FO R
FOR
NORTH FRONTIER RAILWAY
(CONSTRUCTION)
STRUCTURAL CONSULTANTS :-
70 R Tracked vehicle
70 T
4.570
Load CG from rear end = 4.57/2 = 2.285 m
Class A
2.7 2.7 11.4 11.4 6.8 6.8 6.8 6.8
5.124
30 30
Total load for 70R = 100 T
Reaction at Intermediate Support = (24.8762/30)x1.21x1.7x100= 170.57 T (Including IF & CF)
Minimum spacing between two successive vehicles is 20 m. [ As per IRC 6:2017 Cl No-204.1]
Part load of Successive Class A Vehicle
11.4 11.4 Class A
6.8 2.7 2.7
0.2 20
9.709
30 30
Total load for Class A = 55.4 T
Reaction at Intermediate Support = [(20.291/30)x55.4x1.21x1.7]+[(10/30)x2.7x1.21x1.7]+[(8.9/30)x2.7x1.21x1.7]+[(5.7/30)x11.4x1.21x1.7]+
[(4.5/30)x11.4x1.21x1.7]+[(0.2/30)x6.8x1.21x1.7]= 88.64 T (Including IF & CF)
Total reaction at Intermediate Support = 170.57+88.64= 259.21 T (Including IF & CF)
2.285
30 30
Total load for 70R = 70 T
Reaction at Intermediate Support = (27.715/30)x70x1.7x1.21= 133.02 T (Including IF & CF)
Part load of Successive Class A Vehicle
11.4 11.4 Class A
6.8 2.7 2.7
0.2 20
9.709
30 30
Total load for Class A = 55.4 T
Reaction at Intermediate Support = [(20.291/30)x55.4x1.21x1.7]+[(10/30)x2.7x1.21x1.7]+[(8.9/30)x2.7x1.21x1.7]+[(5.7/30)x11.4x1.21x1.7]+
[(4.5/30)x11.4x1.21x1.7]+[(0.2/30)x6.8x1.21x1.7]= 88.64 T (Including IF & CF)
Total reaction at Intermediate Support = 221.66 T (Including IF & CF)
30 30
1
Case 4: Special Vehicle
Total Load = 385 T
0.27
30 30
So critical Live Load combination for substructure design is Case 4 i.e. plying of Special vehicle
Foothpath Live Load:
2
Considering Live Load for foothpath = 0.5 T/m
Width of Footpath = 1.5 m
Live load for Foothpath=0.5x1.5x31.2x2= 46.8 T
Braking Force:
There will be no braking force for Special Vehicle [ Ref: IRC 6-2017 : Cl No 204.5.4]
3 Lane of Class A
Max reaction for 3 Lane Class A vehicles = 265.93 T [ Three lane of Clas A vehicle]
Now max braking force appiled on intermediate span =(88.64x2x0.2+88.64x0.05)/1.21 = 32.965 T acting at 2.855 m from top of bearing
Push/Pull on each end bearing due to braking force = 3.1372 T (+/-)
Horzontal force on c/l of bearing = 32.965 T acting at 10.525 m from top of pile
Max moment due to braking force, Mz =32.965x10.525 = 346.957 T-m at top of pile
1Lane of Class A + 70R Wheled Vehicle
Max reaction for 1 Lane Class A + 70 R wheeled vehicles = 259.21 T
Now braking force appiled on intermediate span =(170.57x0.2+88.64x0.05)/1.21 = 31.856 T acting at 2.855 m from top of bearing
Push/Pull on each end bearing due to braking force = 3.0320 T (+/-)
Horzontal force on c/l of bearing = 31.856 T acting at 10.525 m from top of pile
Max moment due to braking force, Mz =31.856x10.525 = 335.284 T-m at top of pile
1Lane of Class A + 70R Tracked Vehicle
Max reaction for 1 Lane Class A + 70 R tracked vehicles = 133.02 T
Now braking force appiled on intermediate span =(133.023x0.2+88.64x0.05)/1.21 = 25.650 T acting at 2.855 m from top of bearing
Push/Pull on each end bearing due to braking force = 2.4410 T (+/-)
Horzontal force on c/l of bearing = 25.650 T acting at 10.525 m from top of pile
Max moment due to braking force, Mz =25.65x10.525 = 269.966 T-m at top of pile
2
Dead Load:
Super imposed dead load:
Max Overall length of single span = 31.2 m [Ref: Drawing No RDSO/B-11774]
Considering thickness of wearing course = 0.08 m
Clear Carriageway wdith of Road = 11 m [Ref: Drawing No RDSO/B-11774]
Total width of wearing course = 11 m
Unit weight of wearing course = 2.4 T/m3
Weight of wearing course =0.08x11x2.4x31.2= 65.89 T
Total weight for Pier cap, Pier =174.2+195+25= 394.2 T 1200 mm Dia Pile
Total length of pile cap = 9m
Total width of pile cap = 9m 1 2 1 1 6 1
Depth of cap = 2m
Load Summary for Deal Load + Live Load ( Braking Effect downward)
Load Summary for Deal Load + Live Load ( Braking Effect upward)
3
Critical Load Combination for max & min pile reaction is DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A
3.6 3.6
∑ Z 2= 77.76 ∑ X 2= 77.76
Min. Compression :
Reaction at P-1 = 1788.356/9+(248.32318x-3.6)/77.76+(335.284x-3.6)/77.76
= 171.687 T
Net reaction at pile =171.687+55.9548= 227.64 T < 461 T
Max. Compression :
Reaction at P-9 = 1794.42/9+(248.32318x3.6)/77.76+(335.284x3.6)/77.76
226.399 T
Max reaction at pile =226.399+55.9548= 282.3538 T < 461 T
Summary of Pile Reactions (P1 & P9) for Deal Load + Live Load
Net Reaction
Net Reaction at P1
Load Cases at P2 (T)
(T) Min
Max
DL of Super-structure, sub-structure, pile cap + special vehicle 252.603 260.148
DL of Super-structure, sub-structure, pile cap + 3-Class A 230.715 280.774
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 231.468 270.184
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 227.642 282.354
Reaction break up for Different Loading Component at P1 pile for Critical Combination
Seismic Load:
Importance factor ,I = 1.2 [ As per IRC 6:2017 Cl No. 219.5.1.1 Table 19]
Zone factor (Zone V) , Z = 0.36 [ As per IRC 6:2017 Cl No. 219.2]
Sa/g = 2.5 [ As per IRC 6:2017 Cl No. 219.5.1]
Response reduction factor,R= 3 [ For column type structure, as per IRC 6:2017 Cl No. 219.5.5 Table 20]
4
Horizontal force during Seismic for LL =0.18x52.205 = 9.397 T
Acting 3.205+0.35+2+8= 13.555 m from bottom of pile cap
Transverse Moment at top of pile due to LL =9.397x13.555+49.665= 177.04 T-m
Vertical force during Seismic for LL =9.397x2/3 = 6.27 T(+/-)
Horizontal Braking force =31.856x0.2 = 6.3712 T
Acting at 10.525 m from bottom of pile cap
Longitudinal moment at top of pile due to braking=6.3712x10.525= 67.057 T-m
Vertical downward force for brainkg effect during SL = 0.606 T
Vertical upward force for brainkg effect during SL = 0.606 T
Load Summary for Deal Load + Reduced Live Load +Seismic Load(Transverse) [Vertical SL Downward]
