Professional Documents
Culture Documents
: 1187-SP-00-05 (0)
Engineering and
Construction Company DOCUMENT CODE PAGE 1 OF 3
1. INTRODUCTION
This Project specification is an addendum to the NIOEC Standard Specification NIOEC-SP-
00-05 (2) and is issued for Basic Design Phase of Gurreh - Jask Pipeline and Facilities project.
The content of the NIOEC Standard Specification NIOEC-SP-00-05 (2) has been reviewed By
Consultant and will be applied to the Project, without any modification.