Professional Documents
Culture Documents
Project
Manager
HSE Construction
Department Manager
Material Superintende
Planner QA/QC Store & Admin
Control nt
4
We cover.. The EPC
• Storage Tanks
• Off-site 4-tanks concurrent erection, top-down construction method
• Safe working height maintain at 2m from the ground
• Automatic lazer welding sychronised plasma cutting
• 55-60% reduction in manpower
• Costs saving
We also cover.. The “C” in EPC
• Piping Fabrication and Erection
• Equipment Installation
• Prefabricated Module Installation
• Structural Steel Fabrication and Erection
• Fire Proofing, Carboline (USA) Products
6
At A Glance
Our Plans
• Innovation and Automation For To Achieve Utmost
Safety, Quality and Productivity
• Increase Turnover to S$20 mil
• Maintain The Good Safety Records
• To Integrate Our Platform With Our Alliance
Partners
• To Expand Our Clients And Industries Base
• To Expand Regionally In South East Asia
7
Automation Vs Conventional
Automation, Coil/Plates with
Crane Automation, Coil with Conventional, Plates with
Crane
hydraulic jacks
Fast erection; top-down and
4 concurrent complete tanks Best solution for space
erection
Automatic lazer welding constrained site
sychronised plasma cutting
Best solution for Manual Weldings
and final brushdown at butt space constrained Labour intensive works
joint (eliminate conventional
cut and bevelling); site More safety related issue
Good quality with proven due to more manpower
good mechanical tests Good solution for
results Less productive
Safe work height maintains tank with thickness Quality of works are
at 2m throughout the > 15 mm dependent on prevailing
erection
skills of welders
50% to 60% workforce
reduction
Same advantages as
Slower construction
Costs saving. Stainless steel Automated, period
tanks eliminate painting and
scaffolding and reduce long Coil/Plates with Carbon steel tanks will
term maintenance costs
Crane option incur more costs in
Independent planning from painting, scaffolding and
civil works craneage
TOP to BOTTOM No 4 TANKS
Typical layout of the working area
Bypass
area
Rolling area
Welding area
Roof and bottom
construction area
Bypass
area
Bypass
area
Storage
area
Transfert to
basament
Power
Base material. Diam. Height. Av. thick. Erection time
type mm. mm. mm. weeks
316L 8.000 16.000 5.3 12
MATERIALS
Stainless Steel
• 304L,
• 316L,
• 316Ti,
• SAF2205,
• SAF2507,
• 904L,
• C276,
• LDX2101 – this material has a high tensil
stress so it is possible recover a lot of weight
into construction on large SS tanks
ROLLING & ASSEMBLING
STATION
ROLLING & ASSEMBLING
STATION
ROLLING & ASSEMBLING
STATION
WELDING STATION
WELDING STATION
WELDING STATION
BOTTOM PLATE & ACCESSORIES
BOTTOM PLATE & ACCESSORIES
OTHER ACCESSORIES
OTHER ACCESSORIES
TANK TRANSPORTATION
TANK TRANSPORTATION
TANK TRANSPORTATION
TANK TRANSPORTATION
TANK TRANSPORTATION
PAINTING & INSULATION
FINAL RESULT
SOLUTION FOR HEATING COIL