DL of Super-structure, sub-structure, pile cap + 3-Class A 1381.3 65.89 53.32 2551.66 69.391 0.6274 172.5573 51.767
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 1381.3 65.89 46.00 2525.04 53.993 0.4882 171.6626 51.499
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 1381.3 65.89 52.21 2561.38 67.057 0.6064 172.4218 51.727
5
Load Summary for Deal Load + Reduced Live Load +Seismic Load(Transverse) [Vertical SL Upward]
Critical Load Combination for max & min pile reaction is DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A
Mx
1 2 3
Z 3.6
Mz Direction of Traffic
4 5 6
X
3.6 3.6
7 8 9
Horizontal Load Summary for Deal Load + Reduced Live Load +Seismic Load(Transverse)
HL for
HD for super& sub- Hb for
Load Classes HDS for SIDL (T) reduced LL
structure,cap, (T) braking(T)
(T)
DL of Super-structure, sub-structure, pile cap + 3-Class A 237.3 11.86 9.60 7.7797
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 237.3 11.86 8.28 6.0534
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 237.3 11.86 9.40 6.3712
Summary of Pile Reactions (P1 & P9) for Deal Load + Reduced Live Load+ seismic Load (Transverse)
Net
Net
Net Reaction Reaction
Load Cases Horizontal
at P1 (T) Min at P2 (T)
force (T)
Max
DL of Super-structure, sub-structure, pile cap + 3-Class A 76.338 369.017 29.610
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 77.615 366.114 29.272
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 75.894 369.214 29.432
Reaction break up for Different Loading Component at P1 pile for Critical Combination
Reaction break up for Different Loading Component at P9 pile for Critical Combination
6
SL in the direction of traffic
Live Load Component:(3-Class A)
Effective Live Load = 0.000 T
[ As per IRC 6:2017 Cl No. 219.5.2]
Horizontal force during Seismic for LL = 0.00 T
Verticle load due to SL ( LL+ Footpath LL) = 6.40 T
Live Load Component:(70R (W)+ Class A)
Effective Live Load = 0.000 T
[ As per IRC 6:2017 Cl No. 219.5.2]
Verticle load due to SL ( LL+ Footpath LL) = 6.27 T
Live Load Component:(70R (T)+ Class A)
Effective Live Load = 0.000 T
[ As per IRC 6:2017 Cl No. 219.5.2]
Verticle load due to SL ( LL+ Footpath LL) = 5.52 T
Super Imposed Dead Load Component:
SIDL from superstructure = 65.9 T
Horizontal force during Seismic for SIDL(Superstructure) =65.89x0.18= 11.86 T
Acting at 11.661 m from bottom of pile cap
Moment at top of pile due to SIDL(Superstructure) =11.661x11.86= 138.300 T-m
Vertical force during Seismic for SIDL(Superstructure) =11.86x2/3 = 7.91 T(+/-)
Load Summary for Deal Load + Reduced Live Load +Seismic Load(longitudinal) [Vertical SL Downward]
DL of Super-structure, sub-structure, pile cap + 3-Class A 1381.3 65.89 0.00 1834.11 2434.54 0.0000 172.48 51.745
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 1381.3 65.89 0.00 1834.11 2426.55 0.0000 172.35 51.705
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 1381.3 65.89 0.00 1834.11 2437.46 0.0000 171.60 51.481
Load Summary for Deal Load + Reduced Live Load +Seismic Load(longitudinal) [Vertical SL Upward]
DL of Super-structure, sub-structure, pile cap + 3-Class A 1381.3 65.89 0.00 1834.11 2434.54 0.0000 172.48 51.745
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 1381.3 65.89 0.00 1834.11 2426.553 0.0000 172.35 51.705
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 1381.3 65.89 0.00 1834.11 2437.455 0.0000 171.60 51.481
Critical Load Combination for max & min pile reaction is DL of Super-structure,sub-structure,pile cap + 3-Class A
7
Mx
1 2 3
3.6 Direction of Traffic
Z
Mz
4 5 6
X 3.6
7 8 9
Horizontal Load Summary for Deal Load + Reduced Live Load +Seismic Load(Longitudinal)
HD for super&
HL for
sub- HDS for SIDL Hb for
Load Classes reduced LL
structure,cap, (T) braking(T)
(T)
(T)
DL of Super-structure, sub-structure, pile cap + 3-Class A 237.3 11.86 0.00 0.0000
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 237.3 11.86 0.00 0.0000
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 237.3 11.86 0.00 0.0000
Summery of Pile Reactions (P1 & P9) for Deal Load + Reduced Live Load+ seismic Load (Transverse)
Net
Net
Net Reaction Reaction
Load Cases Horizontal
at P1 (T) Min at P2 (T)
force (T)
Max
DL of Super-structure, sub-structure, pile cap + 3-Class A -5.783 #REF! 27.680
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A -5.394 438.901 27.680
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A -5.791 439.298 27.680
Reaction break up for Different Loading Component at P1 pile for Critical Combination
Design Force for Pile Reinforcement under ULS [Ref: RC -6: 2017-Table B.2]
Design Force for Stressess in Pile under SLS [Ref: RC -6: 2017-Table B.3]
PSF for DL = 1
PSF for SIDL = 1.2
PSF for LL = 1
PSF for WL/SL = 1
For Rare Combination:
For, DL+LL Max reaction = 283.82 T Moment = 18.863 T-m
For, DL+SL Max reaction = 370.68 T Moment = 152.492 T-m
8
Calculation of Wind load:
Design wind speed = 50 m/sec
Max height of structure = 12 m
2
So horizontal wind pressure, Pz = 1500 N/m [Ref: IRC 6-2017: Cl No 209.2 Table 12]
Gust factor , G = 2 [Ref: IRC 6-2017: Cl No 209.3.3]
Depth of plate girder = 1.5 m
Cic distance of two girder = 2.5 m
Drag co-efficient, CD= 2.375
Total depth of obstructed area including girder, slab etc = 2.75 m
Total length of obstructed area = 31 m
2
Obstructed area =31x2.75= 85.25 m
Transverse wind force for super structure, FT = 60.74 T
2
Obstructed area for pier cap = 5m
2
Obstructed area for pier = 12 m
Transverse wind force for sub-structure, FT = 12.113 T
No live load shall be considered during wind loading as the design wind speed is greater than 36 m/sec [Ref: IRC 6-2017: Cl No 209.3.7]
Total horizontal force for transverse wind = 72.85 T << 264.88 T(horizontal force in Transeverse Seismic)
The piles are checked under the critical load case i.e. Seismic Load.
