ELECTRICAL QUESTIONAIRE:

1. What is QA/QC?
Ans: QA/QC means “Quality Assurance / Quality Control” The purpose of this (QA /QC) is to establish the
sequence of requirement of quality of materials and quality of works, its inspection and record.

2. What is the basic responsibility of a QA/QC?


Ans: To ensure execution of works and comply fully as per standard and approved specs.

3. What is schedule Q?
Ans: Schedule Q is an attachment to the contract, which is provision of Quality Assurance and Control,
Inspection and Test Plan

3. What is RFI? When an RFI will be raised?


Ans: Request For Inspection(RFI). RFI shall be raised only when the status of the preliminary inspection
is satisfactory, and the work (items) are Hold or Witness points.

4. What is ITP’s ? What are Surveillance, Hold & Witness points?


Ans: ITP means Inspection and Test Plan, details of work scope and required types of inspection.
Surveillance (S) inspector has right to conduct random inspection if works.
Hold Points (H) is the level of inspection that client inspection must required through RFI and can
not be proceed until inspection is done by client.
Witness Point (W) is the level of inspection that inspection activity can be proceeded without
client inspection or if client is not available as per RFI timing.
What are the various level of Inspection? Explain
Ans: They are as followed
Level of inspection for materials:
a) Level 0- Documents requirements only, No inspection
b) Level 1-Inspection prior to shipping
c) Level 2-Minimum requirements, pre-inspection meeting, one or more unspecified “In
progress” surveillance visit.
d) Level 3-Same as level 2 , except that “in progress” surveillance inspection shall be in regular
basis.
e) Level4-Resident inspector continuously monitor the works.

3. What are the basic required documents for a QA/QC personal?


Ans: The basic required documents for a QA/QC personal are as followed
ITP: To conduct the quality check (inspection/ witness/surveillance)etc.
WP: Standard procedure to execute the work.
RFI: To conduct the inspection of completed works.
QR: To maintain the quality records of completed works.
QCO: To issue a warning in case of little violation and observation.
NCR: To issue warning in case of serious violation of standard.

4. What is NCR? Why does it need for a QA/QC personal?


Ans: NCR means Non Compliance report/Non Confirming Report, QA/QC has reserve the right to issue a
warning if the contractor does not comply or violate with standard procedure.

5. What is the general work procedure(WP)


Ans: The general sequence of activities will be as follows;
Receiving drawing and documents
Reproducing of drawings,
Issuing of drawing to site,
New issuing New revision,
Shredding of drawings,
Redlining drawings,
Transmittal of redlines to client (As-built)
Restricted access to the DCO
Work permit prior to start the works
Records

24. What is the meaning of (a) ITP’s & (b) QCP?

Ans: (a) This procedure informs about the kind of Quality check (surveillances, inspection,
witness & hold points) means quality of work is being done in proper sequences.

Ans: (b) This procedure addresses the activity & requirement in details.

What is Quality Inspector?

Ans: Quality Inspector is working for contractor and manufacture to ensure that the work is
performed in accordance with the design and applicable standard by requirement of the client.

What is PID?

Ans : PID is responsible for quality monitoring for all the stage of construction, Pre-
commissioning up to the final acceptance to ensure that the compliance with design and
applicable standard and project specification.

What is Preventive action?

Ans; Preventive action is an action to eliminate the cause of potential for Non-conformity or un-
desirable situation.

What is QMS?
Ans: Quality Monitoring system is a system where an organization needs to demonstrate its
ability to consistently provide products that meet customer’s regulatory requirement s and aim
enhance customer satisfaction through the effect application of the system.

What is Quality Control ?


Ans: Quality control is a management function that is entended to control and regulate the
process in order to perform defective product from being made.

What is QA?
Quality Assurance is plan and systematic action to provide an adequate confidence that a product
will confirm to requirement.
What is transformer?
Ans: A transformer is a static electromagnetic equipment machine used for transforming power
from one circuit to another without changing frequency.

How many types of transformer?


Ans: There are three types of transformers.
1) Step up Transformer
2) Step down Transformer
3) Auto Transformer

What is switchgear?
Ans: A switchgear or electrical switchgear is a generic term which includes all the switching
devices associated with mainly power system protection. It also includes all devices associated
with control, metering and regulating of electrical power system.

What is Circuit breaker?


