Mwandi Town Council Incinerator WaterAid Zambia

ITEM DESCRIPTION QTY UNIT RATE

SUBSTRUCTURE - ALL PROVISIONAL

Preamble

The substructure has been measured up


to an including the concrete floor slab

The site is assumed to be level and the


substructure has been measured accordingly

The top of the ground floor slab is assumed


to be 300mm above existing ground level

The top of the concrete foundation to external


walls and main cross walls is assumed to be
1000mm below existing ground level

Unless otherwise stated, all excavations shall


be in pickable material and including excavating
for working space where applicable

The term "reduced level" shall mean the ground


level after removal of vegetable soil or the
surface level of any filling required

The Quantities of excavation and disposal


within this bill will be found to balance, The
Contractor is to allow in his rates for forming
temporary spoil heaps, multiple handling etc.
as required

The Contractors attention is directed to


PREAMBLE Notes proceeding work section
in the Superstructure Bills. Such notes are
to apply equally to similar work contained in
this substructure Bill

To Collection K

2/1
Mwandi Town Council Incinerator WaterAid Zambia

ITEM DESCRIPTION QTY UNIT RATE

EXCAVATIONS AND EARTHWORK

A Ant treatment to whole of surface of excavations,


top of hardcore bed and foundation walls with
"Deildrin 15" as described 22 m2 5

B Excavate trench to receive foundation


commencing at reduced level and not exceeding
1.50 metres deep 9 m3 20

C Extra over excavaation for excavating in hard


rock as described 1 m3 20

D Well ramming and compaction of the bottom of trenches 8 m2 20

E Backfilling around foundation 1 item 200

F Keep all excavations free from general water 1 item 200

G Provide all necessary planking and strutting


to faces of excavations as described 1 Item 250

To Collection K

2/2
Mwandi Town Council Incinerator WaterAid Zambia

ITEM DESCRIPTION QTY UNIT RATE

EXCAVATIONS AND EARTHWORK CONT'

Hardcore Filling

A 150mm bed hardcore laid and consolidated


as described 15 m2 50

CONCRETE WORK

Reinforced concrete grade 25 as described

B Foundations in trenches 1.8 m3 1,200

C 150mm bed laid level 15 m2 180

Steel fabric reinforcement

D "Conforce" reference 257 or other equal and


approved fabric reinforcement with 150mm
side and end laps 15 m2 50

Sawn formwork to reinforced concrete to


produced a smooth finish as described

E To 100mm vertical edge of bed 17.5 m 25

500 gauge polythene damp proof membrane


with 150mm double taped side and end laps
as described

F laid level on hardcore 15 m2 8

Bituminous felt proof course and laying as


described (no allowance made for laps)

2/3
Mwandi Town Council Incinerator WaterAid Zambia

G 200mm wide 5 m 10

To Collection K

ITEM DESCRIPTION QTY UNIT RATE

BRICKWORK AND BLOCKWORK

Precast concrete hollow blocks type A


(2.5N/mm2) filled solid for substructure as described in
cement mortar (1:4)

A 200mm wall 10 m2 150

Double Solid burnt brick walling, bedded and jointed with


cement mortar (1:4). Incluiding fire brick lining

B 200mm wall 23 m2 800

Sundries

B 200mm wide (nominal) built into 200mm block wall 25 m 10

C 100mm wide (nominal) built into 100mm brick wall 70 m 8

Finishings

D 15mm thick cement sand (1:3) plaster to


concrete block wall 2 m2 30

Painting and Decorating

E Prepare and apply three coats of black


bituminous paint on plastered plinth exceeding 20mm 2 m2 35

F 75 x 75 x 100mm thick concrete chimney coping on top of


flue reinforced with 275 conforce wire 1 Nr. 300

2/4
Mwandi Town Council Incinerator WaterAid Zambia

To Collection K

COLLECTION

Page No 2/1 K

Page No 2/2 K

Page No 2/3 K

Page No 2/4 K

SUBSTRUCTURE/ SUPERSTRUCTURE - TOTAL


CARRIED TO SUMMARY K

ITEM DESCRIPTION QTY UNIT RATE

ROOFING

IBR chromadek steel roofing sheets with approved


end side lapping, fixed in accordance with
manufacturer's recommendations as described

