Test Report issued under the responsibility of:

TEST REPORT
IEC 62040-3
Uninterruptible power systems
Part 3: Method of specifying the performance and test requirements

Report reference No. ..................: 11-EL-0026.06


Date of issue ................................: 2012-07-05
Total number of pages .................: 48
CB Testing Laboratory...................: Electrosuisse
Address ...........................................: Luppmenstrasse 1, CH-8320 Fehraltorf
Switzerland
STS 001
Applicant’s name............................: Newave SA

Address ............................................: Via Luserte Sud 9, 6572 Quartino, Switzerland

Test specification:
Standard ...........................................: IEC 62040-3 (1st Edition):1999
Test procedure .................................: CB Scheme
Non-standard test method…………..: N/A
Test Report Form No......................: IEC62040_3A
Test Report Form(s) Originator ........: Electrosuisse
Master TRF.......................................: Dated 2011-05
Copyright © 2010 Worldwide System for Conformity Testing and Certification of Electrotechnical
Equipment and Components (IECEE), Geneva, Switzerland. All rights reserved.
This publication may be reproduced in whole or in part for non-commercial purposes as long as the IECEE is acknowledged as copy-
right owner and source of the material. IECEE takes no responsibility for and will not assume liability for damages resulting from the
reader's interpretation of the reproduced material due to its placement and context.
If this Test Report Form is used by non-IECEE members, the IECEE/IEC logo and the reference to the CB
Scheme procedure shall be removed.
This report is not valid as a CB Test Report unless signed by an approved CB Testing Laboratory and
appended to a CB Test Certificate issued by an NCB in accordance with IECEE 02.
Test item description .....................: Newave UPS System

Trade Mark .......................................: Newave

Manufacturer ....................................: Newave SA, Via Luserte Sud 9, 6572 Quartino, Switzerland

Model/Type reference ......................: Model: PowerScale


Type: P2S 0262 Cab.C

Ratings .............................................: Input: 3N400/230V~PE, 75.9A, 35-70Hz


Output: 3N400/230V~PE, 45kW, 50kVA, 72.2A, 50Hz
Page 3 of 48 Report No. 11-EL-0026.06

List of Attachments (including a total number of pages in each attachment):

See basic test report No: 11-EL-0026.04

Summary of testing:

The equipment complies with this standard.

Tests performed (name of test and test clause): Testing location:

Complete test performed Newave SA


Via Luserte Sud 9, CH-6572 Quartino

Summary of compliance with National Differences


List of countries addressed: EN 62040-3:2001 + A11:2009

Copy of marking plate


The artwork below may be only a draft. The use of certification marks on a product must be author-
ized by the respective NCBs that own these marks.

Copy of marking plate see basic test report 11-EL-0026.04


detailed information to other models stated in basic test report 11-EL-0026.04

TRF No. IEC62040_3A


Page 4 of 48 Report No. 11-EL-0026.06

Test item particulars .................................................. :


Classification of installation and use ...................... : Class I and indoor use
Supply Connection .................................................... : Terminal provided
...................................................................................... :
Possible test case verdicts:
- test case does not apply to the test object .......... : N/A
- test object does meet the requirement ................. : P (Pass)
- test object does not meet the requirement .......... : F (Fail)
Testing ......................................................................... :
Date of receipt of test item........................................ : 2011-06-06

Date (s) of performance of tests .............................. : 2011-06-06 to 2012-07-05

General remarks:
The test results presented in this report relate only to the object tested.
This report shall not be reproduced, except in full, without the written approval of the Issuing testing
laboratory.
"(see Enclosure #)" refers to additional information appended to the report.
"(see appended table)" refers to a table appended to the report.

Throughout this report a comma / point is used as the decimal separator.

Manufacturer’s Declaration per sub-clause 6.2.5 of IECEE 02:


The application for obtaining a CB Test Certificate Yes
includes more than one factory location and a dec- Not applicable
laration from the Manufacturer stating that the
sample(s) submitted for evaluation is (are) repre-
sentative of the products from each factory has
been provided..............................................................:

When differences exist; they shall be identified in the General product information section.
Name and address of factory (ies) ..........................: CMA Electronics Srl
Via Guiseppe de Vitorio 3
20020 Arconate
Italy

General product information:

PowerScale is a transformerless Uninterruptible Power System (UPS). It is a true online, continuous duty,
double conversion, solid state, three-phase system, providing conditioned and uninterruptible AC power to
protect the customer’s load from all nine power failures.

TRF No. IEC62040_3A


Page 5 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict

5 ELECTRICAL SERVICE CONDITIONS AND PERFORMANCE P


5.1 General P
5.1.1 Complies with annexes A, B and C P
5.1.2 Equipment ratings and instructions P
5.1.2.1 Rating information P
Input supply requirement P
Output ratings P
Rated voltage(s) or Voltage range(s): 3N400/230V P
Symbol for the nature of supply: N/A
Rated frequency or frequency range: 35-70Hz P
Rated current: 75.9A P
Number of phases: 3P + N P
Rated output active power: 45kW P

Rated output apparent power: 50kVA P

Stored energy time Tested without battery, battery N/A


is an option
Manufacturer’s name, trademark or identification Newave P
mark
Model or type reference P2S 0262 Cab-C P
Symbols comply with ISO 7000 and IEC 60417 P
5.1.2.2 Safety instructions and documentation P
Competence necessary for installation: P
a) operator installable N/A
b) service personnel installable User manual, chapter 1.2.7 P
Competence necessary to operate the UPS: P
a) no precious experience N/A
b) with previous training P
Disconnecting device not incorporated in the UPS Disconnecting device is incor- N/A
porated in the UPS
a) permanently connected UPS P
b) pluggable UPS N/A
Warning label for pluggable UPS-type B and per- No pluggable UPS N/A
manently connect UPS without automatic backfeed
isolation
5.1.3 Equipment safety P
5.1.3.1 UPS designed for use in operator accessible areas N/A
and/or operator installable
5.1.3.2 Additional protection for pluggable UPS-type A N/A