Electrical Circuit Breaker is a switching device which can be operated manually as well as
automatically for controlling and protection of electrical power system respectively.

Ground Fault Circuit Interrupted, Vacuum Circuit Breaker, Air Ballast Circuit Breaker, Oil
Circuit Breaker(Tang Type & Bulk Oil Type), Minimum Oil Circuit Breaker, Sulfur
Hexaphloride Circuit Breaker, Miniature Circuit Breaker, Molded Circuit Breaker,

What is relay?
Ans: Electronics Device with two separate circuits or coils, in which current in one
coil controls a much larger (or higher voltage) current in the other coils.

How many types of relay?


Ans: Relays are two types……..,
1. Electromagnetic attraction relays.
2. Electromagnetic induction relays.

Name of the relays


Over current Relay
Phase over current relay
Differential Phase over current
Over voltage relay
Under Voltage Relay
Time Delay Relay
Instantaneous Relay
Monitoring Relay
Read Relay
Ground Fault Relay
Earth Leakage Relay
Type of Battaries.
lead selenium batteries / Nickel-Cadmium batteries/ Valve Regulated Lead Acid(VRLA) batteries
Tubular plate lead-antimony batteries. / Lead-Calcium or Lead low antimony pasted flat plate
batteries.

What is Quality Inspection?

Ans : Quality Inspection is a appraisal activity where a product inspected or tested to determine
whether the confirm to requirement or not.

1. What is the meaning of following abbreviations,

a) NFPA – National Fire Protection Association


b) NEMA – National Electrical Manufacturing Association
c) UL – Underwritten Laboratories
d) NEC –National Electrical Code
e) SAES – Saudi Aramco Engineering Standard
f) SATIP – Saudi Aramco Typical Inspection Plan
g) SAIC –Saudi Aramco Inspection Checklist
h) SAMSS – Saudi Aramco Material System Specification
i) IEC- International Electrotechnical Commission
j) ICEA- Insulated Cable Engineers Association
k) AEIC-Association Of Edison Illuminating Companies
l) ANSI- American National Standards Institute
m) ASTM- American Society For Testing Of Materials
n) ASME- American Society Of Mechanical Engineers
o) BS- British Standard Institution
p) IEEE- Institute Of Electrical And Electronic Engineers
q) SASO- Saudi Arabian Standards Organization
r) AASHTO- American Association of State Highway Transportation Officials
s) IESNA- Illuminating Engineering Society Of North America

2. What is the minimum size of conduit for this TTD Project?

3. What is the standard wire fill requirement for conduit sealing fittings?

a) 30%
b) 25%
c) 40%
d) 35%

Ans. B) Per NEC.501.C-6


4. What is the maximum distance between supports for rigid metal conduit (RMC) on
Horizontal Straight Run?

a) Shall be supported @ intervals not exceeding 4 meter (12 ft)


b) Shall be supported @ intervals not exceeding 5 meters (15 ft)
c) Shall be supported @ intervals not exceeding 3 meters (10 ft)
d) None of the above.
Ans. C) Per NEC.344.30

5. Per NEC, How many degrees bend permitted in a conduit run?


Ans: 360’C Per NEC.346.11

6. Per NEC. What is the minimum working clearance requirement in front of low voltage
electrical equipment?

a) 900 mm (3ft)
b) 800 mm (2.5ft)
c) 700 mm (2.25ft)
d) 600 mm (2ft)
Ans. A) Per NEC. 110-26 (Table 26 (A) (1)

7. What article in NEC you can find grounding system?

a) 300
b) 350
c) 400
d) 250
Ans. D) Per NEC. 250

8. Per NEC, All 125 volts, single phase, 15,20 amps receptacles installed in location specified
in Bathrooms & Kitchens shall be:

a) Single receptacle.
b) Duplex receptacle
c) GFCI(Ground fault circuit interrupter)
d) None of the above
Ans. C) Per NEC. 210.8 A (1)
9. What are the basic reasons for grounding system?

a) To limit the voltages caused by lighting or by accidental contact of the supply


conductors.
b) To stabilize the voltage under normal operating conditions (Which maintains the voltage
@ one level relative to ground)
c) To facilitate the operation of over current devices, such as Fuses, Circuit Breakers or
Relays. Underground fault conditions.
d) All of the above.
Ans. D) Per NEC 250.4(B)

10. Per NEC, how grounding conductors & bonding Jumpers connected to the equipment?

a) Exothermic welding
b) Listed pressure connector
c) Listed clamps or other listed means
d) All of the above
Ans. D) Per NEC 250.8

11. What is the maximum value in Ohms () permitted for single ground rod?

a.) 25 
b.) 30 
c.) 10 
d.) 5
Ans. a.)per NEC-250.6

12. What is meant by “MCC”?

a.) Motor Current Control.


b.) Motor Control Compartment.
c.) Motor Control Center.
d.) None of the above.
Ans. (c.)

