PHOTOGRAPH POWER
Prepared (also subject responsible if other) Document No.
EID/OJI/BCB Ronaldi Mukhsin 1/131 32-114/IPBPD 360 5608 Uen
Doc respons/Approved Checked Date Rev. File
EID/OJI/BCB (Andi Setia Buana) 2012/11/18 A SBTD012G, Bukit Gom

Photos
Project: AXIS 2G/3G REDeployment Project, West Sumatera, INDONESIA
PT. Axis Telekom Indonesia
Site: SBTD012G, Bukit Gombak

1. Rack BBS 2116 2. Battery


2 (5)
PHOTOGRAPH POWER
Prepared (also subject responsible if other) Document No.
EID/OJI/BCB Ronaldi Mukhsin 1/131 32-114/IPBPD 360 5608 Uen
Doc respons/Approved Checked Date Rev. File
EID/OJI/BCB (Andi Setia Buana) 2012/11/18 A SBTD012G, Bukit Gom

Photos
Project: AXIS 2G/3G REDeployment Project, West Sumatera, INDONESIA
PT. Axis Telekom Indonesia
Site: SBTD012G, Bukit Gombak
3. Grounding Cabinet BBS 4. Grounding Bar
3 (5)
PHOTOGRAPH POWER
Prepared (also subject responsible if other) Document No.
EID/OJI/BCB Ronaldi Mukhsin 1/131 32-114/IPBPD 360 5608 Uen
Doc respons/Approved Checked Date Rev. File
EID/OJI/BCB (Andi Setia Buana) 2012/11/18 A SBTD012G, Bukit Gom

Photos
Project: AXIS 2G/3G REDeployment Project, West Sumatera, INDONESIA
PT. Axis Telekom Indonesia
Site: SBTD012G, Bukit Gombak

5. ACPDB (Door Open) 4. 5. ACPDB (Door Close)


4 (5)

SBTD012G, Bukit Gombak


5 (5)

SBTD012G, Bukit Gombak