phase
New shade over existing playground 1
New area lighting 2
New ramada 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Parkview Park
Project Summary: New playground and shade.

Investment: $245,565
Phase(s): 1 (2020-2022) and 2 (2023-2025)
Ward(s): 5

Item Phase
New shade over existing playground 1
New playground with shade 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Pueblo Gardens Park


Project Summary: Basketball court resurfacing, restroom renovation,
and a new walking path.

Investment: $218,835
Phase(s): 2 (2023-2025) and 3 (2026-2028)
Ward(s): 5

Item Phase
Renovate existing restrooms 2
New walking path 3
Renovate existing basketball court surface 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Rodeo Wash Greenway


Project Summary: Renovation of the existing sections of the Rodeo
Wash Greenway and new improvements to an undeveloped section.

Investment: $700,958
Phase(s): 3 (2026-2028)
Ward(s): 1 and 5

Item Phase
Renovation of the existing sections of the Rodeo Wash 3
Greenway and new improvements to an undeveloped section
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Rudy Garcia Park


Project Summary: Multiple projects including renovations to sports
courts, fields, and lighting, walking paths, playgrounds, restrooms, and
renovations to the Mulcahy YMCA.

Investment: $3,852,274
Phase(s): 2 (2023-2025) and 3 (2026-2028)
Ward(s): 5

Item Phase
Park: New walking path 2
Park: Renovation of 3 existing basketball court surfaces 2
Park: New LED lights on 2 existing little league fields 2
Park: Upgrade 1 little league field lights to LED 2
Park: Renovate existing parking lots 2
Park: Replace existing playground with shade 2
Park: New playground with shade 2
Park: New LED lights on existing soccer field 2
Park: Upgrade existing lights on 2 soccer fields to LED 2
Park: Upgrade existing lights on softball field to LED 2
Park: Upgrade existing lights on Baseball 7 to LED 2
Park: Renovate existing restrooms 2
Mulcahy YMCA: Upgrade HVAC controls 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

San Antonio Park


Project Summary: New ramada.

Investment: $72,225
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
New ramada 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Santa Rita Park


Project Summary: Multiple projects including a new splash pad and
renovations to the sports fields and lights, playground, restroom,
ramadas, and walking path.

Investment: $2,984,732
Phase(s): 2 (2023-2025)
Ward(s): 5

Item Phase
2 new ramadas 2
New splash pad 2
New walking path 2
Renovate existing basketball court surface 2
Renovate existing parking lots 2
Renovate existing restrooms 2
Renovate skate park 2
Renovate irrigation system 2
Replace existing playground with shade 2
Upgrade existing lights on baseball field to LED 2
Upgrade existing lights on softball field to LED 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Santa Rosa Park


Project Summary: Renovations to the sports fields and courts,
playground with shade, and walking path.

Investment: $770,490
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
New LED lights on existing soccer field 3
New LED lights on existing little league field 3
New walking path 3
Renovate existing basketball court surface 3
Replace existing playground with shade 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Silverlake Park
Project Summary: Multiple projects including improvements to the
park, Quincie Douglas Center including a memorial to the Buffalo
Soldiers, and Quincie Douglas Pool.

Investment: $1,957,979
Phase(s): 1 (2020-2022) and 2 (2023-2025)
Ward(s): 5

Item Phase
Park: New walking path 2
Park: New covered basketball court 2
Park: New playground with shade 2
Park: New ramada 2
Park: Renovate existing parking lots 2
Park: Renovate existing walking path 2
Quincie Douglas Center: New Buffalo Soldier Memorial 1
Quincie Douglas Center: Upgrade HVAC controls 2
Quincie Douglas Pool: Renovate pool deck 2
Quincie Douglas Pool: Replace pool slide flume 2
Quincie Douglas Pool: Renovate splash pad 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Street Scene Park


Project Summary: New playground with shade.

Investment: $207,045
Phase(s): 2 (2023-2025)
Ward(s): 5

Item Phase
New playground with shade 2
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Sunnyside Pool
Project Summary: Renovations to pool plaster, tile and deck.

Investment: $133,650
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
Renovate pool plaster, tile, and deck 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Swan Park
Project Summary: A new bridge over the wash and a new playground
with shade.

Investment: $385,200
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
New bridge over the wash 3
Replace existing playground with shade 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Tucson Rodeo Grounds


Project Summary: Improvements to roofs, concessions, and water
mainline.

