Professional Documents
Culture Documents
Grown over 40
years with 24
centers spread
Established over 5
COE for locations
Rotating
Established machines 2015
EMI-EMC
specialty 2013
Established center
largest on line
short Circuit 2012
Established Lab in Savli
first Short
Circuit Lab 2007
Started 1998
with 1
center & 2
Product
testing
1983
ERDA’s Facility for IS
1180-2014
• ISI marking is mandatory for transformers up to 2.5 MVA
according to IS 1180-2014
• Testing Capacity at
• ERDA Makarpura, Vadodara - 140 nos. Transformers per
month
• ERDA (West) , Rabale – 10 nos. Transformers per month
• All tests can be carried out except for Short Circuit Test
Year Quantity
Sr. No.
1 2014-15 4
2 2015-16 125
3 2016-17 234
4 2017-18 70
Report issued 433
Under progress 11
1 10 1
2 63 1
3 200 2
Total 4
Rating of Transformers Tested for
BIS in 2015-16
Sr. No. kVA Ratings Quantity
1 10 1
2 16 1
3 25 9
4 63 7
5 100 28
6 160 4
7 200 65
8 315 1
9 400 2
10 500 1
11 630 1
12 1000 1
13 1600 1
14 2500 3
Total 125
Rating of Transformers Tested
for BIS in 2016-17
Sr. No. kVA Ratings Quantity
1 5 2
2 10 1
3 16 15
4 25 8
6 63 2
7 100 41
8 160 11
9 200 108
10 250 6
11 315 5
12 400 2
13 500 13
14 630 7
15 1000 3
16 1600 1
17 2000 2
18 2500 7
Total 234 23
Rating of Transformers Tested
for BIS in 2017-18
Sr. No. kVA Ratings Quantity Under Testing
1 16 3 0
2 25 5 0
3 40 0 1
4 63 2 0
6 100 13 3
7 160 3 0
8 200 29 5
9 250 4 0
10 500 3 0
11 630 4 0
12 1000 2 0
13 1250 0 1
14 1600 0 1
15 2500 2 0
Total 70 11
Average Time taken for
Testing
1 2015-16 20 28
2 2016-17 15 23
3 2017-18 15 23
Average Time for
Testing
Sr. Activity Duration
1 Time taken to allot test dates 2-3 days
27
ERDA’s Experience: IS 1180
• Non conformances observed in following tests:
Temperature Rise
Short Circuit
Impulse tests
Polarity and voltage ratio
Induced over-voltage test
Minimum clearances in air
Constructional requirements and fittings