CONTENTS

1.0 GENERAL

1.1 The project

1.2 Water Supply Submission

2.0 WATER SUPPLY SCHEME

2.1 Phasing and Demand

3.0 SOURCE OF WATER

4.0 WATER SUPPLY SYSTEM

5.0 DISTRIBUTION PIPE NETWORK

6.0 HYDRAULIC AND NETWORK ANALYSIS

7.0 COMPUTATION OF RESIDUAL HEAD

APPENDIX

Appendix ‘A’ Calculation of Demand


Appendix ‘B’ Network Analysis and Diagram
CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN BANGUNAN ARKIB
NEGARA MALAYSIA, CAWANGAN PERAK, DIATAS PLOT 1 ZON 4B BANDAR
MERURAYA, PERAK DARUL RIDZUAN.

WATER SUPPLY

1.0 GENERAL

1.1 The project

Arkib Negara Malaysia is developing an approximately 3.06 acres of land into arkib negara
building. The location and site plan of the proposed development is as shown in Drawing
No. ZESB/008/WS/2007-01.

1.2 Water Supply Submission

This technical report on the water supply scheme outlines the conceptual design for the
proposed project and is prepared for Lembaga Air Perak (LAP) approval. Detailed
calculation and drawings for the scheme is also submitted together with this report.

2.0 WATER SUPPLY SCHEME

2.1 Phasing and Demand

Arkib Negara Malaysia had intended to carry out the proposed arkib negara building. Water
is generally consume for institution usage.

For the estimation of the daily demand, the following rates of water consumption abstracted
from MWA are adopted:-

Institution/Library ……………………………….50gpd/100m2

2.2 The daily water demand based on the foregoing rates of consumption are computed shown
in the table below.
COMPUTATION OF DEMAND

No. Description Built-up Factor Demand


Area Gpd

1 Institution/Perpustakaan 18,500m2 50gpd/100m2 9,250

3.0 SOURCE OF WATER

3.1 The source of water and tapping point shall be from the existing LAP main design by
Perunding Bersatu Consultant Engineers.

3.2 The available pressure head at the tapping points is 10.57 bar residual as given by Perunding
Bersatu Consultant Engineers as per letter from LAP reference Bil.(11) dlm. LAP4/1-514D.

4.0 WATER SUPPLY SYSTEM

4.1 The source of water supply shall be tapped from the 250mm diameter UPVC class D PN12
main pipe at main junction. Same reticulation system is used for fire hydrant and domestic.

5.0 DISTRIBUTION PIPE NETWORK

5.1 The distribution and reticulation pipe network system shall be designed to convey water for
community and fire fighting purposes.

The design criteria are summarised in the following table:-

a) Minimum pipe size : 150mm diameter

b) Minimum residual pressure


draw off : 10m

c) Peak Factor : 2.5 average flow


spacing at 100m apart
d) Fire Flow : 1 stream at 300 igpm

e) Minimum pressure at hydrant : 7m

e) Roughness Coefficient ‘C’ : 100

5.2 The distributions system shall consists of mild steel pipes, valves, and upper tenances all to LAP
requirements and approval. At road crossing, shall be of mild steel pipe lined internally with
cement mortar and externally bituminous felt will be provided.

5.3 Detailed calculations and network diagram of the water distribution network system are as per
appendix attached.

6.0 HYDRAULIC AND NETWORK ANALYSIS

6.1 This reticulation network analysis will be carried out with the aid of computer
program. The following cases will be adopted for analysis:-

Case 1 : Peak flow

Case 2 : Hydrant Flow


(average flow combined with fire flow)

The detailed output data is as shown in Appendix B


Appendix A
Appendix B
PIPENET

Node Average Peak Flow Hydrant Hydraulic Reduce Indicator


Flow (l/s) (l/s) Flow (l/s) Head (m) Level (m) 1 or 0
1 -0.49 -1.225 -23.19 95.57 82.75 1
2 0 0 0 95 83 0
3 0.49 1.225 0.49 94 83.85 0
4 0 0 22.7 93 83 0

PIPECARD

Node Pipe Length Pipe Diameter ‘C’ Value


(mm) (mm)
1–2 18 150 100
2-3 45 150 100
3-4 59 150 100
ZASYAZ Engineerings Sdn. Bhd.