13. What is the minimum conductor to be used for power circuit?

a) 4 mm2 (12 AWG)


b) 2.5 mm2 (14 AWG)
c) 6 mm2 (10 AWG)
d) None of the above
Ans (A)
14. What is the minimum grounding conductor used for equipment grounding for this Project?

a) 25 mm2 (# 4 AWG)
b) 16 mm2 (#6 AWG)
c) 35 mm2 (# 2 AWG)
d) None of the above
Ans (b)

15. In Class 1,Division, Location, transformer and capacitors containing a liquid that will
burn, shall be installed on:
(a)Transformer Pads
(b)Mounted Pads
(c)Vaults
Ans. a.)per NEC-501.2

16. In Class 1, division 1, location, threaded rigid metal conduits, and explosion proof
enclosures used , Threaded joints between the conduit & enclosures shall be made up
with at least

(a)Five Treads.
(b)Seven Treads.
(c)9 Threads.
(d)13 Threads.
Ans. a.)per NEC-501.4

17. In Class 1, Division 1, locations, conduits seals shall be installed within,


(a) 6 inches.
(b) 12 inches.
(c) 18 inches.
(d) 21 inches.
From enclosures.
Ans. c.)per NEC-501.5(a)

18. In Class 1, Division 1, location, pendent fixtures shall be suspended through rigid metal
conduit stems. Stems length should be,
(a) 8 inches.
(b) 10 inches.
(c) 12 inches.
Ans: (c)per NEC-501.9a3
19. For new 15 KV cable, when test voltage should be,
(a)64 KV DC.
(b)53 KV DC.
(c)100 KV DC.
Ans : (b)SAES-P-104 (Para-13.2 e Complementary Note A)

20. Minimum separation ( above or below ground, between (a) power cables operating at
1000 V or above and ( b) power or control cables operating at less than 1000 V, shall ,
(a) 150 mm.
(b) 200 mm.
(c) 250 mm.
(d) 300 mm.
Ans: (d) SAES-P-104 (Para 14.0)

21. Conductor shall not be bent radius less than


(a) 6 times
(b) 8 times
(c) 10 times.
Ans: (b) per NEC 300.34

22. A transformer containing 2000 gal ( 7571L) or more insulating oil should be at least
(a) 15 ft.
(b) 18 ft.
(c) 20 ft.
From any building.
Ans: (c) IEEE STD 9+9 4.4.2 TABLE 2

23. What is the meaning of IFC drawing?

25. What is the meaning of GFCI?

26. What is the minimum grounding resistance for residential / commercial building?

27. What is the SAES- ? - ? for ---- SAES-B-014 ----


(Safety Requirements for Plant and Operations support Buildings).

28. What are the Two Grounding systems are required for instrument systems.
(i) – Equipment Grounding (Safety grounding for persons) ----
(ii) – System Grounding (Instruments circuit grounding) -----
29. Cable Tray specification shall be as per? NEMA VE 1-Per NEC 392
30. Cable tray installation as per? --- NEMA VE 2

31. What is the Standard for CP ? --- SAES-X-400

32. What is JCC card ? --- Job Clearance Certificate

33. System Frequency in Aramco: The frequency of AC electrical power system shall be ?
Ans: 60 Hz. ---

34. Medium voltage cables rated 5 KV to 35 KV shall have the outer jacket consist of:

a.) Polyvinyl chloride (PVC) suitable for 90ºC maximum rated conductor temperature
b.) Shall be sunlight & oil resistant
c.) Both a & b
d.) None of the above
Ans. c.) as per 15-SAMSS-502
CATHODIC PROTECTION

92. When we install distributed impressed current anode:

a). Whenever the soil is wet.


b). Where a remote anode be will provide satisfactory current distribution.
c). Where a remote anode will not provide satisfactory current.
d). In all Place.
Ans. c.) per SAES-X-400 para 4.6.6.1