Design of Pile at BH 05
9
\ Shear capacity of pile (considering concrete section only i.e. ignoring shear capacity of links)
=0.7696x3.14x0.25x108.75^2x100 = 714.85 kN
T = 4.6399812 m
Now the embedded length of pile, Le = 33 m
[Ref: Revised Soil Report prepared by North East Engineers]
Le> 4R Hence the pile will act as long pile and fig. 2 of above referred code is valid for above pile.
Length of pile above G.L., L1= 0m
\ L1/T = 0
From fig. 2 (Determination of depth of fixity) of IS:2911 (Part I/Sec. 2) – 2010
Lf/T = 2.2 i.e Lf = 10.208 m Taking Lf = 10.3 m
10
Calculation of Horizontal Deflection of Pile: [ Ref: IS 2911-2010]
\ Shear capacity of pile (considering concrete section only i.e. ignoring shear capacity of links)
=0.74444x3.14x0.25x108.75^2x100 = 691.48 kN
11
Determination of Stresses for 1200mm dia Pile subjected to Axial Load & Moment under SLS.
Pier-P1
Material parameters (Max Compression)
Grade of concrete = M 35
Characteristic strength of concrete fck = 35 N/mm 2
Grade of steel = Fe 500
Yield stress of steel fy = 500 N/mm 2
Max. Permissible stresses in concrete in compresssion = 16.8 N/mm 2 [IRC 112]
Max. Permissible stresses for steel in flexural tension = 348 N/mm 2
Nd 0.5 D Cos α
Cos = 0.174
0 .5 D
Cos
Nd 0.5 D Cos β = 0.195
r
Sin α = 0.985
Nd R
Sin β = 0.981
d α = 1.3961 radians
R β
N
A
= 1.3750 radians
Sin 4α = -0.643
Sin 2α = 0.342
Sin 2β = 0.382
Determination of neutral axis
Thickness of thin shell of reinforcement Ast / (2 π r) tshell = 0.583 cm
Assuming Neutral axis depth Coefficient N = 0.6200
Depth of Neutral axis (N x deff) dn = 70.43 cm
Expressions for evaluating f s1 from ∑P
Total compression in concrete above neutral axis, Cc Cc = 2974 fs1
Total compression in steel above neutral axis, Cs Cs = 576 fs1
Total tension in steel below neutral axis, Ts Ts = 229 fs1
Expressions for evaluating f s2 from ∑M
Moment of compression in concrete about the centre line of section MCc = 93261 fs2
Moment of compression in steel about the centre line of section MCs = 22804 fs2
Moment of tension in steel about the centre line of section MTs = 10203 fs2
Pier-P1
Material parameters (Max Compression)
Grade of concrete = M 35
Characteristic strength of concrete fck = 35 N/mm 2
Grade of steel = Fe 500
Yield stress of steel fy = 500 N/mm 2
Max. Permissible stresses in concrete in compresssion = 16.8 N/mm 2 [IRC 112]
Max. Permissible stresses for steel in flexural tension = 348 N/mm 2
Nd 0.5 D Cos α
Cos = 0.174
0 .5 D
Cos
Nd 0.5 D Cos β = 0.195
r
Sin α = 0.985
Nd R
Sin β = 0.981
d α = 1.3961 radians
R β
N
A
= 1.3750 radians
Sin 4α = -0.643
Sin 2α = 0.342
Sin 2β = 0.382
Determination of neutral axis
Thickness of thin shell of reinforcement Ast / (2 π r) tshell = 0.583 cm
Assuming Neutral axis depth Coefficient N = 0.6200
Depth of Neutral axis (N x deff) dn = 70.43 cm
Expressions for evaluating f s1 from ∑P
Total compression in concrete above neutral axis, Cc Cc = 2974 fs1
Total compression in steel above neutral axis, Cs Cs = 576 fs1
Total tension in steel below neutral axis, Ts Ts = 229 fs1
Expressions for evaluating f s2 from ∑M
Moment of compression in concrete about the centre line of section MCc = 93261 fs2
Moment of compression in steel about the centre line of section MCs = 22804 fs2
Moment of tension in steel about the centre line of section MTs = 10203 fs2
70 R Tracked vehicle
70 T
4.570
Load CG from rear end = 4.57/2 = 2.285 m
Class A
2.7 2.7 11.4 11.4 6.8 6.8 6.8 6.8
5.124
30 30
Total load for 70R = 100 T
Reaction at Intermediate Support = (24.8762/30)x1.21x1.7x100= 170.57 T (Including IF & CF)
Minimum spacing between two successive vehicles is 20 m. [ As per IRC 6:2017 Cl No-204.1]
Part load of Successive Class A Vehicle
11.4 11.4 Class A
6.8 2.7 2.7
0.2 20
9.709
30 30
Total load for Class A = 55.4 T
Reaction at Intermediate Support = [(20.291/30)x55.4x1.21x1.7]+[(10/30)x2.7x1.21x1.7]+[(8.9/30)x2.7x1.21x1.7]+[(5.7/30)x11.4x1.21x1.7]+
[(4.5/30)x11.4x1.21x1.7]+[(0.2/30)x6.8x1.21x1.7]= 88.64 T (Including IF & CF)
Total reaction at Intermediate Support = 170.57+88.64= 259.21 T (Including IF & CF)
2.285
30 30
Total load for 70R = 70 T
Reaction at Intermediate Support = (27.715/30)x70x1.7x1.21= 133.02 T (Including IF & CF)
Part load of Successive Class A Vehicle
11.4 11.4 Class A
6.8 2.7 2.7
0.2 20
9.709
30 30
Total load for Class A = 55.4 T
Reaction at Intermediate Support = [(20.291/30)x55.4x1.21x1.7]+[(10/30)x2.7x1.21x1.7]+[(8.9/30)x2.7x1.21x1.7]+[(5.7/30)x11.4x1.21x1.7]+
[(4.5/30)x11.4x1.21x1.7]+[(0.2/30)x6.8x1.21x1.7]= 88.64 T (Including IF & CF)
Total reaction at Intermediate Support = 221.66 T (Including IF & CF)
30 30
1
Case 4: Special Vehicle
Total Load = 385 T
0.27
30 30
So critical Live Load combination for substructure design is Case 4 i.e. plying of Special vehicle
Foothpath Live Load:
2
Considering Live Load for foothpath = 0.5 T/m
Width of Footpath = 1.5 m
Live load for Foothpath=0.5x1.5x31.2x2= 46.8 T
Braking Force:
There will be no braking force for Special Vehicle [ Ref: IRC 6-2017 : Cl No 204.5.4]
3 Lane of Class A
Max reaction for 3 Lane Class A vehicles = 265.93 T [ Three lane of Clas A vehicle]
Now max braking force appiled on intermediate span =(88.64x2x0.2+88.64x0.05)/1.21 = 32.965 T acting at 2.855 m from top of bearing
