You are on page 1of 172

FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

CHAPTER TWO

2. ANALYSIS AND DESIGN OF SLABS

2.1.DESIGN OF SOLID ROOF SLAB

INTRODUCTION: - Slabs are structural elements which are used as a floor


or a roof. Slabs may be supported all round by beams, or walls (solid slab), or
directly rested on column (flat slabs). Slabs may be designed as a two way–slab
if supported along all four edges with bending occurring in two direction
perpendicular to each other. If the ratio of the length of perpendicular sides
is greater than two, the slab may be assumed to act as a one way slab with bending
occurring in the short direction.
The depth of all panels of each slab was determined from deflection requirement
and checked for flexure & shear. The governing depth was taken by comparing
depth of each panel and the same depth of slab was employed for each
respective
floor for ease of construction. All the support and span moments are computed
as per EBCS-2 1995 for regularly supported slabs and reinforcement is
provided
using general design table 1-a. Typical panels of each slab from 1st to 4th floor
is shown on drawings below (see
fig.)

2.1.1 Depth determination


The minimum depths required for deflection for each panel was determined as
per
EBCS-2 1995 section 5.2.3 and the governing depth was employed for the slab
system on each floor using the formula. dmin= (.4+.6*fyk/400)Le/βa,
where,
fyk is the characteristic strength of the
reinforcement(Mpa)
Le is the effective span, and, for two way-slabs, the shorter span
Jimma university college of engineering and technology 3
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

βa is the appropriate constant from table 5.1 and for slabs carrying partition
walls likely to crack βa < 150/Lo
Lo is the distance in meter b/n points of zero moments and for cantilever
twice
the length to the face of the support. For determination of Lo see the proofs
below
for both sides fixed and for propped cantilever support
conditions.

Jimma university college of engineering and technology 4


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

1 Depth determination
The depth of the slab should be uniform through the slab except cantilever for aesthetic purpose
𝑓𝑦𝑘 𝐿𝑒
dmin ≥ (0.4 + 0.4 400 ) 𝐵𝑎

Where :- S=300mpa (fyk)

C=25mpa(fck)

Le=Lx=shortest dimension

Panel 1

If Ly/Lx <2 it is two way slab

Ly/Lx=600/600=1 therefore, it is two way slab

Jimma university college of engineering and technology 5


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Table – values of a
Member Simple End span Interior span cantilever
Beams 20 24 28 10
Slabs:
Span ratio 2:1 25 30 35 12

Span ratio 1:1 35 40 45 10


* For intermediate values – interpolation.

From the above table we have the value of a is 40 end span


𝐿𝑒
d ≥ 0.85( )
𝐵𝑎

600
d ≥ 0.85 ( ) = 12.75𝐶𝑚
40

d ≥ 12.75 cm

Panel 2

Thi is uniform span with the above span with a =45


600
d ≥ 0.85 ( ) = 11.33𝐶𝑚
45

d ≥ 11.33 cm

Jimma university college of engineering and technology 6


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 3

Its dimension is same with the above with a =40 and


600
d ≥ 0.85 ( ) = 12.75𝐶𝑚 d ≥ 12.75 cm
40

Panel 4

Its dimension is same with the above with a =40 and

Jimma university college of engineering and technology 7


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

600
d ≥ 0.85 ( ) = 12.75𝐶𝑚
40

d ≥ 12.75 cm

Panel 5

This span is also same with the above in dimension and it is fixed in all sides. It’s a is 45
600
So, d ≥ 0.85 ( 45 ) = 11.33𝐶𝑚

d ≥ 11.33 cm

Panel 6

Jimma university college of engineering and technology 8


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

This panel is fixed in three sides and free in one sides.so it’s a is 40 and depth d is
600
d ≥ 0.85 ( ) = 12.75𝐶𝑚
40

d ≥ 12.75 cm

Cantilever slab 1

Ly/Lx=180/98= 18.4>2, therefore, it is one way slab

98
d ≥ 0.85 ( ) = 8.33𝐶𝑚
10

d ≥ 8.33 cm

Jimma university college of engineering and technology 9


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Cantilever slab 2

Ly/Lx=120/10.3= 11.65 >2, therefore, it is one way slab

103
d ≥ 0.85 ( ) = 8.755𝐶𝑚
1𝑜

d ≥ 8.755cm

Cantilever slab 3

Ly/Lx=600/90= 6.67 >2, therefore, it is one way slab

90
d ≥ 0.85 ( ) = 7.65𝐶𝑚
1𝑜

d ≥ 7.65cm
Jimma university college of engineering and technology 10
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 7

Ly/Lx=600/265= 2.26>2, therefore, it is one way slab

2.65
d ≥ 0.85 ( ) = 9.385𝐶𝑚
24

d ≥ 9.385cm

the governing depth for C1,C2,C3,S1,S2,S3,S4,S5,&S6 is equal to 12.75cm

d ≥ 12.75cm Take F=12

D=d + Cover + 12/2

=127.5+15+6

=148.5mm

Take D=160mm

Jimma university college of engineering and technology 11


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Load on the slab


Self weight of the slab

GK= gc(b)(D)

Take D=160mm

Panel 1

a) due to self Wt = gc(b)(D) gc = 24KN/M3

=23(1)(0.16) =3.84KN/M2

b) due to plastering =g plastering = 23KN/M3

=23×(0.015)

=0.345KN/M2

Jimma university college of engineering and technology 12


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

C) cement screed gc=23KN/M3

=23 ×0.03

=0.69KN/M2

d) due to water proofing g =27KN/M3

=0.002 ×27

=0.054KN/M2

GK=( 3.84+0.345+0.69+0.054)KN/M2

=4.62KN/M2

Live load EBCS-1 1995

QK=0.5KN/M2

Pd=1.6Qk +1.3Gk

=1.6×0.3+1.3×4.62

=6.806KN/M2

Jimma university college of engineering and technology 13


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel designing by strip method

ANALYSIS OF SLABS WITH IREGULAR SUPPORT CONDITION

The method analysis adopted hear for irregular support conditions was strip
method rather than yield line method.This was due to the reason that strip method
is a lower band approach based on satisfaction of equilibrium requirments
everywhere in the slab, it gives results on the safe side, and differences from
the true carrying capacity will never impair safety.It also has got a possibility that
the reinforcement can be calculated and be varied in a logical way leading to an
economical arrangement of steel as well as a safe design.it is also simple to apply.
Determination of depth for such slabs was determined as per the Design of treasures of
RCC Design (SUSHIL KUMAR) page 231

the panel can be designed using strip method analysis because EBCS do not provide

design aid for such type of panel.Design using strip method

Panel 5

in support on larger span

Jimma university college of engineering and technology 14


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

(wd=w=pd=design load)

W=6.806kn/m2

D=130mm

C=25mpa

Fyk=300mpa

Jimma university college of engineering and technology 15


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Design the slab by strip method

{Minimum reinforcement is assumed to be in longer direction}

Along →{B-B}

ASMIN=rminbd

r min=0.5/fyk= 0.5/300=0.00167≈0.002

using F10 &concrete cover=15mm

d=130-15-10/2

= 110

Take b=1000mm

Amin=0.002×1000×110=220mm2

r=AS/bd=0.002

S=bas/AS = 1000×78.54/220=357mm

2 D  260mm
S max  
300mm

Provide F10 ,c/c 250mm

AS=bas/dmax=(1000×78.54)/250 =314.16mm2

Design strength

0.85 fck 0.85  0.8  25


fcd = =
c 1.5

Asw 314.6
ρw = = =0.00286
bw * d 1000110

m=fyd/0.8fcd

Jimma university college of engineering and technology 16


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

= (300/1.15)/(0.8×11.33)=28.78

Section capacity

Mu=0.8×b×d2×fcd×rm(1-0.4rm)

=(0.8×1000×1102×11.33×0.002×28.78)(1-0.4×0.002×28.78)

Mu=6312828.5×0.976976×10-6

=6.167 ≈ 6.2kn.m

Along strip A-A

Wx=(1+k2)w

Mys=WL2/12=(6.806×62)/12=20.42kn/m

Myf=WL2/24=(6.806×62)/24=10.209kn/m

Jimma university college of engineering and technology 17


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Along strip B-B

WX=(1-k1)w

2
(1  k1 ) w  a
Mu = =10.72knm/m
24

6.2=((1-k1)6.806kn/m2×62)/24

=148.8=(1-k1)254.0

=0.607=1-k1

K1=0.393

Along strip C-C

Jimma university college of engineering and technology 18


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

K2=( k1(1-b)2-(2my2)/wb2)/b(2-b)

Take Mo=0

b3.25=0.7

b=0.215

Select mys

Mys=0.5(cantilever moment)

= 0.5(2.7×2.92/2) = 5.68knm/m ≈ 5.7kn/m

Bb = 0.7 b = 3.25 b=0.215

K2=( k1(1-b)2-(2my2)/wb2)/b(2-b)

=(0.393(1-0.215)2-(2×5.68)/(6.806×3.252))/0.215(2-0.215)

K2=0.219

K1=0.393

Strip C-C

Jimma university college of engineering and technology 19


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

2.7(2.55-x)-1.5×0.7=0

6.885-2.7x-1.05=0

X=2.16m

∑mo=0

Myf+2.7(2.55-x) ×(2.55-x)/2-1.5×0.7(2.55-x-0.7/2)

Substitute x=2.16

Myf+1.053×0.195-0.777

Myf = 0.572 ≈0.6kn/m

Strip c-c mys=5.68knm/m

Myf=0.6knm/m

Reinforcement

b= 1m , d=0.127m

𝑓𝑦𝑘 300
fyd = ( )=( ) = 260.87𝑚𝑝𝑎
1.15 1.15
𝑚𝑛 0.5 0.5
RN=( ) rmin=fyk=300=0.00167
bd2

𝑀𝑦𝑠 5.68
Rnys= bd2 = 1∗(0.11)2 = 469.42𝐾𝑛𝑚

𝑀𝑦𝑓 0.6
Rnyf= bd2 = 1∗(0.11)2 = 49.6𝐾𝑛𝑚

𝑓𝑦𝑑 260.87
m=0.8∗fcd = = 28.78
11.33

1 2𝑚𝑅𝑛
r= 𝑚 (1 − √(1 − )
𝑓𝑦𝑑

1 2∗28.78∗469.4
rys= 28.78 (1 − √(1 − )
260.87∗10 𝐸3

1
rys= 28.78 (1 − √(0.8964)

=0.00185

Jimma university college of engineering and technology 20


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

1 2∗28.78∗49.6
ryf= 28.78 (1 − √(1 − 260.87∗10 𝐸3)

1
ryf= 28.78 (1 − √(0.989)

ryf =0.0001916

ryf =0.0001916≥ r min=0.00167

As=rbd

Asys= rys bd

=0.00185x1000x110

=203.5
𝑏𝑎𝑠 1000×78.54
S= 𝐴𝑠 = = 385 ≈ 300
203.5

Provide F10 c/c 300

Asyf = rmin bd =Asmin

=0.00167×1000×110=183.7mm

By using F(8 mm) and its as is 50 mm2

Provide F8 c/c 250

𝑏𝑎𝑠 1000×50
S= 𝐴𝑠 = = 272 ≈ 250
183,7

Strip A-A strong bond


𝑤∗𝐿∗𝐿
Mxs = =20.42Knm
12

𝑤∗𝐿∗𝐿
Mxf = =10.21Knm
24

Reinforcement
Mxs=20.42Knm

Mxf=10.21Knm

Jimma university college of engineering and technology 21


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Using F10mm ,d=150-15-5=110mm

Using F12mm ,d=150-15-6=109mm

b=700mm
𝑀𝑢
Rn = 𝑏𝑑

𝑀𝑥𝑠 20.42𝑘𝑛𝑚
Rnxs = 𝑏𝑑∗𝑑 = 0.7×0.11×0.11 = 2402.3𝐾𝑛𝑚

𝑀𝑥𝑓 10.21𝑘𝑛𝑚
Rnxf = 𝑏𝑑∗𝑑 = 0.7×0.109×0.109 = 1227.61𝐾𝑛𝑚

1 2𝑚𝑅𝑛
r= 𝑚 (1 − √(1 − )
𝑓𝑦𝑑

1 2∗28.78∗2402.3
rxs= 28.78 (1 − √(1 − )
260.87∗10 𝐸3

1
rxs= 28.78 (1 − √(0.46994)

=0.0109
1 2∗28.78∗1227.61
rxf= 28.78 (1 − √(1 − )
260.87∗10 𝐸3

1
rxf= 28.78 (1 − √(0.7291)

=0.00507

As=rbd

Asxs= rxs bd

=0.0109x700x110

=839.3 mm2

Using F 10 with it’s as=78.58 mm2

S= 𝑏𝑎𝑠 700∗78.54
= = = 65.5𝑚𝑚
𝐴𝑠 839.3

Provide = F 10 c/c 40mm

Asxf= rxf bd

Jimma university college of engineering and technology 22


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=0.00507x700x109

=386.84 mm2

Using F 12 with it’s as=113.1 mm2

S= 𝑏𝑎𝑠 700∗113.1
= = = 204.5𝑚𝑚
𝐴𝑠 386.84

Provide = F 12 c/c 180mm

Detailing

Jimma university college of engineering and technology 23


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Fixed in two edge and free on two edge

Depth = 130mm

W= 6.08kn/m

C =25mpa

S =300mpa

𝐿𝑦
r=𝐿𝑥 ; wx=w-wy wx=6.675

𝑤
wy=1+r4 wy=0.131

r4
wx =w(1+r4)

where w is total load per squar meter

wx is portion of total load(w) carried by the slab along short span

wy is portion of total load(w) carried by the slab along span

Jimma university college of engineering and technology 24


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Lx2
mx= wx Vx=wxLx=6.675×2.25=15.018
2

Ly2
my= wy Vy=Wy×LY=0.131×6=0.8
2

Solution

𝐿𝑦 6
r=𝐿𝑥 =2.25 =2.26

w=6.806kn/m
r4 (2.67)4
wx =w(1+r4)= 6.806(1+(2.26)4)=0.13Kn/m

Lx2 (2.25)2
mx= wx = 6.675 = 16.896Knm
2 2

Ly2 62
my= wy = 0.131 2 =2.36Knm
2

using ɸ12 D=130

d=130-15-6=109mm

Jimma university college of engineering and technology 25


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Analysis

ANALYSIS OF SLABS
After computation of all the dead and live loads on all typical panels the design load
(Pd) and support and field moments were computed as per EBCS-1, 1995 table 1.a.
for those slabs that are regularly supported. where as for irregularly supported
slabs it was done using strip method. For the strip method "Desighn of concrete
structures, Arthur H. Nilson" was refered.See tables below.

