You are on page 1of 4

GENERAL ARTEMIO RICARTE MEMORIAL SCHOOL

PROGRAMS AND PROJECTS IMPLEMENTATION SURVEY

Title of Program/Project Status of Implementation Expected Output


KRA National Regional Division- School- Implemented Not
Initiated Initiated Implemented
Access
1. Project SAGIP / / Zero drop-out rate and school
campaign in promoting schooling to
the community.
2. Early Registration Campaign / / Tracking of pre-enrolment and
dissemination of information
regarding enrolment requirements
to provide education for all.
Quality
1. Project HEARTS (Harnessing and / / The reading skills of learners from
Empowering the Art of Reading Kindergarten to Grade 6 is
and Thinking Skills) improved.
2. Operation SC (Skills and / / Teachers are equipped with skills
Competencies Development) and competencies that they need to
deliver quality education among
learners.
3. Project GARMS-EVA (Getting / / The number of pupils under the
Artemians Read beyond frustration level among Grade Three
Meanings of Sentences- pupils is reduced.
Enhancing the Vocabulary of
Artemians)
4. Project GARMS-EVA-X (Getting / / An increase in the vocabulary skills
Artemians Read beyond of Grades 5 and 6 pupils particularly
Meanings of Sentences- in Mathematics, Science and
Enhancing the Vocabulary of English.
Artemians-Extension)
5. Reading for Enrichment Program / / Pupils can gain access to materials
and interactive games related to
reading, and educational games in
English using ICT.
6. Nanay ko, Tatay ko, Guro ko / / A strengthened partnership with
parents by conducting a parent-
assisted tutorial activity in reading
for Grades 1-4.
7. Project 555 / / Grade 6 pupils showed
improvement on identified least
competencies.
8. Project Learning Competency / / A pupils’ portfolio of activities will
Directory be produced.
9.
Governance
1. Project 3Rs (Reduce, Reuse, / / The learners take part in waste
Recycle) segregation measure and realize
their role in the community by
means of preserving the
environment.
2. Project Feedback Mechanism / / Stakeholders are fully informed on
the status of the school and recent
issues and challenges that it faces.
Stakeholders are able to express
their opinions and suggestions for
the betterment of the school-
community.
3. Project PMS (Principal / / An online tracking on completion of
Management System) teacher’s school files such as Daily
Lesson Log, School Forms, Class
Records and others.
4. School Handbook / / Pupils, teachers and stakeholders
are well informed and aware of the
school’s rules and regulations.
5. Batang GARMS, Modelo Ka / / An institutionalized recognition and
incentive system for achievers and
stakeholders who deserve to be
recognized for their helpful
contribution to the school’s mission
and vision.
6. Project ARMS / / A monitoring report on the financial
(Allocation of Resources in the status of the school is displayed in
Maintenance of the School) the transparency board.
Accomplishment reports and
narrative reports are reported to
the stakeholders.
7. Project PERS (Provision of / / The learners are provided with IDs,
Education Resources for test papers, reading materials and
Students) other learning materials through the
MOOE.
8. Adopt-a-School Program / / Additional educational equipment
such as projectors, books for the
reading corner, LED television are
obtained through the ASP and is
reflected to the inventory of
serviceable and non-serviceable
facilities.
9. Brigada Eskwela / / Stakeholders take part in the annual
preparation for the opening of
classes by sharing donations and
serving as manpower.

You might also like