TRF No. IEC62040_3A


Page 6 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict
5.1.3.3 Backfeed protection switching device See UM chapter 10.9 and P
sub-clause 6.3.11
5.1.3.4 Pluggable UPS-type B and permanently connected Permanently connected UPS P
UPS
5.1.3.5 UPS designed for use in electrical switch rooms N/A
5.2 UPS input specification P
5.2.1 Normal service conditions: P
a) Input voltage variation: +/- 10% P
b) Input frequency variation: +/- 2% P
c) three phase input P
d) input voltage distortion factor : THDu < 2% at 100% load P
5.2.2 Rated values and characteristics: See User Manual, chapter P
10.3
a) Rated a.c. input voltage: 400/230V P
b) AC input voltage tolerance: -23% /+ 15% P
c) Rated input frequency: 35-70Hz P
d) input frequency tolerance: (calculated: - 30% / + 16%) P
e) Number of phases: 3 ph + N P
f) Rated input current: see UM, chapter 10.3 P
g) Max. continuous input current: see UM, chapter 10.3 P
h) input current total harmonic distortion: (see appended table) P
i) Input current individual harmonic current levels P
j) max input current: N/A
k) Input power factor: See UM, chapter 10.3 P
l) Input neutral requirements: N/A
m) Inrush current requirements See UM, chapter 10.3 P
n) Earth leakage current N/A
o) Three phase inputs P
p) Power system configuration P
5.2.3 UPS input conditions to be identified by the pur- P
chaser:
a) Supply impedance and system configuration P
b) Voltage in excess N/A
c) Frequency in excess N/A
d) Superimposed high-frequency voltages N/A
e) Existing voltage harmonics N/A
f) Transient voltage N/A
g) Protective device characteristics N/A
h) Requirements for all-pole isolation N/A
i) Stand-by generator characteristics N/A

TRF No. IEC62040_3A


Page 7 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict
5.3 UPS output specifications P
5.3.1 Steady-state and dynamic output voltage character- P
istics
-a) Change of operating mode P
-b) Application of increasing/decreasing load step P
5.3.1.1 Output characteristic- Sinusoidal output voltage P
5.3.1.2 Output characteristic- Non-sinusoidal output voltage N/A
5.3.2 Following rated values and characteristics shall be See User Manual, chapter 10.5 P
specified in all modes of operation by the manufac-
turer/supplier (if applicable):
a) Rated output voltage: See UM chapter 10.5 P
b) Output voltage tolerance: See UM chapter 10.5 P
c) Number of phases: 3 P
d) Rated output current (linear load): See UM chapter 10.5 P
e) Rated output current (non-linear load) See UM chapter 10.5 P
f) Nominal frequency: See UM chapter 10.5 P
g) Max relative harmonic: See UM chapter 10.5 P
h) Maximum synchronized frequency range: See UM chapter 10.5 P
i) UPS nominal inverter frequency: See UM chapter 10.5 P
j) Rate of change of frequency: See UM chapter 10.5 P
k) Permissible load unbalance: See UM chapter 10.5 P
l) Relation between load unbalance und voltage un- See UM chapter 10.5 P
balance
m) Phase angle displacement tolerance: See UM chapter 10.5 P
n) Permissible range of load power factor: See UM chapter 10.5 P
o) Output voltage transient deviation: N/A
p) UPS efficiency of rated load: See UM chapter 10.5 P
q) UPS output fault clearing capability: See UM chapter 10.5 P
r) Overload capability: See UM chapter 10.5 P
s) Current limit identification: See UM chapter 10.5 and UM P
10.12.2
5.3.3 Single UPS and parallel UPS with bypass P
Ratings shall be in accordance with 5.3.2 and in See user manual P
addition, the ^following shall be added for the trans-
fer switch:
a) Transfer switch voltage rating: See user manual P
b) Continuous current rating: See user manual P
c) load power factor: See user manual P
d) Interruption time rating: See user manual P
e) Total system transfer time and interruption time: 0s P

TRF No. IEC62040_3A


Page 8 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict
f) Rated UPS output fault clearing capability no by- short circuit capability (no by- P
pass: pass) UM chap. 10.5
up to 3 * In for 40ms
g) Output voltage transient deviation and recovery N/A
time on transfer:
5.3.4 Performance requirements to be identified by the purchaser P
The purchaser shall identify any special UPS per- P
formance requirements if these deviate form 5.3.2
and 5.3.3
a) Max. load step and load profile versus time: N/A
b) A load which is not balanced between phases: N/A
c) Loads generating harmonic currents: THDi < 3% P
d) Loads generating circulation of a d.c. current: N/A
e) Earth conditions of the output neutral required: See UM, chapter 1.5.1 P
f) Protective device(S) characteristic with which the See UM, chapter 10.5 P
UPS output is required to co-ordinate:
g) Type of load(S) to be connected: Linear and non-linear load P
h) Output relative harmonic content: With linear load: < 2% P
with non-linear load: < 4%
5.3.4.1 Special performance requirements P
the following items should be specified by the See UM, chapter 10.5 P
purchaser:
a) Output voltage stabilization and phase angle tol- P
erance
a) Output voltage stabilization and phase angle tol- P
erance
b) Frequency stability P
c) Synchronization and rate of change of frequency P
during synchronization
d) Efficiency P
e) Load distribution P
f) Future extension N/A
g) Degree of redundancy Full with redundancy P
(DPA decentralize parallel
architecture)
h) Output overvoltage protection Electronic protection and IA2 P
5.4 UPS intermediate d.c. circuit and/or battery circuit specification P
Rated value and characteristics specified by the See UM, chapter 10.4 P
manufacturer/supplier (if applicable):
a) Nominal d.c. voltage: See UM, chapter 10.4 P
b) Nominal d.c. currant: See UM, chapter 10.4 P
c) Isolation of d.c. link: N/A
d) Earth conditions of d.c. link: See UM, chapter 1.5 P
e) Type of batteries: VRLA or NiCd P