Mi=αipdLd2

Pd=6.806Kn/m
𝐿𝑦
=6/6=1:1
𝐿𝑥

Lx=6

For s1,s2,s4 ,s5&s6

coefficient

αxs=0.032

αxf=0.024

αys=0.032

αyf=0.024

Jimma university college of engineering and technology 26


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

moment

Mxs=αxspdLx2

=0.032(6.806)62=7.84Kn/m

Mxf=αxfpdLx2

=0.024(6.806)(6)2=5.9knm/m

Mys=αyspdLx2

=0.032(6.806)62=7.84Kn/m

Myf=αyfpdLx2

=0.024(6.806)(6)2=5.9knm/m
𝐿𝑦 6
= =1
𝐿𝑥 6

Lx=6

Coefficient

αxs=0.039

αxf=0.029

αys=0.039

αyf=0.029

Moment

Mxs=αxspdLx2=0.039×6.608×62=9.55Knm/m

Mxf=αxfpdLx2=0.029×6.608×62=7.1Knm/m
Jimma university college of engineering and technology 27
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Mys=αyspdLx2=0.039×6.608×62=9.55Knm/m

Myf=αyfpdLx2=0.029×6.608×62=7.1Knm/m

S7

𝐿𝑦 6
= =
𝐿𝑥 3

2≤ 2

Two way slab

By interpolation

Coefficient

αxs=0.093

αxf=0.07

αys=0.047

αyf=0.036

Moment

Mxs=αxspdLx2=0.093×6.608×62=22.8Knm/m

Mxf=αxfpdLx2=0.07×6.608×62=17.15Knm/m

Mys=αyspdLx2=0.047×6.608×62=11.51Knm/m

Myf=αyfpdLx2=0.036×6.608×62=8.82Knm/m

Jimma university college of engineering and technology 28


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Cantilever
W=0.11×24=2.46kn/m2

P=0.11×24kn/m3×2.64

W=0.66kn/m2

Pd=1.3×0.66knm/m2

=0.86knm/m2

6.806  0.982
Mmax=
2
=4.11knm/m

V=WL+P

=6.806×0.98+0.86

=7.53kn

Cantilever 2

ɣhcb =14kn/m

1.79×14=25.05kn/m2

Gk=25.06×0.2

=5.012kn/m

6.806  2.25  2.25


Mmax= +5.012+2.25
2

=28.5knm/m

Jimma university college of engineering and technology 29


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

V=WL+P

=6.806×2.25+5.012

=20.32kn

Cantilever 3

6.806  0.9  0.9


Mmax= +0.86+0.9
2

=3.53knm/m

V=WL+P

=6.806×0.9+0.86=6.965kn

Jimma university college of engineering and technology 30


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Moment adjustment

Jimma university college of engineering and technology 31


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Support moment

Since there should be one moment at the support the differet moment shout be equalified
According to EBCS 2-1995

Between c1 & s1

Ms=4.11

Ml=7.84

Ms 7.84 - 4.11 3.73


= = =0.476≥0.2
l arg er 7.84 7.84

If need redistribution

1
Ksmall= =1.02
0.98

1
Klarge= =0.167
6

Ksmall + Klarge=1.187

0.167
Md large =7.84kn/m - ×3.73=7.315knm/m
1.187

1.02
Md small=4.11+ ×3.73=7.315knm/m
1.187

C1 and s5

9.55 - 4.11
=0.569≥0.2 need redistributed
9.55

1
. Ksmall= =1.02 Ktotal=1.187
0.98

Jimma university college of engineering and technology 32


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

1
Klarge= =0.167
6

0.167
Md large =9.55kn/m - ×5.14=8.83knm/m
1.187

1.02
Md lsmall=4.11knm/m+ ×5.14=8.83knm/m
1.187

Between c2 & s1

Ms=7.84

Ml=28.5

Ms 28.5 - 7.84 20.66


= = =0.725≥0.2
l arg er 28.5 28.5

If need redistribution

1
Ksmall= =0.444
2.25

1
Klarge= =0.167
6

Ksmall + Klarge=0.611

0.167
Md large =28.5kn/m - ×20.66=22.85knm/m
0.611

0.444
Md lsmall=7.84knm/m+ ×20.66=22.85knm/m
0.611

S2 and S3

9.55 - 7.84
Md small =7.84knm/m ≤ 0.179 take the average
9.55

Md large=9.55knm/m

9.55 7.84
=8.695knm/m
2

M=8.695knm/m

Jimma university college of engineering and technology 33


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Between S3 and S6 M=8.695knm/m

Between S4 and S7

Ml=20.42

Ms=11.54

Ms 20.42 - 11.54 8.88


= = =0.435≥0.2
l arg er 20.42 20.42

It need redistribution

1
Ksmall= =0.167
6

1
Klarge= =0.167
6

Ksmall + Klarge=0.334

0.167
Md large =20.42kn/m - ×8.88=15.98knm/m
0.334

0.167
Md lsmall=11.54knm/m+ ×8.88=15.98knm/m
0.334

Between S5 and S4

Ml=20.42

Ms=16.9

Ms 20.42 - 16.9 3.52


= = =0.172≤0.2
l arg er 20.42 20.42

So take the average of the two

20.42 16.9
=18.66knm/m
2

Jimma university college of engineering and technology 34


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Between S6 and S3

Ms=3.53

Ml=7.84

Ms 7.84 - 3.53 4.31


= = =0.55≥0.2
l arg er 7.84 7.84

It need redistribution

1
Ksmall= =1.11 Ksmall + Klarge=1.277
0 .9

1
Klarge= =0.167
6

0.167
Md large =7.84kn/m - ×4.31=7.276knm/m
1.277

0.167
Md lsmall=3.53knm/m+ ×4.31=7.276knm/m
1,277

Between C5 and S4

Ms=2.36

Ml=7.84

Ms 7.84 - 2.36 5.58


= = =0.55≥0.2
l arg er 7.84 7.84

It need redistribution

1
Klarge= =0.167 Ksmall + Klarge=0.611
6

Jimma university college of engineering and technology 35


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

1
Ksmall= =0.44
2.25

0.167
Md large =7.84kn/m - ×5.48=6.34knm/m
1.277

0.44
Md lsmall=2.36knm/m+ ×5.48=6.34knm/m
1,277

Between S5 and C4

Ms=5.7

Ml=7.84

Ms 7.84 - 5.4 2.14


= = =0.27≥0.2
l arg er 7.84 7.84

It need redistribution

1
Klarge= =0.167 Ksmall + Klarge=0.611
6

1
Ksmall= =0.307
3.25

0.167
Md large =7.84kn/m - ×2.14=7.087knm/m
1.277

0.307
Md lsmall=5.7knm/m+ ×2.14=7.087knm/m
1,277

Between C6 and S7

Ml=22.8

Ms=7.84

Ms 22.8 - 7.84 14.96


= = =0.65≥0.2
l arg er 22.8 22.8

It need redistribution

Ksmall=0.25 Ksmall + Klarge=0.417

Jimma university college of engineering and technology 36


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Klarge=0.167

0.25
Md large =22.8kn/m - ×14.96=13.83knm/m
0.417

0.167
Md lsmall=7.84knm/m+ ×14.96=13.83knm/m
0.417

B - span moment adjustment

Span moment are adjested only in the direct in which support moment is decreased (reduced)
during balancing support moment.

ΔMxs=(mxs,larger)-( mxs,adjested)

ΔMys=(mys,larger)-( mys,adjested)

ΔMxf=CxΔ mxs +CxΔ mys

ΔMyf=CyΔ mxs +CyΔ mys

Ly/Lx=6/6=1

ΔMxs=7.84-7.315=0.525

ΔMys =28.5-22.85=5.65

Cx  0.28
Mx  
Cy  0.38

Jimma university college of engineering and technology 37


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Cx  0.38
My  
Cy  0.28

ΔMxf= CxΔ mxs +CxΔ mys

=0.28×0.525+0.38×5.65=2.294

ΔMys= CyΔ mxs +CyΔ mys

=0.38×0.525+0.28×5.65=1.2815

Mxf=mx+Δ mxf

=5.9+2.294=8.2knm/m

Myf= my +Δ myf

=5.9+1.7815=7.6815knm/m

S3

Ly/Lx=6/6=1

ΔMxs=9.55-8.83=0.72

ΔMys=9.55-8.695=0.855

ΔMxf= CxΔ mxs +CxΔ mys

=0.28×0.72-0.38×0.855=0.5265

ΔMyf=CyΔ mxs +CyΔ mys

=(0.38)(0.72)+(0.28)(0.855)=0.513
Jimma university college of engineering and technology 38
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

ΔMxf= mx +Δ mxf

=7.1+0.5265=7.6265

Myf= my +Δ myf

=7.1+0.513=7.613knm/m

Mxf= mx +Δ mxf=7.1+0.5265=7.625knm/m

Ly/Lx=1

ΔMxs=9.55-8.695=0.855

ΔMys=7.84-7.276=0.564

ΔMxf=(0.38)(0.855)+(0.28)(0.564)

Cx  0.38 Cx  0.28


Mxs Mys
Cy  0.28 , Cy  0.38

ΔMyf=(0.28)(0.855)+(0.38)(0.564)

=0.454
Mxf=5.9+0.483=6.383knm/m

Myf=5.9+0.454=6.354knm/m

ΔMxs=22.8-13.83=8.82

ΔMys=20.42-15.98=4.44

ΔMxf= CxΔ mxs +CxΔ mys

=0.484×8.82+0.238×4.44=5.32

Cx  0.484
Mxs
Cy  0.248

Cx  0.28
Mys
Cy  0.055

ΔMyf=(0.248)(8.82)+(0.055)(4.44)

=2.43
Jimma university college of engineering and technology 39
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Mxf=17.25+5.32=22.47knm/m

Myf=8.82+2.43=11.25knm/m

Ly/Lx=6/3.25=1.85≈1.9

ΔMxs=7.84-7.087=0.753

ΔMys=20.42-18.66=1.76

ΔMxf=(0.753)(0.258)+(0.481)(1.763)=1.0408

Cx  0.258 Cx  0.481


Mx  My 
Cy  0.6 Cy  0.6

ΔMyf=(0.6)(0.753)+(0.251)(1.76)

Mxf=0.6+1.041=0.625

Myf=10.2+0.8933=11.1

Jimma university college of engineering and technology 40


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Reinforcement provision
𝐾𝑠𝑀𝑑
S= 1000
𝑑

Asmin=rmin bd b=1000mm=1m=> Asmin=1.67d;ɸ12

0.5
rmin=𝑓𝑦𝑘=0.00167

2D  2  160  320


Smax , midle  
350

2S max  2  320  640


Smax, edge  
400 Smax edge 400m

𝑚𝑑
Km =(√( ))/d
𝑏

Where b&d in meter

B=1m for slab case


𝑏𝑎𝑠
S=Asmin

Where b=1000

as is area of a single ɸ12

Jimma university college of engineering and technology 41


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Md 2 d3 Km Ks 1 As Asmin Middle M spacing provided


spacing
1 8.2 139 20.6 3.98 3.61 232.13 320 ɸ12 c/c300
7.68 127 21.82 3.96 219.9 212.1 320 ɸ12 c/c 300
7.315 139 19.46 3.96 208.4 232.13 320 ɸ12c/c300
22.85 139 34.39 4.1 674.0 232.1 167 ɸ12c/c300

2 8.2 139 20.6 3.9 233.6 232.13 320 ɸ12c/c300


5.9 127 19.12 3.96 184 212.1 320 ɸ12c/c300
7.315 139 19.46 3.97 209 232.13 320 ɸ12c/c300
7.84 139 20.14 3.98 224.5 232.13 320 ɸ12c/c300

3 7.625 139 19.86 3.96 217.25 232.0 320 ɸ12c/c300


7.615 127 21.73 3.96 238.64 212.1 320 ɸ12c/c300
8.83 139 21.4 3.97 252.13 232.13 320 ɸ12c/c300
8.695 139 21.21 3.97 252.13 232.13 320 ɸ12c/c300

4 5.9 139 17.5 3.95 167.7 232.13 320 ɸ12c/c300


5.9 127 19.12 3.95 183.5 212.1 320 ɸ12c/c300
7.84 139 20.14 3.97 223.92 232.13 320 ɸ12c/c300
7.84 139 20.14 3.97 223.92 232.13 320 ɸ12c/c300

5 6.383 139 18.17 3.95 181.4 232.13 320 ɸ12c/c300


6.354 127 19.85 3.97 198.62 212.1 320 ɸ12c/c300
8.695 139 21.21 3.98 246.97 232.13 320 ɸ12c/c300
7.276 139 19.4 3.96 207.3 232.13 320 ɸ12c/c300

6 22.47 139 34.1 4.10 668.2 232.13 320 ɸ12c/c160


11.25 127 26.1 4.00 354.3 212.1 320 ɸ12c/c300
13.83 139 26.75 4.00 398.0 232.13 320 ɸ12c/c280
15.98 139 28.74 4.03 463.5 232.13 320 ɸ12c/c240

Jimma university college of engineering and technology 42


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

7 0.34 139 4.19 - 232.19 232.19 320 ɸ12c/c300


18.66 139 31.08 4.05 543.2 232.19 320 ɸ12c/c200

Asmin=rmin bd

=1000×0.00167×d

=1.67d

Check depth for flexure

Mmax=22.85knm/m

S=300mpa

C=25mpa

Concrete

1) ɣc=24kn/m2
2) classІ work
3) C=25 mpa
4) F.s =1.5
5) Fck=0.8×25=20mpa
6) Fck=o.21fck2/3=1.5mpa
0.85 fck
7) fcd = =11.33mpa
c

fctd=0.21fck2/3=1.031mpa

fyd
m=
0.8 fcd

=28.78

C1=2.5/m=0.0869

C2=0.32mfcd=3003

Jimma university college of engineering and technology 43


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

rmax=0.019

fyd=fyk/ɣs=260.87mpa

Check depth for flexure

a) Mmax=22.85knm/m
22.85∗10𝐸6
Dmin=√0.8∗1000∗11.33∗0.019∗28.78(1−0.4∗0.019∗28.78)

22.85∗10𝐸6
=√ 3872.3

=√5900.886

=76.81mm

D=76.81+15+7

=98.1≤160mm

Take D=100mm≤160mm

B,Check for shear

Vc=0.25*fctd*K1*K2*bw*d

Where ;- K1=(1+50ρ) ≤ 2

ρ=0.5/300=0.00167
K1=1.0835

K2=1.6-d≥1

=1.6-0.138

Jimma university college of engineering and technology 44


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

K2=1.461

Vc=0.25х1.0315 х1.0835 х1.46 х1000 х138

Vc =56.33kn> Vmax , OK!

