NAMA - NAMA PEDAGANG PASAR RT.

006/03
DESA WAYAME YANG MASIH AKTIF

1. YANG MENEMPATI LOS

NO NAMA PEDAGANG ALAMAT KETERANGAN

1 WA RAPIA
2 WA JAIDA
3 WA OCI
4 WA IMA LANDORO
5 WA NIWA `
6 WA IMA LA EDY
7 LA NUR USMAN KELAPA
8 LA PATY
9 ABU KASIM
10 LA KARMAN KELAPA
11 WA RINA
12 WA SIA
13 WA LIANA
14 WA NENY Lesehan
15 WA PUMA
16 WA SURI Lesehan
17 WA ALIMUA
18 WA LIA
19 WA IDA
20 MAIMUNA
21 MAMA ANGGI
22 BAPAK LA ATE
23 WA TINA LAMESI
24 FANDI ERNI
25 LA SANGE
26 LANDELE KELAPA
27 LA OLU
28 WA SINE
29 LA RAPI KELAPA
30 WA ASI
31 WA UCE
32 WA ALE
33 WA ITA
34 KUSMIRA Lesehan
35 WAMPATA Lesehan
36 MASNO
37 WA SENGO
38 ABU KAEPESINA
39 WA KIA
40 WA BORI
41 BPK JAE
42 WA NONI
43 WA EMU
44 WA OMA RAHMAN
45 WA ARIMU
46 WA NUNU
47 BPK AJID PARANG
48 LA DIDI KELAPA
49 WA IRA
50 MAMA HODI
51 WA LARI
52 YATI
53 WA ATE
54 WA NANJA
55 BPK MAHMUD
56 MAMA NYORA IKAN ASAR
57 LA HALI
58 WA UNU
59 WA ENDANG
60 WA ABU PAKAIAN BEKAS
61 WA NANO
62 WA HETY
63 MAMA NURU
64 WA KATA
65 BPK SEDEK PECAH BELA
66 MAMA YAYA Lesehan
67 MAMA ANN Lesehan
68 WIWIN KUE
69 NN Lesehan
70 NN Lesehan
71 NN Lesehan
72 NN Lesehan
73 NN Lesehan
2. YANG MENEMPATI KIOS

NO NAMA PEDAGANG ALAMAT KETERANGAN

1 TINA TUHELELE SEMBAKO


2 BPK LA SATU PECAH BELA
3 MAMA IDA PAKAIAN
4 LA HUSNI ASESORIS
5 WA DEWI PAKAIAN
6 KAKA FAT JAHITAN
7 MAMA ARJUN PAKAIAN
8 LA SULE PAKAIAN
9 NENE HAJI PAKAIAN
10 FIRDAUS MAINAN
11 INDRI MAINAN
12 MAMA DARNI PAKAIAN
13 MAMA AKI SENDAL SEPATU
14 MAMA UFI PAKAIAN
15 MAMA NARTY SENDAL SEPATU
16 MAMA HAJI RAHMA PAKAIAN
17 LA TINDRING JAHITAN
18 MAMA EYA JAHITAN
19 MAMA KENA PAKAIAN
20 NARTI ASESORIN
21 MAMA ALA ASESORIN
22 WA EMI KOSMETIK
23 KAKA ILA PECAH BELAH
24 AJID SEMBAKO
25 LA TIHA SEMBAKO
26 LA TONI SEMBAKO
27 LA HAMID SEMBAKO
28 MAMA HESA SEMBAKO
29 WA ONA SEMBAKO
30 LA DIEN SEMBAKO
31 LA JULIADIN SPATU/SANDAL
32 WA ROSNA SEMBAKO
33 BPK LA HARA
34 WA YENI
35 MUHIDIN
36 MAMA NA ABDULLAH
37 MBAK JAMU
38 MAS GARENG
39 LA UMAR KRANJANG TELUR
3. YANG MENEMPATI LOS IKAN

NO NAMA PEDAGANG ALAMAT KETERANGAN

1 LAPAK IKAN
2 LA AMIR
3 BPK KENA
4 WA EMA
5 ANDEP
6 MAMA BOLU
7 ANIA
8 WA MIMI
9 RINA
10 MAMA AWA
11 MAMA MUNA
12 MILYAM
13 ATI LAHA
14 USU LAHA
15 AWA LAHA
16 LA MADI
17 NN
18 NN
19 NN
20 NN
21 NN
DAYA TAMPUNG KIOS DAN LAPAK