TRF No. IEC62040_3A


Page 9 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict
f) Number of batteries and Ah rating: See UM, chapter 10.10 P
g) Stored energy time: See UM, chapter 10.6 P
h) Restored energy time: N/A
i) Nominal d.c. battery charging voltage and toler- See UM, chapter 10.4 P
ance band:
j) Charging current limit value or range: See UM, chapter 10.4 P
k) Battery ripple current or voltage: See UM, chapter 10.4 P
l) Battery undervoltage and/or overvoltage charging Adjustable due to battery P
protection levels: manufacturer’s specification
m) Battery charging regime: See UM, chapter 10.4 (IU, P
DIN 41773)
n) Battery protective device ratings and type and Battery fuse. See UM 10.12.2 P
number:
o) Battery protection requirements: Electronic protection for over P
charging and deep charging
p) Battery cable voltage drop recommendations: N/A
5.5 UPS switches, rated values and performance P
5.5.1 General P
Switches specified by the manufacturer: See user manual P
a) Normal service conditions: See user manual P
b) Continuous duty: See user manual P
5.5.2 UPS switches: specified with (if appropriate): P
a) Voltage and its tolerance band: N/A
b) Number of poles/number of phases: 4 P
c) Continuous current capability: N/A
d) Short-circuit making capability: N/A
e) Short-circuit breaking capability: N/A
f) Overload current capability: N/A
g) Make time: N/A
h) Break time: N/A
i) Circuit repetitive peak off-state voltage: N/A
j) Circuit non-repetitive peak off-state voltage: N/A
k) Leakage current: N/A
l) Max. permissible rate of rise of the off-state N/A
voltage:
m) Losses at rated load: N/A
n) Isolation capability: N/A
o) Load power factor limits: See user manual, chapter P
10.3
p) frequency and its tolerance band See user manual, chapter P
10.5

TRF No. IEC62040_3A


Page 10 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict
q) Rate of rise of current at closing N/A
5.6 Redundant and parallel UPS systems P
5.6.1 Standby redundant UPS P
5.6.1.1 Without bypass shall be stated: With bypass N/A
a) Total number of UPS units N/A
b) UPS ratings and performance N/A
c) UPS switch losses N/A
d) UPS switch ratings N/A
5.6.1.2 With bypass shall be stated: P
a) Total number of UPS units Two or more P
b) UPS ratings and performance Bypass has the same value as P
input
c) UPS switch losses See user manual P
d) UPS switch ratings Bypass switch rating P
according to max. UPS output
power
Bypass ratings as defined in 5.3.3 P
5.6.2 Parallel redundant UPS N/A
5.6.2.1 Without bypass shall be stated: N/A
a) Total number of equal UPS units working N/A
normally in parallel:
b) Total number of UPS units in parallel needed to N/A
supply specified max. continuous load::
c) UPS switch and transfer performance: N/A
d) Continuous rating with all UPS units in operation: N/A
e) Continuous rating with minimum required number N/A
of UPS units in operation
5.6.2.2 With bypass P
a) Total number of equal UPS units working P
normally in parallel:
b) Total number of UPS units in parallel needed to Two or more P
supply specified max. continuous load::
c) UPS switch and transfer performance: N/A
d) Continuous rating with all UPS units in operation: yes P
Bypass rating and performance in accordance with N/A
B.2
5.7 Electromagnetic compatibly P
Complies with IEC 62040-2 See TR-No: Ber111025_2 P
5.8 Signalling circuits P
Complies with IEC 60950 See TR-No: 11-EL-0026.05 P

6 ELCTRICAL TESTS FOR UPS P

TRF No. IEC62040_3A


Page 11 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict
6.1 General P
6.1.1 Type tests P
6.1.2 Routine tests P
6.1.3 Test conditions: Performed in electrical condi- P
tions
6.2 UPS functional unit tests P
6.2.1 UPS rectifier tests comply with IEC 60146-1-1 See TR-No: Ber111025_2 P
clauses 4.1.3 to 4.2
6.2.2 UPS Inverter tests comply with IEC 60146-2 if See TR-No: Ber111025_2 P
applicable
6.2.3 UPS switch tests comply with IEC 60146-1-1 and See TR-No: Ber111025_2 P
IEC 60146-1-2 if applicable
6.2.4 Monitoring and control equipment tests P
Tests comply with IEC 60146-1-1 Comply with IEC 62040-1 P
see TR-No: 11-EL-0026.04
6.2.5 Battery tests P
6.3 Type tests of manufacturer’s declared characteristics as a complete UPS P
If complete UPS testing is not performed at the fac- P
tory, a functional unit test in accordance with 6.2
shall be completed prior to testing on side
6.3.1 Control and monitoring signals P
6.3.2 UPS input tests P
6.3.2.1 Steady-state input voltage tolerance P
6.3.2.2 Input frequency variation P
6.3.3 Input inrush current (see appended table) P
6.3.4 UPS output characteristics-static conditions P
6.3.4.1 Output – normal mode – no load P
6.3.4.2 Output – normal mode – full load (see appended table) P
6.3.4.3 Output – stored energy mode – no load (see appended table) P
6.3.4.4 Output – stored energy mode – full load (see appended table) P
6.3.4.5 UPS rated output fault clearing capability – normal (see appended table) P
mode
6.3.4.6 DC components in the output P
6.3.5 UPS output characteristics – Overload and short-circuit P
6.3.5.1 Output – normal mode - overload P
6.3.5.2 Output - stored energy mode – overload P
6.3.5.3 Output – normal mode – short-circuit (see appended table) P
6.3.5.4 Output – stored energy mode - overload (see appended table) P
6.3.5.5 UPS rated output fault clearing capability – normal P
mode
6.3.5.6 UPS rated output fault clearing capability – stored P
energy mode

