Professional Documents
Culture Documents
Preliminary Procedures
1. NP
CDU Pre-flight
Exterior Inspection
Pre-flight
1. CDU performance entries once LOAD SHEET is available <GW, CG, ASSUMED TEMP, TRIM, V SPEEDS>. Arm A/T
and VNAV
2. COMPANY, TAKEOFF CONFIG, THREAT AND ERROR, AND DEPARTURE BREIF
3. Check door indications. If still not prepared, request for time until ac will be ready
4. Request ATC CLEARANCE. ARM LNAV
5. Capt requests to pressurise HYD. SYS on Upper DU
6. NP. Capt calls BEFORE START CHECKLIST
Takeoff procedure
Descent Procedures
Approach Procedure
Landing Procedure
1. NP