YANG TERSEDIA RENCANA TERPAKAI


NO JENIS BANGUNAN +/- KET
YANG ADA RENCANA JUMLAH ATAS BAWAH JUMLAH
1 KIOS 30 37 67 46 39 85 -18
2 LOS SAYUR 72 5 77 31 68 99 -22
3 LOS KELAPA 7 5 12 7 5 12 0 AMAN
4 LOS IKAN 36 36 14 21 35 +1 AMAN
5 LOS PAKAIAN BEKAS 19 19 16 2 18 +1 AMAN

CATATAN :
1 Untuk pasar Bawah
Jumlah tersebut sdh termasuk yang lesehan sebanyak 12 orang

2 Untuk Pasar Damai


Yang belum mendesak untuk berjualan 5 orang
RENCANA ANGGARAN BIAYA
(R A B)

PEKEERJAAN : TAMBAHAN LAPAK DAN KIOS SEMENTA


LOKASI : PASAR DAMAI WAYAME KOTA AMBON
TAHUN : 2018

HARGA
NO NAMA PEKERJAAN SAT. VOLUME SATUAN
(Rp)

I PEKERJAN TANAH DAN PASANGAN


1 Pekerjaan urugan tanah m3 90.65 166,020.00
2 Pekerjaan talud tambahan m3 3.75 939,840.00
SUB JUMLAH
II PEKERJAAN KIOS (37 kios)
1 Pasang dinding Papan uk. 2,5 x 25 x 300 kayu klas II m3 555 158,475.00
2 Pasang pintu tripleks m2 177.6 434,620.00
3 pekerjaan kuda kuda kayu klas II m3 1.295 4,326,000.00
4 Pekerjaan gording kayu klas II m3 3.33 4,237,250.00
5 Pekerjaan plafon tripleks 3 mm m2 231.25 154,775.00
6 Pasang atap zink gelombang 0,20 m2 453.25 62,850.00
7 engsel pintu 3 x 4 cn psng 148 30,000.00
8 Grendel pintu Kios bh 296 10,000.00
9 Rabat beton camp. 1 : 3 : 5 m3 31.7275 907,541.00
10 Acian lantai m2 453.25 35,000.00
11 Pasang imstalasi listrik ttk 37 75,000.00
12 Lampu philips 18 watt bh 37 50,000.00
13 Fittimg tempel bh 37 25,000.00
14 Stop kontak tempel bh 37 30,000.00
15 saklar tempel bh 37 25,000.00
16 Cat dinding papan, plafon dan pitu dengan cat tembok m2 1418.95 21,320.00
17 Gembok sedang bh 37 50,000.00
SUB JUMLAH

III PEKERJAAN KIOS DI ATAS SALURAN (18 Bh)


1 Pasang dinding Papan uk. 2,5 x 25 x 300 kayu klas II m2 216 158,475.00
2 Pasang pintu double tripleks t. 3 mm m2 86.4 434,620.00
3 pekerjaan kuda kuda kayu klas II m3 0.945 4,326,000.00
4 Pekerjaan gording kayu klas II m3 0.81 4,237,250.00
5 Pekerjaan plafon tripleks 3 mm dlm kios m2 90 154,775.00
6 Pasang atap zink gelombang 0,20 m2 135 62,850.00
7 engsel pintu 3 x 4 cn psng 72 30,000.00
8 Grendel pintu Kios bh 144 10,000.00
9 Pasang lantai papan t. 3 cm Kayu klas II unit 18 350,000.00
10 Pasang imstalasi listrik ttk 18 75,000.00
11 lampu philips 18 watt bh 18 50,000.00
12 Fittimg tempel bh 18 25,000.00
13 Stop komtak tempel bh 18 30,000.00
14 saklar tempel bh 18 25,000.00
15 Cat dinding papan, plafon dan pitu dengan cat tembok m2 586.8 21,320.00
16 Gembok sedang bh 18 50,000.00
SUB JUMLAH

