Maximum

Number of Maximum
number of
Name barrels in weight of
units in
unit unit
train
Small 27 314 kg 5
Medium 6 310 kg 4
Large 4 289 kg 6
Time for Time for
Number of assembly drilling
trains A5 A3
(HOURS) (HOURS)

5 7.1 5.5
6 7.3 6.5
6 8.5 6.5
SMALL
Activity Time Unit Class
Rotate section 25 minutes Per train
Zip line instalation/Removall 100 minutes Per train
Unit preparation (pre assy.) 75 minutes Per unit
Place unit at designed position 50 minutes Per unit
Assembly steel wire between units 50 minutes Per unit
Drill platform holes 75 minutes Per train

Drill flange holes 330 Minutes Per train


Assembly steel wire flange 50 minutes Per train

MEDIUM
Activity Time Unit Class
Rotate section 30 minutes Per train
Zip line instalation/Removall 120 minutes Per train
Unit preparation (pre assy.) 60 minutes Per unit
Place unit at designed position 40 minutes Per unit
Assembly steel wire between units 40 minutes Per unit
Drill platform holes 90 minutes Per train

Drill flange holes 390 Minutes Per train


Assembly steel wire flange 60 minutes Per train

LARGE
Activity Time Unit Class
Rotate section 30 minutes Per train
Zip line instalation/Removall 120 minutes Per train
Unit preparation (pre assy.) 90 minutes Per unit
Place unit at designed position 60 minutes Per unit
Assembly steel wire between units 60 minutes Per unit
Drill platform holes 90 minutes Per train

Drill flange holes 390 Minutes Per train


Assembly steel wire flange 60 minutes Per train
SMALL
Coments
*Rollers
*Lifting platform
*Car for movement, forkift for transport
*Zip line system
*Torque wrench
*Laser tape measure, Drilling machine

To be done in A3
30 min to mark the holes position
30 min to drill and thread each hole (12 holes)
*Torque wrench

MEDIUM
Coments
*Rollers
*Lifting platform
*Car for movement, forkift for transport
*Zip line system
*Torque wrench
*Laser tape measure, Drilling machine

To be done in A3
30 min to mark the holes position
30 min to drill and thread each hole (12 holes)
*Torque wrench

LARGE
Coments
*Rollers
*Lifting platform
*Car for movement, forkift for transport
*Zip line system
*Torque wrench
*Laser tape measure, Drilling machine

To be done in A3
30 min to mark the holes position
30 min to drill and thread each hole (12 holes)
*Torque wrench