Push/Pull on each end bearing due to braking force = 3.1372 T (+/-)
Horzontal force on c/l of bearing = 32.965 T acting at 10.525 m from top of pile
Max moment due to braking force, Mz =32.965x10.525 = 346.957 T-m at top of pile
1Lane of Class A + 70R Wheled Vehicle
Max reaction for 1 Lane Class A + 70 R wheeled vehicles = 259.21 T
Now braking force appiled on intermediate span =(170.57x0.2+88.64x0.05)/1.21 = 31.856 T acting at 2.855 m from top of bearing
Push/Pull on each end bearing due to braking force = 3.0320 T (+/-)
Horzontal force on c/l of bearing = 31.856 T acting at 10.525 m from top of pile
Max moment due to braking force, Mz =31.856x10.525 = 335.284 T-m at top of pile
1Lane of Class A + 70R Tracked Vehicle
Max reaction for 1 Lane Class A + 70 R tracked vehicles = 133.02 T
Now braking force appiled on intermediate span =(133.023x0.2+88.64x0.05)/1.21 = 25.650 T acting at 2.855 m from top of bearing
Push/Pull on each end bearing due to braking force = 2.4410 T (+/-)
Horzontal force on c/l of bearing = 25.650 T acting at 10.525 m from top of pile
Max moment due to braking force, Mz =25.65x10.525 = 269.966 T-m at top of pile
2
Dead Load:
Super imposed dead load:
Max Overall length of single span = 31.2 m [Ref: Drawing No RDSO/B-11774]
Considering thickness of wearing course = 0.08 m
Clear Carriageway wdith of Road = 11 m [Ref: Drawing No RDSO/B-11774]
Total width of wearing course = 11 m
Unit weight of wearing course = 2.4 T/m3
Weight of wearing course =0.08x11x2.4x31.2= 65.89 T
Total weight for Pier cap, Pier =174.2+195+25= 394.2 T 1200 mm Dia Pile
Total length of pile cap = 9m
Total width of pile cap = 9m 1 2 1 1 6 1
Depth of cap = 2m
Load Summary for Deal Load + Live Load ( Braking Effect downward)
Load Summary for Deal Load + Live Load ( Braking Effect upward)
3
Critical Load Combination for max & min pile reaction is DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A
3.6 3.6
∑ Z 2= 77.76 ∑ X 2= 77.76
Min. Compression :
Reaction at P-1 = 1788.356/9+(248.32318x-3.6)/77.76+(335.284x-3.6)/77.76
= 171.687 T
Net reaction at pile =171.687+47.4768= 219.16 T < 399 T
Max. Compression :
Reaction at P-9 = 1794.42/9+(248.32318x3.6)/77.76+(335.284x3.6)/77.76
226.399 T
Max reaction at pile =226.399+47.4768= 273.8758 T < 399 T
Summary of Pile Reactions (P1 & P9) for Deal Load + Live Load
Net Reaction
Net Reaction at P1
Load Cases at P2 (T)
(T) Min
Max
DL of Super-structure, sub-structure, pile cap + special vehicle 244.125 251.67
DL of Super-structure, sub-structure, pile cap + 3-Class A 222.237 272.296
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 222.99 261.706
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 219.164 273.876
Reaction break up for Different Loading Component at P1 pile for Critical Combination
Seismic Load:
Importance factor ,I = 1.2 [ As per IRC 6:2017 Cl No. 219.5.1.1 Table 19]
Zone factor (Zone V) , Z = 0.36 [ As per IRC 6:2017 Cl No. 219.2]
Sa/g = 2.5 [ As per IRC 6:2017 Cl No. 219.5.1]
Response reduction factor,R= 3 [ For column type structure, as per IRC 6:2017 Cl No. 219.5.5 Table 20]
4
Horizontal force during Seismic for LL =0.18x52.205 = 9.397 T
Acting 3.205+0.35+2+8= 13.555 m from bottom of pile cap
Transverse Moment at top of pile due to LL =9.397x13.555+49.665= 177.04 T-m
Vertical force during Seismic for LL =9.397x2/3 = 6.27 T(+/-)
Horizontal Braking force =31.856x0.2 = 6.3712 T
Acting at 10.525 m from bottom of pile cap
Longitudinal moment at top of pile due to braking=6.3712x10.525= 67.057 T-m
Vertical downward force for brainkg effect during SL = 0.606 T
Vertical upward force for brainkg effect during SL = 0.606 T
Load Summary for Deal Load + Reduced Live Load +Seismic Load(Transverse) [Vertical SL Downward]
DL of Super-structure, sub-structure, pile cap + 3-Class A 1381.3 65.89 53.32 2551.66 69.391 0.6274 172.5573 51.767
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 1381.3 65.89 46.00 2525.04 53.993 0.4882 171.6626 51.499
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 1381.3 65.89 52.21 2561.38 67.057 0.6064 172.4218 51.727
5
Load Summary for Deal Load + Reduced Live Load +Seismic Load(Transverse) [Vertical SL Upward]
Critical Load Combination for max & min pile reaction is DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A
Mx
1 2 3
Z 3.6
Mz Direction of Traffic
4 5 6
X
3.6 3.6
7 8 9
Horizontal Load Summary for Deal Load + Reduced Live Load +Seismic Load(Transverse)
HL for
HD for super& sub- Hb for
Load Classes HDS for SIDL (T) reduced LL
structure,cap, (T) braking(T)
(T)
DL of Super-structure, sub-structure, pile cap + 3-Class A 237.3 11.86 9.60 7.7797
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 237.3 11.86 8.28 6.0534
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 237.3 11.86 9.40 6.3712
Summary of Pile Reactions (P1 & P9) for Deal Load + Reduced Live Load+ seismic Load (Transverse)
Net
Net
Net Reaction Reaction
Load Cases Horizontal
at P1 (T) Min at P2 (T)
force (T)
Max
DL of Super-structure, sub-structure, pile cap + 3-Class A 67.86 360.539 29.610
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 69.137 357.636 29.272
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 67.416 360.736 29.432
Reaction break up for Different Loading Component at P1 pile for Critical Combination
