GENERAL
1.1 Date of Inspection :-
1.2 Name & Designation of Quality Monitor :-
1.3 Name of Sub-division
1.4 Name of Division
1.5 Name of road on major bridge/minor bridge/
slab drain/box culverts:-
1.6 Estimated cost as per Job No. :-
1.7 Technical sanction cost:-
1.8 Tender cost :- ……………. (% above/below)
1.9 Name of Agency :-
1.10 Tender Agreement No. :-
1.11 Date of starting of work:-
1.12 Stipulated date of completion :-
1.13 Actual date of completion (if work completed) :-
1.14 Details of Engineer nominated by Agency : 1.
2.
3.
1.15 Name and Designation of officer present : 1.
2.
3.
2. PHYSCIAL PROGRESS
(In case of ongoing works only) Construction programme & Physical progress
% of Date of completion as Completion Delay in
Item
progress per programme Date months
Layout
Foundation
Sub-Structure
Super Structure
Protection Work
Approaches
3. PARTICULARS OF BRIDGE
3.1 Type of the bridge:- High level/Submersible
1
3.2 Type of foundation:- Open/Raft/Well/Pile
3.3 No. of Spans/ Spans length:- …….. Spans of …… m. c/c
3.4 Width of Bridge:- 5.50 m/7.50 m/12.0 m
3.5 R.T.L.
3.6 HFL/OFL
3.7 Bed level (lowest) :-
3.8 Type of river protection works if any :-
3.9 Type of Sub-Structure:-
3.10 Type of Bearings :-
3.11 Type of Superstructure :-
3.12 Type of Returns :-
3.13 Whether approaches are in cutting or filling :-
3.14 Whether benchmark is established near the :-
Bridge site (give location and RL)
3.15 Type of Railing :-
3.16 Type of Wearing coat :-
4. QUALITY CONTROL
4.1 Location of Field Laboratory :-
4.2 Quality Control Register i.e. Cement Register &
Material Testing Register maintained properly:- Yes/No
4.3 MB No. :-
4.4 Field Book No. :-
4.5 Measurement checked by DEE:- ………. %
4.6 Measurement checked by EE :- ………. %
5. Inspection by SE, CE, SE (QC), CE (QC) or other senior officers and action taken
Sr.
Date of Inspected by (Name Observation/ Grade Action taken by concern
No
visit & Designation) awarded EE with date
.
1
2
3
4
Date:- Signature :- …………………….
Place:- Name of Executive Engineer :- …………………….
REPORT OF QUALITY MONITOR
Part-II- Observation of Quality Monitor
2
(To be filled up by Quality Monitor)
ITEM NO. 1 : MAIN INFORMATORY BOARD
Observations- : Main Informatory Board Fixed : Yes/No
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
ITEM NO. 4 (a), (b) & (c): QUALITY ARRANGEMENT (in case of ongoing works only)
Observations:-
Whether field laboratory Whether all necessary testing equipment Whether equipment
established (Y/N) available in working condition (Y/N) have been used (Y/N)
(a) (b) (c)
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
Item No. 5 (d): Verification of Test Results (P- confirm, F- Does not confirm)
Observations:-
3
Name of Results of the test Test result as per QC register at Whether the test
Test conducted by Quality the same location (mention the results recorded in
Monitor at a defined page No. of QC register also) QC register found
location (P/F) (P/F) correct? (Y/N)
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
S/SRI/U
competent authority
Grade awarded
Grade of Concrete
Location
reinforcementLaying of
C.C.Workability of
Coarse Aggregate
Fine Aggregate
Reinforcement
Compaction
Shuttering
Cement
1 2 3 4 5 6 7 8 9 10 11 12 13
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
4
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
S/SRI/UGrade awarded
Item No. 7 (a) : Ongoing (work in progress)
Observations:-
weep holesArrangement of
Quality of material Workmanship
C.C.Workability of
reinforcementLaying of
Coarse Aggregate
Fine Aggregate
Reinforcement
Location
Compaction
Shuttering
Cement
1 2 3 4 5 6 7 8 9 10 11 12 13
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
Grade : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
5
Grade Awarded
C.C.Workability of
Grade of Concrete
Reinforcement
Reinforcement
Compaction
S/SRI/U
Shuttering
laying of
Location
Camber
Cement
C.A.
F.A.
1 2 3 4 5 6 7 8 9 10 11 12
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
Approach slab
Protection work
Grade of Concrete
strength ofCompressive
acceptabilitySurface
Stopper
S/SRI/UGrade Awarded
Wearing coat
Exp. Joints
Bearing
Railing
Krebs
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
6
Item No. 9 (b) : Sub Base
Observations:-
Suitability Gradation Grade
Location Thickness Compaction
of Material S/SRI/U
1 2 3 4 5 6
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
Grading : S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
7
ITEM NO. 10 : ROAD FURNITURE AND MARKINGS :
Observations :-
Guard stones fixed on approaches : Yes/No
Mandatory and caution signage : Yes/No
Grade: S/SRI/U if this item is graded SRI/U, write clear reasons and suggestions for
improvement :
(2)
(3)
(4)
8
ITEM NO. 13 : QUALITY GRADING OF ITEMS AND SUB-ITEMS OF WORK :
The grading of every sub-item and item of work is given below:
Sr. In case of Awardable Awarded
Sub item for observation
No. work Grades Grade
1 2 3 4 5
Item No. 1 Main Informatory Board
Main Informatory Board Ongoing S/SRI/U
Item Grading S/SRI/U
Item No. 2 Engineer Nominated By Agency
Engineer Nominated By Agency Ongoing S/SRI/U
Item Grading S/SRI/U
Item No. 3 Concrete Mix Design
Ongoing/ S/SRI/U
Concrete Mix Design
Completed
Item Grading S/SRI/U
Item No. 4 Quality Arrangements
a Field laboratory established S/SRI/U
All necessary testing equipment available in S/SRI/U
b Ongoing
working condition
c Equipment have been used S/SRI/U
Item Grading S/SRI/U
Item No. 5 Attention to Quality
a All required tests as per test scheduled S/SRI/U
conducted
b Register maintained as per provisions Ongoing/ S/SRI/U
c MB, FB maintained and checking by DEE Completed S/SRI/U
or EE as per provisions
d Verification of test results S/SRI/U
Item Grading S/SRI/U
Item No.6 Foundation
a Ongoing work Ongoing S/SRI/U
b Completed work Completed S/SRI/U
Item Grading S/SRI/U
Item No.7 Sub Structure
a Ongoing work Ongoing S/SRI/U
b Completed work Completed S/SRI/U
Item Grading S/SRI/U
Item No.8 Super Structure
a Ongoing work Ongoing S/SRI/U
b Completed work Completed S/SRI/U
Item Grading S/SRI/U
9
Sr. In case of Awardable Awarded
Sub item for observation
No. work Grades Grade
1 2 3 4 5
Item No. 9 Approaches
a Embankment Ongoing/ S/SRI/U
Completed
b Sub Base Ongoing/ S/SRI/U
Completed
c Base Course Ongoing/ S/SRI/U
Completed
d Wearing Course Ongoing/ S/SRI/U
Completed
Item Grading S/SRI/U
Item No.10 Road Furniture and Markings
Guard Stone, Mandatory and caution S/SRI/U
Completed
signage :
Item Grading S/SRI/U
10