You are on page 1of 76

LISTA DE MATERIALES

PROYECTO: REMODELACIÓN DE PALACIO MUNICIPAL


FACULTAD DE INGENIERA, UASLP
BRIGADA H
CLAVE MATERIAL UNIDAD COSTO
ACABADOS
M-001 PINTURA VINÍLICA PARA INTERIOR BLANCA LT $37.66
M-002 PINTURA ESMALTE LT $90.97
M-003 PEGAPISO O PISO ADECON TON $3,060.34
M-004 VITROPISO M2 $88.77
M-005 AZULEJO M2 $85.00
M-006 BOQUILLA TON $9,655.17
M-007 YESO TON $1,831.90
ALBAÑILERÍA
M-008 CEMENTO GRIS TON $2,931.03
M-009 MORTERO TON $2,224.14
M-010 GRAVA 3/4 M3 $330.46
M-011 TEPETATE MOLIDO M3 $122.72
M-012 ARENA M3 $330.46
M-013 AGUA M3 $43.10
M-014 CALHIDRA TON $1,373.31
M-015 BLOCK HUECO 12X20X40 PZA $9.05
M-016 LADRILLO DE CUÑA RECOCIDO PZA $4.31
M-017 ALAMBRE RECOCIDO KG $25.86
M-018 ALAMBRÓN 1/4" KG $24.14
M-019 VARILLA CORRUGADA 3/8" KG $15.52
M-020 VARILLA CORRUGADA 1/2" KG $15.52
M-021 VARILLA CORRUGADA 5/8" KG $15.52
M-022 VARILLA CORRUGADA 3/4" KG $15.52
M-023 ARMEX 15X20-5 PZA $254.31
M-024 MALLA PARA TECHO PZA $121.31
M-025 CLAVO PARA MADERA 2 1/2" KG $14.22
M-026 CONCRETO PREMEZCLADO F´C: 250 KG/CM2 M3 $1,422.41
M-027 CURACRETO LT $17.39
M-028 DESMOLDANTE LT $51.63
M-029 PIEDRA BRAZA M3 $223.18
M-030 MARCO Y CONTRAMARCO PARA REGISTRO PZA $310.00
CIMBRA
M-031 TRIPLAY DE PINO (4X8) X 9MM M2 $121.45
M-032 RENTA ANDAMIO PZA $258.62
M-033 ACEITE QUEMADO LT $8.50
M-034 POLÍN 3"X3"-8" PZA $59.48
M-035 DUELA DE 1/2´´x 4´´x 8´´ PZA $41.81
INSTALACIONES ESPECIALES
M-036 IMPERMEABILIZANTE CUBETA $ 1,595.00
INSTALACIONES ELECTRICAS
M-037 INTERRUPTOR SENCILLO 3 VÍAS MARCA PZA
LEVITON INCLUYE PLACA $75.00

