1/. Dependable Capacity is based on Daily Operating Highlights (DOH) every Fridays.
2/. System Load is derived from the actual peak of the previous week except for March 5, 2010 which is derived from DOH.
3/. Limitations were due to deration of hydro plants (irrigation requirements only) & N-1 contingency for San Jose transformers.
Remarks:
1. Masinloc U1 on emergency shutdown Feb. 28, 2010 (1529H) due to boiler tube leak. OJ!..Mar. 5, 2010 (0810H).
2. Malampaya SPEX shutdown, Feb. 10 - Mar. 11, 2010.
3. Sta Rita M10 - On maintenance outage, Feb. 6 - Mar. 7, 2010.
4. BCF U2 - On outage due to boiler tube leak, Mar. 3, 2010 (0504H), ETI Mar. 12,2010.
5. IIijan GT1-1 - On maintenance outage, Feb. 2 - Mar. 8, 2010.
6. lIijan GT1-2 and ST1- On maintenance outage, Feb. 5 - Mar. 11,2010.
7. lIijan Block B - On maintenance outage, Febr. 27 - Mar. 7, 2010.
8. Sta Rita M30 - On maintenance outage, Jan. 30 - Feb. 26, 2010. ETI Mar. 6, 2010.
9. Makban U7 - On maintenance outage, Jan 30 - extended to Mar. 13, 2010.
~ERYE
•
•
• •
Oil 363 353 353 373 373 363 363
E -10
•
.---- .----
BEGW' ATING
~ •
. .---- •
.----
Geothermal 93 93 93 93 93 93 93 50Mar 6-Mar 8-Mar 10-Mar
7-Mar 9-Mar 11·Mar
Jjydro .ss ~ 85 85 85 85 85
-
85
G ·110
A .210
System Load (MW) 1451 1421 1393 1441 1459 1453 1456
-- w
Gross Reserve/Deficlenc.}' ~W) -700 -680 -652 -680 -698 -702 -705 ·310
A
Limitations (HydroITL) 0 0 0 ..Q 0 ..Q 0 -410
T
~red Regulati~ Reserve ...!! f--- 40 39 40 41 41 41 ·510
T
Reguired Conti!lg~ Reserve 105 I--- 105 105 105 105 105 105 5 -610 -652
ReQuired DisDatchable Reserve 105 105 105 105 105 105 105 ·710
·700 ~-680 -
--680 -698 ·702 ·705
Note: Dependable Capacity are based on the submitted weekly nominations of NPC owned and IPP-NPC owned plants
Remarks:
Hydro Plants: On forced outage Agus 1 Unit 1 (since Feb. 16, 2010); Agus 7 Unit 2 PMS (March 5-20, 2010); Agus Unit 4 PMS (March 2-31, 2010)
Thermal Plants: WMPC - Unit 3 on Rehab; SPPC Unit 4 PMS (March 3-7, 2010); WMPC U9 PMS (March 10-Apr. 10, 2010);
WMPC U7 PMS (March 6, 2010); WMPC U5 PMS (March 7, 2010)
IMF-LSO-205A
31512010 10:19 AM
NATIONALGRID CORPORAnON
OF THE PHILIPPINES
MARCH I
DATE 5 6 7 8 9 10 11
FRI SAT SUN MON TUE WED THU
47 T 80
•. 70
-
REO C
75
- -
Export for NeQros) 70 125 166 45 45 75 47 T
limitations 0 0 0 0 0 0 0 s 30 - - ~~
Required Regulating Reserve 16 15 13 16 16 15 16 ~
Required Ccntinoencv Reserve 55 55 55 55 55 55 55 0
Required Dispatchable Reserve 55 55 55 55 55 55 55 S-Mar 6-Mar 7-Mar S-M••. 9-Mar lo.Mar 11-Mar
a
28 85 85 5 3 39 3 T
40
limitations 0 0 0 0 0 0 0 T
s 20
5 I
Required Regulatina Reserve 6 6 6 6 6 6 6 EO' ~ 3
Required Contingency Reserve 36 36 36 36 36 36 36 0
Required Dispatchable Reserve 36 36 36 36 36 36 36 S-Mar S-Mar 7-Mar S-M. ~ar l()'Mar 11-M_
-so
.J2
...
LEYTE-SAMAR ISLANDS POWER OUTLOOK RESERVE
PROFILE
(MWI
Dependable Capacity (MW) 554 554 554 554 554 554 554 .so
Geothermal 554 554 554 554 554 554 554 M400 .......A-
ISystem Load (MW) 167 149 145 154 155 171 164 , 350 82 -
79
- 103 ---y- ~ 32 =5F
-:m- r---
Gross Reserve/Deficiency (MW) 386 405 408 399 398 383 390 G300 '31 ......a.... 333 f--- 331 I- 330 - 332
Export for Cebu) 293 296 276 333 331 330 332 A 2113 216 - f--- -
w
250 - - 276 f-
Exoort (for Bohal) 31 30 29 32 32 32 33 I-
200 - - -
Exoort for LUZON) 1(lmoortl 62 79 103 35 35 0 24
A
T 150
liE D lISf'AT H
limitations 0 0 0 0 0 0 0 T 100 - f--- RE ro CONn IGE NCYR! Sa hiE -
Required Regulatina Reserve 5 4 4 4 4 5 5 s - f--- -
RE1m REGU ~ ~YRE ERiE
50
Required Contingency Reserve 72 72 72 72 72 72 72
Required Dispatchable Reserve 72 72 72 72 72 72 72 0
s.Mar s.Mar 7-Mar S-_ 9-Mar l()'Mar 11·Mar
°HVDCEx ort to Luzon duri 10 Off·Peak time onlv
R~.£l'"
Hydro 3.4 3.4 3.4 3.4 3.4 3.4 3.4 G 10
Import (from Leyte) 31 30 29 32 32 32 33 A
Luzon Grid:
Peak demand this week is expected to reach 6890 MW. The system reserve level will continue to be
lean during the week ahead with no dispatchable reserve available mainly due to the following
events;
o Continued shutdown of Malampaya SPEXup to Mar 11 for maintenance of its facilities.
o Shutdown of Sta Rita M30 and Ml0 until Mar 7 for maintenance.
o Shutdown of lIijan Block A until Mar 11 for maintenance. Shutdown of lIijan Block B until
Mar 7.
It is expected that the Malaya plant units 1 and 2 will be operational during the week to augment the
power supply.
Visayas Grid:
Non-coincident peak demand for Cebu-Negros-Panay (CNP) Grid this week is forecasted to reach
1022 MW, Leyte-Samar Grid at 172 MW and Bohol grid at 53 MW. HVDC export to CNP will average
313 MW in the coming week. System reserve will continue to be thin this week in spite of the
continuing reliability test of CEDC Ul due to the shutdown of CTPP U2 for maintenance. MLD is
expected during the week due to the continuing low voltage problem in the CNP region.
Mindanao Grid:
System load is anticipated to reach 1459 MW in the coming week. System deficiency is expected to
drop to an average of 688 MW due to the following;
o Hydro plant capabilities average 210 MW only during the coming week
Probability of MLD is likely this week due to the continuing generation deficiency in the region.
~:Jg
Head, TSD- System Operations
~~