PERHITUNGAN HYDRAULIC BALANCE

P1 = 2,6 kg/cm2G (P aktual) Konsumsi CW


v1 = 0,81 m/s Stab CAB = 1656 T/D
3
No. Item Quantity Line D, in Eq. L/D L, m L tot, m Pf, kg/cm2 69 m /hr

1 Pipe - 11,938 - 181,5 SRMGC = 1195 LPM


3
2 Elbow 90o 2 11,938 30 18,19 71,7 m /hr

3 Elbow 45o 0 11,938 16 0 220,1612 0,039 Total CW =


3
140,7 m /hr
3
4 Block Valve 1 11,938 7,5 2,27 Roughness e = 0,046 Total CW = 211,05 m /hr (50 % Margin)

5 Tee 1 11,938 60 18,19 Roughness pipe e/D = 0,0001517

(commercial steel pipe) Density CW = 1 Kg/Lt

Viscous CW = 0,89 cp

Re = 276479,483 Flowrate CW = 211,05 m3/hr

A = 3,7658E+21

B = 1,3288E-14

f = 0,00401835

= 3842,62556

1. Stab AB
REQUIREMENT PRESSURE

Static Head = 6m

Static Head = 0,6 kg/cm2G

Friction Loss = 0,16 kg/cm2G

DelP Condenser = 1,02 kg/cm2G (Calculated)

Press OSBL Stab AB = 1,78 kg/cm2G

Press calculated @OSBL = 2,56 kg/cm2G

ADEQUACY CHECK

P1 = 2,6 kg/cm2G (P aktual)


v1 = 3,14 m/s

No. Item Quantity Line D, in Eq. L/D L, m L tot, m Pf, kg/cm2

1 Pipe - 6,065 - 10

2 Elbow 90o 2 6,065 30 9,24

3 Elbow 45o 0 6,065 16 0 29,6415 0,16

4 Block Valve 1 6,065 7,5 1,16 Roughness e = 0,046

5 Tee 1 6,065 60 9,24 Roughness pipe e/D = 0,0002986

(commercial steel pipe)

Re = 544206,441

A = 3,4208E+21

B = 2,6172E-19
f = 0,00406691

= 15470,6545

2. STAB C & SRMGC

Konsumsi CW
REQUIREMENT PRESSURE Stab CAB = 552 T/D
3
Static Head = 12 m 23 m /hr

Static Head = 1,2 kg/cm2G SRMGC = 1195 LPM


3
Friction Loss = 0,04 kg/cm2G 71,7 m /hr
3
DelP Condenser = 1,02 kg/cm2G Total CW = 94,7 m /hr
3
Press OSBL Stab AB = 2,26 kg/cm2G Total CW = 142,05 m /hr (50 % Margin)

Press calculated @OSBL = 2,52 kg/cm2G

Density CW = 1 Kg/Lt
ADEQUACY CHECK
Viscous CW = 0,89 cp
P1 = 2,6 kg/cm2G (P aktual) Roughness e = 0,046 Flowrate CW = 142,05 m3/hr
v1 = 0,78 m/s Roughness pipe e/D = 0,00018074

No. Item Quantity Line D, in Eq. L/D L, m L tot, m Pf, kg/cm2 (commercial steel pipe)

1 Pipe - 10,02 - 100

2 Elbow 90o 6 10,02 30 45,81 Re = 221708,653

3 Elbow 45o 0 10,02 16 0 180,17 0,04 A = 2,6834E+21

4 Block Valve 2 10,02 7,5 3,82 B = 4,545E-13

5 Tee 2 10,02 60 30,54 f = 0,00419222

= 3567,7746