So the section is adequate for shear.

K2=1.6-d ≥1 K1= ( 1+50𝜌) ≤ 2

= 1.6-0.138≥1 𝜌 =0.5/300=0.00167

1.461≥1 K1=1+50(0.00167 ) ≤ 2

K2=1.461 1.0835≤ 1

K1=1.0835

Load transfer to the beam

Vi=βi*Pd*Lx

Where Vi=characteristics shear forces per unit widith support

βi=coefficient

Lx=short span of the panel

Vx=βvx*Pd*Lx, where Pd =6.806kn/m2

Vy=βvy*Pd*Lx

Jimma university college of engineering and technology 45


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Ly 6
= =1
Lx 6

Coeffiocents, βvx=0.33

βvy =0.33

Vx continuous = βvx*Pd*Lx,

=0.33*6.806*6

=13.47kn/m

Vy continuous = βvx*Pd*Lx,

=0.33*6.806*6

=13.47kn/m

Shear force for panel 1, 2, 4 and 5, 6 both same

that is Vx =13.47kn/m

Vy =13.47kn/m

Panel 3

Ly 6
= =1
Lx 6
Jimma university college of engineering and technology 46
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Coeffiocents, βvxc=0.36

βvy c=0.36

βvy c=0.24

Vxc = βvxd*Pd*Lx,

=0.36*6.806*6 =14.70kn/m

Vyc =0.36*6.806*6 =14.7kn/m

Vyd =0.24*6.806*6 =9.8kn/m

Panel 7

Ly 6
= =2
Lx 3

Coeffiocents, βvxc=0.6

βvxd=0.4

βvy c=0.4

βvy d=0.26

Vxc =0.6*6.806*6 =24.50kn/m


Jimma university college of engineering and technology 47
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Vxd =0.4*6.806*6 =16.33kn/m

Vyc =0.4*6.806*6 =16.33kn/m

Vyd =0.26*6.806*6 =10.62kn/m

Shear for strip Method


Panel C4

L11=3.25m

L2=6m

Ly 6
= = 1.846 and K1 = 0.393 , K2 = 0.219
Lx 3.25
Vxc = βvxd*Pd*Lx,

Vxc =K1wL1

=0.393*6.806*3.25 =8.7kn/m

Vyc =(1-K1)wL2/2

=(1-0.393)*6.806*6/2

=12.4kn/m

Jimma university college of engineering and technology 48


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Vycd=(1+K2)wL2/2

=(1+0.219)*6.806*6/2

=15.95kn/m

The self weight of the beam curbs position

Jimma university college of engineering and technology 49


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

W=1.3(0.24*0.258*25) =1.95kn/m

Load transfer

Jimma university college of engineering and technology 50


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Jimma university college of engineering and technology 51


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

2.2 . ANALYSIS AND DESIGN OF3ND, 4rd AND 5th FLOOR SLAB

RIBBED SLAB

INTRODUCTION
The functions of the floors are mainly for bed room building with live
load of 2KN/m2 and corridors & balcony with live load of 4KN/m2. All
slabs are designed as ribbed slab rather than solid slab as the live load is
moderately light and the span are somewhat long. This makes the design
to be more economical.

ANALYSIS AND DESIGN OF JOISTS


It is clearly shown in fig above that the length of the joists in the panels
have variable length. There are many joists which need separate analysis
and design but this is very difficult task. Therefore; it is decided to
analyze one joist from each panel having different dimensions. The
reinforcement is provided at support and middle (span of joists). This
makes the design safer.
The analyses of joists are done manually. The bending moment diagram
and shear force diagram are shown in each joist design. The detail
procedure for the design of joists is shown at the first joist design and
the remaining joists are shown in table

Jimma university college of engineering and technology 52


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Step 1

Depth determination
0.6𝑓𝑦𝑘
d≥ (0.4 + ) 𝑙𝑒/𝛽𝑎 ,using C-25 and S-300
400

0.6𝑓𝑦𝑘
d𝑚𝑖 = (0.4 + ) 𝑙𝑒/𝛽𝑎
400

=0.85 𝑙𝑒/𝛽𝑎

Table:- Determination of depth of joist for deflection requirement

Jimma university college of engineering and technology 53


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

joist Lx(mm) Ly(mm) Ly/ Lx 𝛽𝑎 dmin=0.85 𝑙𝑒/𝛽𝑎


1 6000 6000 1 28 182.14
2 6000 6000 1 28 182.14
3 6000 6000 1 28 182.14
4 3000 6000 12 24 106.25
5 3000 6000 2 24 106.25
6 980 19430 19.83 10 83.3
7 9150 1030 0.11 10 87.55
8 6000 400 0.067 10 34
9 2210 1050 0.5 10 89.25
10 3000 3110 1.04 10 255.0
The governing depth =255mm

D=d+cover+Ø/2 and use( ØL=14 and Øs=6mm)

D=255+15+14/2

D=277mm

Use D=300mm and

d=300-15-14/2=278mm

Check Dj

Dj 4*bw+Dt

300 4*80+50

300 370…….OK!

Assume the hollow block dimension is 400 200mm as shown in the figure below.

Jimma university college of engineering and technology 54


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

A=A1+3A2+2A3

=40*400+3*210*40+2*100*40=0.0492m2

 Requirement from [EBCS-21995 page 84]


 Thickness of slab (topping) Dt (1/12*clear distance b/n joists)
 Rib width bw=80mm>50mm
 Overall depth Dj 4*bw+thickness of slab (D𝑡)
 Rib spacing is generally less than 1m

Determination of thickness of topping

Hf=50mm or 400/10=40mm

=50mm

Jimma university college of engineering and technology 55


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Dj=300mm

step 2
Loading

Calculation of loads

Materials used from EBCS

 Pvc tile floor finishing


 Granite tile floor finishing
 Marble floor finishing
 Non slippery ceramic tile floor finishing

Thickness of the slab contains

 5 cm marble
 30 cm ribbed slab
 2 cm plastering

Specific gravity of the materials is

γmarble= 27kn/m3
γceramic= 27kn/m3

γconcrete= 24kn/m3

Jimma university college of engineering and technology 56


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

1. Load of marble/ceramic=27kn/m3*0.05m*0.4m=0.54kn/m

2. Load of concrete topping =24*0.05*0.4=0.48kn/m


3. Load of joist(web topping)= γconcrete*tweb*d
=24*0.08*0.21
=0.403kn/m
4. Self weight of HCB= γHCB*AHCB=12kn/m3*0.049m2=0.5904kn/m
5. Load of plastering= γconcrete*wstrip*tplaster
=12kn/m3*0.02*0.4m2=0.184kn/m

1) Strip 1

For panel 1 and 2

Dead load=concrete topping +joist +plastering + marble + HCB

=0.48+0.4896+0.184+0.324+0.54+0.5904

=2.284 kN/m

Live load=2kn/m2(bed room in hotels) from EBCS 1- 1995

=2*0.4=0.8kN/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


=(14*0.2*4.3*2.8+23*0.05*4.3*2.80)/(6*6)

=1.321 kN/m2*0.4m

=0.5284 kN/m

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+0.5284)+1.6*0.8

Jimma university college of engineering and technology 57


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=4.936 kN/m

For panel 3 and 2

Dead load=concrete topping +joist +plastering + marble + HCB

=0.48+0.4896+0.184+0.324+0.54+0.5904

=2.284 kn/m

Live load=2kn/m2(bed room in hotels) from EBCS 1- 1995

=2*0.4=0.8kn/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


=(14*0.2*10.43*2.8+23*0.05*10.43*2.80)/(6*6)

=3.204 kn/m2*0.4m

=1.282 kN/m

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+1.282)+1.6*0.8

=5.916 kn/m

For panel 4 and 5

 Dead load=concrete topping +joist +plastering + marble + HCB

=0.48+0.4896+0.184+0.324+0.54+0.5904

=2.284 kn/m

Live load=4kn/m (balconies in hotels) from EBCS 1- 1995

=4*0.4=1.6 kn/m

Partition load=(14*0.15*4.78*2.8+23*0.05*4.78*2.80)/(3*6)

=2.42 kn/m2*0.4m

=0.968 kn/m

Jimma university college of engineering and technology 58


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+0.968)+1.6*1.6

=6.788 kn/m

For cantilever (C1)

DL=2.284kn/m

LL=5kn/m2(corroidor EBCS 1-1995)

=5*0.4kn/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


=(14*0.2*1.6*2.8+23*0.05*1.6*2.80)/(6*6)

=3.03 kn/m2*0.4m

=1.212 kn/m

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+1.212)+1.6*2

=7.745 kn/m

Jimma university college of engineering and technology 59


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Analysis

2) Strip 2

i) For panel 1

Jimma university college of engineering and technology 60


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Dead load=concrete topping +joist +plastering + marble + HCB

=0.48+0.4896+0.184+0.324+0.54+0.5904

=2.284 kn/m

Live load=2kn/m2(bed room in hotels) from EBCS 1- 1995

=2*0.4=0.8kn/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


=(14*0.2*4.3*2.8+23*0.05*4.3*2.80)/(6*6)

=1.321 kn/m2*0.4m

=0.5284 kn/m

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+0.5284)+1.6*0.8

=4.936 kn/m

ii) For cantilever

DL=2.284kn/m

LL=5kn/m2(corridor EBCS 1-1995)

=5*0.4=2kn/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


=(14*0.2*1.6*2.8+23*0.05*1.6*2.80)/(6*6)

=3.03 kn/m2*0.4m

=1.212 kn/m

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+1.212)+1.6*2

=7.745 kn/m

iii) For panel S6 (around)

Jimma university college of engineering and technology 61


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

DL=2.284kn/m

LL=5kn/m2(corridor EBCS 1-1995)

=5*0.4=2kn/m

Partition load = no
Design load Pd=1.3DL+1.6LL

=1.3*(2.284+1.212)+1.6*2

=6.17 kn/m

Analysis:-

3) Strip 3
For panel 1

Dead load=concrete topping +joist +plastering + marble + HCB


Jimma university college of engineering and technology 62
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=0.48+0.4896+0.184+0.324+0.54+0.5904

=2.284 kn/m

Live load=2kn/m2(bed room in hotels) from EBCS 1- 1995

=2*0.4=0.8kn/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


=(14*0.2*1.6*2.8+23*0.05*1.6*2.80)/(0.98*6)

=3.03 kn/m2*0.4m

=1.212kn/m

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+1.211)+1.6*2

=7.745 kn/m

Jimma university college of engineering and technology 63


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Analysis:-

4) Cantilever 5(strip 4)

DL=2.284kn/m

LL=5kn/m2(corridor EBCS 1-1995)

=5*0.4=2kn/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


Jimma university college of engineering and technology 64
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=(14*0.2*5.75*2.8+23*0.05*5.75*2.80)/(3.11*6)

=6.82 kn/m2*0.4m

=2.73 kn/m

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+2.73)+1.6*2

=9.72 kn/m

Analysis

Jimma university college of engineering and technology 65


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

5.Strip 5 ( cantilever C2)

DL=2.284kn/m

LL=5kn/m2(corridor EBCS 1-1995)

=5*0.4=2kn/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


=(14*0.2*9.15*2.8+23*0.05*9.15*2.80)/(9.05*6)

=10.74 kn/m2*0.4m

=4.30 kn/m

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+4.30)+1.6*2

=11.76 kn/m

Jimma university college of engineering and technology 66


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Analysis:-

5) Strip6 ( cantilever C4)

DL=2.284kn/m

LL=5kn/m2(corridor EBCS 1-1995)

=5*0.4=2kn/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


=(14*0.2*4.41*2.8+23*0.05*4.41*2.80)/(1.05*6)

=21.02 kn/m2*0.4m

=8.41 kn/m

Jimma university college of engineering and technology 67


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Design load Pd=1.3DL+1.6LL

=1.3*(2.284+8.41)+1.6*2

=17.10 kn/m

Analysis

Design for flexure


Design constant
fcu=25,fck=fcu/1.25=25/1.25=20mpa

fcd=0.85fck/γc=11.33mpa

fctk=0.21fck2/3=1.55mpa

fyk=300mpa,fyd=fyk./γ=260.87mpa,

m=fyd/(0.8*fcd)=260.87(0.8*11.33)=28.78

c1=2.5/m=2.5/28.78=0.0869

Jimma university college of engineering and technology 68


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

c2=0.4fyd*m=0.4*260.87*28.78

=3003.13

k1=1+50ρ=1.50*0.0232=1.085

ρ= ρmax=0.6Єcu/( Єcu+ Єyd)

=0.6* 0.0035*11.33/(0.0035*260.87*260.87*200E-3)=0.019

1)Strip 1
Panel C 1
Md=3.72knm
D=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =109.6 mm<278mm OK!

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 𝑏∗𝑑∗𝑑∗𝐶2

=0.0024<ρmax=0.0174 OK!

As=ρbw*d=0.024*80*278=53.40mm2

Provide 2Ø10mm

Panel 1,2 :- Because the design moment is negative we design the T-beam as rectangular with
b=bw

d=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =248.76 mm<278mm OK!

Jimma university college of engineering and technology 69


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 𝑏∗𝑑∗𝑑∗𝐶2

=0.0142<ρmax=0.019

As=ρbw*d=0.0142*80*278=315.32mm2

Provide 3Ø12

Span reinforcement
Positive moment

It can be designed as rectangular or T-section which is governed by the location of neutral


axies.

𝐿𝑒 6000
𝑏𝑤 + = 80 + = 1280𝑚𝑚
Effective width be≤ { 5 5 }
𝑐𝑒𝑛𝑡𝑒𝑟 𝑡𝑜 𝑐𝑒𝑛𝑡𝑒𝑟 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 400
be=400mm

Assume initially the nutria axies is on the flange hence using b=be and flexural equation.

ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 4𝑀𝑑/(𝑏 ∗ 𝑑 ∗ 𝑑 ∗ 𝐶2)=0.00759

x=ρmd=0.00141*28.78*278=11.27mm< hf=50

As =ρbed=0.00141*400*278

Jimma university college of engineering and technology 70


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=156.80 mm2

#Provide 2Ø12

Panel 2;3

Support moment

M=-13.22

d=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =206.6 mm<278mm OK!

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 −
𝑏∗𝑑∗𝑑∗𝐶2

=0.00915<ρmax=0.019

As=ρbw*d=0.00915*80*278=203.4 mm2

Provide 2Ø12

Span reinforcement
Md=10.22knm
𝐿𝑒 6000
𝑏𝑤 + = 80 + = 1280𝑚𝑚
Effective width be≤ { 5 5 }
𝑐𝑒𝑛𝑡𝑒𝑟 𝑡𝑜 𝑐𝑒𝑛𝑡𝑒𝑟 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 400
be=400mm

Assume initially the nutria axies is on the flange hence using b=be and flexural equation.

ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 4𝑀𝑑/(𝑏 ∗ 𝑑 ∗ 𝑑 ∗ 𝐶2)=0.0013

x=ρmd=0.0013*28.78*278=10.3 mm< hf=50

As =ρbed=0.0013*400*278

=144.56 mm2

#Provide 2Ø10

Jimma university college of engineering and technology 71


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 4,5

Span reinforcement
Md=2.38knm

d=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =87.7 mm<278mm OK!

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 𝑏∗𝑑∗𝑑∗𝐶2

=0.0003<ρmax=0.019

As =ρbed=0.0003*400*278

=33.36 mm2

#Provide 2Ø10

Strip 1
Panel C1 the same as strip 1(panel 1)

Panel 1, 2 the same as strip 1(panel 1)

Panel 6

Support reinforcement

Md=-14.8 knm

d=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =218.66 mm<278mm OK!

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 𝑏∗𝑑∗𝑑∗𝐶2

=0.01<ρmax=0.019

As =ρbed=0.01*400*278

=222.40 mm2

#Provide 2Ø12

Spant reinforcement

Md=0.63knm
Jimma university college of engineering and technology 72
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

𝐿𝑒 6000
𝑏𝑤 + = 80 + = 1280𝑚𝑚
Effective width be≤ { 5 5 }
𝑐𝑒𝑛𝑡𝑒𝑟 𝑡𝑜 𝑐𝑒𝑛𝑡𝑒𝑟 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 400
be=400mm

Assume initially the nutria axies is on the flange hence using b=be and flexural equation.

ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 4𝑀𝑑/(𝑏 ∗ 𝑑 ∗ 𝑑 ∗ 𝐶2)=0.0000781

x=ρmd=0.0000781*28.78*278=0.62 mm< hf=50

As =ρbed=0.0000781*400*278

=8.7 mm2

#Provide minimum reinforcement 1Ø10

Jimma university college of engineering and technology 73


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Design for shear


Strip 1

Panel 1

D=300fctk2/3

d=300-(15+5) =280mm
7.59
=0.98/0.5=3.87KN
𝑉𝑑𝑟

0.21fctk2/3 0.21(20)2/3
fctd= = =1.032
𝛾𝑐 1.05

K1=1+50 ρ
ρ =80∗280
2∗78.5
=0.007

K1 = 1+(50*0.007) = 1.35 < 2------ok

K2 = 1.6 – d

= 0.25 fctdK1K2bwd

=0.25*1.032*1.35*1.32*80*280=10.3KN

Vd < Vc only required nominal (minimum) reinforcement

𝐴𝑦𝑓𝑦𝑘 2∗50∗300
S< = = 937.5mm
0.4𝑏𝑤 0.4∗80

# provide 8 ϕ c/c 900mm

Jimma university college of engineering and technology 74


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel & 2

D = 300 ϕ12

d = 300-15-6

= 279 mm

From similarity

12/2.52 = Vdl / 3.001 =Vdr=15.074KN

K1=1+50 ρ
ρ = (3*113.1)/(80*279) = 0.015
= K1r = 1+ 50(0.015) = 1.75

K2 = 1.6 – d

= 1.6 – 0.279 = 1.321mm

K2 = 1.6 – d =1.321 mm

Vcr = Vct = 0.25 fctdK1K2bwd

=0.25*1.032*1.75*1.321*80*279=13.31KN

1) Vcl < Vcr

:- only required minimum (nominal ) reinforcement


𝐴𝑦𝑓𝑦𝑘 2∗50∗300
S< = = 937.5mm
0.4𝑏𝑤 0.4∗80

# provide 8 ϕ c/c 900mm

2) Vdr < Vcr


2/3 (limiting shear = Vrd)
Vrd = 0.25fcdbw*d
= 0.25*11.33*80*279 = 63.22KN
(2/3)*63.33 = 42.15 KN

Jimma university college of engineering and technology 75


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

0.5dmm
S max  
300mm

S = 136.5mm use S = 140mm


𝐴𝑦𝑑𝑓𝑦𝑑 2∗50∗260.87∗279
Vs = =
𝑆𝑚𝑎𝑥 140

= 52KN

VEXT= Vcr + Vs =13.31 + 52 = 65.31 KN

# provide 8ϕ c/c 140mm


Panel 3

ϕ = 10

D =300mm

d = 300-15-6 = 279mm

from similarity

K1=1+50 ρ
ρ = (3*113.1)/(80*279) = 0.01
= K1r = 1+ 50(0.01) = 1.5

K2 = 1.6 – d

= 1.6 – 0.279 = 1.321mm


18.84 𝑉𝑑𝑟
= 3.24 = 2.761

Vdh = 13.77 KN

Vcr= Vch = 0.25 fctdK1K2bwd

=0.25*1.032*1.5*1.321*80*279=11.41KN
Jimma university college of engineering and technology 76
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Vdr > Vcr


2/3 (limiting shear = Vrd)
Vrd = 0.25fcdbw*d
= 0.25*11.33*80*279 = 63.22KN
(2/3)*63.33 = 42.15 KN
0.5dmm  0.5 * 279  139.5
S max  
300mm

S = 136.5mm use S = 140mm


𝐴𝑦𝑑𝑓𝑦𝑑 2∗50∗260.87∗279
Vs = =
𝑆𝑚𝑎𝑥 140

= 52KN

VEXT= Vcr + Vs =13.31 + 52 = 65.31 KN

# provide 8ϕ c/c 140mm

Panel 4

ϕ = 10

D =300mm

d = 300-15-5 = 280mm

from similarity

K1=1+50 ρ
ρ = (78.54)/(80*280) = 0.0035
= K1r = 1+ 50(0.0035) = 1.175

K2 = 1.6 – d

= 1.6 – 0.28 = 1.32mm

Jimma university college of engineering and technology 77


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

14.59 𝑉𝑑𝑟
1) =
2.16 1.68

Vdl = 11.35 KN
5.77 𝑉𝑑𝑟
2) =
0.84 0.36

Vdr=2.5KN

Vcr= Vch = 0.25 fctdK1K2bwd

=0.25*1.032*1.175*1.32*80*280=8.96KN

Vdr > Vcr


2/3 (limiting shear = Vrd)
Vrd = 0.25fcdbw*d
= 0.25*11.33*80*280 = 63.45KN
(2/3)*63.45 = 42.3 KN

0.5dmm  0.5 * 280  140


S max  
300mm

S = 140mm use S = 140mm


𝐴𝑦𝑑𝑓𝑦𝑑 2∗50∗260.87∗280
Vs = =
𝑆𝑚𝑎𝑥 140

= 52.174KN

VEXT= Vcr + Vs =8.96 + 52.174 = 61.134 KN

# provide 8ϕ c/c 140mm


Vd < Vc only required nominal (minimum) reinforcement

𝐴𝑦𝑓𝑦𝑘 2∗50∗300
S< = = 937.5mm
0.4𝑏𝑤 0.4∗80

# provide 8 ϕ c/c 900mm

Jimma university college of engineering and technology 78


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 2

Panel 5, 1&2

ϕ = 12

D =300mm

d = 300-15-6 = 279mm

from similarity

K1=1+50 ρ
ρ = (3*113.1)/(80*279) = 0.015
= K1r = 1+ 50(0.015) = 1.76

K2 = 1.6 – d

= 1.6 – 0.279 = 1.321mm


12.65 𝑉𝑑𝑟
1) =
2.64 2.161

Vdl = 10.61 KN
16.65 𝑉𝑑𝑟
2) =
3.36 2.88

Vdr=2.5KN

Vcr= Vch = 0.25 fctdK1K2bwd

=0.25*1.032*1.76*1.321*80*279=13.40KN

A) Vdl < Vcl only required nominal (minimum) reinforcement

𝐴𝑦𝑓𝑦𝑘 2∗50∗300
S< = = 937.5mm
0.4𝑏𝑤 0.4∗80

# provide 8 ϕ c/c 900mm

Jimma university college of engineering and technology 79


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

B) Vdr > Vcr


2/3 (limiting shear = Vrd)
Vrd = 0.25fcdbw*d
= 0.25*11.33*80*279 = 63.22KN
(2/3)*63.45 = 42.15 KN

0.5dmm  0.5 * 279  139.5


S max  
300mm

S = 139.5mm use S = 140mm


𝐴𝑦𝑑𝑓𝑦𝑑 2∗50∗260.87∗279
Vs = =
𝑆𝑚𝑎𝑥 140

= 52KN

VEXT= Vcr + Vs =13.4 + 52 = 65.4 KN

# provide 8ϕ c/c 140mm


Panel 6

from similarity

K1=1+50 ρ
ρ = (3*113.1)/(80*279) = 0.01
= K1r = 1+ 50(0.01) = 1.51

K2 = 1.6 – d

= 1.6 – 0.279 = 1.321mm

Jimma university college of engineering and technology 80


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

13.9 𝑉𝑑𝑟
1) =
2.268 1.789

Vdl = 10.88 KN
5.64 𝑉𝑑𝑟
2) =
0.882 0.403

Vdr=2.6KN

Vcr= Vch = 0.25 fctdK1K2bwd

=0.25*1.032*1.51*1.321*80*279=11.49KN

Vdl < Vcl &

Vdr > Vcr

only required nominal (minimum) reinforcement

𝐴𝑦𝑓𝑦𝑘 2∗50∗300
S≤ = = 937.5mm
0.4𝑏𝑤 0.4∗80

# provide 8 ϕ c/c 900mm

Jimma university college of engineering and technology 81


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Jimma university college of engineering and technology 82


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

2.3.SECOND FLOOR SLAB

Step 1 Depth determination


𝑓𝑦𝑘 𝑙𝑒
d ≥ ( 0.4 + 0.6 400 ) 𝐵𝑎 ,using C-25 , S – 300

300 𝑙𝑒 𝑙𝑒
dmin= ( 0.4 + 0.6400 ) 𝐵𝑎 = 0.85𝐵𝑎

Table Determination depth of joists for deflection requirement

Joist Lx (mm) Ly ( mm) 𝐿𝑦 Ba 300 𝑙𝑒


dmin= ( 0.4+0.6 )
𝐿𝑥 400 𝐵𝑎

1 6000 6000 1 24 212.5


2 6000 6000 1 28 182.14
3 6000 6000 1 28 182.14
4 2650 6000 2.25 24 93.85
5 6000 6000 1 24 212.5
6 6000 6000 1 28 182.14
7 6000 6000 1 24 212.5
8 6000 6000 1 24 212.5
9 6000 6000 1 28 182.14
10 2300 6000 2.6 10 195.5

The governing depth , d=212.5 Assume rib spacing , S=400mm

But for safety d=278 width of rib bw =80mm

D = d + cover + ф/2 + ф s

300 𝑙𝑒 50mm
dj ≥ ( 0.4 + 0.6400 ) 𝐵𝑎 thick ness of topping hf = hf .> 
(1 / 12) * 400mm  33.33mm
hf = 50mm
𝑙𝑒
dj ≥ 𝐵𝑎

300 6000
dj ≥ ( 0.4 + 0.6400 ) 24

Jimma university college of engineering and technology 83


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

dj ≥ 212.5

dj = 278

assume ф 14 longitudinal reinforcement

Dj= 212.5 + 15 + 7

= 234.5mm ≈ 300mm

Take Dj = 300mm

Check depth of joists

Dj < 4*bw*Dt

Dj < 370mm

300mm ≤ 370mm ok!