TRF No. IEC62040_3A


Page 12 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict
6.3.6 UPS output dynamic tests P
6.3.6.1 Change of operating mode – normal to stored en- (see appended table) P
ergy – linear load
6.3.6.2 Change of operating mode – stored energy to nor- (see appended table) P
mal – linear mode
6.3.6.3 Change of operating mode – stored energy to nor- (see appended table) P
mal mode
6.3.6.4 Change of operating mode – normal to bypass (see appended table) P
mode
6.3.7.1 UPS output load steps – linear load (see appended table) P
6.3.8.1 Reference non-linear load output distortion – normal (see appended table) P
mode
6.3.8.2 Reference non-linear load output distortion – stored (see appended table) P
energy mode
6.3.8.3 Reference non-linear load change of operating (see appended table) P
mode
6.3.8.4 Reference non-linear load steps – normal load < (see appended table) P
4kVA rating
6.3.8.5 Reference non-linear load steps – normal mode > The used Test equipment non N/A
4kVA rating linear load is in a certain way
constructed, that the load
steps are selectable, but the
connection to the UPS Load
side is performed with a global
automatic contactor.
Before a load step change will
be active and released, the to-
tal nonlinear load is discon-
nected from the UPS and with
a time delay reconnected with
the preselected step again. In
this way the equipment is not
able to proceed in steps as
described in clause 6.3.8.5.
The reason for this control of
the non linear load bank is
made to ensure that the inside
used DC capacitors are pre-
charged and discharged in a
secure way.
6.3.8.6 Reference non linear load steps – stored energy (see appended table) P
mode
6.3.9 Stored energy and restored energy tests P
6.3.9.1 Stored energy time P
6.3.9.2 Restored energy time P
6.3.10 Efficiency and input power factor (see appended table) P
(checked with linear and
non-linear load)

TRF No. IEC62040_3A


Page 13 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict
6.3.11 Backfeed tests Permanent connection P
option: - K1: rectifier
- K2: output
- K4: bypass
6.3.12 EMC test See TR-No: Ber111025_2 P
6.6 Factory witness tests/on-site tests P
6.6.1 UPS tests P
6.6.2 Test specifications: With and without bypass, P
linear and non-linear load
6.6.3 Light load test: Output voltage, output P
frequency, maintenance
bypass switch
6.6.4 UPS auxiliary device(s) test N/A
6.6.5 Synchronization test N/A
6.6.5.1 Output frequency slew rate test N/A
6.6.6 AC input failure test (see appended table) P
6.6.7 AC input return test (see appended table) P
6.6.8 Simulation of parallel redundant UPS fault test (see appended table) P
6.6.9 Transfer test (see appended table) P
6.6.10 Full load test P
6.6.11 UPS efficiency test (see appended table) P
6.6.12 Unbalanced load test P
6.6.13 Balanced load test P
6.6.14 Test of current division in parallel or parallel redun- (see appended table) P
dant UPS
6.6.15 Rated stored energy time test P
6.6.16 Rated restored energy time P
6.6.17 Battery ripple current measurement P
6.6.18 Overload capability test (see appended table) P
6.6.19 Short circuit test: (see appended table) P
a) operation of protective devices or circuits N/A
b) peak output short-circuit current P
c) output steady-state short-circuit current and P
length of time
6.6.20 Short-circuit protection device test P
6.6.21 Restart test P
6.6.22 Output overvoltage test P
6.6.23 Periodic output voltage variation test (see appended table) P
6.6.24 Frequency variation test See TR-No: Ber111025_2 P
6.6.25 Radiofrequency interference and conducted noise See TR-No: Ber111025_2 P
test
6.6.26 Harmonic components measurement (see appended table) P

TRF No. IEC62040_3A


Page 14 of 48 Report No. 11-EL-0026.06

IEC 62040-3
Clause Requirement — Test Result — Remark Verdict
6.6.27 Earth fault test TN-S system N/A
6.6.28 On-site ventilation test P
6.6.29 Standby generator compatibility test N/A
6.7 UPS switches testing procedure P
6.7.1 Testing schedule P
6.7.2 Test specification: P
6.7.3 Interconnection cable check P
6.7.4 Light load test a and b P
6.7.5 Full load test P
6.7.6 Transfer test P
6.7.7 Overload capability test (see appended table) P
6.7.8 Short-circuit current capability test (see appended table) P
6.7.9 Overvoltage test (electronic power switches) See TR-No: Ber111025_2 P
-a) Circuit repetitive peak off-state voltage See TR-No: Ber111025_2 P
-b) Circuit non-repetitive peak off-state voltage See TR-No: Ber111025_2 P
6.7.10 Radiofrequency interference and conducted noise See TR-No: Ber111025_2 P
6.7.11 Audible noise Refer to data sheet P
6.7.12 On-site ventilation test P
6.7.13 Earth fault test TN-S system N/A
6.7.13 Additional tests (agreement between the purchaser P
and the supplier

7 NON-ELECTRICAL TEST P
7.1 Environmental and transportation test methods N/A
7.1.1 transportation N/A
7.1.1.1 Shock test N/A
7.1.1.2 Free fall test N/A
7.2 Environments storage and operating test methods N/A
7.2.1 Storage condition tests: N/A
7.2.2 Operating condition tests: 40°C P
7.3 Acoustic noise due to UM, chapter 10.6 P

TRF No. IEC62040_3A


Page 15 of 48 Report No. 11-EL-0026.06

5.2.2.h / TABLE: - Input current total harmonic distortion P


6.6.26 - Harmonic components measurement
Description of test conditions / test construction:

Each single input current phase is measured @ 100 % load and the 3rd , 5th , 7th and 9th current harmon-
ics are measured to achieve the total harmonics distortion of current THDi on the input

Note that THDI is strictly related to Input voltage value and Input Distribution Impedance, therefore meas-
ured values may vary according to mentioned characteristics.