Reaction break up for Different Loading Component at P9 pile for Critical Combination
6
SL in the direction of traffic
Live Load Component:(3-Class A)
Effective Live Load = 0.000 T
[ As per IRC 6:2017 Cl No. 219.5.2]
Horizontal force during Seismic for LL = 0.00 T
Verticle load due to SL ( LL+ Footpath LL) = 6.40 T
Live Load Component:(70R (W)+ Class A)
Effective Live Load = 0.000 T
[ As per IRC 6:2017 Cl No. 219.5.2]
Verticle load due to SL ( LL+ Footpath LL) = 6.27 T
Live Load Component:(70R (T)+ Class A)
Effective Live Load = 0.000 T
[ As per IRC 6:2017 Cl No. 219.5.2]
Verticle load due to SL ( LL+ Footpath LL) = 5.52 T
Super Imposed Dead Load Component:
SIDL from superstructure = 65.9 T
Horizontal force during Seismic for SIDL(Superstructure) =65.89x0.18= 11.86 T
Acting at 11.661 m from bottom of pile cap
Moment at top of pile due to SIDL(Superstructure) =11.661x11.86= 138.300 T-m
Vertical force during Seismic for SIDL(Superstructure) =11.86x2/3 = 7.91 T(+/-)
Load Summary for Deal Load + Reduced Live Load +Seismic Load(longitudinal) [Vertical SL Downward]
DL of Super-structure, sub-structure, pile cap + 3-Class A 1381.3 65.89 0.00 1834.11 2434.54 0.0000 172.48 51.745
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 1381.3 65.89 0.00 1834.11 2426.55 0.0000 172.35 51.705
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 1381.3 65.89 0.00 1834.11 2437.46 0.0000 171.60 51.481
Load Summary for Deal Load + Reduced Live Load +Seismic Load(longitudinal) [Vertical SL Upward]
DL of Super-structure, sub-structure, pile cap + 3-Class A 1381.3 65.89 0.00 1834.11 2434.539 0.0000 172.48 51.745
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 1381.3 65.89 0.00 1834.11 2426.553 0.0000 172.35 51.705
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 1381.3 65.89 0.00 1834.11 2437.455 0.0000 171.60 51.481
Critical Load Combination for max & min pile reaction is DL of Super-structure,sub-structure,pile cap + 3-Class A
7
Mx
1 2 3
3.6 Direction of Traffic
Z
Mz
4 5 6
X 3.6
7 8 9
Horizontal Load Summary for Deal Load + Reduced Live Load +Seismic Load(Longitudinal)
HD for super&
HL for
sub- HDS for SIDL Hb for
Load Classes reduced LL
structure,cap, (T) braking(T)
(T)
(T)
DL of Super-structure, sub-structure, pile cap + 3-Class A 237.3 11.86 0.00 0.0000
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 237.3 11.86 0.00 0.0000
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 237.3 11.86 0.00 0.0000
Summery of Pile Reactions (P1 & P9) for Deal Load + Reduced Live Load+ seismic Load (Transverse)
Net
Net
Net Reaction Reaction
Load Cases Horizontal
at P1 (T) Min at P2 (T)
force (T)
Max
DL of Super-structure, sub-structure, pile cap + 3-Class A -14.261 430.812 27.680
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A -13.872 430.423 27.680
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A -14.269 430.82 27.680
Reaction break up for Different Loading Component at P1 pile for Critical Combination
Reaction break up for Different Loading Component at P9 pile for Critical Combination
Design Force for Pile Reinforcement under ULS [Ref: RC -6: 2017-Table B.2]
Design Force for Stressess in Pile under SLS [Ref: RC -6: 2017-Table B.3]
PSF for DL = 1
PSF for SIDL = 1.2
PSF for LL = 1
PSF for WL/SL = 1
For Rare Combination:
For, DL+LL Max reaction = 275.34 T Moment = 18.863 T-m
For, DL+SL Max reaction = 362.20 T Moment = 152.492 T-m
8
Calculation of Wind load:
Design wind speed = 50 m/sec
Max height of structure = 12 m
2
So horizontal wind pressure, Pz = 1500 N/m [Ref: IRC 6-2017: Cl No 209.2 Table 12]
Gust factor , G = 2 [Ref: IRC 6-2017: Cl No 209.3.3]
Depth of plate girder = 1.5 m
Cic distance of two girder = 2.5 m
Drag co-efficient, CD= 2.375
Total depth of obstructed area including girder, slab etc = 2.75 m
Total length of obstructed area = 31 m
2
Obstructed area =31x2.75= 85.25 m
Transverse wind force for super structure, FT = 60.74 T
2
Obstructed area for pier cap = 5m
2
Obstructed area for pier = 12 m
Transverse wind force for sub-structure, FT = 12.113 T
No live load shall be considered during wind loading as the design wind speed is greater than 36 m/sec [Ref: IRC 6-2017: Cl No 209.3.7]
Total horizontal force for transverse wind = 72.85 T << 264.88 T(horizontal force in Transeverse Seismic)
The piles are checked under the critical load case i.e. Seismic Load.
Design of Pile at BH 03
9
\ Shear capacity of pile (considering concrete section only i.e. ignoring shear capacity of links)
=0.76886x3.14x0.25x108.75^2x100 = 714.16 kN
T = 4.6399812 m
Now the embedded length of pile, Le = 28 m
[Ref: Revised Soil Report prepared by North East Engineers]
Le> 4R Hence the pile will act as long pile and fig. 2 of above referred code is valid for above pile.
Length of pile above G.L., L1= 0m
\ L1/T = 0
From fig. 2 (Determination of depth of fixity) of IS:2911 (Part I/Sec. 2) – 2010
Lf/T = 2.2 i.e Lf = 10.208 m Taking Lf = 10.3 m
10
Calculation of Horizontal Deflection of Pile: [ Ref: IS 2911-2010]
\ Shear capacity of pile (considering concrete section only i.e. ignoring shear capacity of links)
=0.74444x3.14x0.25x108.75^2x100 = 691.48 kN
11
Determination of Stresses for 1200mm dia Pile subjected to Axial Load & Moment under SLS.