-------------------------------------------------------------------------------------------------------------------
PIPE NETWORK ANALYSIS
-----------------------------------------------------------------------------------------------------------------!@

Job title : Arkib Negara Malaysia - Domestic external water supply

-------------------------------------------------------------------------------------------------------------------
Number of nodes ........ 4
Number of pipes ........ 3
Minimum flow correction ...... .01 litres/sec
-----------------------------------------------------------------------------------------------------------------E
--------------------------------------------------
Node data (ZASYAZ Engineerings Sdn. Bhd.)
--------------------------------------------------
F
NODE NO. DRAW OFF HYDRAULIC HEAD REDUCED LEVEL RESIDUAL HEAD
litres/sec m m m
-------------------------------------------------------------------------------------------------------------------
1 -1.2 95.570 C 82.8 12.820
2 0.0 95.568 83.0 12.568
3 1.2 95.564 83.8 11.714
4 0.0 95.564 83.0 12.564
-------------------------------------------------------------------------------------------------------------------E
-----------------------------------------------------------------
Pipe data (ZASYAZ Engineerings Sdn. Bhd.)
-----------------------------------------------------------------
F
NA NB DIA LGTH C R FLOW VELOCITY HD.LOSS HY.GRAD.
mm m litres/sec m/sec m m/1000m
------------------------------------------------------------------------------------------------------------------
1 2 150. 18. 100. 0.001 1. 0.07 0.002 0.089
2 3 150. 45. 100. 0.003 1. 0.07 0.004 0.090
3 4 150. 59. 100. 0.004 0. 0.00 0.000 0.000
-------------------------------------------------------------------------------------------------------------------
NUMBER OF REITERATIONS = 45

**End of program execution**


---------------------------------------------------------
NUMBER OF REI
ZASYAZ Engineerings Sdn. Bhd.

---------------------------------------------------------------------------------------------------------------------
PIPE NETWORK ANALYSIS
-------------------------------------------------------------------------------------------------------------------!@

Job title : Arkib Negara Malaysia - Hydrant external water supply

---------------------------------------------------------------------------------------------------------------------
Number of nodes ........ 4
Number of pipes ........ 3
Minimum flow correction ...... .01 litres/sec
--------------------------------------------------------------------------------------------------------------------E
------------------------------------------------------------------
Node data (ZASYAZ Engineerings Sdn. Bhd.)
------------------------------------------------------------------
F
NODE NO. DRAW OFF HYDRAULIC HEAD REDUCED LEVEL RESIDUAL HEAD
litres/sec m m m
-----------------------------------------------------------------------------------------------------------------------
1 -23.2 95.570 C 82.8 12.820
2 0.0 95.197 83.0 12.197
3 0.5 94.263 83.8 10.413
4 22.7 93.087 83.0 10.087
----------------------------------------------------------------------------------------------------------------------E
----------------------------------------------------------------
Pipe data (ZASYAZ Engineerings Sdn. Bhd.)
----------------------------------------------------------------
F
NA NB DIA LGTH C R FLOW VELOCITY HD.LOSS HY.GRAD.
mm m litres/sec m/sec m m/1000m
-----------------------------------------------------------------------------------------------------------------
1 2 150. 18. 100. 0.001 23. 1.31 0.373 20.740
2 3 150. 45. 100. 0.003 23. 1.31 0.933 20.740
3 4 150. 59. 100. 0.004 23. 1.29 1.176 19.931
-----------------------------------------------------------------------------------------------------------------
NUMBER OF REITERATIONS = 10

**End of program execution**


---------------------------------------------------------
NUMBER OF REIT