You are on page 1of 5

Daily SOC Report

Reported By: Mohsin Raza Tariq RIG Name: Hilong 05 Well Name: Rajani-1

S# Date Position Company Description Category

Waste was thrown properly at proper designated place and


1 22-Aug-16 Roustabout Hilong Housekeeping
housekeeping being maintained by the crew workers.

Painting job performed by a worker without mask was at risk of health


2 22-Aug-16 HSE Hilong Health Hazards
hazards and could damage his health.

Crane inspection being performed properly using PTW and area


3 22-Aug-16 HSE Hilong Appreciation
barricaded.

4 22-Aug-16 HSE Hilong A worker was without helmet at work. PPE

Thiner was carried by a worker in mineral water bottle could be very Procedures &
5 22-Aug-16 HSE Hilong
risky; worker was informed to stop this unsafe act;he agree Orderliness

Procedures &
6 22-Aug-16 HSE Hilong A worker found using mobile at work instead of working/performing task.
Orderliness

9
10

Cards
S# Category
Quantity

1 Confined Space Entry 0

2 Cost Saving Opportunity 0

3 Driving Safety 0

4 Dropped Objects 0

5 Energy Isolation 0

6 Environmental Hazards 0

7 Ground Disturbance 0

8 Health Hazards 1

9 Housekeeping 1

10 HSE Suggestion 0

11 Lifting Operations 0

12 Management of Change 0

13 Maintenance 0

14 Permit to Work 0

15 PPE 1

16 Procedures & Orderliness 2

17 Appreciation 1

18 Slip/Trip/Fall 0

19 Tools & Equipment 0

20 Working at Heights 0
21 Manual lifting 0

22 Pinch Point 0

Total 6
Rajani-1

Location of Target
Status Remarks
Observation Date

HL-05 N/A

HL-05 Closed N/A

HL-05 N/A

HL-05 Closed N/A

HL-05 Closed N/A

HL-05 Closed N/A

You might also like