Pier-P 2 & P3
Material parameters (Max Compression)
Grade of concrete = M 35
Characteristic strength of concrete fck = 35 N/mm 2
Grade of steel = Fe 500
Yield stress of steel fy = 500 N/mm 2
Max. Permissible stresses in concrete in compresssion = 16.8 N/mm 2 [IRC 112]
Max. Permissible stresses for steel in flexural tension = 348 N/mm 2
Nd 0.5 D Cos α
Cos = 0.174
0 .5 D
Cos
Nd 0.5 D Cos β = 0.195
r
Sin α = 0.985
Nd R
Sin β = 0.981
d α = 1.3961 radians
R β
N
A
= 1.3750 radians
Sin 4α = -0.643
Sin 2α = 0.342
Sin 2β = 0.382
Determination of neutral axis
Thickness of thin shell of reinforcement Ast / (2 π r) tshell = 0.583 cm
Assuming Neutral axis depth Coefficient N = 0.6200
Depth of Neutral axis (N x deff) dn = 70.43 cm
Expressions for evaluating f s1 from ∑P
Total compression in concrete above neutral axis, Cc Cc = 2974 fs1
Total compression in steel above neutral axis, Cs Cs = 576 fs1
Total tension in steel below neutral axis, Ts Ts = 229 fs1
Expressions for evaluating f s2 from ∑M
Moment of compression in concrete about the centre line of section MCc = 93261 fs2
Moment of compression in steel about the centre line of section MCs = 22804 fs2
Moment of tension in steel about the centre line of section MTs = 10203 fs2
Pier-P 2 & P3
Material parameters (Max Compression)
Grade of concrete = M 35
Characteristic strength of concrete fck = 35 N/mm 2
Grade of steel = Fe 500
Yield stress of steel fy = 500 N/mm 2
Max. Permissible stresses in concrete in compresssion = 16.8 N/mm 2 [IRC 112]
Max. Permissible stresses for steel in flexural tension = 348 N/mm 2
Nd 0.5 D Cos α
Cos = 0.174
0 .5 D
Cos
Nd 0.5 D Cos β = 0.195
r
Sin α = 0.985
Nd R
Sin β = 0.981
d α = 1.3961 radians
R β
N
A
= 1.3750 radians
Sin 4α = -0.643
Sin 2α = 0.342
Sin 2β = 0.382
Determination of neutral axis
Thickness of thin shell of reinforcement Ast / (2 π r) tshell = 0.583 cm
Assuming Neutral axis depth Coefficient N = 0.6200
Depth of Neutral axis (N x deff) dn = 70.43 cm
Expressions for evaluating f s1 from ∑P
Total compression in concrete above neutral axis, Cc Cc = 2974 fs1
Total compression in steel above neutral axis, Cs Cs = 576 fs1
Total tension in steel below neutral axis, Ts Ts = 229 fs1
Expressions for evaluating f s2 from ∑M
Moment of compression in concrete about the centre line of section MCc = 93261 fs2
Moment of compression in steel about the centre line of section MCs = 22804 fs2
Moment of tension in steel about the centre line of section MTs = 10203 fs2
70 R Tracked vehicle
70 T
4.570
Load CG from rear end = 4.57/2 = 2.285 m
Class A
2.7 2.7 11.4 11.4 6.8 6.8 6.8 6.8
5.124
30 30
Total load for 70R = 100 T
Reaction at Intermediate Support = (24.8762/30)x1.21x1.7x100= 170.57 T (Including IF & CF)
Minimum spacing between two successive vehicles is 20 m. [ As per IRC 6:2017 Cl No-204.1]
Part load of Successive Class A Vehicle
11.4 11.4 Class A
6.8 2.7 2.7
0.2 20
9.709
30 30
Total load for Class A = 55.4 T
Reaction at Intermediate Support = [(20.291/30)x55.4x1.21x1.7]+[(10/30)x2.7x1.21x1.7]+[(8.9/30)x2.7x1.21x1.7]+[(5.7/30)x11.4x1.21x1.7]+
[(4.5/30)x11.4x1.21x1.7]+[(0.2/30)x6.8x1.21x1.7]= 88.64 T (Including IF & CF)
Total reaction at Intermediate Support = 170.57+88.64= 259.21 T (Including IF & CF)
2.285
30 30
Total load for 70R = 70 T
Reaction at Intermediate Support = (27.715/30)x70x1.7x1.21= 133.02 T (Including IF & CF)
Part load of Successive Class A Vehicle
11.4 11.4 Class A
6.8 2.7 2.7
0.2 20
9.709
30 30
Total load for Class A = 55.4 T
Reaction at Intermediate Support = [(20.291/30)x55.4x1.21x1.7]+[(10/30)x2.7x1.21x1.7]+[(8.9/30)x2.7x1.21x1.7]+[(5.7/30)x11.4x1.21x1.7]+
[(4.5/30)x11.4x1.21x1.7]+[(0.2/30)x6.8x1.21x1.7]= 88.64 T (Including IF & CF)
Total reaction at Intermediate Support = 221.66 T (Including IF & CF)
30 30
1
Case 4: Special Vehicle
Total Load = 385 T
0.27
30 30
So critical Live Load combination for substructure design is Case 4 i.e. plying of Special vehicle
Foothpath Live Load:
2
Considering Live Load for foothpath = 0.5 T/m
Width of Footpath = 1.5 m
Live load for Foothpath=0.5x1.5x31.2x2= 46.8 T
Braking Force:
There will be no braking force for Special Vehicle [ Ref: IRC 6-2017 : Cl No 204.5.4]
3 Lane of Class A
Max reaction for 3 Lane Class A vehicles = 265.93 T [ Three lane of Clas A vehicle]
Now max braking force appiled on intermediate span =(88.64x2x0.2+88.64x0.05)/1.21 = 32.965 T acting at 2.855 m from top of bearing
Push/Pull on each end bearing due to braking force = 3.1372 T (+/-)
Horzontal force on c/l of bearing = 32.965 T acting at 10.525 m from top of pile
Max moment due to braking force, Mz =32.965x10.525 = 346.957 T-m at top of pile
1Lane of Class A + 70R Wheled Vehicle
Max reaction for 1 Lane Class A + 70 R wheeled vehicles = 259.21 T
Now braking force appiled on intermediate span =(170.57x0.2+88.64x0.05)/1.21 = 31.856 T acting at 2.855 m from top of bearing
Push/Pull on each end bearing due to braking force = 3.0320 T (+/-)
Horzontal force on c/l of bearing = 31.856 T acting at 10.525 m from top of pile
Max moment due to braking force, Mz =31.856x10.525 = 335.284 T-m at top of pile
1Lane of Class A + 70R Tracked Vehicle
Max reaction for 1 Lane Class A + 70 R tracked vehicles = 133.02 T
Now braking force appiled on intermediate span =(133.023x0.2+88.64x0.05)/1.21 = 25.650 T acting at 2.855 m from top of bearing
Push/Pull on each end bearing due to braking force = 2.4410 T (+/-)
Horzontal force on c/l of bearing = 25.650 T acting at 10.525 m from top of pile
Max moment due to braking force, Mz =25.65x10.525 = 269.966 T-m at top of pile
2
Dead Load:
Super imposed dead load:
Max Overall length of single span = 31.2 m [Ref: Drawing No RDSO/B-11774]
Considering thickness of wearing course = 0.08 m
Clear Carriageway wdith of Road = 11 m [Ref: Drawing No RDSO/B-11774]
Total width of wearing course = 11 m
Unit weight of wearing course = 2.4 T/m3
Weight of wearing course =0.08x11x2.4x31.2= 65.89 T
Total weight for Pier cap, Pier =174.2+195+25= 394.2 T 1200 mm Dia Pile
Total length of pile cap = 9m
Total width of pile cap = 9m 1 2 1 1 6 1
Depth of cap = 2m
Load Summary for Deal Load + Live Load ( Braking Effect downward)
Load Summary for Deal Load + Live Load ( Braking Effect upward)
3
Critical Load Combination for max & min pile reaction is DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A
3.6 3.6
∑ Z 2= 77.76 ∑ X 2= 77.76
Min. Compression :
Reaction at P-1 = 1788.356/9+(248.32318x-3.6)/77.76+(335.284x-3.6)/77.76
= 171.687 T
Net reaction at pile =171.687+52.5636= 224.25 T < 433 T
Max. Compression :
Reaction at P-9 = 1794.42/9+(248.32318x3.6)/77.76+(335.284x3.6)/77.76
226.399 T
Max reaction at pile =226.399+52.5636= 278.9626 T < 433 T
Summary of Pile Reactions (P1 & P9) for Deal Load + Live Load
Net Reaction
Net Reaction at P1
Load Cases at P2 (T)
(T) Min
Max
DL of Super-structure, sub-structure, pile cap + special vehicle 249.212 256.757
DL of Super-structure, sub-structure, pile cap + 3-Class A 227.324 277.383
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 228.077 266.793
