Professional Documents
Culture Documents
2 – A (control) 5 – K (control)
14 – H (PCB) DOWN
Fuse PCB (TVSS)
1 – LOAD (Supply)
LOAD – 11 (PCB)
A – 24 (Open S.B.) 2 – NEUTRAL (Supply)
NEUTRAL – 13 (PCB)
B – 24 (Close S.B.) 4 – NEUTRAL (4 to 5)