Professional Documents
Culture Documents
For PM 2.2
1. Send gate pass to customer (3 days in advance)
2. To register at security gate ( Need to give them ID card or Driver Card)
3. To register to learn safety firstly (just for first time and need to extend)
4. Get work permit at the control room
5. Take samples:
a. Make up water: 2 samples
b. Evaporator 1: 3 samples
c. Evaporator 2: 3 samples
d. Closed cooling: 1 sample
Send 1 sample of MU water, 2 sample of Evaporator 1, 2 sample of Evaporator 2 to
Singapore Lab
6. Testing sample at lab room
SG Petrol
1. Send our plan to customer
2. To register at security gate ( Need to give them ID card or Driver Card)
3. Get work permit at the control room
4. Take samples:
a) Make up water : 1 sample
b) Cooling water: 1 sample
5. Get operation data
i) Make up water flow rate m3/hr
j) BD water flow rate m3/hr
k) T
l) Check chemical feed system ( stroke of pump, consumption) and chemical inventory of:
AT 3203
5 K1