M-038 RECEPTÁCULO DUPLEX 20 A MARFIL PZA


POLARIZADO MARCA LEVITON CON PLACA $36.00
M-039 FOCO 60 WATTS PZA $25.00
M-040 CINTA DE AISLAR PZA $12.95
M-041 CHALUPA PZA $10.00
M-042 CABLE ELECTRICO CAL. 12 M $3.98
M-043 CAJA CUADRADA METÁLICA 4X4" PZA $17.80
M-044 CAJA CUADRADA METÁLICA 6X6" M $54.26
M-045 POLIDUCTO 3/4" M $3.50
M-046 SOKCET PZA $8.00
PLOMERIA
M-047 LAVAMANOS PEDESTAL AUSTRIA 4" HUESO PZA $999.00
M-048 URINARIO CON VÁLVULA PZA $1,890.00
M-049 TUBERÍA - DN 1/2" PVC M $12.60
M-050 TUBERÍA - DN 1" MM PVC M $26.00
M-051 TUBERÍA - DN 1 1/4" MM PVC M $31.00
M-052 TUBERÍA - DN 4" MM PVC M $35.00
M-053 CODO 90° NORMAL - DN 1/2" PVC PZA $13.50
M-054 CODO 90° NORMAL - DN 1" PVC PZA $25.00
M-055 CODO 90° NORMAL - DN 1 1/4" PVC PZA $28.00
M-056 CODO 90° NORMAL - DN 2" PVC PZA $31.70
M-057 CODO 90° NORMAL - DN 4" MM PVC PZA $42.50
M-058 TINACO DE 450L CON ACCESORIOS PZA $1,449.00
M-059 BOMBA 1/2 hp PZA $504.31
M-060 MANGUERA COFLEX VIN. LAV 1/2X1/2 A0CM PZA $39.90
M-061
MANGUERA COFLEX VIN SANT 1/2X7/8 35 CM PZA $41.50
M-062 TAPA METALICA PARA CISTERNA 60 X 60 PZA $329.00
M-063 CISTERNA DE 2800 LTS PZA $4,836.80
M-064 SANITARIO WC PZA $619.00
CANCELERIA Y PUERTAS
M-065 VENTANA DE 2 X 1 DE ALUMINIO BLANCO PZA $2,835.00
M-066 VENTANA DE 1 X 1 DE ALUMINIO BLANCO PZA $1,450.00
M-067 VENTANA DE 1.5 X 1 DE ALUMINIO BLANCO PZA $1,950.00
M-068 VENTANA DE 2.25 X 0.59 DE ALUMINIO BLANC PZA $1,725.00
M-069 VENTANA DE 1.50 X 0.40 DE ALUMINIO BLANC PZA $1,400.00
M-070 VENTANA DE 0.70 X 1 DE ALUMINIO BLANCO PZA $1,350.00
M-071 VENTANA DE 0.65 X 0.50 DE ALUMINIO BLANC PZA $670.00
M-072 VENTANA DE 1.30 X 1.0 DE ALUMINIO BLANCO PZA $1,315.00
M-073 VENTANA DE 1.20 X 1.0 DE ALUMINIO BLANCO PZA $1,198.00
M-074 PUERTA INGLESA 6 TABLEROS 90X213 CM PZA $1,929.00
M-075 PUERTA INGLESA 6 TABLEROS 80X213 CM PZA $1,929.00
M-076 PUERTA DE ACERO LISA BLANCO C28 90 X 213 PZA $1,299.00
M-077 MARCO PARA PUERTA ACERO BLANCO 90 X 213 PZA $379.00
M-078 MARCO ROSY ROBLE 100 X 220 CM 3 BISAGRAS PZA $539.00
COMBUSTIBLES
M-079 GASOLINA LT $16.98
M-080 DIESEL LT $17.29
M-081 ACEITE LUBRICANTE LT $44.83
SALARIO
SALARIO
CLAVE CATEGORIA FSR
BASE
MO-01 Oficial albañil 271.43 1.6093
MO-02 Ayudante Albañil 171.42 1.6418
MO-03 Oficial pintor 257.14 1.6124
MO-04 Ayudante pintor 162.39 1.6467
MO-05 Ayudante Electrcista 197.14 1.6303

Encargado de
MO-06 192.85 1.6320
bodega
Operador de
MO-07 257.14 1.6124
maquinaria ligera
MO-08 Topográfo 360.00 1.5957
MO-09 Auxiliar topográfo 182.85 1.6363
Carpintero de obra
MO-10 300.00 1.6040
negra

MO-11 Ayudante carpintero 189.46 1.6334

Operador de camion
MO-12 378.51 1.5936
volteo
MO-13 Oficial fierrero 300.00 1.6040
MO-14 Ayudante fierrero 192.85 1.6320
MO-16 Cabo 300.00 1.6040
MO-17 Velador 285.71 1.6066
MO-20 Oficial electricista 357.14 1.5960
MO-21 Chofer de camioneta 197.14 1.6303
MO-22 Oficial plomero 360.00 1.5957
MO-23 Aux Plomero 238.00 1.6172
MO-24 Peón 182.85 1.6363
MO-25 Electricista 299.22 1.6042
MO-26 Ayudante Electrcista 171.42 1.6418
SALARIO
REAL
436.8255838
281.4418033
414.6234618
267.4120509
321.4025156

314.737218

414.6234618

574.4352373
299.2003936
481.2142911

309.4756724

603.1938992
481.2142911
314.737218
481.2142911
459.012169
569.9917055
321.4025156
574.4352373
384.88598
299.2003936
480.0008651
281.4418033
FSR

DIAS PAGADOS DIAS TRABAJADOS

DIAS ANUALES 365 IMPUESTO SOBRE NOMINA(ISN)