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 224.251 278.962
Reaction break up for Different Loading Component at P1 pile for Critical Combination
Seismic Load:
Importance factor ,I = 1.2 [ As per IRC 6:2017 Cl No. 219.5.1.1 Table 19]
Zone factor (Zone V) , Z = 0.36 [ As per IRC 6:2017 Cl No. 219.2]
Sa/g = 2.5 [ As per IRC 6:2017 Cl No. 219.5.1]
Response reduction factor,R= 3 [ For column type structure, as per IRC 6:2017 Cl No. 219.5.5 Table 20]
4
Horizontal force during Seismic for LL =0.18x52.205 = 9.397 T
Acting 3.205+0.35+2+8= 13.555 m from bottom of pile cap
Transverse Moment at top of pile due to LL =9.397x13.555+49.665= 177.04 T-m
Vertical force during Seismic for LL =9.397x2/3 = 6.27 T(+/-)
Horizontal Braking force =31.856x0.2 = 6.3712 T
Acting at 10.525 m from bottom of pile cap
Longitudinal moment at top of pile due to braking=6.3712x10.525= 67.057 T-m
Vertical downward force for brainkg effect during SL = 0.606 T
Vertical upward force for brainkg effect during SL = 0.606 T
Load Summary for Deal Load + Reduced Live Load +Seismic Load(Transverse) [Vertical SL Downward]
DL of Super-structure, sub-structure, pile cap + 3-Class A 1381.3 65.89 53.32 2551.66 69.391 0.6274 172.5573 51.767
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 1381.3 65.89 46.00 2525.04 53.993 0.4882 171.6626 51.499
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 1381.3 65.89 52.21 2561.38 67.057 0.6064 172.4218 51.727
5
Load Summary for Deal Load + Reduced Live Load +Seismic Load(Transverse) [Vertical SL Upward]
Critical Load Combination for max & min pile reaction is DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A
Mx
1 2 3
Z 3.6
Mz Direction of Traffic
4 5 6
X
3.6 3.6
7 8 9
Horizontal Load Summary for Deal Load + Reduced Live Load +Seismic Load(Transverse)
HL for
HD for super& sub- Hb for
Load Classes HDS for SIDL (T) reduced LL
structure,cap, (T) braking(T)
(T)
DL of Super-structure, sub-structure, pile cap + 3-Class A 237.3 11.86 9.60 7.7797
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 237.3 11.86 8.28 6.0534
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 237.3 11.86 9.40 6.3712
Summary of Pile Reactions (P1 & P9) for Deal Load + Reduced Live Load+ seismic Load (Transverse)
Net
Net
Net Reaction Reaction
Load Cases Horizontal
at P1 (T) Min at P2 (T)
force (T)
Max
DL of Super-structure, sub-structure, pile cap + 3-Class A 72.947 365.626 29.610
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 74.224 362.723 29.272
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 72.503 365.823 29.432
Reaction break up for Different Loading Component at P1 pile for Critical Combination
Reaction break up for Different Loading Component at P9 pile for Critical Combination
6
SL in the direction of traffic
Live Load Component:(3-Class A)
Effective Live Load = 0.000 T
[ As per IRC 6:2017 Cl No. 219.5.2]
Horizontal force during Seismic for LL = 0.00 T
Verticle load due to SL ( LL+ Footpath LL) = 6.40 T
Live Load Component:(70R (W)+ Class A)
Effective Live Load = 0.000 T
[ As per IRC 6:2017 Cl No. 219.5.2]
Verticle load due to SL ( LL+ Footpath LL) = 6.27 T
Live Load Component:(70R (T)+ Class A)
Effective Live Load = 0.000 T
[ As per IRC 6:2017 Cl No. 219.5.2]
Verticle load due to SL ( LL+ Footpath LL) = 5.52 T
Super Imposed Dead Load Component:
SIDL from superstructure = 65.9 T
Horizontal force during Seismic for SIDL(Superstructure) =65.89x0.18= 11.86 T
Acting at 11.661 m from bottom of pile cap
Moment at top of pile due to SIDL(Superstructure) =11.661x11.86= 138.300 T-m
Vertical force during Seismic for SIDL(Superstructure) =11.86x2/3 = 7.91 T(+/-)
Load Summary for Deal Load + Reduced Live Load +Seismic Load(longitudinal) [Vertical SL Downward]
DL of Super-structure, sub-structure, pile cap + 3-Class A 1381.3 65.89 0.00 1834.11 2434.54 0.0000 172.48 51.745
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 1381.3 65.89 0.00 1834.11 2426.55 0.0000 172.35 51.705
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 1381.3 65.89 0.00 1834.11 2437.46 0.0000 171.60 51.481
Load Summary for Deal Load + Reduced Live Load +Seismic Load(longitudinal) [Vertical SL Upward]
DL of Super-structure, sub-structure, pile cap + 3-Class A 1381.3 65.89 0.00 1834.11 2434.539 0.0000 172.48 51.745
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 1381.3 65.89 0.00 1834.11 2426.553 0.0000 172.35 51.705
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 1381.3 65.89 0.00 1834.11 2437.455 0.0000 171.60 51.481
Critical Load Combination for max & min pile reaction is DL of Super-structure,sub-structure,pile cap + 3-Class A
7
Mx
1 2 3
3.6 Direction of Traffic
Z
Mz
4 5 6
X 3.6
7 8 9
Horizontal Load Summary for Deal Load + Reduced Live Load +Seismic Load(Longitudinal)
HD for super&
HL for
sub- HDS for SIDL Hb for
Load Classes reduced LL
structure,cap, (T) braking(T)
(T)
(T)
DL of Super-structure, sub-structure, pile cap + 3-Class A 237.3 11.86 0.00 0.0000
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A 237.3 11.86 0.00 0.0000
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A 237.3 11.86 0.00 0.0000
Summery of Pile Reactions (P1 & P9) for Deal Load + Reduced Live Load+ seismic Load (Transverse)
Net
Net
Net Reaction Reaction
Load Cases Horizontal
at P1 (T) Min at P2 (T)
force (T)
Max
DL of Super-structure, sub-structure, pile cap + 3-Class A -9.174 435.899 27.680
DL of Super-structure,sub-structure,pile cap + 70R(T)+Class A -8.785 435.51 27.680
DL of Super-structure,sub-structure,pile cap + 70R(W)+Class A -9.182 435.907 27.680
Reaction break up for Different Loading Component at P1 pile for Critical Combination
Reaction break up for Different Loading Component at P9 pile for Critical Combination
Design Force for Pile Reinforcement under ULS [Ref: RC -6: 2017-Table B.2]
Design Force for Stressess in Pile under SLS [Ref: RC -6: 2017-Table B.3]
PSF for DL = 1
PSF for SIDL = 1.2
PSF for LL = 1
PSF for WL/SL = 1
For Rare Combination:
For, DL+LL Max reaction = 280.43 T Moment = 18.863 T-m
For, DL+SL Max reaction = 367.29 T Moment = 152.492 T-m
8
Calculation of Wind load:
Design wind speed = 50 m/sec
Max height of structure = 12 m
2
So horizontal wind pressure, Pz = 1500 N/m [Ref: IRC 6-2017: Cl No 209.2 Table 12]
Gust factor , G = 2 [Ref: IRC 6-2017: Cl No 209.3.3]
Depth of plate girder = 1.5 m
Cic distance of two girder = 2.5 m
Drag co-efficient, CD= 2.375
Total depth of obstructed area including girder, slab etc = 2.75 m
Total length of obstructed area = 31 m
2
Obstructed area =31x2.75= 85.25 m
Transverse wind force for super structure, FT = 60.74 T
2
Obstructed area for pier cap = 5m
2
Obstructed area for pier = 12 m
Transverse wind force for sub-structure, FT = 12.113 T
No live load shall be considered during wind loading as the design wind speed is greater than 36 m/sec [Ref: IRC 6-2017: Cl No 209.3.7]
Total horizontal force for transverse wind = 72.85 T << 264.88 T(horizontal force in Transeverse Seismic)
The piles are checked under the critical load case i.e. Seismic Load.