IV PEKERJAAN LAPAK SAYUR DAN KELAPA


1 Pembuatan meja kayu klas II bh 10 300,000.00
2 Pekerjaan pemasangan tiang dan kuda kuda kayu klas II m3 0.48 4,326,000.00
3 Pasang gording 5/10 kayu klas II m3 0.24 4,237,250.00
4 Pasang atap zink 0.20 m2 96 62,850.00
5 Rabat beton camp, 1 : 3 : 5 m3 3.85 907,541.00
6 Acian beton lantai m2 38.5 35000
SUB JUMLAH

JUMLAH TOTAL
DIBULATKAN
Terbilang : empat ratus tujuh puluh tiga juta tiga puluh lima ribu rupiah

Ambon, 26 Oktober 2018


Dibuat Oleh
KOPERASI SERBA USAHA DAMAI WAYAME

W. ANAKOTA LA WEHE
Ketua Sekretaris
N KIOS SEMENTARA
E KOTA AMBON

JUMLAH
HARGA
(Rp)

15,049,713.00
3,524,400.00
18,574,113.00

87,953,625.00
77,188,512.00
5,602,170.00
14,110,042.50
35,791,718.75
28,486,762.50
4,440,000.00
2,960,000.00
28,794,007.08
15,863,750.00
2,775,000.00
1,850,000.00
925,000.00
1,110,000.00
925,000.00
30,252,014.00
1,850,000.00
308,775,587.83

34,230,600.00
37,551,168.00
4,088,070.00
3,432,172.50
13,929,750.00
8,484,750.00
2,160,000.00
1,440,000.00
6,300,000.00
1,350,000.00
900,000.00
450,000.00
540,000.00
450,000.00
12,510,576.00
900,000.00
128,717,086.50

3,000,000.00
2,076,480.00
1,016,940.00
6,033,600.00
3,494,032.85
1,347,500.00
16,968,552.85

473,035,340.18
473,035,000.00
upiah

LA WEHE
Sekretaris
ANALISA PEKERJAAN TANAH

1 SNI B16 = 1 M3 Urugan Tanah/Timbunan


Bahan :
Tanah Urug/Timbunan 1.2000 M3 x Rp. 112,100.00 = Rp. 134,520.00
Tenaga :
Pekerja 0.3000 Oh x Rp. 100,000.00 = Rp. 30,000.00
Tukang - Oh x Rp. 125,000.00 = Rp. -
Kepala Tukang - Oh x Rp. 130,000.00 = Rp. -
Mandor 0.0100 Oh x Rp. 150,000.00 = Rp. 1,500.00
166,020.00
ANALISA PEKERJAAN PONDASI

1 SNI. C5 = 1 M3 Pasangan pondasi batu kali 1Pc : 4 Psr


Bahan :
Batu Kali /Karang 1.1000 M3 x Rp. 298,300.00 = Rp. 328,130.00
Semen Portland 163.0000 Kg x Rp. 1,600.00 = Rp. 260,800.00
Pasir Pasang 0.5200 M3 x Rp. 205,500.00 = Rp. 106,860.00
Tenaga :
Pekerja 1.5000 Oh x Rp. 100,000.00 = Rp. 150,000.00
Tukang 0.6000 Oh x Rp. 125,000.00 = Rp. 75,000.00
Kepala Tukang 0.0600 Oh x Rp. 130,000.00 = Rp. 7,800.00
Mandor 0.0750 Oh x Rp. 150,000.00 = Rp. 11,250.00
939,840.00

ANALISA PEKERJAAN KAYU

1 SNI. G1= 1 M3 Pasang kusen pintu dan jendela kayu Kls.I


Bahan :
Kayu Kls.II 1.1000 M3 x Rp. 1,950,000.00 = Rp. 2,145,000.00
Tenaga
Pekerja 6.0000 Oh x Rp. 100,000.00 = Rp. 600,000.00
Tukang Kayu 20.0000 Oh x Rp. 125,000.00 = Rp. 2,500,000.00
Kepala Tukang 2.0000 Oh x Rp. 130,000.00 = Rp. 260,000.00
Mandor 0.3000 Oh x Rp. 150,000.00 = Rp. 45,000.00
5,550,000.00