Load Harmonic Phase 1 Phase 2 Phase 2 Remark


(%) No. (dB) (dB) (dB)
100 3 36.4 35.6 35.3 Cab. C

100 5 44.8 43.1 43.4 Cab. C

100 7 40.2 37.9 37.3 Cab. C

100 9 61.5 56.4 53.5 Cab. C

THD Distortion Distortion Distortion Expected value due to the Verdict


at phase 1 at phase 2 at phase 3 specification of the manu-
facturer
see formula to 1.90% 2.21% 2.30% < 3.0% P
THD below

2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20  
       

TRF No. IEC62040_3A


Page 16 of 48 Report No. 11-EL-0026.06

Measured graph:

yellow: input voltage, green: output current THDi at L1

THDi at L2 THDi at L3

TRF No. IEC62040_3A


Page 17 of 48 Report No. 11-EL-0026.06

6.3.3 / TABLE: - Inrush current test P


6.3.6.2 & - Change of operating mode – Stored energy to normal mode – linear load
6.6.7 - AC input return test

Description of test conditions / test construction:

Purpose of test: Demonstrate the reaction of the UPS in case of loss and return of mains.

Procedure: UPS running normally with load. The input switch (Mains) is switched ON and OFF.
Output voltage will be recorded using input current as trigger for the detection of the mains failure.
Note: measure taken with 100% load
IA1

Bypass
IA2 L
O

voltage
A
D
AC/DC DC/AC
current

Measured graph:

1. Loss of mains:

yellow: input voltage; green: input current; purple: output voltage

2. Return of mains:

yellow: input voltage; green: input current; purple: output voltage

TRF No. IEC62040_3A


Page 18 of 48 Report No. 11-EL-0026.06

6.3.4.2 / TABLE: - Output – Normal mode – Full load P


6.6.26 - Harmonic components measurement
Description of test conditions / test construction:

Procedure: Load the unit at 100 % of its nominal capacity. The output voltages as well the output voltage
distortion per phase (3°, 5°, 7°, 9° harmonics) are measured
Note: output harmonic distortion

Load Harmonic Phase 1 Phase 2 Phase 2 Remark


(%) No. (dB) (dB) (dB)
100 3 40.9 40.3 41.0 Cab. C

100 5 55.1 54.9 54.6 Cab. C

100 7 58.9 58.5 55.0 Cab. C

100 9 58.1 59.4 58.6 Cab. C

THD Distortion Distortion Distortion Expected value due to the verdict


at phase 1 at phase 2 at phase 3 specification of the manu-
facturer
see formula to 0.94% 1% 0.94% < 2% P
THD below

2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20  
       

TRF No. IEC62040_3A


Page 19 of 48 Report No. 11-EL-0026.06

Measured graph:

yellow: output voltage, green: output current THDu at L1

THDu at L2 THDu at L3

TRF No. IEC62040_3A


Page 20 of 48 Report No. 11-EL-0026.06

6.3.4.3 / TABLE: - Output – Stored energy mode – No load P


6.6.26 - Harmonic components measurement
Description of test conditions / test construction:

Procedure: Load the unit at 100 % of its nominal capacity. The output voltages as well the output voltage
distortion per phase (3°, 5°, 7°, 9° harmonics) are measured

Load Harmonic Phase 1 Phase 2 Phase 2 Remark


(%) No. (dB) (dB) (dB)
0 3 44.8 44.7 44.8 Cab. C

0 5 53.5 53.1 52.9 Cab. C

0 7 65.4 67.4 65.0 Cab. C

0 9 61.8 59.2 63.0 Cab. C

THD Distortion Distortion Distortion Expected value due to the Verdict


at phase 1 at phase 2 at phase 3 specification of the
manufacturer
see formula to 0.62% 0.63% 0.62% < 2% P
THD below

2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20  
       

TRF No. IEC62040_3A


Page 21 of 48 Report No. 11-EL-0026.06

Measured graph:

Yellow: output voltage THDu at L1

THDu at L2 THDu at L3

TRF No. IEC62040_3A


Page 22 of 48 Report No. 11-EL-0026.06

6.3.4.4 / TABLE: - Output – Stored energy mode – Full load P


6.6.26 - Harmonic components measurement
Description of test conditions / test construction:

Procedure: Load the unit at 100 % of its nominal capacity. The output voltages as well the output voltage
distortion per phase (3°, 5°, 7°, 9° harmonics) are measured

Load Harmonic Phase 1 Phase 2 Phase 2 Remark


(%) No. (dB) (dB) (dB)
100 3 40.2 39.6 39.9 Cab. C

100 5 52.8 52.7 53.3 Cab. C

100 7 55.7 57.5 56.5 Cab. C

100 9 57.4 60.5 59.3 Cab. C

THD Distortion Distortion Distortion Expected value due to the Verdict


at phase 1 at phase 2 at phase 3 specification of the
manufacturer
see formula to 1.03% 1.09% 1.05% < 2% P
THD below

2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20  
       

TRF No. IEC62040_3A


Page 23 of 48 Report No. 11-EL-0026.06

Measured graph:

yellow: output voltage, green: output current THDu at L1

THDu at L2 THDu at L3

TRF No. IEC62040_3A


Page 24 of 48 Report No. 11-EL-0026.06

6.3.4.5 TABLE: Output voltage unbalance test P


Description of test conditions / test construction:

Procedure: phases L1, L2 and L3 will be loaded with symmetric load. An asymmetric load will be
additionally connected to L1 or L2 or L3

Measured graph:

a) Asymmetric load additionally connected to L1

For all 3 graph: yellow: L1 Uout; green: Iout (asymmetric load); purple: L2 Uout; blue: L3 Uout

b) Asymmetric load additionally connected to L2

b) Asymmetric load additionally connected to L3

TRF No. IEC62040_3A


Page 25 of 48 Report No. 11-EL-0026.06

6.3.5.3 / TABLE: - Output – Normal mode – short circuit P


6.6.19. - Short circuit test
6.7.8 - Short circuit current capability test

Description of test conditions / test construction:

Purpose of the test: Demonstrate the operation of the UPS in case of short circuit on the load site.
The inverter should supply the short circuit during 40ms with two times the nominal current.
Procedure: UPS run online without bypass line (Bypass fuses open).
Make a short circuit between the phases and the neutral on the output
Record the output voltage and current

Note: Measure taken without Bypass

IA1
current

Bypass
IA2 L
O
A Fuse

voltage
D
AC/DC DC/AC

Measured graph:

Cabinet C: IRMS = 186.8A

yellow: output voltage


green: output current

TRF No. IEC62040_3A


Page 26 of 48 Report No. 11-EL-0026.06

6.3.5.4 / TABLE: - Output – Stored energy mode – short circuit P


6.6.19 - Short circuit test

Description of test conditions / test construction:

Purpose of the test: Demonstrate the operation of the UPS in case of short circuit on the load site.
The inverter should supply the short circuit during 40ms with two times the nominal current.
Procedure: UPS run online on battery without mains supply.
Make a short circuit between the phases and the neutral on the output
Record the output voltage and current

Note: Measure taken without Bypass


IA1
current

Bypass
IA2 L
O
A Fuse

voltage
D
AC/DC DC/AC

Measured graph: stored energy mode: short circuit

Cabinet C: IRMS = 187.1A

yellow: output voltage, green: output current

TRF No. IEC62040_3A


Page 27 of 48 Report No. 11-EL-0026.06

6.3.6.1 / TABLE: - Change of operating mode – Normal to stored energy mode – linear load P
6.6.6 (resistive)
- AC input failure test
Description of test conditions / test construction:

Purpose of test: Demonstrate the reaction of the UPS in case of loss of mains.

Procedure: UPS running normally with load. The input switch (Mains) is switched OFF.
Output voltage will be recorded using input current as trigger for the detection of the mains failure.

IA1

Bypass
IA2 L
O

voltage
A
voltage

D
AC/DC DC/AC

current

Measured graph:

yellow: input voltage; green: Input current; purple: output voltage

TRF No. IEC62040_3A


Page 28 of 48 Report No. 11-EL-0026.06

6.3.6.3 TABLE: - Change of operating mode – Stored energy to normal mode P

Description of test conditions / test construction:

Purpose of test: Demonstrate the reaction of the UPS in case of loss and return of mains.

Procedure: UPS running in stored energy mode with load. The input switch (Mains) is switched ON.
Output voltage will be recorded using input current as trigger for the detection of return of mains

IA1

Bypass
IA2 L
O

voltage
A
voltage

D
AC/DC DC/AC

current

Measured graph:

Synchrony: mains off (loss of mains)

yellow: input voltage; green: input current; purple: output voltage

TRF No. IEC62040_3A


Page 29 of 48 Report No. 11-EL-0026.06

Measured graph:
Synchronization: Load transfer from stored energy to normal mode

yellow: input voltage; green: input current; purple: output voltage

Load transfer from stored energy to normal

yellow: input voltage, green: input current, purple: output voltage

Synchonisation

yellow: input voltage, green: input current, purple: output voltage

TRF No. IEC62040_3A


Page 30 of 48 Report No. 11-EL-0026.06

6.3.6.4 / TABLE: - Change of operating mode – Normal to bypass mode P


6.6.9 - Transfer test
Description of test conditions / test construction:
Purpose of the test: Demonstrate that the UPS will switch between bypass and inverter without any
interruption on the output voltage.
Procedure: Switch the UPS between bypass and inverter with full load. Record the voltage on the load and
use the bypass current as trigger for the detection of the transfer…
current
current

IA1 current
IA1

Bypass Bypass
IA2 IA2 L
L
O

voltage
O

voltage
A A
D D
AC/DC DC/AC AC/DC DC/AC

Load transfer from normal mode to bypass Load transfer from bypass to normal mode
Measured graph:

Load transfer from normal mode to bypass

yellow: output voltage, green: bypass current

Load transfer from bypass to normal mode

yellow: output voltage, green: bypass current

TRF No. IEC62040_3A


Page 31 of 48 Report No. 11-EL-0026.06

6.3.7.1 TABLE: Output load steps – Linear load P

Description of test conditions / test construction:

Purpose of the test: Demonstrate the reaction of the inverter output voltage when the load of 80% is
switched ON and OFF.