Design of Pile at BH 07
9
\ Shear capacity of pile (considering concrete section only i.e. ignoring shear capacity of links)
=0.76886x3.14x0.25x108.75^2x100 = 714.16 kN
T = 4.6399812 m
Now the embedded length of pile, Le = 31 m
[Ref: Revised Soil Report prepared by North East Engineers]
Le> 4R Hence the pile will act as long pile and fig. 2 of above referred code is valid for above pile.
Length of pile above G.L., L1= 0m
\ L1/T = 0
From fig. 2 (Determination of depth of fixity) of IS:2911 (Part I/Sec. 2) – 2010
Lf/T = 2.2 i.e Lf = 10.208 m Taking Lf = 10.3 m
10
Calculation of Horizontal Deflection of Pile: [ Ref: IS 2911-2010]
\ Shear capacity of pile (considering concrete section only i.e. ignoring shear capacity of links)
=0.74444x3.14x0.25x108.75^2x100 = 691.48 kN
11
Determination of Stresses for 1200mm dia Pile subjected to Axial Load & Moment under SLS.
Pier- P 8 & P 9
Material parameters ( Max Compression )
Grade of concrete = M 35
Characteristic strength of concrete fck = 35 N/mm 2
Grade of steel = Fe 500
Yield stress of steel fy = 500 N/mm 2
Max. Permissible stresses in concrete in compresssion = 16.8 N/mm 2 [IRC 112]
Max. Permissible stresses for steel in flexural tension = 348 N/mm 2
Nd 0.5 D Cos α
Cos = 0.174
0 .5 D
Cos
Nd 0.5 D Cos β = 0.195
r
Sin α = 0.985
Nd R
Sin β = 0.981
d α = 1.3961 radians
R β
N
A
= 1.3750 radians
Sin 4α = -0.643
Sin 2α = 0.342
Sin 2β = 0.382
Determination of neutral axis
Thickness of thin shell of reinforcement Ast / (2 π r) tshell = 0.583 cm
Assuming Neutral axis depth Coefficient N = 0.6200
Depth of Neutral axis (N x deff) dn = 70.43 cm
Expressions for evaluating f s1 from ∑P
Total compression in concrete above neutral axis, Cc Cc = 2974 fs1
Total compression in steel above neutral axis, Cs Cs = 576 fs1
Total tension in steel below neutral axis, Ts Ts = 229 fs1
Expressions for evaluating f s2 from ∑M
Moment of compression in concrete about the centre line of section MCc = 93261 fs2
Moment of compression in steel about the centre line of section MCs = 22804 fs2
Moment of tension in steel about the centre line of section MTs = 10203 fs2
Pier- P 8 & P 9
Material parameters ( Min Compression )
Grade of concrete = M 35
Characteristic strength of concrete fck = 35 N/mm 2
Grade of steel = Fe 500
Yield stress of steel fy = 500 N/mm 2
Max. Permissible stresses in concrete in compresssion = 16.8 N/mm 2 [IRC 112]
Max. Permissible stresses for steel in flexural tension = 348 N/mm 2
Nd 0.5 D Cos α
Cos = -0.243
0 .5 D
Cos
Nd 0.5 D Cos β = -0.272
r
Sin α = 0.970
Nd R
Sin β = 0.962
d α = 1.8160 radians
R β
N
A
= 1.8460 radians
Sin 4α = 0.831
Sin 2α = -0.471
Sin 2β = -0.523
Determination of neutral axis
Thickness of thin shell of reinforcement Ast / (2 π r) tshell = 0.583 cm
Assuming Neutral axis depth Coefficient N = 0.4000
Depth of Neutral axis (N x deff) dn = 45.44 cm
Expressions for evaluating f s1 from ∑P
Total compression in concrete above neutral axis, Cc Cc = 1635 fs1
Total compression in steel above neutral axis, Cs Cs = 411 fs1
Total tension in steel below neutral axis, Ts Ts = 730 fs1
Expressions for evaluating f s2 from ∑M
Moment of compression in concrete about the centre line of section MCc = 67206 fs2
Moment of compression in steel about the centre line of section MCs = 18672 fs2
Moment of tension in steel about the centre line of section MTs = 28146 fs2
Table 4 of Annexure C of IS2911 ( referred for preloaded caly) but the table given as general
clay property for Unconfined Compressive Strength and corresponding Modulus of Subgrade Recation
Note below Table 4 -NOTE —" For qu less than 25, k1 may be taken as zero,
which implies that there is no lateral resistance."
So in this case the cohesion is very low which can not be regarded as Preloaded Clay.
It may be noted that this soil in our case is C-Φ soil
It is also to be noted that long pile has very high resistance against yielding of soil due to infinite passive resistance.
[Reference :Pile Design and Construction Practice-M.J.Tomlinson,]
"Ultimate resistance of long piles
The passive resistance provided by the soil to the yielding of an infinitely long pile is infinite. Thus the ultimate lateral load
which can be carried by the pile is determined solely from the ultimate moment of resistance Mu of the pile shaft."