Loading

→Floor finish tiles 𝛄 ceramic = 27KN/m3


-ceramic tile 𝛄 marble = 27KN/m3
Jimma university college of engineering and technology 84
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

-Marble

Floor finishing tiles

Ceramic tiles = 27KN/M3 *0.4m*0.05m ( 𝛄 ceramic*strip width *thickness of ceramic)


= 0.54KN/M

Marble tiles = 27KN/M *0.4m*0.05m ( 𝛄 marble*strip width *thickness of marble)


= 0.54KN/M

Concrete toping

Concrete at toping * strip width* 𝛄 concrete


0.04m * 0.4m * 24KN/M

=0.384KN/M

Joist web toping

𝛄 concrete*tweb*d
=24KN/M*0.08m*0.278

=0.407KN/M ≈ 0.5338 KN/M

Self weight HCB

= 𝛄 HCB * AHCB
=12*0.0494

=0.5904KN/M

Jimma university college of engineering and technology 85


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Plastering = 𝛄 conc*wstrip*tplastering

=23*0.4*0.02 = 0.184KN/M

𝛄 HCB =12KN/M - - - - -for slabs


=14KN/M3 - - - -for partition wall

1) Strip

Panel 1
Dead load =concrete toping + joists + plastering + HCB + marble
= 0.384 + 0.5338 + 0.184 + 0.5904 + 0.54
= 2.232KN/m
Live load =5*0.4=2KN/M EBCS -1 1995 –pp -45 -46
=1.3Dl +1.6Ll
= 1.3*2.232 + 1.6*2
Pd=6.102 KN/M

Panel 2
Dead load =concrete toping + joists + plastering + HCB + ceramic
= 0.384 + 0.5338 + 0.184 + 0.5904 + 0.54
= 2.232KN/m
Live load =3KN/M2 ,3*0.4=1.2KN/M EBCS -1 1995 –pp -45 -46
=1.3Dl +1.6Ll
= 1.3*2.232 + 1.6*1.2
Pd=4.82KN/M

Panel 3
Dead load =concrete toping + joists + plastering + HCB + marble
= 0.384 + 0.5338 + 0.184 + 0.5904 + 0.54

Jimma university college of engineering and technology 86


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

= 2.232 KN/m
Live load =3KN/M2 ,3*0.4=1.2KN/M EBCS -1 1995 –pp -45 -46
=1.3Dl +1.6Ll
= 1.3*2.232 + 1.6*1.2
Pd=4.82KN/M

Panel 4
Dead load =concrete toping + joists + plastering + HCB + marble
= 2.232 KN/m
Live load =3KN/M2 ,3*0.4=1.2KN/M EBCS -1 1995 –pp -45 -46
=1.3Dl +1.6Ll
= 1.3*2.232 + 1.6*1.2
Pd=4.82KN/M

Strip 2

Panel 5
Dead load =concrete toping + joists + plastering + HCB + marble + partition wall
= 0.384 + 0.5338 + 0.184 + 0.5904 + 0.54 + 0.784
= 3.02 KN/m
Partition load =( HCB * Tpw * Lpw*hpw)/Astrip + (plastering * tplastering*lpw*hpw)/ Astrip
=1.2726 + 0.542
= 1.814KN/M*0.4M
=0.726KN/M

Live load =3KN/M2 ,3*0.4=1.2KN/M EBCS -1 1995 –pp -45 -46

=1.3Dl +1.6Ll
= 1.3*3.2 + 1.6*1.2
Pd=5.85 KN/M

Jimma university college of engineering and technology 87


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 6
Dead load = 2.232KN/M
Live Load = 3KN/M2*0.4M=1.2KN/M EBCS 1 pp45-46
Pd =1.3DL + 1.6LL =1.3*2.232 +1.6*1.2
=4.822KN/M
Panel 7
Partition load =( HCB * Tpw * Lpw*hpw)/Astrip + (plastering * tplastering*lpw*hpw)/ Astrip

= 1.22 + 0.52
= 1.74KN/M2*0.4M =0.696KN/M

Dead load =concrete toping + joists + plastering + HCB + ceramic tile + partition wall

= 0.384 + 0.5338 + 0.184 + 0.5904 + 0.54 + 0.69


= 2.92KN/M
Live Load = 3KN/M2*0.4M=1.2KN/M
Pd =1.3DL + 1.6LL =1.3*2.92 +1.6*1.2
=5.72KN/M

Panel 8
Dead load =concrete toping + joists + plastering + HCB + ceramic tile + partition wall

= 0.384 + 0.5338 + 0.184 + 0.5904 + 0.324 + 0.599


= 2.62 KN/M

Partition load =( HCB * Tpw * Lpw*hpw)/Astrip + (plastering * tplastering*lpw*hpw)/ Astrip

=(1.05 + 0.44)KN/M2
Partition load = 1.49*0.4=0.599KN/M
Live Load = 2KN/M2*0.4M=0.8 KN/M EBCS 1 pp45-46

Jimma university college of engineering and technology 88


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Pd =1.3DL + 1.6LL =1.3*2.62 +1.6*0.8


=5.81KN/M

Panel 9
Dead load= 2.23KN/M
Live Load = 3KN/M2 from EBCS 1 pp45-46
Live Load = 3KN/M2*0.4M=1.2 KN/M
Pd =1.3DL + 1.6LL =1.3*2.23 +1.6*1.2
=4.82KN/M
Panel 10
Dead load= 2.23KN/M
Live Load = 5KN/M2 from EBCS 1 pp45-46
Live Load = 5KN/M2*0.4M=2 KN/M
Pd =1.3DL + 1.6LL =1.3*2.23 +1.6*2
=6.1 KN/M

Strip 4

Dead load = concrete toping + joists + plastering + HCB + ceramic tile + partition wall

= 0.384 + 0.5338 + 0.184 + 0.5904 + 0.54 + 0.73


= 2.96 KN/M

Partition load 1= (14 *0.1*3.5*2.8)/(2.36*6) +(23*0.03*3.5*2.8)/(2.36*6)


=0.99+0.82
=1.81KN/M2 * 0.4M =0.73KN/M

Live Load = 3KN/M2 from EBCS 1 pp45-46


Live Load = 3KN/M2*0.4M=1.2 KN/M
Pd =1.3DL + 1.6LL =1.3*2.93 +1.6*1.2
Jimma university college of engineering and technology 89
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=5.77 KN/M

Cantilever 2 (c-2)

Dead load = concrete toping + joists + plastering + HCB + ceramic tile

= 0.384 + 0.5338 + 0.184 + 0.5904 + 0.54


= 2.23 KN/M

Live Load = 3KN/M2 from EBCS 1 pp45-46


Live Load = 3KN/M2*0.4M=1.2 KN/M
Pd =1.3DL + 1.6LL =1.3*2.23 +1.6*1.2
=4.82 KN/M

Jimma university college of engineering and technology 90


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Design for shear and flexure


For material given ,design moment fcu=25

Fck=20mpa , fyk =300mpa


0.8∗20
Fcd=0.8𝑓𝑐𝑘
γc = 1.15
=11.33mpa
𝑓𝑦𝑘 300
Steel: fyd= γs = =260.87mpa
1.15
𝑓𝑦𝑑 260.87
m= = =28.78
0.8fcd 0.8∗11.33
2.5 2.5
C1=m= =0.0869
28.78

C2=0.32*m2*fcd
=0.32*28.782*11.33
=3003
ρ = ρmax=ℇcu+ℇyd/ℇs
0.6∗ℇcu 𝑓𝑐𝑑
fyd
Es=200Gpa=200*1000Mpa

Panel 1

ρmax =0.019
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)=

d=√(20.61 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))


d=257.94<278mm- - - -ok!

P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)


P=0.0155<pmax=0.019
As=pbwd=0.0155*80*278 =344.72mm2

#provide 3ф 12

Jimma university college of engineering and technology 91


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Span reinforcement
Positive moment
It can be designed as rectangular or T-section which is governed by location
Of neutral axis.

bw  a / 5  80  6000 / 5
Md=18.11 be
C / C  400mm

Be=400mm
Assume initially, the newtral axis is on the flange, hence b=be

P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)


P=1/2(0.0869-√(0.0869)2 − 4 ∗ 18.11 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
X=pmd=0.0023*28.78*278=18.4
P=0.0023<pmax=0.019
As=pbwd=0.0023*80*278 =255.76m
#provide 2ф 12

Panel 2
a)for support moment 13.86KNM
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)=

d=√(13.86 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))


d=211.52 <278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 13.86 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.00966<pmax=0.019
As=pbwd=0.00966*80*278 =214.8m
#provide 2ф 12

Jimma university college of engineering and technology 92


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

b) for span
Msd=4.45KNM
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)=
d=√(4.45 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=119.85mm <278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 4.45 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.006<pmax=0.019
X=pmd=0.006*28.78*278=48.00
0.8*4.8=3.84<hf----------------ok!
As=pbwd=0.006*80*278 =133.44mm2
#provide 2ф 10
Panel 3
Msd=-10.98KNM
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)=
d=√(10.98 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=188mm <278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 10.98 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.0074<pmax=0.019
As=pbwd=0.0074*80*278 =164.56mm2
#provide 2ф 12

b) for span moment


Md=9.27KNM
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 9.27 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.0016<pmax=0.019
X=pmd=0.0016*28.78*278=12.8 ≤ hf ok!
As=pbwd=0.0016*80*278 =177.92mm2
#provide 2ф 12

Jimma university college of engineering and technology 93


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 4
Support moment Md=0.52
b=be=400mm
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 0.52 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.000645<pmax=0.019
X=pmd=0.000645*28.78*278=5
0.8x=4< hf ok!
As=pbwd=0.000645*400*278 =71.724mm2
#provide ф 10mm
Strip-2
Panel 1
Support moment Md=19
ρmax =0.019
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm))=
d=√(19 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=247.61mm <278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 19 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.014<pmax=0.019
As=pbwd=0.014*80*278 =311.36mm2
#provide 2ф14 mm
Span moment
Md=17.69
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(17.69 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=238.96mm <278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 17.69 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.0025<pmax=0.019
X=pmd=0.0025*28.78*278=20.0≤ hf ok!
0.8x ≤ hf
As=pbwd=0.0025*400*278 =278mm2
#provide 2ф 12mm

Jimma university college of engineering and technology 94


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 2
Support moment Md=-18.63
ρmax =0.019
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(18.63 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=245.2mm <278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 18.63 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.0137<pmax=0.019
As=pbwd=0.0137*80*278 =289.12mm2
#provide 3ф 12mm
Span moment
Md=2.8KNM
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(2.8 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=95.1mm <278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 2.8 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.000348<pmax=0.019
X=pmd=0.000348*28.78*278=2.78 ≤ hf ok!
0.8x ≤ hf
As=pbwd=0.000348*80*278 =289.12mm2
#provide 3ф 12
Panel 3

a) For support moment


#provide 2ф 12
b) For span reinforcement
Md =17.26

b = be
d = 238.69mm
P=0.0023 ≤ pmax=0.019
X=pmd=0.0023*28.78*278=18.4 ≤ hf ok!
As=pbwd=0.0023*80*278 =255.76mm2
#provide 2ф 12
Jimma university college of engineering and technology 95
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 3
Panel 1
Support reinforcement
Md= 21.02KN-M
Pmax=0.019
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(21.02 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=260.48mm < 278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 21.02 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.016 < pmax = 0.019
As=pbwd=0.016*80*278 =355.84mm2
#provide 3ф 12
span reinforcement
Md=16.6KN-M
Pmax=0.019
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(16.6 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=231.9mm < 278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 16.6 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.00211 < pmax = 0.019
X=pmd=0.00211*28.78*278=16.88 ≤ hf ok!
As=pbwd=0.00211*80*278 =234.63mm2
#provide 2ф 12

Panel 2
Support moment -9.21KN-M
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(9.21 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=172.42mm < 278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 9.21 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.0061 < pmax = 0.019
As=pbwd=0.0061*80*278 =135.65mm2
#provide 2ф 10

Jimma university college of engineering and technology 96


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Span reinforcement
Md=6.96KN-M
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(6.96 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=149.89mm < 278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 6.96 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.00174 < pmax = 0.019
X=pmd=0.00174*28.78*278=13.42 ≤ hf ok!
0.8x<hf
As=pbwd=0.00174*80*278 =194.48mm2
#provide 2ф 10
Panel 3
Support reinforcement
-use 2ф14mm
Span reinforcement
Md=0.94
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(0.94 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=55.08mm < 278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 𝑜. 94 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.0001 < pmax = 0.019
X=pmd=0.0001*28.78*278=0.8 ≤ hf ok!
0.8x<hf
As=pbwd=0.0001*80*278 =11.12mm2
#provide ф10 for minimum reinforcement

Jimma university college of engineering and technology 97


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip -4
Panel -1
Md=-15.26KN-M
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(15.26 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=221.7mm < 278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 15.26 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.0108 < pmax = 0.019
As=pbwd=0.0108*80*278 =240.2mm2
#provide 3ф 10
Panel 2
Md=12.75KN-M
d=√𝑀𝑠𝑑/(0.8𝑝𝑚𝑏fcd(1 − 0.4pm)
d=√(12.75 ∗ 10E6)/(0.8 ∗ 0.019 ∗ 28.78 ∗ 80 ∗ 11.33(1 − 0.4 ∗ 0.019 ∗ 28.78))
d=203.15mm < 278mm- - - -ok!
P=1/2(C1-√𝐶12 − 4𝑀𝑑/(𝑏𝑤 ∗ 𝑑2 ∗ 𝐶2)
P=1/2(0.0869-√(0.0869)2 − 4 ∗ 12.75 ∗ 10𝐸6/(400 ∗ (278)2 ∗ 3003)
P=0.00879 < pmax = 0.019
As=pbwd=0.00879*80*278 =195.48mm2
#provide 2ф 12

Jimma university college of engineering and technology 98


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Design for shear

Strip 1
Panel 1

Vc=0.25 fctdK1K2bwd
Fcu=25
𝑓𝑤 25
Fck= = 1.25 =20mpa
1.25

Fctk=0.21fck2/3=0.21*202/3=1.547
𝑓𝑐𝑡𝑘 1.547
fctd= = =1.032
γc 1.5

K1=1+50 ρ =1+50(0.0016) =1.08

K2 = 1.6 – d = 1.6-0.279=1.321
0.5 0.5
p= fyd=300=0.0016

−14.47 2.535
=2.535−(0.278+0.2)
x1

−14.67 2.535
= −2.057
X1

−14.6−2.057
Vd1 = =-11.9KN
2.535

Vd1=-11.9KN =Usd,A

Jimma university college of engineering and technology 99


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

21.74 3.465
=
Vd2 3.465−(0.278+0.2)

Vd2=18.74KN : Vsd B

Vrd = 0.25 fctdK1K2bwd

=0.25*1.032*1.08*1.322*80*278=8.1KN

Vdr > Vcr


2/3 (limiting shear = Vrd)
Vrd = 0.25fcdbw*d
= 0.25*11.33*80*278 = 62.82KN
(2/3)*62.82 = 41.8 KN
vc <vd<2/3Vrd
8.1<18.74<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Panel 2

−15.59 3.15
=3.15−(0.278+0.2)
Vd1

Vd1=13.22KN : Vsd A

Jimma university college of engineering and technology 100


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

13.57 2.85
=
Vd2 2.85−(0.278+0.2)

Vd2=11.29KN : Vsd B

Vrd = 0.25 fctdK1K2bwd

=0.25*1.032*1.08*1.322*80*278=8.1KN

Vdr > Vcr


2/3 (limiting shear = Vrd)
Vrd = 0.25fcdbw*d
= 0.25*11.33*80*278 = 62.82KN
(2/3)*62.82 = 41.8 KN
vc <vd<2/3Vrd
8.1<13<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Panel 3

14.94 3.11
=3.11−(0.278+0.2)
Vd1

Vd1=12.64KN : Vsd A

Jimma university college of engineering and technology 101


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

13.96 2.89
=
Vd2 2.89−(0.278+0.2)

