You are on page 1of 1

2017121148

Inspection Call Details


Call Date :- 12.12.2017 Proposed Date :- 19.12.2017
PO Number :- 6900004520 Insp. Type :- CIP Final Inspection
Contractor Code :- 2100020843 Contractor Name :- Alstom T&D (India) Ltd., Kolkat
Manufacturer Name :- Switchgear & Structurals Inspection Level :- Level Four - Final
Manufacturer Code :- 3000000145 Call Status :- Submitted by Vendor
Manufacturer Address:- Phase V, IDA,Jeedimetla,, Anticipated Inspection Mandays :- 1
Hyderabad,500055Andra Pradesh(India)
Project Detail :- Insp. Office :-
Insp. Engineer :-

Contact Details:- Requester Details:-


Contact Person :- MR O V SHIV SHANKAR Call Requested By :- Sameer prabhakar
Telephone Number :- 9949409393 Designation :- Project Staff Specialist
shivshankar@switchgearindia.co E-Mail Address :- sameer.prabhakar@ge.com
E-Mail Address :- m
Weekly Off :- Sunday Your Mobile No. :- 9560311770

PO line Material Item Description WBS Element Total Offered Quantity Unit
Item No. Quantity Quantity Accepted
00080 00000000100 765KV,3150A, 40KA 3PH VKDB ISOLATOR TR-201531-07-
+2E/S 4 4 0 EA
0005851 01-02
00090 00000000100 765KV,2000A, 40KA 1PH VKDB ISOLATOR TR-201531-07-
+1E/S 7 7 0 EA
0005841 01-02
00100 00000000100 765KV, 2000A, 40KA 1PH VKDB ISOLATOR TR-201531-07- 11 11 0 EA
0005792 01-02
00200 00000000100 765KV,3150A, 40KA 3PH VKDB ISOLATOR TR-201531-07-
+1E/S 8 8 0 EA
0005850 01-02

Vendor Comments :-
Material ready for Inspection

Documents Available :-
Type test is Approved :- Yes
GTP is Approved :- Yes
Drawings are Approved :- Yes
MQP/ITP/FAT is approved :- Yes
Certificate
We confirm that all the documents related to the contract are available at the place of inspection.
We categorically confirm that the material offered has already been Inspected by our Quality Assurance Department and found in Order.
Specifically, we confirm that the item meets approved standard MQP and POWERGRID Specification Requirements, the type test approval
has been obtained from POWERGRID Engg and all previous inspection stages have been cleared. We also confirm that this material has not
been offered to any other inspection agency / POWERGRID in the past.

Page 1 of 1