A Roof sheets fixed to 75 x 50mm soft wood purlins


(measured seperately) by 4" roof nails 14 m2 130

B Fill with bitumastic filler between the roofing sheets and brick 1 item 300
work

C 75mm x 50mm softwood purlins fixed to tubular steel column


bolted on angle cleats 14 m 68

ROOFING - TOTAL CARRIED


TO SUMMARY K

2/5
Mwandi Town Council Incinerator WaterAid Zambia

ITEM DESCRIPTION QTY UNIT RATE

STEEL WORK

Type ST 250/16 steel as manufactured by Shonga steel


Limited or equal and approved, rimed with two coats of
p red oxide before delivery to site

A 50mm dia.Tubular steel column 14 m 120

B Top hung metal door angle frame with 600 x 450mm opening 1 nr 300
complete with pad lock, handle etc

C 6mm thick metal sleeve built into brickwork 1 item 100

D 60 x 60mm angle bars 2 nr 200

E 15.2mm dia. Fire bars at 50mm c/c 3 nr. Cross pieces


welded on and fitted loose on brickwork projection 7 kg 20

STEEL WORK
TOTAL CARRIED TO SUMMARY K

2/6
Mwandi Town Council Incinerator WaterAid Zambia

ITEM DESCRIPTION QTY UNIT RATE

FINISHINGS

Cement and sand (1:3) screed finished with a


steel trowel and laid in one layer as described

A 38mm screed laid level on concrete 11 m2 25

Prepare and apply one undercoat and three coats


of PVA emulsion described

B Plastered walls 14 m2 25

Touch up primer and apply one under coat


three coats gloss oil paint as described on

C Small diameter steel pipes and steel door 2.5 m2 25

2/7
Mwandi Town Council Incinerator WaterAid Zambia

Knot, prime stop and apply one under coat and


three coats gloss oil paint as described on

D General surfaces of s/w purlins 3.5 m 25

FINISHINGS - TOTAL
CARRIED TO SUMMARY K

ITEM DESCRIPTION QTY UNIT RATE

SUMMARY PAGE

SUBSTRUCTURE/ UPERSTRUCTURE 2/2 K

ROOFING 2/4 K

STEEL WORK 2/5 K

FINISHINGS 2/6 K

2/8
Mwandi Town Council Incinerator WaterAid Zambia

TOTAL CARRIED TO GENERAL SUMMARY K

NOTE: Prices used for these rates are based on average market prices for Mwandi and may vary by
+/-25% depending on the supplier.
:
Prepared by : Mwanza Steven

2/9
Mwandi Town Council Incinerator WaterAid Zambia

AMOUNT

2/10
Mwandi Town Council Incinerator WaterAid Zambia

AMOUNT

110

180

20

160

200

200

250

1,120

2/11
Mwandi Town Council Incinerator WaterAid Zambia

AMOUNT

750

2,160

2,700

750

438

120

2/12
Mwandi Town Council Incinerator WaterAid Zambia

50

6,968

AMOUNT

1,500

18,400

250

560

60

70

300

2/13
Mwandi Town Council Incinerator WaterAid Zambia

21,140

1,120

6,968

21,140

29,228

AMOUNT

1,820

300

952

3,072

2/14
Mwandi Town Council Incinerator WaterAid Zambia

AMOUNT

1,680

300

100

400

140

2,620

2/15
Mwandi Town Council Incinerator WaterAid Zambia

AMOUNT

275

350

63

2/16
Mwandi Town Council Incinerator WaterAid Zambia

88

775

AMOUNT

29,228

3,072

2,620

775

2/17
Mwandi Town Council Incinerator WaterAid Zambia

35,695