You are on page 1of 3

TAKUT SEVENTH-DAY ADVENTIST CHURCH

Brgy. Takut, Sto.Nino, Samar, Philippines

Bill of Materials

ITEM DESCRIPTION Q’TY COST TOTAL


1 FENCE ( 10 m X 20 m )
1.1 Hallow block
1.2 Cement bag (50 kg)
1.3 Sand
1.4 Gravel
1.5 Reinforcement bar 10 mm
1.6 Reinforcement bar 12 mm
1.7 Tie wire
1.8 C purlins 3” X ¼ X 20 feet

2. WALLING ( 2.2 m X 7 m X 14 m )
2.1 Hallow block
2.2 Cement bag (50 kg)
2.3 Sand
2.4 Gravel
2.5 Reinforcement bar 10 mm
2.6 Reinforcement bar 12 mm
2.7 Tie wire
2.8 Window
2.9 Doors

3. FLOORING ( 7 m X 14 m )
3.1 Hallow block
3.2 Cement bag (50 kg)
3.3 Sand
3.4 Gravel
3.5 Reinforcement bar 10 mm
3.6 Tie wire
3.7 Granite (40 cm X 40 cm)

4. ROOFING ( 7 m X 14 m)
4.1 C purlins 3” X ¼ X 20 feet
4.2 Longs span colour roof
4.3 Insulation
4.4 Ceiling
4.4.1 Wood 2” X 2” X 16 feet
4.4.2 Plywood ordinary 4’ X 8’ X ¼
4.4.3 common nail 1 “
4.4.4 common nail 3”
4.2 Tick srew

5 Overhead Water tank (1 m X 1 m X 1 m)


3.1 Hallow block
3.2 Cement bag (50 kg)
3.3 Sand
3.4 Gravel
3.5 Reinforcement bar 10 mm
3.6 Tie wire
3.7 Sahara Water proofing
3.8 Reinforcement Bar 12 mm

6. Electrical
6.1

7. Toilet (4’ X 6’)

8. Kitchen

9 INTERIOR

You might also like