PROJECT : UPGRADATION OF FIRE PROTECTION SYSTEM AT
11 INSTALLATIONS (GROUP II) OF ANKLESHWAR ASSET
tRrlt
•Petro6E&c
I
TITLE: DESIGN CALCULATION OF ABOVE GROUND FIRE WATER
PUMP HOUSE
Document Number:
UPS2-GNG-CV-CL-P10-A-05
Revision: B4
46
PROJECT : UPGRADATION OF FIRE PROTECTION SYSTEM AT
11 INSTALLATIONS (GROUP II) OF ANKLESHWAR ASSET
...
t...
Rrlt
•Petro6E&c TITLE: DESIGN CALCULATION OF ABOVE GROUND FIRE WATER
PUMP HOUSE
Document Number:
UPS2-GNG-CV-CL-P10-A-05
Revision: B4
B) DESIGN FORCES:
Case 1: Position of wheel loads is in such a way that "CG of wheel load"
and "one of the wheel load" are equidistance from CG of girder.
~
I I
. j
~0.23~f238)j~E------~0.~47~5~)~
5.{oo
= : =
8.00 T-m
Case 2: Position of wheel load is in such a way that One wheel load is at centre of Span
This case is critical when wheel base distance is more
Mu2 = WIJ4:
= 4.88 T·m
47
PROJECT : UPGRADATION OF FIRE PROTECTION SYSTEM AT
11 INSTALLATIONS (GROUP II) OF ANKLESHWAR ASSET
...
t...
Rrlt
•Petro6E&c TITLE: DESIGN CALCULATION OF ABOVE GROUND FIRE WATER
PUMP HOUSE
Document Number:
UPS2-GNG-CV-CL-P10-A-05
Revision: B4
8.2 Horizontal bending moment My Lateral load per wheel= 10% (crane capadty + crab)/4
= 2 X Whll X (U2 -C/4)2 0.1 T
Factored load Wh = 0.2 T
My - 0.38 T -m
Vz2 = WU2 ... ... . .. . Shear force due to self weight of girder
= 0.31 T
Vz. = Vz1+Vz2
= 7.38 T
Properties of section
Bottom Plate
Properties ISMB350 ISMC250
Details if any OK
wtperm 52.4 Ka 30.6 Ka 0.00 .!52....
Area 66.7 em1 39 cm2 0 em:
Depth 35 em 25 em 0 em
Width of nange 14 em 8 em 0 em
Thkofnange 1.42em 1.41 em
0.81
-
Thkof web
Cyy
·---- £11 0.72
2.3
·~
em --
-
bcx 13600 em' 3880 em'
-
lyy 538 em' 211 em'
"""'I Zo --~
· ---· = Yb (in em)
i y
To calculate NA taking moments@ base blate
y= 23.37 em
0 .1 Elastic lateral torsional buckling m oment Mer = C1 = 1.13 ___ Table 4218 800:2007
E = 200000 mpa
Mer =C1 X~r•2~.
E~, lt, [1+..!..('-ul ")')"'
10 h,ll,
hf = 3572 mm
l u =Eff•ctiv• l• ngth in lat• rat torsional buckling
101 T-m 5000 rnrn .......(l•ngth to I>• d•fin.d wh•n
Ly is support•d with t.i• rn•rnl>••)
ry = 64.7 mm
tf = 21.4
S 1.0
l'LT • {
~LT +[(T -A~T 1' }
Mdz = Jib . Zp. fbc ......... ............ ... ...... Refer 8.2..2, IS 800:2007
: 22 T.m > 8
Check OK
F) SHEAR CHECK:
Shear capacity = Vz ........... ........... ............ ....... .................. Refer Clause 8.1
v2 d- Av tyw
- v3 Vmo
37.20 T
Vzd > V2. Check OK
Vwb = 22 T > Vz
Check OK
50
PROJECT : UPGRADATION OF FIRE PROTECTION SYSTEM AT
11 INSTALLATIONS (GROUP II) OF ANKLESHWAR ASSET
...
t...
Rrlt
•Petro6E&c TITLE: DESIGN CALCULATION OF ABOVE GROUND FIRE WATER
PUMP HOUSE
Document Number:
UPS2-GNG-CV-CL-P10-A-05
Revision: B4
I
Buc kling r esi stance = V wcr.
Vwcr. = Effective length x t hk x fy/ ymo
= beff x tw x fy/ymo
beff = b1+n2
.
n2 =(14.2 + 20) X2.5
86 mm
d 1= 20 m m
beff = 186 mm
Vwcr . • 34 T > Vz
Check OK
...... = P xL [
3
6x E xlxx
3x a -
4x L
(.2._)]
L
For case where
or= P: a fl } base dislllnce is
where more
{
= 1.6 m m L___ _ _...J
p = 2.500 T
a= Distance of one load from adjacent
a= (L - c)/2= 2.025 m
L= Span = 5.000 m
c= D istance between w hee ls = 0.950 m
3.08 mm
L .... V ertical
Allowable D efl ection
750
7 mm Check OK
~(.2._)J
3
Om.. = Ph xL [
6x E xlyc 4X L
L
Ph = 0.1 T
lye = 4 149 em'
0.74 mm
L ... .Horizonta l
Allow able Defl ection
500
10
Check OK