Vd2=11.65KN : Vsd B

Vc = 0.25 fctdK1K2bwd

=0.25*1.032*1.08*1.322*80*278=8.1KN

Vdr > Vcr


2/3 (limiting shear = Vrd)
Vrd = 0.25fcdbw*d
= 0.25*11.33*80*278 = 62.82KN
(2/3)*62.82 = 41.8 KN
vc <vd<2/3Vrd
8.1<12.64<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Panel 4
Vc=8.1KN Vrd=62.82KN

−10.53 2.285
=2.285−(0.278+0.2)
Vd1

Vd1=8.34KN : Vsd A
−2.24 3.715
=3.715−(0.278+0.2)
Vd2

Vd2=1.95KN : Vsd B

Jimma university college of engineering and technology 102


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Vc=8.1KN Vrd=62.82KN
vc <vd<2/3Vrd
8.1<8.34<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Strip 2
Panel 1
Vc=8.1KN Vrd=62.82KN, 2/3Vrd=41.88
vc <vd<2/3Vrd
8.1<8.34<41.88

20.61 3.39
=3.39−(0.278+0.2)
Vd1

Vd1=17.64KN : Vsd A
−14.31 2.61
=2.61−(0.278+0.2)
Vd2

Vd2=-11.68KN : Vsd B

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Jimma university college of engineering and technology 103


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 2

Vc=8.1KN Vrd=62.82KN, 2/3Vrd=41.88


vc <vd<2/3Vrd
8.1<12.27<41.88

−14.51 3.1
=3.1−(0.278+0.2)
Vd1

Vd1=12.27KN : Vsd A
14.41 2.9
=2.9−(0.278+0.2)
Vd2

Vd2=12.03KN : Vsd B

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Jimma university college of engineering and technology 104


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 3
Vc=8.1KN Vrd=62.82KN, 2/3Vrd=41.88

−14.51 3.1
=3.1−(0.278+0.2)
Vd1

Vd1=12.27KN : Vsd A
14.41 2.9
=2.9−(0.278+0.2)
Vd2

Vd1=12.03KN : Vsd B
Vc=8.1KN Vrd=62.82KN
vc <vd<2/3Vrd
8.1<12.27<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Jimma university college of engineering and technology 105


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 4
Vc=8.1KN Vrd=62.82KN, 2/3Vrd=41.88

−20.27 3.5
=3.5−(0.278+0.2)
Vd1

Vd1=17.5KN : Vsd A
14.05 2.5
=
Vd2 2.5−(0.278+0.2)

Vd2=11.36KN : Vsd B
Vc=8.1KN Vrd=62.82KN
vc <vd<2/3Vrd
8.1<17.5<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Jimma university college of engineering and technology 106


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 3
Panel 1

Vc=8.1KN Vrd=62.82KN, 2/3Vrd=41.88

−17.42 2.51
=2.51−(0.278+0.2)
Vd1

Vd1=14.1KN : Vsd A
26.36 3.49
=3.49−(0.278+0.2)
Vd2

Ud2=22.75KN : usd B
Vc=8.1KN Vrd=62.82KN
vc <vd<2/3Vrd
8.1<22.75<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Jimma university college of engineering and technology 107


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 2

Vc=8.1KN Vrd=62.82KN, 2/3Vrd=41.88

−21.36 3.5
=3.5−(0.278+0.2)
Vd1

Vd1=18.44KN : Vsd A
16.46 2.5
=2.5−(0.278+0.2)
Vd2

Ud2=13.31KN : usd B
Vc=8.1KN Vrd=62.82KN
vc <vd<2/3Vrd
8.1<18.44<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 6c/c 130mm

Jimma university college of engineering and technology 108


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 3

Vc=8.1KN Vrd=62.82KN, 2/3Vrd=41.88

−14.2 1.9
=1.9−(0.278+0.2)
Vd1

Vd1=10.63KN : Vsd A
8.56 4.1
=
Vd2 4.1−(0.278+0.2)

Vd2=7.56KN : Vsd B
Vc=8.1KN Vrd=62.82KN
vc <vd<2/3Vrd
8.1<10.63<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Jimma university college of engineering and technology 109


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 4

C1
Vc=8.1KN Vrd=62.82KN, 2/3Vrd=41.88

−13.27 2.3
=2.3−(0.278+0.2)
Vd

Vd=10.57KN

vc <vd<2/3Vrd
8.1<10.57<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

C2

−11.086 2.3
=2.3−(0.278+0.2)
Vd

Vd=8.78KN

Jimma university college of engineering and technology 110


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

vc <vd<2/3Vrd
8.1<8.78<41.88

0.5dmm  0.5 * 278  139


S max  
300mm

S = 139mm use ф 8c/c 130mm

Strip 1

Strip 2

Strip 3

Jimma university college of engineering and technology 111


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 4

Strip 5

Load transfer to beam


Partition wall

Axis D

Axis 1D beam 1,2


Partition load = 0.2*2.7*14*1.3=9.828KN/M

Self weight of the beam=0.3*0.5*24*1.3 =4.6KNm/M

Dl = 14.428KN/M

Axis 2D 2,3

Partition load= 0.15*2.7*14*1.3=7.37KN/M

Self weight of the beam = 0.3*0.5*24*1.3 =4.6KNm/M

DL 11.97KN/M
Jimma university college of engineering and technology 112
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Axis 3D beam 3,4

Partition load = 0.2*2.7*14*1.3=7.37KN/M

Self weight of the beam =4.6KN/M

DL 11.97KN/M

Axis 4D beam 4,5

Partition load = 0.7*2.7*14*1.3=9.828KN/M

Self weight of the beam = 0.3*0.5*24*1.3 =4.6KNm/M

DL 14.51KN/M

Axis B

Axis B, beam 1,2

Partition load = 0.7*2.7*14*1.3=9.828KN/M

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Axis B beam3,4

Partition load= 0.15*2.7*14*1.3=7.37KN/M

Self weight of the beam =4.68KN/M

DL 12.05KN/M

Axis A

Axis A beam 1,2

Partition load = 0.7*2.7*14*1.3=9.828KN/M

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Axis A,beam 3,4

Partition load = 0.7*2.7*14*1.3=9.828KN/M


Jimma university college of engineering and technology 113
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Axis 1, beam A’ ,A

Partition load = 0.7*2.7*14*1.3=9.828KN/M

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Axis 2, beam A,B

Partition load = 0.7*2.7*14*1.3=9.828KN/M

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Axis 2 beam C, D

Partition load = 0.7*2.7*14*1.3=9.828KN/M

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Axis 3 beam A, B

Partition load = 0.7*2.7*14*1.3=9.828KN/M

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Axis 4 beam A, B

Partition load = 0.7*2.7*14*1.3=9.828KN/M

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Axis 4, beamB, C

Partition load = 0.7*2.7*14*1.3=9.828KN/M


Jimma university college of engineering and technology 114
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Axis 4, beamC,D

Partition load = 0.7*2.7*14*1.3=9.828KN/M

Self weight of the beam =4.68KN/M

DL 14.51KN/M

Design of toping
The toping is provided with mesh reinforcement. According to EBCS 2 specification unless

Calculation required for ribspasing larger than 1m . toping of slabs are provided with
reinforcement of 0.001b*tf in both direction for temperature and shrinkage problems or

0.008b*tf at right angle to the joist.

From this point area of mesh = 0.001*b*tf =0.001*1000*50=50mm2


𝑎𝑠 𝜋∗6∗6
S=bAs=1000* =565.2
50

use ф6c/c 565mm

Jimma university college of engineering and technology 115


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Load transferred to beam

Jimma university college of engineering and technology 116


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

2.4.FIRST FLOOR SLAB DESIGN


Steep 1

Depth determination
0.6𝑓𝑦𝑘
d≥ (0.4 + ) 𝑙𝑒/𝛽𝑎 ,using C-25 and S-300
400

0.6𝑓𝑦𝑘
d𝑚𝑖𝑛 = (0.4 + ) 𝑙𝑒/𝛽𝑎
400

=0.85 𝑙𝑒/𝛽𝑎

The following

determines the depth of joist for deflection requirement

The governing depth =212.5mm

D=d+cover+Ø/2 and use( ØL=14 and Øs=6mm)

D=212.5+15+14/2

Jimma university college of engineering and technology 117


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

D=250.14mm

Use D=300mm and d=300-15-14/2=278mm

Assume the hollow block dimension is 400×200mm as shown in the figure below.

A=A1+3A2+2A3

=40*400+3*210*40+2*100*40=0.0492m2

Requirement from EBCS-2 1995 page 84

Thickness of slab (topping) Dt≥(1/10*clear distance b/n joists)

Rib width bw=80mm>50mm

Overall depth Dj≥4*bw+thickness of slab (D𝑡)

Rib spacing is generally less than 1m

Determination of thickness of topping

Hf=50mm or 400/10=40mm

=50mm

Dj=300mm

Jimma university college of engineering and technology 118


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

STEP 2
Loading

Calculation of loads

Materials used from EBCS

 Pvc tile floor finishing


 Granite tile floor finishing
 Marble floor finishing
 Non slippery ceramic tile floor finishing

Thickness of the slab contains

 5 cm marble
 30 cm ribbed slab
 2 cm plastering

Specific gravity of the materials is

γmarble= 27kn/m3
γceramic= 27kn/m3

γconcrete= 24kn/m3
Load of marble/ceramic=27kn/m3*0.03m*0.4m=0.32kn/m
Jimma university college of engineering and technology 119
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Load of concrete topping =24*0.05*0.4=0.48kn/m

Load of joist(web topping)= γconcrete*tweb*d

=24*0.08*0.21

=0.403kn/m

Self weight of HCB= γHCB*AHCB=12kn/m3*0.049m2=0.5904kn/m


Load of plastering= γconcrete*wstrip*tplaster
=23kn/m3*0.02*0.4m2=0.184kn/m

1) Strip 1

For panel 1

Dead load=concrete topping +joist +plastering + marble + HCB

=0.48+0.403+0.184+0.324+0.5904

=1.9814kn/m

Live load=5kn/m2 from EBCS 1- 1995

=5*0.4=2kn/m

Partition load = (γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip


=(14*0.15*3.93*2.8+23*0.05*3.93*2.80)/(6*6)

=0.993kn/m2*0.4m

=0.397kn/m

Design load Pd=1.3DL+1.6LL

=1.3*(1.981+0.397)+1.6*2
Jimma university college of engineering and technology 120
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=6.29kn/m

For panel 2

 Dead load =1.981kn/m


 Live load=2kn/m
 Partition load=(γHCB*tpw*Lpw*hpw + γplastering*tplas*Lplas*hplas)/Astrip
14∗0.15∗4.07∗2.8 23∗0.05∗4.07∗2.8
= +
6∗6 6∗6

=1.03kn/m2*0.4m=0.41kn/m

Design load Pd=1.3DL+1.6LL

=1.3*(1.981+0.41)+1.6*2

=6.31kn/m

For panel 3

 Dead load=concrete topping +joist +plastering + marble + HCB

=0.48+0.403+0.184+0.324+0.5904

=1.9814kn/m

 Live load=5*0.4=2kn/m
 Partition load=0 ( no Partition wall)

Design load Pd=1.3DL+1.6LL

=1.3*(1.9814)+1.6*2

=5.77kn/m

Jimma university college of engineering and technology 121


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

2) Strip 2&3

I. For panel 4(ditto as panel 3)

Pd=5.77kn/m

II. For panel 5

Pd=5.77kn/m

3) Strip 4

i) Panel 9 &10 (Ditto as panel 3)

Pd=5.77kn/m

Jimma university college of engineering and technology 122


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 1

Jimma university college of engineering and technology 123


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 2 &3

Jimma university college of engineering and technology 124


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 4

Strip 5&6 (c1 &c2)

 Dead load=concrete topping +joist +plastering + marble + HCB

Jimma university college of engineering and technology 125


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=0.48+0.403+0.184+0.324+0.5904

=1.9814kn/m

 Live load=5*0.4=2kn/m
 Partition load=0 ( no Partition wall)

Design load Pd=1.3DL+1.6LL

=1.3*(1.9814)+1.6*2

=5.77kn/m

Design constant

fcu=25,fck=fcu/1.25=25/1.25=20mpa

fcd=0.85fck/γc=11.33mpa

fctk=0.21fck2/3=1.55mpa

fyk=300mpa,fyd=fyk./γ=260.87mpa,

m=fyd/(0.8*fcd)=260.87(0.8*11.33)=28.78

c1=2.5/m=2.5/28.78=0.0869

c2=0.4fyd*m=0.4*260.87*28.78

Jimma university college of engineering and technology 126


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=3003.13

k1=1+50ρ=1+1.50*0.0232=1.085

k2=1.6-d=1.322

ρb=(0.8*ec/ec+es)fcd/fyd=0.0232

ρmax=0.75 ρb=0.75*0.0232

=0.019

Design for shear and flexure


Because the design moment is negative we design T_beam as rectangular with b=bw=400mm.

Design for flexure

For support reinforcment

d=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =261.6mm<278mm OK!

ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 4𝑀𝑑/(𝑏 ∗ 𝑑2 ∗ 𝐶2)=0.0141<ρmax=0.019

As=ρbw*d=0.0141*80*278=313.58mm2

Jimma university college of engineering and technology 127


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

#Provide 2Ø14

Span reinforcement

𝐿𝑒 6000
𝑏𝑤 + = 80 + = 1280𝑚𝑚
Effective width be≤ { 5 5 }
𝑐𝑒𝑛𝑡𝑒𝑟 𝑡𝑜 𝑐𝑒𝑛𝑡𝑒𝑟 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 400
be=400mm

Assume initially the nutral axis is on the flange hence using b=be and flexural equation.

ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 4𝑀𝑑/(𝑏 ∗ 𝑑2 ∗ 𝐶2)=0.0219

X=pmd=17.52mm

0.8x=14.02<hf=50 ,it is rectangular as we assumed

As =ρbed=0.00315*400*278

=350.28 mm2

#Provide 2Ø14

Jimma university college of engineering and technology 128


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 2

Support reinforcement

d=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =183.40mm<278mm OK!