2 SNI.G19 = 1 M2 Pasang pintu tripleks 3 mm rangkap, rangka kayu kls.II


Bahan :
Kayu Kls.II 0.0196 M3 x Rp. 1,950,000.00 = Rp. 38,220.00
Paku Biasa 1/2"- 1" 0.3000 Kg x Rp. 25,000.00 = Rp. 7,500.00
Lem Kayu 0.3000 Lt x Rp. = Rp. -
tripleks 3 mm 2.2000 m2 x Rp. 22,000.00 = Rp. 48,400.00
Tenaga
Pekerja 0.6000 Oh x Rp. 100,000.00 = Rp. 60,000.00
Tukang 2.0000 Oh x Rp. 125,000.00 = Rp. 250,000.00
Kepala Tukang 0.2000 Oh x Rp. 130,000.00 = Rp. 26,000.00
Mandor 0.0300 Oh x Rp. 150,000.00 = Rp. 4,500.00
434,620.00

3 SNI.G27 = 1 M3 Pasang konstruksi kuda-kuda kayu kls.II


Bahan :
Kayu kls.II 1.1000 M3 x Rp. 1,950,000.00 = Rp. 2,145,000.00
Besi Strip 15.0000 Kg x Rp. 5,000.00 = Rp. 75,000.00
Paku Biasa 2"- 5" 0.8000 Kg x Rp. 25,000.00 = Rp. 20,000.00
Tenaga
Pekerja 4.0000 Oh x Rp. 100,000.00 = Rp. 400,000.00
Tukang 12.0000 Oh x Rp. 125,000.00 = Rp. 1,500,000.00
Kepala Tukang 1.2000 Oh x Rp. 130,000.00 = Rp. 156,000.00
Mandor 0.2000 Oh x Rp. 150,000.00 = Rp. 30,000.00
4,326,000.00

4 1 M3 Pasang gording kayu kls.II


Bahan :
Kayu kls.II 1.1000 M3 x Rp. 1,950,000.00 = Rp. 2,145,000.00
Paku Biasa 2"- 5" 0.2500 Kg x Rp. 25,000.00 = Rp. 6,250.00
Tenaga
Pekerja 4.0000 Oh x Rp. 100,000.00 = Rp. 400,000.00
Tukang 12.0000 Oh x Rp. 125,000.00 = Rp. 1,500,000.00
Kepala Tukang 1.2000 Oh x Rp. 130,000.00 = Rp. 156,000.00
Mandor 0.2000 Oh x Rp. 150,000.00 = Rp. 30,000.00
4,237,250.00

5 SNI.G38 = 1 M2 Pasang rangka langit-langit (1.00 x1.00) m, kayukls.II


Bahan :
Kayu kls.II 0.0120 M3 x Rp. 1,950,000.00 = Rp. 23,400.00
Paku Biasa 2"- 5" 0.1000 Kg x Rp. 25,000.00 = Rp. 2,500.00
Tenaga
Pekerja 0.1500 Oh x Rp. 100,000.00 = Rp. 15,000.00
Tukang 0.2500 Oh x Rp. 125,000.00 = Rp. 31,250.00
Kepala Tukang 0.0250 Oh x Rp. 130,000.00 = Rp. 3,250.00
Mandor 0.0750 Oh x Rp. 150,000.00 = Rp. 11,250.00
86,650.00

6 SNI.G52 = 1 M' Pasang lisplank uk. 2 x (2 x 20) cm, kayu kls.II


Bahan :
kayu kls.II 0.0088 M3 x Rp. 1,950,000.00 = Rp. 17,160.00
Paku Biasa 2"- 5" 0.0600 Kg x Rp. 25,000.00 = Rp. 1,500.00
Tenaga
Pekerja 0.1000 Oh x Rp. 100,000.00 = Rp. 10,000.00
Tukang 0.1000 Oh x Rp. 125,000.00 = Rp. 12,500.00
Kepala Tukang 0.0100 Oh x Rp. 130,000.00 = Rp. 1,300.00
Mandor 0.0500 Oh x Rp. 150,000.00 = Rp. 7,500.00
49,960.00
7 SNI.G57 = 1 M2 Pasang dinding pemisah rangkap, rangka kayu kls.II
Bahan :
Kayu Kls. II, Balok 0.0195 M3 x Rp. 1,950,000.00 = Rp. 38,025.00
Kayu kls.II, Papan 0.0070 M3 x Rp. 1,950,000.00 = Rp. 13,650.00
Paku Biasa 2"- 5" 0.1000 Kg x Rp. 25,000.00 = Rp. 2,500.00
Lem Kayu 0.5600 Lt x Rp. - = Rp.

