You are on page 1of 6

Business and Functional

Requirements Document
Typewriter to Computer

Business Requirement Document Version 1.0

07/07/2017

BRD ULTRALIGHT SIGN-OFF


Sign-off is a prerequisite for moving forward on the project. This BRD Document will be baselined to
ensure the delivered system meets the approved business and functional requirements as per the
Configuration Management process. Once approved and signed-off, the requirements are fixed and any
subsequent changes to the project requirements or scope must follow the Configuration Management
process for the project.

BRD Approvals Name / Signature Date Approval Received

Stakeholder:

Stakeholder:

Stakeholder:

Stakeholder:

Stakeholder:

Project / Application
Delivery Manager:
Revision History
Typewriter to Computer

Version No. Date Revised By Revision Description


0.1 05/24/2017 Akhilendra P Singh Initial Draft

0.2 05/31/2017 Akhilendra P Singh Updated Based on Comments


0.3 06/05/2017 Akhilendra P Singh Updated Based on Comments
1.0 06/27/2017 Akhilendra P Singh Approved and baselined

1 Introduction
Company X is currently using Typewriters to perform its daily operations. As a result, processing is very
slow and it takes 5 days to process 1 application. It is very hard to retrieve the processed application if
you need to refer to some old contracts.
Lots of efforts are needed to record and log the processed applications along with higher risk of losing
documents.

1.1 Current Situation and Business Need

Company X is currently using Typewriters to perform its daily operations. As a result, processing is very
slow and it takes 5 days to process 1 application. It is very hard to retrieve the processed application if
you need to refer to some old contracts.
Lots of efforts are needed to record and log the processed applications along with higher risk of losing
documents.

Business Need to automate the process of processing applications, retrieving processed applications and
solution should make it easier to record and log the processing.

1.2 Out of Scope

1. User training
2. Infrastructure changes to support the solution implementation.
3.
1.3 Systems/Departments Impacted:

o Team A
o Team B

Page 2 of 6 Document1
Typewriter to Computer

2 Challenges/Assumptions
Challenge # Challenge Description Priority
Ude.2.01 Training users to work with new system High

2.1 Assumptions

1. Training department will update their training manuals for computer usage.
2. Admin team will make necessary changes to support computer installation.

3 High-Level Requirements
High-Level High-Level Requirement Description Associated Priority
Requirement # Challenge #
Ude.3.01 Solution should improve the processing Ude.2.01 High
speed.
Ude.3.02 Solution should automate the process of Ude.2.01 High
templating
Ude.3.03 Solution should make it easier to access Ude.2.01 High
the produced letters.
Ude.3.04 Solution should make it easier to print the Ude.2.01 High
letters

4 Business and Functional Requirements


4.1 Detailed Requirements
4.1.1 Team A

Requirement # Description Priority


Ude.4.1. 01 This is a SAMPLE Requirement for Team A change Medium
Ude.4.1.02 This is a SAMPLE Requirement for Team A change High
Ude.4.1.03 This is a SAMPLE Requirement for Team A change Low

4.1.2 Team B

Requirement # Description Priority


Ude.4.2. 01 This is a SAMPLE Requirement for Team B change Medium

Page 3 of 6 Document1
Typewriter to Computer

4.1.3 Additional Miscellaneous Requirements


Manual Processing, Operations

Requirement # Description Priority

4.1.4 Form

Attach copy of existing forms here.

Page 4 of 6 Document1
Typewriter to Computer

5 Screen and Report Requirements


5.1 Screen and User Interface Requirements

Requirement # Description Priority

5.2 Report Requirements

Sample Reports- Do not treat as standard


Requirement # Description Priority

5.3 Screen and Report Data Elements

Requirement # Data Element Description Priority


Name

6 Non-Functional Requirements
Requirement # Description Priority

7 Open Items
Requirement # Question/Open Item Response

Page 5 of 6 Document1
Typewriter to Computer

8 Appendix
8.1 Supplemental Documents

Document Title Version Date Released URL


A.

Page 6 of 6 Document1

You might also like