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 𝑏∗𝑑∗𝑑∗𝐶2

=0.008505<ρmax=0.019

As=ρbw*d=0.014*80*278=235.76mm2

Provide 2Ø12

Jimma university college of engineering and technology 129


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Span reinforcement

𝐿𝑒 6000
𝑏𝑤 + = 80 + = 1280𝑚𝑚
Effective width be≤ { 5 5 }
𝑐𝑒𝑛𝑡𝑒𝑟 𝑡𝑜 𝑐𝑒𝑛𝑡𝑒𝑟 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 400
be=400mm

Assume initially the neutral axis is on the flange hence using b=be and flexural equation.

ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 4𝑀𝑑/(𝑏 ∗ 𝑑 ∗ 𝑑 ∗ 𝐶2)=0.006824

x= ρmd=13.54mm,0.8x<hf=50mm,it is rectangular as we assumed

As=ρbed=0.006824*400*278

=215 mm2

#Provide 2Ø12

Jimma university college of engineering and technology 130


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 3

Span reinforcement

𝐿𝑒 6000
𝑏𝑤 + = 80 + = 1280𝑚𝑚
Effective width be≤ { 5 5 }
𝑐𝑒𝑛𝑡𝑒𝑟 𝑡𝑜 𝑐𝑒𝑛𝑡𝑒𝑟 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 400
be=400mm

ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 4𝑀𝑑/(𝑏 ∗ 𝑑 ∗ 𝑑 ∗ 𝐶2)

x= ρmd=8.6mm<hf=50mm,it is rectangular as we assumed

As=ρbed=163.44 mm2

#Provide 2Ø10

Jimma university college of engineering and technology 131


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 2&3
Panel 4&6

Support reinforcement

d=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =167.23mm<278mm OK!

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 𝑏∗𝑑∗𝑑∗𝐶2

=0.010<ρmax=0.019

As=ρbw*d=235.76mm2

Provide 2Ø12

Jimma university college of engineering and technology 132


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Span reinforcement

𝐿𝑒 6000
𝑏𝑤 + = 80 + = 1280𝑚𝑚
Effective width be≤ { 5 5 }
𝑐𝑒𝑛𝑡𝑒𝑟 𝑡𝑜 𝑐𝑒𝑛𝑡𝑒𝑟 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 400
be=400mm

Assume initially the neutral axis is on the flange hence using b=be and flexural equation.

ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 4𝑀𝑑/(𝑏 ∗ 𝑑 ∗ 𝑑 ∗ 𝐶2)=0.0012

x= ρmd=9.6mm,0.8x=7.68<hf=50mm,it is rectangular as we assumed

As=ρbed=173 mm2

#Provide 2Ø10

Jimma university college of engineering and technology 133


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 4
Panel 8

Support reinforcement

d=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =92mm<278mm OK!

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 𝑏∗𝑑∗𝑑∗𝐶2

=0.0028<ρmax=0.019

As=ρbw*d=311.366mm2

Provide 2Ø14

Jimma university college of engineering and technology 134


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 9

Support reinforcement

d=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =75mm<278mm OK!

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 𝑏∗𝑑∗𝑑∗𝐶2

=0.00678>ρmax=0.019

As=ρbw*d=455mm2

Provide 2Ø14

Span reinforcement

𝐿𝑒 6000
𝑏𝑤 + = 80 + = 1280𝑚𝑚
Effective width be≤ { 5 5 }
𝑐𝑒𝑛𝑡𝑒𝑟 𝑡𝑜 𝑐𝑒𝑛𝑡𝑒𝑟 𝑑𝑖𝑠𝑡𝑎𝑛𝑐𝑒 = 400
be=400mm

Assume initially the nutria axis is on the flange hence using b=be and flexural equation.

Jimma university college of engineering and technology 135


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 4𝑀𝑑/(𝑏 ∗ 𝑑 ∗ 𝑑 ∗ 𝐶2)=0.00214

x= ρmd=17.18mm,0.8x=21.48mm<hf=50mm,it is rectangular as we assumed

As=ρbed=378mm2

#Provide 3Ø12

Strip 5&6
Cantilever 1&2

Support and span reinforcement

M=16.08knm

d2=√𝑀𝑠𝑑/(0.8𝜌𝑚 ∗ 𝑏 ∗ 𝑓𝑐𝑑 ∗ (1 − 0.4𝜌𝑚)) =82.61mm<278mm OK!

4𝑀𝑑
ρ=0.5(𝐶1 − √𝐶1 ∗ 𝐶1 − 𝑏∗𝑑∗𝑑∗𝐶2

=0.0114<ρmax=0.0174 OK!

As=ρbw*d=254mm2

Provide 2Ø12

Design for shear


Strip 1
Panel 1

Vc=0.25*fctd*K1*K2*bw*d use column size 400mmx400mm

Where C/2=0.2m and d=0.278m

K1=1.0835 d+C/2=0.478m

K2=1.322

Vc=0.25х1.033 х1.0835 х1.322х1000 х278

Vc =8.238kn

Jimma university college of engineering and technology 136


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

14.77 2.35 22.97 3.65


= =
𝑉𝑑1 2.35−(0.278+0.2) 𝑉𝑑2 2.35−(0.278+0.2)

Vd1=8.25kn Vd2=19.96kn

Vd2> Vd1 ,so Vd= Vd2=19.96kn

If Vd> Vc, shear reinforcement is required

Vrd=0.25*fcd*bw*d

= 0.25*11.33*0.8*278

=62.83kn
2 2
Vrd = *62.83=41.88kn
3 3

Vc< Vd< Vrd

8.238< 19.96<62.83………………………….provided

0.5𝑑 = 0.5 ∗ 278 = 139𝑚𝑚


S≤ { }
300𝑚𝑚
Use S=130mm

#Provide Ø8 c/c 130mm

Jimma university college of engineering and technology 137


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 2

Vc=8.238kn

20.97 3.39 16.89 2.61


= =
𝑉𝑑1 2.912 𝑉𝑑2 2.132

Vd1=18.01kn Vd2=13.79kn

Vd1
Vd>[ ,Vd= Vd1=18.01kn
Vd2

Vrd=0.25*fcd*bw*d

= 0.25*11.33*0.8*278

=62.83kn
2 2
Vrd = *62.83=41.88kn
3 3

Vc< Vd< Vrd………………………….provided

0.5𝑑 = 139𝑚𝑚
S≤ { }
300𝑚𝑚
Use S=130mm

#Provide Ø8 c/c 130mm

Jimma university college of engineering and technology 138


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 3

Vc=8.238kn

12.17 2.16 15.14 0.84


= =
𝑉𝑑1 1.682 𝑉𝑑2 0.362

Vd1=9.47kn Vd2=6.52kn

Vd= Vd1=9.47kn

Vrd=0.25*fcd*bw*d

= 0.25*11.33*0.8*278

=62.83kn
2 2
Vrd = *62.83=41.88kn
3 3

Vc< Vd< Vrd………………………….provided

0.5𝑑 = 139𝑚𝑚
S≤ { }
300𝑚𝑚
Use S=130mm

#Provide Ø8 c/c 130mm

Jimma university college of engineering and technology 139


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 2&3
Panel 4&6

Vc=8.238kn

14.29 1.53 20.34 4.47


= =
𝑉𝑑1 1.052 𝑉𝑑2 3.992

Vd1=9.82kn Vd2=18.16kn

Vrd=0.25*fcd*bw*d

= 0.25*11.33*0.8*278

=62.83kn
2 2
Vrd = *62.83=41.88kn
3 3

Vc< Vd< Vrd………………………….provided

0.5𝑑 = 139𝑚𝑚
S≤ { }
300𝑚𝑚
Use S=130mm

#Provide Ø8 c/c 130mm

Jimma university college of engineering and technology 140


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 5

Vc=8.238kn

12 2.08
=
𝑉𝑑 1.602

Vd=9.24+2.93=12.17kn

Vrd=0.25*fcd*bw*d

= 0.25*11.33*0.8*278

=62.83kn
2 2
Vrd = *62.83=41.88kn
3 3

Vc< Vd< Vrd………………………….provided

0.5𝑑 = 139𝑚𝑚
S≤ { }
300𝑚𝑚
Use S=130mm

#Provide Ø8 c/c 130mm

Jimma university college of engineering and technology 141


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 4
Panel 8

Vc=8.238kn

11.32 1.87
=
𝑉𝑑 1.392

Vd=8.43kn

Vrd=0.25*fcd*bw*d

= 0.25*11.33*0.8*278

=62.83kn
2 2
Vrd = *62.83=41.88kn
3 3

Vc< Vd< Vrd………………………….provided

0.5𝑑 = 139𝑚𝑚
S≤ { }
300𝑚𝑚
Use S=130mm

#Provide Ø8 c/c 130mm

Jimma university college of engineering and technology 142


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 9

Vc=8.238kn

15.91 2.87 18.71 3.13


= =
𝑉𝑑1 2.392 𝑉𝑑2 2.652

Vd1=13.26 kn Vd2=15.85 6kn

Vd1 = 13.26 kn
Vd>[ ,
Vd2 = 15.85 kn
Vd =15.85 kn

Vrd=0.25*fcd*bw*d

= 0.25*11.33*0.8*278

=62.83kn
2 2
Vrd = *62.83=41.88kn
3 3

Vc< Vd< Vrd………………………….provided

Jimma university college of engineering and technology 143


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

0.5𝑑 = 139𝑚𝑚
S≤ { }
300𝑚𝑚
Use S=130mm

#Provide Ø8 c/c 130mm

Panel 10

Vc=8.238kn

15.29 2.65
=
𝑉𝑑 2.172

Vd=2.172kn

Vrd=0.25*fcd*bw*d

= 0.25*11.33*0.8*278

=62.83kn
2 2
Vrd = *62.83=41.88kn
3 3

Vc< Vd< Vrd………………………….provided

0.5𝑑 = 139𝑚𝑚
S≤ { }
300𝑚𝑚
Use S=130mm

#Provide Ø8 c/c 130mm

Jimma university college of engineering and technology 144


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Strip 5&6

Cantilever 1and 2

Vc=8.238kn

13.63 2.36
=
𝑉𝑑 1.882

Vd=10.86 kn

Vrd=0.25*fcd*bw*d

= 0.25*11.33*0.8*278

=62.83kn
2 2
Vrd = *62.83=41.88kn
3 3

Vc< Vd< Vrd………………………….provided

0.5𝑑 = 139𝑚𝑚
S≤ { }
300𝑚𝑚
Use S=130mm

#Provide Ø8 c/c 130mm

Jimma university college of engineering and technology 145


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Load transfer to beam

AxisD, 1-3 Assume

Beam 300x500

Partition load=(0.2*2.5*14)*1.3=9.1kn/m Colume 500x500

Self weight of beam=1.3*0.3*0.5*24=4.68kn/m

DL=13.78 kn/m

AxisC, 1-2

Partition load=(0.2*2.5*14)*1.3=9.1kn/m

Self weight of beam=1.3*0.3*0.5*24=4.68kn/m

DL=13.78 kn/m

AxisC, 3-5

Partition load=(0.2*2.5*14)*1.3=9.1kn/m

Self weight of beam=1.3*0.3*0.5*24=4.68kn/m

DL=13.78 kn/m

Jimma university college of engineering and technology 146


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Jimma university college of engineering and technology 147


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

2.5.GROUND FLOOR SLAB

Design of Slab

Cantilever depth determination

fyk=300 Mpa and C-25Mpa


0.6𝑓𝑦𝑘
d≥ (0.4 + ) 𝑙𝑒/𝛽𝑎 ,using C-25 and S-300
400

0.6𝑓𝑦𝑘
d𝑚𝑖𝑛 = (0.4 + ) 𝑙𝑒/𝛽𝑎
400

=0.85 𝑙𝑒/𝛽𝑎

Panel 1(C1)

Ly/Lx=6/2.36=2.54>2,it is one way slab

d ≥0.85 𝑙𝑒/𝛽𝑎
0.85∗180
d≥ = 12.75cm
12

Jimma university college of engineering and technology 148


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 2 (C2)

Ly/Lx=6/2.36=2.54>2,it is one way slab

d ≥0.85 𝑙𝑒/𝛽𝑎
0.85∗180
d≥ = 12.75cm
12

Panel 3 (C3)

Ly/Lx=6/2.36=2.54>2,it is one way slab

d ≥0.85 𝑙𝑒/𝛽𝑎
0.85∗180
d≥ = 12.75cm
12

therefore d=12.75cm

Jimma university college of engineering and technology 149


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

D=d+15+Ø/2

D=127.5+15+7=149.5mm

D=150mm

Load on cantilever slab

A) Self weight of RC slab

D=0.15m and γc=24kn/m3

W= γc*0.15=24*0.15=3.6kn/m3

B) Load due to partition wall γHCB=14kn/m2

H=2.85

L=2.16m*3=6.48m

Gk=WHCB= γHCB*thickness of HCB*length


=14*0.2*2.85*6.48

=51.71kn

Distribution over the panel area

A=W*L=2.16*18=38.88

Distribution load=51.71/38.88=1.33kn/m2

C) Due to plastering of partition wall(both sides)

γplas=23kn/m3
Gk= γplas*t*v ,where, t=3cm on both sides

Gk=23*0.03*2.85*6.48=12.74kn

Distribution load=12.74kn /38.88 =0.33kn/m2

D) Due to cement screed


Jimma university college of engineering and technology 150
Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

γplas=23kn/m3
γs=23kn/m3
Gk= γs*t ,where, t=4cm

Gk=23*0.04=0.92 kn/m2

E) Due to floor finish

γppc =16kn/m3
Gk= γppc*t ,where, t=2cm

Gk=23*0.02 =0.032 kn/m2

Dead load
 Self weight of RC slab=3.6kn/m3

 partition wall =1.33kn/m2

 plastering of partition wall=0.33kn/m2

 cement screed=0.92 kn/m2

 floor finish=0.032 kn/m2

Total load =6.212 kn/m2


Live load

According to EBCS 1 page 45-46


C5 access area, live load =5kn/m2
Pd=1.3DL+LL
Pd=1.3*6.212+1.6*5=16.075kn/m2
Mi = αi* Pd*Lx 2

Jimma university college of engineering and technology 151


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Panel 1(C1)

Ly/Lx=6/2.36=2.54

α
Moment coefficient from EBCS table , =0.2

M= 16.075*0.5*2.36 2 +7.90*2.36
M=63.59Knm
V=W*L+P
V=16.075*2.36+7.96=45.92kn/m

Jimma university college of engineering and technology 152


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

On Axis A ,B/n 1-4

Jimma university college of engineering and technology 153


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Self weight of beam, Assume 400mmx300mm