Tenaga
Pekerja 0.2000 Oh x Rp. 100,000.00 = Rp. 20,000.00
Tukang 0.6000 Oh x Rp. 125,000.00 = Rp. 75,000.00
Kepala Tukang 0.0600 Oh x Rp. 130,000.00 = Rp. 7,800.00
Mandor 0.0100 Oh x Rp. 150,000.00 = Rp. 1,500.00
158,475.00
8 SNI.G60 = 1 M' Pasang list plafond gipsum profil
Bahan :
Gipsum profil 1.0500 M' x Rp. 20,000.00 = Rp. 21,000.00
Tenaga
Pekerja 0.0210 Oh x Rp. 100,000.00 = Rp. 2,100.00
Tukang 0.0210 Oh x Rp. 125,000.00 = Rp. 2,625.00
Kepala Tukang 0.0020 Oh x Rp. 130,000.00 = Rp. 260.00
Mandor 0.0010 Oh x Rp. 150,000.00 = Rp. 150.00
26,135.00

ANALISA PEKERJAAN BETON

1 SNI H1 = 1 M3 Membuat beton tumbuk, 1Pc : 3Psr : 5Kr


Bahan :
Sement Portland 218.0000 Kg x Rp. 1,600.00 = Rp. 348,800.00
Pasir Beton 0.5200 M3 x Rp. 205,500.00 = Rp. 106,860.00
Kerikil Beton 0.8700 M3 x Rp. 276,300.00 = Rp. 240,381.00
Tenaga
Pekerja 1.6500 Oh x Rp. 100,000.00 = Rp. 165,000.00
Tukang 0.2500 Oh x Rp. 125,000.00 = Rp. 31,250.00
Kepala Tukang 0.0250 Oh x Rp. 130,000.00 = Rp. 3,250.00
Mandor 0.0800 Oh x Rp. 150,000.00 = Rp. 12,000.00
907,541.00

ANALISA PEKERJAAN ATAP

1 SNI I38 = 1M2 Pasang atap seng gelombang


Bahan :
Seng gelombang 0.7000 lbr x Rp. 58,500.00 = Rp. 40,950.00
Paku seng 0.0200 Kg x Rp. 36,000.00 = Rp. 720.00
Tenaga
Pekerja 0.1200 Oh x Rp. 100,000.00 = Rp. 12,000.00
Tukang 0.0600 Oh x Rp. 125,000.00 = Rp. 7,500.00
Kepala Tukang 0.0060 Oh x Rp. 130,000.00 = Rp. 780.00
Mandor 0.0060 Oh x Rp. 150,000.00 = Rp. 900.00
62,850.00

2 SNI I38 = 1M2 Pasang atap nok seng


Bahan :
Seng datar 0.3000 lbr x Rp. 52,000.00 = Rp. 15,600.00
Paku seng 0.0200 Kg x Rp. 36,000.00 = Rp. 720.00
Tenaga
Pekerja 0.1200 Oh x Rp. 100,000.00 = Rp. 12,000.00
Tukang 0.0600 Oh x Rp. 125,000.00 = Rp. 7,500.00
Kepala Tukang 0.0060 Oh x Rp. 130,000.00 = Rp. 780.00
Mandor 0.0060 Oh x Rp. 150,000.00 = Rp. 900.00
37,500.00

3 SNI J21 = 1M2 Langit-langit triplex 3 mm + rangka kayu kls.II


Bahan :
Kayu Kls. II 0.0230 M' x Rp. 1,950,000.00 = Rp. 44,850.00
Paku 2" - 5" 0.0600 Kg x Rp. 25,000.00 = Rp. 1,500.00
Triplex 3 mm 1.1000 M2 x Rp. 22,000.00 = Rp. 24,200.00
Tenaga
Pekerja 0.2700 Oh x Rp. 100,000.00 = Rp. 27,000.00
Tukang 0.4000 Oh x Rp. 125,000.00 = Rp. 50,000.00
Kepala Tukang 0.0400 Oh x Rp. 130,000.00 = Rp. 5,200.00
Mandor 0.0135 Oh x Rp. 150,000.00 = Rp. 2,025.00
154,775.00

