Title of Program/Project Status of Implementation Expected Output
KRA National Regional Division- School- Implemented Not Initiated Initiated Implemented Access 1. Project SAGIP / / Zero drop-out rate and school campaign in promoting schooling to the community. 2. Early Registration Campaign / / Tracking of pre-enrolment and dissemination of information regarding enrolment requirements to provide education for all. Quality 1. Project HEARTS (Harnessing and / / The reading skills of learners from Empowering the Art of Reading Kindergarten to Grade 6 is and Thinking Skills) improved. 2. Operation SC (Skills and / / Teachers are equipped with skills Competencies Development) and competencies that they need to deliver quality education among learners. 3. Project GARMS-EVA (Getting / / The number of pupils under the Artemians Read beyond frustration level among Grade Three Meanings of Sentences- pupils is reduced. Enhancing the Vocabulary of Artemians) 4. Project GARMS-EVA-X (Getting / / An increase in the vocabulary skills Artemians Read beyond of Grades 5 and 6 pupils particularly Meanings of Sentences- in Mathematics, Science and Enhancing the Vocabulary of English. Artemians-Extension) 5. Reading for Enrichment Program / / Pupils can gain access to materials and interactive games related to reading, and educational games in English using ICT. 6. Nanay ko, Tatay ko, Guro ko / / A strengthened partnership with parents by conducting a parent- assisted tutorial activity in reading for Grades 1-4. 7. Project 555 / / Grade 6 pupils showed improvement on identified least competencies. 8. Project Learning Competency / / A pupils’ portfolio of activities will Directory be produced. 9. Governance 1. Project 3Rs (Reduce, Reuse, / / The learners take part in waste Recycle) segregation measure and realize their role in the community by means of preserving the environment. 2. Project Feedback Mechanism / / Stakeholders are fully informed on the status of the school and recent issues and challenges that it faces. Stakeholders are able to express their opinions and suggestions for the betterment of the school- community. 3. Project PMS (Principal / / An online tracking on completion of Management System) teacher’s school files such as Daily Lesson Log, School Forms, Class Records and others. 4. School Handbook / / Pupils, teachers and stakeholders are well informed and aware of the school’s rules and regulations. 5. Batang GARMS, Modelo Ka / / An institutionalized recognition and incentive system for achievers and stakeholders who deserve to be recognized for their helpful contribution to the school’s mission and vision. 6. Project ARMS / / A monitoring report on the financial (Allocation of Resources in the status of the school is displayed in Maintenance of the School) the transparency board. Accomplishment reports and narrative reports are reported to the stakeholders. 7. Project PERS (Provision of / / The learners are provided with IDs, Education Resources for test papers, reading materials and Students) other learning materials through the MOOE. 8. Adopt-a-School Program / / Additional educational equipment such as projectors, books for the reading corner, LED television are obtained through the ASP and is reflected to the inventory of serviceable and non-serviceable facilities. 9. Brigada Eskwela / / Stakeholders take part in the annual preparation for the opening of classes by sharing donations and serving as manpower.