Procedure: Switch ON and OFF the load of 80% supplied by the inverter and record the output voltage. The
output current will be used as a trigger for the detection of the switch ON and OFF of the load of 80%

Note: Output voltage dynamic variations caused by LOAD (20% to 100% and 100% to 20%)

IA1
current

Bypass
IA2 L
O

voltage
A
D
AC/DC DC/AC

Measured graph:

3. Output load changes from 20% to 100%

yellow: output voltage, green: output current

TRF No. IEC62040_3A


Page 32 of 48 Report No. 11-EL-0026.06

Measured graph:

2. Output load changes from 100% to 20%

yellow: output voltage, green: output current

3. Output load changes from 100% to 0% 4. Output load changes from 0% to 100%

yellow: output voltage, green: output current

TRF No. IEC62040_3A


Page 33 of 48 Report No. 11-EL-0026.06

6.3.8.1 TABLE: - Reference non-linear load output distortion – Normal mode P

Description of test conditions / test construction:

Description of test conditions / test construction: non-linear load (due to annex E) the unit at 100 % of its
nominal capacity. The output voltages as well the output voltage distortion per phase (3°, 5°, 7°, 9° harmon-
ics) are measured

Note: Output harmonic distortion

Load Harmonic Phase 1 Phase 2 Phase 3 remark


(%) No. (dB) (dB) (dB)
90 3 33.6 33.2 32.9 Cab.C

90 5 37.9 37.7 37.8 Cab. C

90 7 41.0 40.7 41.3 Cab. C

90 9 47.2 46.7 47.6 Cab. C

THD Distortion Distortion Distortion Expected value due to the Verdict


at phase 1 at phase 2 at phase 3 specification of the manu-
(%) (%) (%) facturer
(%)
see formula to 2.63% 2.75% 2.77% < 4% (with non-linear P
THD below load)

2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20  
       

TRF No. IEC62040_3A


Page 34 of 48 Report No. 11-EL-0026.06

Measured graph:

Detail view of UPS output (Fourier represented graphically for 3 phase)

Yellow: output voltage, green: output current THDu at L1

THDu at L2 THDu at L3

TRF No. IEC62040_3A


Page 35 of 48 Report No. 11-EL-0026.06

6.3.8.2 TABLE: - Reference non-linear load output distortion – Stored energy mode P

Description of test conditions / test construction:

Description of test conditions / test construction: non-linear load (due to annex E) the unit at 100 % of its
nominal capacity. The output voltages as well the output voltage distortion per phase (3°, 5°, 7°, 9° harmon-
ics) are measured

Note: Output harmonic distortion

Load Harmonic Phase 1 Phase 2 Phase 3 remark


(%) No. (dB) (dB) (dB)
90 3 33.1 33.1 32.9 Cab. C
90 5 37.9 38.9 37.8 Cab. C
90 7 41.4 41.4 41.0 Cab. C
90 9 48.5 48.8 47.6 Cab. C

THD Distortion Distortion Distortion Expected value due to the Verdict


at phase 1 at phase 2 at phase 3 specification of the manu-
(%) (%) (%) facturer
(%)
see formula to 2.71 2.65 2.78 < 4% (with non-linear P
THD below load)

2 2 2 2
 3   5   7   9 
THD  100  10 20   10 20   10 20   10 20  
       

TRF No. IEC62040_3A


Page 36 of 48 Report No. 11-EL-0026.06

Measured graph:

Detail view of UPS output (Fourier represented graphically for 3 phase):

Yellow: output voltage, green: output current THDu at L1

THDu at L2 THDu at L3

TRF No. IEC62040_3A


Page 37 of 48 Report No. 11-EL-0026.06

6.3.8.3 TABLE: - Reference non-linear load – Change of operating mode - P


Normal to stored energy mode

Description of test conditions / test construction:

Purpose of test: Demonstrate the reaction of the UPS in case of loss of mains (with non-linear load).

Procedure: UPS running normally with 100% non-linear load. The input switch (Mains) is switched OFF.
Output voltage will be recorded using input current as trigger for the detection of the mains failure.

IA1

Bypass
IA2 L
O

voltage
A
D
AC/DC DC/AC

current

Measured graph:

Input mains failure

Yellow: output voltage, green: input current

TRF No. IEC62040_3A


Page 38 of 48 Report No. 11-EL-0026.06

6.3.8.4 TABLE: - Reference non-linear load steps – Normal mode  4.0 kVA rating P

Description of test conditions / test construction:

Normal mode with 30% linear load of rated output apparent power as base load and additional reference
non-linear load set to 70% of rated output apparent power. Measured the output voltage waveform transient
deviation.

Measured graph:

Yellow: output voltage, green: input current

Remarks: the output voltage is overdriven at the beginning. The output tried to adjust, the output voltage
will be then stabilized.

TRF No. IEC62040_3A


Page 39 of 48 Report No. 11-EL-0026.06

6.3.8.5 TABLE: - Reference non-linear load steps – Normal mode  4.0 kVA rating N/A

Description of test conditions / test construction:

Measured graph:

TRF No. IEC62040_3A


Page 40 of 48 Report No. 11-EL-0026.06

6.3.8.6 TABLE: - Reference non-linear load steps – Stored energy mode P


(6.3.8.4)

Description of test conditions / test construction:

test repeated according to sub-clause 6.3.8.4

Measured graph:

Yellow: output voltage, green: input current

TRF No. IEC62040_3A


Page 41 of 48 Report No. 11-EL-0026.06

6.3.8.6 TABLE: - Reference non-linear load steps – Stored energy mode N/A
(6.3.8.5)

Description of test conditions / test construction: test repeated according to sub-clause 6.3.8.5

Measured graph:

TRF No. IEC62040_3A


Page 42 of 48 Report No. 11-EL-0026.06

6.3.10 / TABLE: - Efficiency and input power factor P


6.6.11 - UPS efficiency test
6.6.23 - Periodic output voltage variation test

Description of test conditions / test construction: at linear load


Measured at Cabinet C

Input power factor: total power of 3 phases

Load Expected value due to Verdict


Active Power Apparent Power Power Factor the specification of the
(%) manufacturer

97 45.7kW 45.9kW 0.996 0.99 P

Load Efficiency Input voltage Output voltage Expected value due to Verdict
(%) (V) (V) the specification of the
manufacturer

25 95.0 233.5 232.8 94.5 P

52 95.6 233.3 232.7 95.0 P

77 95.2 233.1 232.6 95.5 * P

97 95.1 233.1 232.5 95.5 * P

Description of test conditions / test construction: at apparent and active power

Load Efficiency Input power Output power Expected value due to Verdict
(%) the specification of the
manufacturer
Active power at linear load