AGUINALDO 15 FSI
PRIMA VACACIONAL 2 PRESTACIONES EN ESPECIE
TOTAL 382.0 RIESGOS DE TRABAJO
DIAS NO TRABAJADOS INVALIDEZ Y VIDA
DESCANSO 52.143 CESANTIA EN EDAD AVANZADA
POR LEY 7.167 ENFERMEDAD Y MATERNIDAD
VACACIONES 6 GUARDERIAS
COSTUMBRE 3.5 SALARIO MINIMO
ENFERMEDAD 1
CLIMA 2
TOTAL 71.810

OFICIAL AYUDANTE AYUDANTE OFICIAL


OFICIAL PINTOR
ALBAÑIL ALBAÑIL PINTOR ELECATRICISTA

SALARIO BASE SEMANAL $ 1,900.0 $ 1,199.9 $ 1,800.0 $ 1,136.7 $ 2,500.0


SALARIO BASE DIARIO $ 271.430 $ 171.420 $ 257.140 $ 162.390 $ 357.140
SALARIO BASE + ISN $ 278.22 $ 175.71 $ 263.57 $ 166.45 $ 366.07
SALARIO INTEGADO $ 362.490 $ 228.928 $ 343.406 $ 216.869 $ 476.954

CARPINTERO OPERADOR DE
AYUDANTE CHOFER DE
DE OBRA CAMION CABO
CARPINTERO CAMIONETAS
NEGRA VOLTEO

SALARIO BASE SEMANAL $ 2,100.000 $ 1,326.2 $ 2,649.6 $ 1,380.0 $ 2,100.000


SALARIO BASE DIARIO $ 300.000 $ 189.464 $ 378.510 $ 197.140 $ 300.000
SALARIO BASE + ISN $ 307.50 $ 194.20 $ 387.97 $ 202.07 $ 307.50
SALARIO INTEGADO $ 400.644 $ 253.025 $ 505.493 $ 263.277 $ 400.644

IMSS

OFICIAL AYUDANTE AYUDANTE OFICIAL


OFICIAL PINTOR
ALBAÑIL ALBAÑIL PINTOR ELECTRICISTA

PRESTACIONES EN ESPECIE $ 3.806 $ 2.404 $ 3.606 $ 2.277 $ 5.008


RIESGOS DE TRABAJO $ 27.508 $ 17.373 $ 26.060 $ 16.458 $ 36.195
INVALIDEZ Y VIDA $ 6.344 $ 4.006 $ 6.010 $ 3.795 $ 8.347
CESANTIA EN EDAD AVANZADA Y VEJEZ $ 11.418 $ 7.211 $ 10.817 $ 6.831 $ 15.024
ENFERMEDAD Y MATERNIDAD $ 21.634 $ 19.230 $ 21.291 $ 19.013 $ 23.695
GUARDERIAS $ 3.62 $ 2.29 $ 3.43 $ 2.17 $ 4.77
IMSS $ 74.34 $ 52.51 $ 71.22 $ 50.54 $ 93.04
SALARIO REAL $ 436.826 $ 281.442 $ 414.623 $ 267.412 $ 569.992
FSR 1.60935 1.64183 1.61244 1.64673 1.59599

IMSS
CARPINTERO OPERADOR DE
AYUDANTE CHOFER DE
DE OBRA CAMION CABO
CARPINTERO CAMIONETAS
NEGRA VOLTEO

PRESTACIONES EN ESPECIE $ 4.207 $ 2.657 $ 5.308 $ 2.764 $ 4.207


RIESGOS DE TRABAJO $ 30.404 $ 19.201 $ 38.361 $ 19.979 $ 30.404
INVALIDEZ Y VIDA $ 7.011 $ 4.428 $ 8.846 $ 4.607 $ 7.011
CESANTIA EN EDAD AVANZADA Y VEJEZ $ 12.620 $ 7.970 $ 15.923 $ 8.293 $ 12.620
ENFERMEDAD Y MATERNIDAD $ 22.321 $ 19.664 $ 24.208 $ 19.849 $ 22.321
GUARDERIAS $ 4.01 $ 2.53 $ 5.05 $ 2.63 $ 4.01
IMSS $ 80.57 $ 56.45 $ 97.70 $ 58.13 $ 80.57
SALARIO REAL $ 481.214 $ 309.476 $ 603.194 $ 321.403 $ 481.214
FSR 1.60405 1.63343 1.59360 1.63033 1.60405
Entidad Porcentaje del Pagina de
S TRABAJADOS 293.190 Federativa Impuesto Internet
San Luis Potosí 2.50% http://www.slpfina
O SOBRE NOMINA(ISN) 2.5 % nzas.gob.m

