You are on page 1of 2

0RWRU67$786

3DJHRI
&DVH1XPEHU

&DVH+LVWRU\
Data was acquired over a 2 month
period. Load, vibration, and
temperature problems occurred
during the monitoring period.
Status acquisition was set at
“monthly trend.”

Load was spiking due to a process


problem, which was corrected on
11/4/97.

Corrected process problem

• Motor fan clogged with pulp.

• Motor heating (frame-ambient)


increased by 11oC.
Motor fan cleaned
• Motor was cleaned 11/19/97.

$XWKRUBruce Hoge 'DWHDecember 15, 1997


&RPSDQ\MJ Electric 3ODQWPaper Plant (anonymity requested)
0RWRU67$786
3DJHRI
&DVH1XPEHU

&DVH+LVWRU\

• Vibration problem was fixed


11/7/97.

• Corrected alignment, greased


Vibration problem corrected
coupling, repacked pump.

• Spikes after correction are


believed to be cavitation by the
analyst.

• Overall vibration 0.23 in/sec.

• Spectrum shows coupling or


looseness problem.

• Vibration decrease by factor of


10 after repair.

&RQFOXVLRQV 5HFRPPHQGDWLRQV

• Often machines have multiple problems as illustrated in this case history.

• The systematic identification and correction of this machine’s operational, environmental and mechanical
problems will increase its life by many years over by allowing it to run in a degraded condition.

$XWKRUBruce Hoge 'DWHDecember 15, 1997


&RPSDQ\MJ Electric 3ODQWPaper Plant (anonymity requested)