25 95.0 12.1kW 11.5kW 94.5 P

52 95.6 23.5kW 24.6kW 95.0 P

77 95.2 36.3kW 34.6kW 95.5 * P

97 95.1 45.7kW 43.5kW 95.5 * P

apparent power at linear load

25 95.0 13.1kVA 11.5kVA 94.5 P

52 95.6 25.1kVA 23.5kVA 95.0 P

77 95.2 36.6kVA 34.6kVA 95.5 * P

97 95.1 45.9kVA 43.5kVA 95.5 * P

Note to *): Depending on power rating

TRF No. IEC62040_3A


Page 43 of 48 Report No. 11-EL-0026.06

Description of test conditions / test construction: at reference non-linear load

Load Efficiency Input voltage Output voltage Expected value due to Verdict
(%) (V) (V) the specification of the
manufacturer

25 ** 93.8 233.0 233.0 93.5 P

29 94.1 233.5 232.8 93.5 P

48 94.3 233.4 232.7 94.0 P

50 ** 94.3 233.0 233.0 94.0 P

75 ** 94.3 233.0 233.0 94.5 * P

88 94.2 233.2 232.7 94.5 * P

100 ** 93.8 233.0 233.0 94.5 * P

Description of test conditions / test construction: at apparent and active power

Expected value due to


Load Efficiency
Input Power Output Power the specification of the Verdict
(%) (%)
manufacturer

Active Power at non-linear load

25 ** 93.8 8.7kW 8.2kW 93.5 P

29 94.1 10.7kW 10.0kW 93.5 P

48 94.3 16.4kW 15.5kW 94.0 P

50 ** 94.3 17.9kW 16.9kW 94.0 P

75 ** 94.3 27.2kW 25.6kW 94.5 * P

88 94.2 31.9kW 30.1kW 94.5 * P

100 ** 93.8 36.4kW 34.3kW 94.5 * P

TRF No. IEC62040_3A


Page 44 of 48 Report No. 11-EL-0026.06

Expected value due to


Load Efficiency
Input Power Output Power the specification of the Verdict
(%) (%)
manufacturer

Apparent Power at non-linear load

25 ** 93.8 9.9kVA 12.5kVA 93.5 P

29 94.1 11.8kVA 14.5kVA 93.5 P

48 94.3 18.3kVA 24.0kVA 94.0 P

50 ** 94.3 19.7kVA 25.0kVA 94.0 P

75 ** 94.3 29.6kVA 37.5kVA 94.5 * P

88 94.2 34.6kVA 43.8kVA 94.5 * P

100 ** 93.8 39.5kVA 50.0kVA 94.5 * P

Note to*) depending on power rating.


**) Interpolated values.

PowerScale 50kVA (C-cab) - Efficiency=f(Load_percentage) - Non-Linear Load

100.0%

94.1% 94.3% 94.3% 94.3% 94.2%


95.0%
94.3% 94.3%
93.8% 93.8%

90.0%
Efficiency [%]

Measured
85.0% Interpolated
Poli. (Measured)

80.0%

y = -0.4425x4 + 1.1148x3 - 1.0221x2 + 0.4019x + 0.8859


75.0% R2 = 1

70.0%
0% 20% 40% 60% 80% 100% 120%
Load percentage [%]

TRF No. IEC62040_3A


Page 45 of 48 Report No. 11-EL-0026.06

6.6.8 TABLE: Simulation of parallel redundant UPS fault test P

Description of test conditions / test construction: measures at the system output, load bus-bars
UPS1 UPS2 UPSn

AC/DC AC/DC AC/DC

DC/AC DC/AC DC/AC


IA1 IA1 IA1

IA2 IA2 IA2

LOAD busbars

Measured graph:

yellow: output voltage; green: UPS#1 input current

TRF No. IEC62040_3A


Page 46 of 48 Report No. 11-EL-0026.06

6.6.14 TABLE: Test of current division in parallel or parallel redundant UPS P

Description of test conditions / test construction:

Redundant Parallel System; LOAD sharing. Measures at the system output, LOAD bus-bars

UPS1 UPS2 UPSn

AC/DC AC/DC AC/DC

DC/AC DC/AC DC/AC


IA1 IA1 IA1

IA2 IA2 IA2

LOAD busbars

Measured graph:

yellow=output voltage; green=first UPS current

yellow=output voltage; green=last UPS current

TRF No. IEC62040_3A


Page 47 of 48 Report No. 11-EL-0026.06

6.6.18 TABLE: Overload capability test P


6.7.7

Description of test conditions / test construction:

System will be overloaded with 110% and 135% of normal load. The time will be checked refer to the
specified time interval of the manufacturer.

Overload capability is software controlled.


This table is valid for every PowerScale UPS (A-cab, B-cab and C-cab).

PowerScale Overload time

20.00

15.00

10.00
Min

0.06m in = 4s
0.11m in = 7s
0.95m in = 57s

5.00

0.00

-5.00
104

106

108

110

112

114

116

118

120

122

124

126

128

130

132

134

136

138

140

142

144

146

148

150
% Load

Load Input voltage Input power Output voltage Output power Specified Verdict
(%) (V) (kVA) (kW) (V) (kVA) (kW) time
interval
(s)

110 % @ P
225V 52.0 kW 233V 49.50 kW 10min
PF=1.0

135 % @ P
225V 63.8 kW 233V 60.75 kW 1min
PF=1.0

TRF No. IEC62040_3A


Page 48 of 48 Report No. 11-EL-0026.06

TABLE: List of critical components P


Object/part no. Manufacturer/ Type/model Technical data Standard Mark(s) of con-
trademark formity 1.
See TR-No: 11-EL-0026.04

Supplementary information:
1. An asterisk indicates a mark that assures the agreed level of surveillance.

TRF No. IEC62040_3A