You are on page 1of 3

Project Transformer - Phase One

Greetings from Pro-edge Associates!

Please spare a few minutes of your valuable time to fill-in the following questionnaire and submit the soft
directly to Mr. Priotosh Bhowmik, HR Specialist, Pro-edge Associates at priotosh@proedge-asso.com. We
hope the briefing session was useful, however, if you need any further clarification, please contact Mr
Priotosh Bhowmik (01712541053) and Zakir Ahmed (01677666777). Your cooperation is highly
appreciated to meet your project objectives.

Please provide the following information focusing on your Job Responsibilities.


Please use this MSWord format only – no other format is acceptable

Full Name Md Motiur Rahman Job title/Designation Sr. Executive


Department Project Management Office Unit and Location 215, Bir Uttam Mir
Shawkat Sarak, Tejgaon
I/A, Dhaka-1208.
ID No 14142 Mobile Phone No 01700707251
Date of Joining 3-june, 2018 Joined as Sr. Executive
Date of last N/A Any other Job title N/A
promotion
Date of Birth 23-March, 1990 E-mail Address motiur@rancon.com.bd

1. Educational qualification (Last Education Only):


Bsc in Civil Engineering from Bangladesh University of Engineering and Technology.

2. Previous experiences (All work experiences – Mentioned only company name and tenure):
a) Environ Structure ltd, From December-2014 to August-2016
b) Design and Development Solution, February-2017 to May-2018.

3. Who is your current Direct Supervisor you are reporting to


Name: Md. Hasan Parvez Ibne Emdad
Designation: Head of Business Development.
4. Who is your other/indirect supervisor, if any, you are reporting to for any other assignments/job?
Name: Md. Habib Ul Alam
Designation: Manager, RPL
5. What are your Routine Tasks/Duties/Responsibilities?
List of Routine Tasks/Duties/Responsibilities? % of total
time/works
1. Structural Analysis 25
2. Structural Design 25
3. Guide Structural Detailer to produce drawings 10
4. Site visit 5

1| P a g e
Project Transformer - Phase One

5. Giving Advice to site engineers


5
6. Meeting with vendors 5
7. Retrofitting works of Buildings 10
8. Providing drawing related solutions 5
9. Checking Structural Drawings 10
(add rows here if needed)
What are your periodic tasks/duties/responsibilities?
List of periodic tasks/duties/responsibilities Period: weekly,
fortnightly, monthly,
quarterly, half yearly,
yearly, others along with
% of total periodic works
1. Monthly meeting 35
2. Knowledge sharing session (Monthly) 35
3. Town hall meeting(yearly) 30
4.
(add rows here if needed)
6. What are your most important jobs/tasks (as per your opinion in terms of priority, volume and
frequency)
1. Structural Analysis
2. Structural Design
3. Guide Structural Detailer to produce drawings
4. Checking Structural Drawings
5. Retrofitting works of Buildings

(add more if needed)

7. In your own language, please state the output as per your perception based on the job
responsibilities:
 Mention the criteria for measuring outputs: Amount/volume/quantity/number as appropriate.
 Mention in daily/ weekly/ fortnightly/ monthly/ quarterly /half-yearly/ yearly basis as appropriate.
Output 1 It takes approx. 4 months to complete a commercial project.

Output 2 For completing a residential building, 2 months needed.

Output 3 Performing structural design

Output 4 Normally 14 working days needed for preliminary analysis of a building.

Output 5 3 commercial and a residential project can be done fully by 1 year.

Output 6

2| P a g e
Project Transformer - Phase One

Output 7

(add rows here if needed)

8. Problems and issues that you are facing to do your jobs/tasks efficiently

a. Management is not aware of the importance of the structural design.


b. Sound pollution while working.
c. Repeated change in architectural drawings create problems.
d. People from higher rank want immediate solution, which creates heavy work pressure and late
night works.
e. There should be OT for us.

9. Other Tasks/Duties/Responsibilities (not covered under periodic and routine tasks) ?


a. Developing excel spreadsheets for ease of the tasks.
b. Studying different codes for proper solution.
c. Keeping daily work schedule.
d. Making sure the project complies with legal requirements.
e. Provide technical advice regarding design, construction, or program modifications and structural
repairs.
f. Give hand sketch for structural detailing.

Note: You can attach pages if required.

3| P a g e

You might also like