Investment: $353,260
Phase(s): 3 (2026-2028)
Ward(s): 5

Item Phase
Renovate west concessions and water mainline 3
Replace deteriorating roofs 3
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Drexel Road Shared-Use Path


12th Ave to Country Club Rd

Project Summary: New off-street walking and biking path on the


southside of Drexel Rd. Safety and comfort improvements include
shade trees, path lighting, and ADA accessible curb ramps.

Project Category: Greenways & Shared-Use Paths


Project Subcategory: Shared-Use Path

Investment: $1,230,908
Phase(s): 2 (2023-2025)
Connects: 4 parks, 5 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS

El Paso & Southwestern Greenway


University Blvd at Main Ave to Kino Sports Complex

Project Summary: New off-street asphalt path shared by people biking


and walking. Improvements include landscaping, shade trees, lighting,
and benches. Connects to the Loop at the Kino Sports Complex.

Project Category: Greenways & Shared-Use Paths


Project Subcategory: Greenways

Investment: $2,586,280
Phase(s): 2 & 3 (2023-2028)
Connects: 26 parks, 10 schools, 2 libraries
Ward(s): 1, 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Airport Wash Greenway
Liberty Ave to S. 12th Ave

Project Summary: New off-street asphalt path shared by people biking


and walking. Improvements include landscaping, shade trees, lighting, and
benches.

Project Category: Greenways & Shared-Use Paths


Project Subcategory: Greenways

Investment: $530,950
Phase(s): 3 (2026-2028)
Connects: 3 parks, 1 school
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Arroyo Chico Greenway


Reid Park to Downtown

Project Summary: New off-street asphalt path shared by people biking


and walking. Improvements include landscaping, shade trees, lighting,
and benches.

Project Category: Greenways & Shared-Use Paths


Project Subcategory: Greenways

Investment: $4,401,445
Phase(s): 2 (2023-2025)
Connects: 6 parks, 5 schools
Ward(s): 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Nebraska Street Pedestrian Safety & Walkability Project


Old Nogales Hwy to 12th Ave

Project Summary: Street improvements to provide complete and


connected sidewalks on both sides of the road, enhanced street crossings,
street lighting, and landscaping for shade.

Project Category: Pedestrian Safety & Walkability

Investment: $2,773,840
Phase(s): 3 (2026-2028)
Connects: 4 parks, 3 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS

S 12th Avenue Pedestrian Safety & Walkability Project


Drexel Rd to Ajo Way

Project Summary: Street improvements to include sidewalk


improvements, enhanced crossings, and landscaping.

Project Category: Pedestrian Safety & Walkability

Investment: $2,127,530
Phase(s): 1 (2020-2022)
Connects: 4 parks, 5 schools, 1 library
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS

36th Street Pedestrian Safety & Walkability Project


6th Ave to Country Club Rd

Project Summary: Street improvements to provide complete and


connected sidewalks on the north side of the road (El Paso Southwest
Greenway to be on the south side of road), enhanced street crossings,
street lighting, and landscaping for shade.

Project Category: Pedestrian Safety & Walkability

Investment: $1,958,426
Phase(s): 1 (2020-2022)
Connects: 4 parks, 5 schools, 1 library
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Andrew Street Bicycle Boulevard
Aviation Bikeway to Jessica-Mann Ave

Project Summary: Residential street improvements including enhanced


street crossings at Swan and Wilmot Roads, traffic calming to slow car
speeds, wayfinding signage, pavement markings, and landscaping to
enhance the walking and biking environment. Connects to the Aviation
Bikeway.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $1,198,717
Phase(s): 1 (2020-2022)
Connects: 8 parks, 6 schools, 1 library
Ward(s): 2, 4, 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Calle Alvord Bicycle Boulevard


Liberty Ave to Calle Pinta

Project Summary: Residential street improvements including traffic


calming to slow car speeds, wayfinding signage, pavement markings,
and landscaping to enhance the walking and biking environment.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $126,645
Phase(s): 1 (2020-2022)
Connects: 2 parks, 2 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Greenway Drive Bicycle Boulevard


Drexel Rd to Cherry Ave

Project Summary: Residential street improvements including enhanced


street crossings at Campbell Ave and Irvington Rd, traffic calming to slow
car speeds, wayfinding signage, pavement markings, and landscaping to
enhance the walking and biking environment.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $ 738,492
Phase(s): 1 (2020-2022)
Connects: 3 parks, 2 schools
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS

8th Avenue / Convent Avenue Bicycle Boulevard


Jullian Wash Greenway to Cushing St

Project Summary: Residential street improvements including an


enhanced street crossing at 22nd Street, traffic calming to slow car
speeds, wayfinding signage, pavement markings, and landscaping to
enhance the walking and biking environment. Connects to the Loop at
the Julian Wash Greenway.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $684,954
Phase(s): 2 (2023-2025)
Connects: 15 parks, 5 schools, and 2 libraries
Ward(s): 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Michigan / Fair Street Bicycle Boulevard
Santa Cruz River Park to Julian Wash

Project Summary: Residential street improvements including an


enhanced street crossing at 6th Avenue, traffic calming to slow car
speeds, wayfinding signage, pavement markings, and landscaping to
enhance the walking and biking environment. Connects to the Rodeo
Wash Greenway.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $ 502,921
Phase(s): 1 (2020-2022)
Connects: 10 parks, 3 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Santa Clara Avenue Bicycle Boulevard
Los Reales Rd to Julian Wash Greenway

Project Summary: Residential street improvements including traffic


calming to slow car speeds, wayfinding signage, pavement markings,
and landscaping to enhance the walking and biking environment.
Connects to the Loop at the Julian Wash Greenway, the Rodeo Wash
Greenway, and the Los Reales Shared Use Path.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $1,126,554
Phase(s): 3 (2026-2028)
Connects: 7 parks, 8 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Nebraska Street Bicycle Boulevard
Santa Clara Ave to Ajo Way

Project Summary: Residential street improvements including an


enhanced street crossing at Irvington Road, traffic calming to slow car
speeds, wayfinding signage, pavement markings, and landscaping to
enhance the walking and biking environment.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $ 666,056
Phase(s): 3 (2026-2028)
Connects: 4 parks, 3 schools
Ward(s): 1, 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS

18th St Bicycle Boulevard


Santa Cruz River Park to Kino Environmental Restoration Project

Project Summary: Residential street improvements including traffic


calming to slow car speeds, wayfinding signage, pavement markings,
and landscaping to enhance the walking and biking environment.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $476,087
Phase(s): 1 (2020-2022)
Connects: 9 parks, 5 schools, 1 library
Ward(s): 1, 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Bantam Road Bicycle Boulevard


Country Club Rd to Park Ave

Project Summary: Residential street improvements including an


enhanced street crossing at Park Avenue, traffic calming to slow car
speeds, wayfinding signage, pavement markings, and landscaping to
enhance the walking and biking environment. environment. Connects to
the Aviation Bikeway.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $430,432
Phase(s): 1 (2020-2022)
Connects: 1 parks, 2 schools
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Palo Verde Bicycle Boulevard
3rd St to Kleindale Rd

Project Summary: Residential street improvements including an


enhanced street crossing at Ft. Lowell Rd, traffic calming to slow car
speeds, wayfinding signage, pavement markings, and landscaping to
enhance the walking and biking environment. Connects to Aviation
Bikeway and the Multi-use Path at Reid Park.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $1,260,581
Phase(s): 2 (2023-2025)
Connects: 6 parks, 3 schools
Ward(s): 3, 5, 6
PARKS + CONNECTIONS
PROP. 407 PROJECTS

Cherry Avenue Bicycle Boulevard


Bantam Rd to Michigan St / Fair St

Project Summary: Residential street improvements including an


enhanced street crossing at Irvington Road, traffic calming to slow car
speeds, wayfinding signage, pavement markings, and landscaping to
enhance the walking and biking environment.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $391,522
Phase(s): 1 (2020-2022)
Connects: 3 parks, 3 schools
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Cherrybell Stravenue / Pinal Vista Bicycle
Boulevard
James Thomas Park to 18th St

Project Summary: Residential street improvements including an


enhanced street crossing at 36th Street, traffic calming to slow car
speeds, wayfinding signage, pavement markings, and landscaping to
enhance the walking and biking environment.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $398,802
Phase(s): 1 (2020-2022)
Connects: 3 parks, 4 schools, 1 library
Ward(s): 5
PARKS + CONNECTIONS
PROP. 407 PROJECTS
Treat Avenue Bicycle Boulevard
Aviation Park to Rillito River Park
Project Summary: Residential street improvements including
enhanced street crossings at Prince Rd, Glenn Rd, Speedway Blvd, 6th
Street, traffic calming to slow car speeds, wayfinding signage, pavement
markings, and landscaping to enhance the walking and biking
environment. Connects to the Loop at the Rillito River Park and to
Aviation Bikeway.

Project Category: Bicycle Safety & Mobility


Project Subcategory: Bicycle Boulevard

Investment: $1,438,040
Phase(s): 1 (2020-2022)