FSI 1.303 %
CIONES EN ESPECIE 1.05% %
GOS DE TRABAJO 7.58875%
ALIDEZ Y VIDA 1.75%
A EN EDAD AVANZADA 3.15%
EDAD Y MATERNIDAD
UARDERIAS 1.00%
LARIO MINIMO $ 88.36

OPERADOR DE
AYUDANTE ENCARGADO AUXILIAR OFICIAL AYUDANTE
MAQUINA TOPOGRAFO
ELECTRICISTA DE BODEGA TOPOGRAFICO FIERRERO FIERRERO
LIGERA

$ 1,380.0 $ 1,350.0 $ 1,800.0 $ 2,520.000 $ 1,280.0 $ 2,100.000 $ 1,350.0


$ 197.140 $ 192.850 $ 257.140 $ 360.000 $ 182.850 $ 300.000 $ 192.850
$ 202.07 $ 197.67 $ 263.57 $ 369.00 $ 187.42 $ 307.50 $ 197.67
$ 263.277 $ 257.548 $ 343.406 $ 480.773 $ 244.193 $ 400.644 $ 257.548

OFICIAL AYUDANTE AYUDANTE


PEON VELADOR ELECTRICISTA
PLOMERO PLOMERO ELECTRICISTA

$ 1,280.0 $ 2,520.000 $ 1,666.000 $ 2,000.0 $ 2,094.5 $ 1,199.9


$ 182.850 $ 360.000 $ 238.000 $ 285.710 $ 299.219 $ 171.420
$ 187.42 $ 369.00 $ 243.95 $ 292.85 $ 306.70 $ 175.71
$ 244.193 $ 480.773 $ 317.845 $ 381.560 $ 399.601 $ 228.928

IMSS
OPERADOR DE
AYUDANTE ENCARGADO AUXILIAR OFICIAL AYUDANTE
MÁQUINA TOPOGRAFO
ELECTRICISTA DE BODEGA TOPOGRAFO FIERRERO FIERRERO
LIGERA

$ 2.764 $ 2.704 $ 3.606 $ 5.048 $ 2.564 $ 4.207 $ 2.704


$ 19.979 $ 19.545 $ 26.060 $ 36.485 $ 18.531 $ 30.404 $ 19.545
$ 4.607 $ 4.507 $ 6.010 $ 8.414 $ 4.273 $ 7.011 $ 4.507
$ 8.293 $ 8.113 $ 10.817 $ 15.144 $ 7.692 $ 12.620 $ 8.113
$ 19.849 $ 19.745 $ 21.291 $ 23.763 $ 19.505 $ 22.321 $ 19.745
$ 2.63 $ 2.58 $ 3.43 $ 4.81 $ 2.44 $ 4.01 $ 2.58
$ 58.13 $ 57.19 $ 71.22 $ 93.66 $ 55.01 $ 80.57 $ 57.19
$ 321.403 $ 314.737 $ 414.623 $ 574.435 $ 299.200 $ 481.214 $ 314.737
1.63033 1.63203 1.61244 1.59565 1.63632 1.60405 1.63203

MSS

OFICIAL AUXILIAR AYUDANTE


PEON VELADOR ELECTRICISTA
PLOMERO PLOMERO ELECTRICISTA

$ 2.564 $ 5.048 $ 3.337 $ 4.006 $ 4.196 $ 2.404


$ 18.531 $ 36.485 $ 24.120 $ 28.956 $ 30.325 $ 17.373
$ 4.273 $ 8.414 $ 5.562 $ 6.677 $ 6.993 $ 4.006
$ 7.692 $ 15.144 $ 10.012 $ 12.019 $ 12.587 $ 7.211
$ 19.505 $ 23.763 $ 20.831 $ 21.978 $ 22.302 $ 19.230
$ 2.44 $ 4.81 $ 3.18 $ 3.82 $ 4.00 $ 2.29
$ 55.01 $ 93.66 $ 67.04 $ 77.45 $ 80.40 $ 52.51
$ 299.200 $ 574.435 $ 384.886 $ 459.012 $ 480.001 $ 281.442
1.63632 1.59565 1.61717 1.60657 1.60418 1.64183
Básicos