93. What size of DC cables shall be used for all connections to rectifiers?

a). 35mm2
b). 70mm2
c). 240mm2
d). 25mm2
Ans. d.) per SAES-X-400 para 4.9.1

94. Rectifiers for vessels and tank internals shall be installed in locations:

a). Accessible to operations and project inspection for repair and periodic monitoring.
b). Accessible to operations and maintenance personnel for repair and periodic monitoring
c). Not accessible to anyone
d). Close to road crossing.
Ans b.) per SAES-X-500,Para.4.7.2
95. Mercury activated aluminum anodes and zinc anodes:

a.) It is ok to use in water system where human and/or animals may consume the water.
b.) Shall not be used in water system where humans and/or animals may consume the water
c.) Any Where
d.) Only in populated area
Ans. b.) per SAES-X-500 Para 4.6.6

96. Per Saudi Aramco standard, what is the minimum clearance required to insulate or
Coat Buried copper conductors crossing a pipeline or piping under cathodic
Protection?

a) 30 Mts.
b) 15 Mts.
c) 10 Mts.
d) 6 Mts.
Ans. d.) per SAES-X-400/4.9.3

97. What type of Transformer rectifier can be installed in outdoor & indoor locations?

a.) Oil immersed or air cooled type


b.) Air immersed or oil cooled type
c.) Oil immersed or indoor type
d.) None of the above.
Ans. a.) per SAES-X-400/4.8.1

98. What terminal points connection is required for protecting equipment for Cathodic
Protection system?

a.) Negative (-)


b.) Positive (+)
c.) Both
d.) None of the above
Ans. c.) per SAES-X series referring S.A standard drawing AA-036378.

SAUDI ARAMCO STANDARD


99. What is the Basic Saudi Aramco Industrial Facility Power Generation &
Distribution?

a) 6.9 KV, 3 , 4wires


b) 13.8 KV, 3 , 4wires
c) 4.16 KV, 3 , 4wires
d) None of the above
Ans. b.) Per SAES-P-100/PARA.6.1.3

100. Per S. Aramco Standard, What type of cables are to be use for security lighting or
Perimeter & area lighting?

a) Unarmored cables
b) Armored cables
c) Metal clad cables
d) Both b & c
Ans. d.) Per SAES-P-104,PARA.5.9.

101. Per S. Aramco Series, spring pressure twist-on type Connectors & pressure sets
Screw with insulating caps are permitted:

a) In Non- Industrial Application


b) For Lighting & receptacle circuit in non – hazardous locations
c) Both a & b
d) None of the above
Ans. c.) Per SAES-P-104,PARA 6.3

102. Per S. A. Standard, what type of wire / cable connector is to be used for control wiring?

a) Insulated ring tongue


b) Locking for tongue
c) Flanged fork tongue & pin type compression
d) All of the above
Ans. d.) Per SAES-P-104, PARA 6.6

103. Per Saudi Aramco Standard, A type 300 stainless Steel breather & Drain Fittings are
required for enclosure, junction boxes, having an internal volume of.

a) Less than 1,000 cubic centimeters


b) Less than 1,500 cubic centimeters
c) Exceeding 2,000 cubic centimeters
d) Exceeding 5000 cubic centimeters
Ans. c.) Per SAES-P-104 PARA.7.7
104. Per Saudi Aramco standard series, what is the minimum size of conduit permitted to
Be installed inside Building of non -Industrial areas?
a) 2 in
b) 3 in
c) ½ in
d) ¾ in
Ans. d) Per SAES-P-107, PARA 8.6.

105. Per S. A. Standard, Electrical Metallic tubing (EMT) is acceptable to be installed in


What location?

a) In hazardous outdoor locations


b) In non – hazardous in door locations.
c) In hazardous in door locations
d) In non – hazardous in door locations.
Ans. d.) Per SAES-P-104, PARA 8.4

106. According to SAES series, what type of enclosure cab be installed on severe
Corrosive environment?

a) Type NEMA 3R, 3 & 4


b) Type NEMA 4x, 3 & 4
c) Type NEMA 1
d) None of the above.
Ans. b) Per SAES-P-104, 7.3

