Reported By: Mohsin Raza Tariq RIG Name: Hilong 05 Well Name: Rajani-1
Bop trolly winch slings were found damaged during TPI MPI , was Tools &
1 13-Aug-16 Driller Hilong
replaced by new one. Equipment
Trailing cables found present on the main track could be damaged If Tools &
2 13-Aug-16 Roustabout Hilong
crane moves over it. Equipment
Crane operator observed that some people continously stands behind Procedures &
3 13-Aug-16 Crane Operator Hilong
the crane even hearing the reversing alarm. Orderliness
5 13-Aug-16 Crane Operator Hilong Waste/garbagge found infront of a container in the mini camp. Housekeeping
A worker was applying paint on a piece of metal and at the same time
Procedures &
6 13-Aug-16 Assistant Mechanic Hilong another worker was washing the other part of the metal, the paint could
Orderliness
be effected by the water.
9
10
Cards
S# Category
Quantity
3 Driving Safety 0
4 Dropped Objects 0
5 Energy Isolation 0
6 Environmental Hazards 0
7 Ground Disturbance 0
8 Health Hazards 0
9 Housekeeping 2
10 HSE Suggestion 0
11 Lifting Operations 0
12 Management of Change 0
13 Maintenance 0
14 Permit to Work 0
15 PPE 0
17 Appreciation 0
18 Slip/Trip/Fall 0
20 Working at Heights 0
21 Manual lifting 0
22 Pinch Point 0
Total 6
Rajani-1
Location of Target
Status Remarks
Observation Date
HL-05 Closed N/A Discussed in the safety meeting with all crew.
HL-05 Closed N/A Discussed in the safety meeting with all crew.
HL-05 Closed N/A Discussed in the safety meeting with all crew.
HL-05 Closed N/A Discussed in the safety meeting with all crew.
HL-05 Closed N/A Discussed in the safety meeting with all crew.
HL-05 Closed N/A Discussed in the safety meeting with all crew.