 Self weight of beam=1.3*0.4*0.3*25=3.9kn/m


 Weight of plaster=1.3*23*0.03*2.85=2.55kn/m
 Weight of HCB partition wall =1.3*14*0.2*2.85=10.374kn/m, where H=2.85m
Total load=3.9+10.374=14.274kn/m

On axis C b/n 1-4

Load on cantilever slab

A. Self weight of RC slab

D=0.15m and γc=24kn/m3

W= γc*0.15=24*0.15=3.6kn/m3

B)Load due to partition wall γHCB=14kn/m2

H=2.85

L=2.16m*3=6.48m

Gk=WHCB= γHCB*thickness of HCB*length


=14*0.2*2.85*6.48

=51.71kn

Jimma university college of engineering and technology 154


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Distribution over the panel area

A=W*L=2.16*18=38.88

Distribution load=51.71/38.88=1.33kn/m2

C)Due to plastering of partition wall(both sides)

γplas=23kn/m3
Gk= γplas*t*v ,where, t=3cm on both sides

Gk=23*0.03*2.85*6.48=12.74kn

Distribution load=12.74kn /38.88 =0.33kn/m2

D)Due to cement screed

γplas=23kn/m3
γs=23kn/m3
Gk= γs*t ,where, t=4cm

Gk=23*0.04=0.92 kn/m2

E)Due to floor finish

γppc =16kn/m3
Gk= γppc*t ,where, t=2cm

Gk=23*0.02 =0.032 kn/m2

4 Dead load
 Self weight of RC slab=3.6kn/m3

 partition wall =1.33kn/m2

 plastering of partition wall=0.33kn/m2

 cement screed=0.92 kn/m2

Jimma university college of engineering and technology 155


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

 floor finish=0.032 kn/m2

Total load =6.212 kn/m2


Live load
According to EBCS 1 page 45-46

C5 -access area, live load =5kn/m2


Pd=1.3DL+LL
Pd=1.3*6.212+1.6*5=16.075kn/m2
Mi = αi* Pd*Lx 2

Panel 1(C1)

Ly/Lx=6/2.36=2.54>2,it is one way slab

d ≥0.85 𝑙𝑒/𝛽𝑎
0.85∗180
d≥ = 12.75cm
12

Jimma university college of engineering and technology 156


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

CHAPTER THREE
3. DESIGN OF STAIR CASE

3.1. Design of stair case 1

steps followed in designing stair case are


.modeling typical stairs
.Load calculation (due to self weight) on landings &
steps
.Determination of live load (EBCS1-1995)
.Analysis & design(reinforcement
provision)
.Lay out and quantity calculation for concrete &
reinforcement

3.1.1. Modeling the


staircase
In modeling the staircase the part that's supported on the ground
and the
landing part was assumed to be hinged support and the one
which is
monoletically casted with the slab was assumed to be fixed.

3.1.2. Load
calculations
The self weight of the stair both on the inclined and the level portion
was
determined accordingly. Live loads on stairs was taken from
EBCS-1 1995.

Jimma university college of engineering and technology 157


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Stair case 1

Modeling
Namber of raising =number of going +1

By taking raising =15cm and thread=30cm

Namber of raising =(1.5m/0.15)=10

Namber of thread =10-1=9

Jimma university college of engineering and technology 158


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Angle of inclination

Tanө=1.5/2.82=0.53

Ө=27.92

Depth for deflection

D=Le=8250,βa=24(edge)

D=0.85Le/ βa =0.85*8250/24 =292mm

D=d+cover+ Ө/2

D=292+25+7=324mm

Take D=325mm

d=325-25-7=293mm

d=293mm

Jimma university college of engineering and technology 159


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Loading
Dead load

1) Inclined part

Steps

-Weight of concrete

=thickness*length*unit weight/cosө=0.325*1.27*25/cos27.92

=12.19kn/m

- Weight of plastering

= thickness*length*unit weight/cosө=0.02*1.27*23/cos27.92

=0.78kn/m

- Weight of steps

=0.5*rise/width*unit weight

=0.5*0.15*1.27*25=2.3812kn/m

- Marble finish

=((rise+going)*thickness*no*unit weight)/length of inclined part

=((0.15+0.3)*0.03*1.27*9*27)/2.82

= 1.50kn/m

Total dead load for inclined part=12.19+0.78+2.381+1.5

=16.851kn/m

2/landing

Concrete =depth*width*unit weight

=0.325*1.27*25=10.32kn/m

Plastering= depth*width*unit weight

=0.02*1.27*23

Jimma university college of engineering and technology 160


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=0.584kn/m

Marble= depth*width*unit weight

=0.03*1.27*23=0.8763kn/m

Total dead load for landing=11.783kn/m

Live load
Live load =qk+Q*width/area, From EBCS-1995 take qk =3kn/m, q=2kn/m2

=3+2*1.27/(1.27*8.2)

=3.24kn/m

Design load

Pd1=1.3DL+1.6LL

=1.3*16.85+1.6*3.24

=27.1kn/m

Pd2=1.3*11.783+1.6*3.24

=20.5kn/m

Analysis & design ( reinforcement provision) of the staircase


The analysis was done by ETABS2009.i.e the span & support
moments & shear values are taken from ETABS 2009 output.
and it was checked for flexure & shear resistance.Reinforcement
provision was done as per general desigm table 1-a
Using concrete class C-25 and steel S-300, Asmin=0.5*b*d/fyk
fyk=300Mpa S=b*as/Asprov.
fck=25/1.25=20Mpa Smax=2D
fcd=.85*fck/1.5=11.33Mpa Vc=0.25*fctd*K1*K2*b*d
fyd=fyk/1.15=260.87Mpa K1=1+50ρmax<2.0
ρmax=0.6Ecu/(Ecu+Eyd)*(fcd/fyd)=.019 K2=1.6-d
dmin=√Mmax*10^6/(0.8*b*fcd*ρmax*m(1-0.4*ρmax*m)) m=fyd/0.8*fcd=28.78
Km=(√M)/b/d c1=2.5/m=0.0869

Jimma university college of engineering and technology 161


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

As=KsM/d c2=0.32m2*fcd=3003Mpa

M at support B =77.06knm

M at span Ba=42.10knm

Chek depth b=1.27m,d=3.03mm,fcd=11.33Mpa

Fyd=260.87Mpa.m=28.78

4𝑀𝑑
ρ=0.5(C1-√𝐶1 ∗ 𝐶1 − (𝑏𝑑∗𝑑∗𝐶2) ) rmax=0.75rb

C1=2.5/m=2.5/28.78=0.087,b=1000mm

C2=0.32m2*fcdType equation here.=3003

4∗77.06∗10𝐸6
ρ =0.5(0.087-√0.087 ∗ 0.087 − 1000∗293∗293∗3003) )

Jimma university college of engineering and technology 162


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

=0.00358

ρ max=0.019

77.06∗10𝐸6
ρmin =√1000∗0.8∗11.33∗0.019∗28.78(1−0.4∗0.019∗28.78)

=284.6≤303 OK!

Check for shear

Vc=0.25*fctd*K1*K2*bw*d

Where

K1=1.0835

K2=1.461

Vc=0.25х1.0315 х1.0835 х1.307х1000 х293

Vc =106kn> Vmax =81.21kn, OK!

Reinforcement providing at support


Mmax=87.8knm

Km=√𝑀𝑑(𝑘𝑛𝑚)/𝑏(𝑚)/d(mm)

Km=√77.06/1.27/0.293

Km=26.4

Ks=4.03

As=Ks*Md*1000/d=4.03*77.06*1000/293=1059.9mm2

Spacing=asb/As=1270*153.89/1059.9=184.4mm

So takeØ14 bars
as∗b
= 153.89 ∗ 1270/506.01
Asmin
Smax≤ { 2 ∗ 𝑑 = 606 }
350𝑚𝑚

Jimma university college of engineering and technology 163


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

So 350>187.34mm

So, Provide Ø14 c/c180mm

Reinforcement providing at span


Mmax=47.68knm

Km=√42.18/1.27/0.293

Km=19.65

Ks=3.96

As=568.99 mm2

Spacing=asb/As=1270*113.10/568.99=252.5mm

Provide Ø12 c/c250mm

Reinforcement at the other support

Mmax=51.89knm

Km=√51.89/1.27/0.293

Km=21.8

Ks=3.96

As=644.1mm2

Provide Ø12 c/c200mm

Jimma university college of engineering and technology 164


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Detailing

Jimma university college of engineering and technology 165


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

3.2. DESIGN OF STAIR CASE 2

Modeling
Namber of raising =number of going +1

By taking raising =15cm and thread=30cm

Jimma university college of engineering and technology 166


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Namber of raising =(1.5m/0.15)=10

Namber of thread =10-1=9

Tanө=1.5/2.9=0.5172

Ө=27.35

Depth for deflection

D=Le=7.65m,βa=24(edge)

D=0.85Le/ βa =0.85*7650/24 =270mm

D=d+cover+ Ө/2

D=270+25+7=300mm

Take D=300mm

d=325-25-7=268mm

d=268mm

Jimma university college of engineering and technology 167


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Loading
Dead load

1) Inclined part

Steps

-Weight of concrete

=thickness*length*unit weight/cosө=0.3*1.28*25/cos27.35

=10.81kn/m

- Weight of plastering

= thickness*length*unit weight/cosө=0.02*1.28*23/cos27.35

=0.663kn/m

- Weight of steps

=0.5*rise/width*unit weight

=0.5*0.15*1.28*25=2.4kn/m

- Marble finish

= (rise+going)*thickness*noo*unit weight/length of inclined part

= (0.15+0.3)*0.03*1.28*9*27/2.9

= 1.45kn/m

Total dead load for inclined part=10.81+0.663+2.4+1.45

=15.523kn/m

2/landing

Concrete =depth*width*unit weight

=0.325*1.28*25=9.6kn/m

Jimma university college of engineering and technology 168


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Plastering= depth*width*unit weight

=0.03*1.28*23=0.883kn/m

Marble= depth*width*unit weight

=0.03*1.28*23=0.876kn/m

Total dead load for landing=11.36kn/m

Live load
Live load =qk+Q*widith/area, From EBCS-1995 take qk =3kn/m,q=2kn/m2

=3+2*1.27/(1.28*8.2)

=3.26kn/m

Design load

Pd1=1.3DL+1.6LL

=1.3*15.54+1.6*3.26

=225.4kn/m

Pd2=1.3*11.36+1.6*3.24

=19.98kn/m

Jimma university college of engineering and technology 169


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

M at support B =84.34knm

M at support A=27.20knm

M at span AB=49.29knm

Chek depth b=1.28m,d=268mm,fcd=11.33Mpa

Fyd=260.87Mpa.and m=28.78

4𝑀𝑑
ρ=0.5(C1-√𝐶1 ∗ 𝐶1 − )≤rmax=0.75rb
(𝑏𝑑∗𝑑∗𝐶2)

C1=2.5/m=2.5/28.78=0.087,b=1000mm

C2=0.32m2*fcd=3003

4∗84.34∗10𝐸6
ρ =0.5(0.087-√0.087 ∗ 0.087 − )
1000∗265∗265∗3003)

Jimma university college of engineering and technology 170


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

ρ =0.00475< ρ max=0.19 OK!

84.34∗10𝐸6
ρmin =√
1000∗0.8∗11.33∗0.019∗28.78(1−0.4∗0.019∗28.78)

ρmin =147.66≤268 OK!

Check for shear

Vc=0.25*fctd*K1*K2*bw*d

Where

K1=1.0835

K2=1.6-0.268=1.332>1

Vc=0.25х1.0315 х1.332 х1.0835х1000 х263

Vc =99.74kn> Vmax =84.34kn, OK!

Reinforcement providing at support A


Mmax=13.55knm

Km=√𝑀𝑑(𝑘𝑛𝑚)/𝑏(𝑚)/d(mm)

Km=√27.2/1.28/0.268

Km=17.20

Ks=is less than the minimum value, so provide minimum area

Asmin=1.67d=1.67*268=447.50mm2

Spacing=asb/As=1280*78.54/447.5=224.65mm

So use Ø10bars

So, Provide Ø10 c/c200mm

Jimma university college of engineering and technology 171


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Reinforcement providing at support B


Mmax=96.25knm

Km=√𝑀𝑑(𝑘𝑁𝑀)/𝑏(𝑚)/d(mm)

Km=√84.34/1.28/0.268

Km=30.24

Ks=4.05

As =Ks*Md**1000/d =4.05*84.34*1000/268=1275.2mm2

Spacing=asb/As=1280*153.94/1275.2=154.47mm

use Ø14bars

So, Provide Ø14c/c150mm and number of bars are 11

Reinforcement providing at span AB


Mmax=53.73nm

Km=√49.29/1.28/0.268

Km=23.1

Ks=3.97

As=730.15 mm2

Spacing=asb/As=1280*113.10/730.15=198.3mm

Provide Ø12 c/c190mm, No of bars is 8

Jimma university college of engineering and technology 172


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

Detailing

Jimma university college of engineering and technology 173


Department of civil engineering
FINAL YEAR PROJECT REPORT ON STRUCTURAL DESIGN OF G+5 BUILDING MAY-2011

CHAPTER FOUR
4. LATERAL LOAD ANALYSIS

4.1. DETERMINATION OF CENTER OF STIFFNESS


The center of stiffness was determined using D value method by considering
lateral stiffness of the frame elements along x and y direction respectively.
the sections of the grade beam and all interior beams are assumed to be
500*300mm(depth & width) and the column of footing section was assumed
to be 500*500mm and 2m depth. other column sections are different
from floor to floor since the weights they carry increases as we go down
columns on floor ground floor 500*500mm, on 1st floor 500*500mm.
On 3rd & 4th floor 500*500mm. And at roof level 500*500mm. Section of
top tie beam was assumed 400*250mm( depth to width).see the tables below
for each calculation and labeling of all beams.

4.1.1 CALCULATION OF BEAM AND COLUMN STIFFNESS


key to the tables below
b1=beam one Kb=beam stiffness
Kxc=column stiffness in the x-axis
Kyc=column stifness in the y axis
L=beam length & column length
TL=top level, G= ground level

Jimma university college of engineering and technology 174


Department of civil engineering

You might also like