107. As Per standard series, what is the minimum clearance for crossing or parallel
Between DB cables or conduits?

a) 150 mm
b) 200 mm
c) 250 mm
d) 300 mm
Ans. d.) Per SAES-P-104, PARA 10.13

108. As Per S. A. Standard, what size of cable is to be used for 2-hole compression
Terminal connector?

a) 4/0
b) 3/0
c) 2/0
d) 1/0
Ans. a.) Per SAES-P-104, PARA 6.1

109. As Per standard series, what is the minimum maintained luminance level required
Inside battery room?

a) 500 Lux
b) 750 Lux
c) 300 Lux
d) 200 Lux
Ans. c.) As Per SAES-P-123 ARTICES

110. Per S. A. Standard, what is the Characteristics of grounding rods?

a) Be copper or copper Jacketed Steel or Aluminum.


b) If Aluminum., only be used in areas protected by cathodic protection
c) Have a minimum length of 2 meters.
d) For copper or cooper jacketed Steel Rods be min of 16 mm.
Ans. d.) Per SAES-P-111/5.2

111. Per S. A. Standard, which of the following is true about Battery installation in
Battery Room?

a) Manned Work Station shall be located in Battery Rooms.


b) The maintained illuminance level shall be 200 lux
c) Battery shall be instated in class 1, Division 1 locations
d) Cabinet or rock shall not be provided in Battery Room to have enough space for battery.
Ans. b.) Per SAES-P-103

112. What would be the color of insulated grounding conductor Per S. A. Standard?

a) Yellow Jacket or Yellow Jacket with Green Stripes


b) Green Jacket or Green Jacket with white Stripes
c) Green Jacket or Green Jacket with Yellow Stripes
d) None of the above
Ans. c.) Per SAES-P-111/5.1(e)

113. Per S. A. Standard, what is the minimum creepage distance measured between line &
ground, based on the line-to-line voltage, e.g. for 13.8 KV outdoor termination?
a) 525 mm
b) 542 mm
c) 552 mm
d) None of the above
Ans. c.) Per SAES-P-104,Para, 6.12

114. What fact is true for cable tray system?

a) Cable tray shall be aluminum free, except fiberglass cable trays maybe used for
alternative.
b) Cable Tray shall be Designed, manufactured rated & tested in accordance with NEMA
FG1
c) Fiber glass cable tray shall be designed, manufactured, rated & tested in accordance with
NEMA VE 1
d) Cable tray shall be installed as a complete system.
Ans. d.) Per SAES-P-104, PARA 97

115. In outdoor plant & other Industrial areas located in severe corrosive environments, type of
enclosure shall be:

a) Type IP 66
b) NEMA type 3 or 4
c) Type 304
d) All of the above
Ans. d.) Per SAES-P-104/7.3

116. What is the minimum grounding conductor used for equipment grounding?

a) 25 mm2 (# 4 AWG)
b) 16 mm2 (#6 AWG)
c) 35 mm2 (# 2 AWG)
d) None of the above
Ans b.) Per SAES-P-111/5.1(h)

117. What is the minimum conductor to be used for power circuit?

a) 4 mm2 (12 AWG)


b) 2.5 mm2 (14 AWG)
c) 6 mm2 (10 AWG)
d) None of the above
Ans. a) Per SAES-P-104/5.8 (Table 1)
118. What type of conduit to be used for severe corrosive environment?

a) PVC coated
b) Hot dip cavaliered PVC coated
c) EMT conduit
d) All of the above
Ans. b) Per SAES-P-104/8.3

119. What is the minimum clearance depth for direct buried low voltage cable?

a) 460 mm
b) 500 mm
c) 600 mm
d) 920 mm
Ans. c) Per SAES-P-104, PARA 10.1 (TAB-2)

120. What is the minimum length of grounding electrode (Ground Rod) to be used per SEAS-P-
111?

a) 2.8 MTS
b) 3.0 MTS
c) 2.4 MTS
d) 2.6 MTS
Ans. c.) Per PARA 5.2 (C)

121. What is the maximum number of field splices permitted in circuit for new installations of
cables rated above 1000v (excluding submarine cables)?
a) Is the number made necessary by the use of Standard size reels with full length cables
b) Is the number made necessary by the use of standard size reels with full length cables,
plus one extra spices
c) Is the number made necessary by the use of Standard size reels with full length, plus one
extra splices
d) None of the above.
Ans. b.) Per SAES-P-111/8.3

