1 | 26May 2016 | M. Tanaka N. Ahiko N. Ahiko Revised as per Employer's
Comment
o_| 20 Jan.2016 _| M. Tanaka N. Ahiko N.Ahiko First Issue,
Rev. | _Rev. Date Created by Checked by | Approved by Description
a
M® PERTAMINA
GEOTHERMAL ENERGY
=!¢
LUMUT BALAI GEOTHERMAL FCRS AND
POWER PLANT PROJECT
CONTRACT NO: 1148/PGE000/2014-S0
TITLE:
PIPING SPECIFICATION FOR POWER PLANT
PORTION
DRAWING / DOCUMENT. No. LMIB1-E-2-L0-ODS-MS0-002 REV:1
CONTRACTOR:
Marubeni
Responsible Dept Createdby Theory Tapraved by Tomar
Turbine pent equipment Dept M. Tanaka N. Abiko N. Anko | Aa size
Piping Systom Design Ge
Issue. Type :_MIFor Approval_[_IFor Information Other
Doc. Status: [Approved [1Approved Excepted as Noted
TOSHIBA
LiReturned for Correction and Re-submission
Dwg/Doc. No. DDKW25783 Rev. B
Total 17_Page (including this cover Sheet)TOSHIBA DDKW25783-b 1/16
BLE BIB RK desi data sheet
4 TITLE
Piping Specification for POWER PLANT PORTION
ERB ‘CUSTOMER PERTAMINA geothermal energy
FeRAM —EO/SYS.
ae JOB 257008 CG 2001
FSyb — PROJECT XILBt
The information in this material is confidential
fand contains Toshiba’s intellectual property
including know-how, It shall not be disclosed to|
‘any third party, copied, reproduced, used for
‘unauthorized purposes ‘nor modified without|
prior written consent of Toshiba,
‘Toshiba Corporation
eras APPROVED BY
strumeet ae lissueD sy N. ahiko
DISTRIBUTION oe cae
Seva WE REVIEWED By
N. Abiko
ee watiey 23 May. 2016
TURBINE PLANT EQUIPMENT DEPT. [WM PREPARED BY
PIPING SYSTEM DESIGN GROUP |. Tanaka
23 May. 2016
ene FARE su
(HR) ELMS 2016/05/23 RERBOAT LIERTOSHIBA DDKW25783-b 2/16
BLE BIB RK desi data sheet
This line specification was made with refs
PIPING MATERIAL AND VALVES SPECIFICATION/ LMBI-E-1-L0-BES-AA0-504
Each specification numbers are put by same manner from above reference.
‘And the last letter suffixes were use from “P”.
Reference Document;
LMB1-E-2-L0-OCS-MS1-003 WALL THICKNESS CALCULATION FOR PIPING (POEWR PLANT PORTION)
(HR) DHSS 2016/05/29 SFRVOAT LGA