ANALISA PEKERJAAN PENGECATAN

1 SNI O8 = 1 M2 Pengecatan bidang kayu baru ( 1 lapis plamir, lapis cat dasar, 2 lapis cat penutup)
Bahan :
Cat Meni 0.2000 Kg x Rp. = Rp. -
Plamir 0.1500 Kg x Rp. = Rp. -
Cat Dasar 0.1700 Kg x Rp. 28,000.00 = Rp. 4,760.00
Cat Penutup 2 x 0.2600 Kg x Rp. 28,000.00 = Rp. 7,280.00
Tenaga :
Pekerja 0.0700 Oh x Rp. 100,000.00 = Rp. 7,000.00
Tukang 0.0090 Oh x Rp. 125,000.00 = Rp. 1,125.00
Kepala Tukang 0.0060 Oh x Rp. 130,000.00 = Rp. 780.00
Mandor 0.0025 Oh x Rp. 150,000.00 = Rp. 375.00
21,320.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN BANGUNAN

NO. JENIS BAHAN BANGUNAN DAN UPAH SATUAN HARGA ( Rp. ) KET

1 2 3 4 5

I UPAH KERJA
1 Mandor Org/Hari 150,000.00
2 Kepala Tukang Org/Hari 130,000.00
2 Tukang Org/Hari 125,000.00
3 Pekerja Org/Hari 100,000.00

II BAHAN BANGUNAN
1 Batu Kali M³ 298,300.00
2 Kerikil Sungai / Pantai 2/3 cm M³ 276,300.00
3 Pasir Pasang M³ 205,500.00
4 Tanah Timbunan M³ 112,100.00
5 Semen PC (50 Kg) Kg 75,000.00
6 Semen PC (50 Kg) Kg 1,600.00
7 Tripleks 3 mm m2 22,000.00
8 Zink Datar BJLS 0,25 m2 52,000.00
9 Zink Gelombang BJLS 0,25 m2 58,500.00
10 Paku campur Kg 25,000.00
11 Benang roll 15,000.00
12 Paku 5 -12 Kg 25,000.00
13 Paku Zink Kg 36,000.00
14 Engsel Jendela Bh 20,000.00
15 Hak Angin daun jendela Bh 8,500.00
16 Grendel jendela Bh 20,000.00
17 Cat Tembok Kg 30,000.00
18 Cat Minyak Kg 47,500.00
19 Dumpul Kg 25,000.00
20 Menie Kayu Kg 39,000.00
21 Menie Besi Kg 39,000.00
22 Minyak Cat Kg 28,000.00
23 Plamir Kg 25,000.00
24 Kertas Gosok Lbr 10,000.00
25 Plint profil kayu klas I uk. 2/10 M' 45,000.00
26 Stop Kontak Bh 30,000.00
27 Saklar Tunggal Bh 25,000.00
28 Saklar Ganda Bh 30,000.00
29 Sekring Bh 500,000.00
30 Instalasi listrik Ttk 150,000.00
31 Lampu TL 2x40 Watt + kap segiti Bh 30,000.00
32 Lampu SL 18 w Bh 75,000.00
33 Vitting Tempel Bh 15,000.00
34 Lampu Down Light SL 18 W Buah 150,000.00
35 Lampu TL 1x40 W bambu Bh 150,000.00
36 Kran air Buah 75,000.00
37 Kayu Klas I M3 6,500,000.00
38 Kayu Klas II M3 1,950,000.00
39 Batu conblok berongga Buah 3,600.00
DAYA TAMPUNG PEDAGANG
PASAR DAMAI WAYAME

DAN

RENCANA ANGGARAN BIAYA (RAB)


PEMBANGUNAN KEBUTUHAN LAPAK DAN KIOS SEMENTARA

LOKASI
PASAR DAMAI WAYAME
DESA WAYAME KECAMATAN TELUK AMBON