122. Per S. Aramco Standard, what is the minimum temperature for low voltage wire?

a) 75’c (wet)/90’c (dry)


b) 80’c (wet/90’c (dry)
c) 90’c (wet/90’c (dry)
d) None of the above.
Ans. a.) Per SAES-P-104/5.2.2.1

123. What is the minimum unobstructed space required for switchgear?

a) 2 meters (front) & 1 meter side


b) 1.5 meters (front) & 1 meter side
c) 1 meter (front) & 1 meter side
d) None of the above.
Ans. a.) Per SAES-P-116

124. What is the minimum clear space between Pipeline & poles for o/h towers for any
Voltage between 13.8 KV and larger?

a) 20 meters
b) 25 meters
c) 30 meters
d) 35 meters
Ans. c.) Per SAES-B-064/10.6

125. What is the minimum vertical clearance of O/H line above grade for plant entrance?

a) 8.5 meters @ 120’c total conductor TCMP


b) 7.5 meters
c) 9.5 meters
d) 10.5 meters
Ans. a.) Per SAES-P-107/4.8

126. Per S. Aramco Standard, what is the minimum size of wire for grounding grid?

a) 240 mm2
b) 70 mm2
c) 120 mm2
d) 35 mm2
Ans. b.) Per SAES-P-111/5(g)

127. In which location can Switchgears, control gears & Switchboard be installed?

a) Ventilated/Fan environment
b) Non-Ventilated/Plan environment
c) Air-Condition environment
d) None of the above
Ans. c.) Per SAES-P-116/1.1
128. In what S. Aramco Standard reference shall be used for electrical area classification?

a) SAES-B-006
b) SAES-B-014
c) SAES-B-068
d) SAES-B-086
Ans. c.)

129. What type of cable/conductor is not permitted to be installed on cable tray?

a) PLTC type
b) Low voltage unjacketed wires
c) Armored type
d) None of the above
Ans. b.) Per SAES-P-104/5.2.2.3

130. Spring pressure type twist-on connectors & pressure set screw connectors with
Insulating caps are only permitted to use for:

a.) Lighting & receptacle circuits in non-hazardous location


b.) Hazardous classified location
c.) Non-Industrial application
d.) All of the above
Ans. a.) & c.) Per SAES-P-104/6.3

131. As Per S. Aramco Standard, what PCB stands for?

a) Power/control breaker
b) Poly chlorinated biphenyl
c) Poly chlorinated bus
d) None of the above
Ans. b.) Per SAES-P-100

132. According to SAES series, what is the acceptable value in OHMS for resistance
Grounded system above & _______ below 600 volts?
a) 2 OHMS
b) 3 OHMS
c) 4 OHMS
d) 3 OHMS
Ans. b.) Per SAES-P-111/8.3

133. What SAES series requires minimum depth clearance for 600Volts to 35 KV direct
Buried cable power supply?
a) 700 mm
b) 800 mm
c) 920 mm
d) 1070 mm
Ans. c.) Per SAES-P-104/10.1 (Table-2)

134. What type of conduit can be used in concrete encased duct bank installation?

a) Hot-Dip galvanized rigid steel conduit


b) PVC conduit
c) RGS-PSV coated conduit
d) All of the above
Ans. d.) Per SAES-P-104/10.4

135. What is the minimum size of equipment grounding connected to a ground grid or
Rods?
a) 70 mm2
b) 35 mm2
c) 25 mm2
d) 16 mm2
Ans. c.) Per SAES-P-111/5.1(h)

136. What is the normal secondary rating of current transformer?

a) 5 AMPS
b) 7 AMPS
c) 9 AMPS
d) None of the above.
Ans. a.) SAES-P-114/4.11.2 SAES-P-121/7.2.2

137. What is the distance & height requirements on installing duplex, wire, 20A,
Receptacle outlet inside substation?
a) Every 8 mts. of wall space &15 mts. above the floor
b) Every 6 Mts. of wall space & 1 mtr above the floor
c) Every 5 mts. of wall space & 2 mts above the floor
d) All of the above
Ans. b.) Per SAES-P-119/6.7

138. Medium voltage cables rated 5 KV to 35 KV shall have the outer jacket consist of:

e.) Polyvinyl chloride (PVC) suitable for 90ºC maximum rated conductor temperature
f.) Shall be sunlight & oil resistant
g.) Both a & b
h.) None of the above
Ans. c.) as per 15-SAMSS-502