MORTERO ARENA 1:% (M3) UNIDAD COSTO


CEMENTANTE MORTERO TN $2,224.14
PETREOS ARENA M3 $330.46
COMPLEMENTO AGUA M3 $43.10

MORTERO CEMENTO-MORTERO- UNIDAD COSTO


ARENA 1:1:5 (M3)
CEMENTANTE CEMENTO GRIS TN $2,931.03
CEMENTANTE MORTERO TN $2,224.14
PETREOS ARENA M3 $330.46
COMPLEMENTO AGUA M3 $43.10

MORTERO CEMENTO-ARENA 1:5 UNIDAD COSTO


(M3)
CEMENTANTE CEMENTO GRIS TN $2,931.03
PETREOS ARENA M3 $330.46
COMPLEMENTO AGUA M3 $43.10

CONCRETO F´C=100 KG/CM2 (M3) UNIDAD COSTO


CEMENTANTE CEMENTO GRIS TN $2,931.03
PETREOS ARENA M3 $330.46
PETREOS GRAVA 3/4 M3 $330.46
COMPLEMENTO AGUA M3 $43.10

CONCRETO F´C=150 KG/CM2 (M3) UNIDAD COSTO


CEMENTANTE CEMENTO GRIS TN $2,931.03
PETREOS ARENA M3 $330.46
PETREOS GRAVA 3/4 M3 $330.46
COMPLEMENTO AGUA M3 $43.10

CONCRETO F´C=200 KG/CM2 (M3) UNIDAD COSTO


CEMENTANTE CEMENTO GRIS TN $2,931.03
PETREOS ARENA M3 $330.46
PETREOS GRAVA 3/4 M3 $330.46
COMPLEMENTO AGUA M3 $43.10

CONCRETO F´C=250 KG/CM2 (M3) UNIDAD COSTO


CEMENTANTE CEMENTO GRIS TN $2,931.03
PETREOS ARENA M3 $330.46
PETREOS GRAVA 3/5 M3 $330.46
COMPLEMENTO AGUA M3 $43.10

ANDAMIO (UN) UNIDAD COSTO


CIMBRAS POLIN 3´´x 3´´x 8´ PZ $59.48

CIMBRA DE LOSA (M2) UNIDAD COSTO


TRIPLAY PINO PARA CIMBRA 9 mm x
CIMBRAS PZ $121.45
1.22M x2.44M
CIMBRAS POLIN 3´´x 3´´x 8´ PZ $59.48
CIMBRAS DUELA DE 1/2´´x 4´´x 8´´ PZ $41.81

CIMBRA DE CASTILLO, UNIDAD COSTO


CERRAMIENTO O BANQUETA (LT)
CIMBRAS DUELA DE 1/2´´x 4´´x 8´´ PZ $41.81
CIMBRA DE TRABE (LT) UNIDAD COSTO
CIMBRAS DUELA DE 1/2´´x 4´´x 8´´ PZ $41.81

FIRME BASICO (LT) UNIDAD COSTO


BASICO CONCRETO F´C=150 KG/CM2 M3 $1,297.30
CIMBRA DE CASTILLO,
BASICO LT $83.62
CERRAMIENTO O BANQUETA

MURO DE TABIQUE PLANA BAJA


UNIDAD COSTO
BASICO (M2)
MORTERO CEMENTO-MORTERO-
BASICO M3 $1,412.05
ARENA 1:1:5
BASICO ANDAMIO UN $0.59
PETREOS TABIQUE RECOCIDO PZ $4.31

MURO DE TABIQUE PLANA BAJO UNIDAD COSTO


BASICO (M2)
BASICO MORTERO CEMENTO-ARENA 1:5 M3 $1,412.05
BASICO ANDAMIO UN $0.59
PETREOS BLOCK 12x20x40 PZ $9.05

APLANADO DE MEZCLA BASICO PB UNIDAD COSTO


(M2)
MORTERO CEMENTO-MORTERO-
BASICO M3 $1,412.05
ARENA 1:1:5
BASICO ANDAMIO UN $0.59

APLANADO DE MEZCLA BASICO N1 UNIDAD COSTO


(M2)
MORTERO CEMENTO-MORTERO-
BASICO M3 $1,412.05
ARENA 1:1:5
BASICO ANDAMIO UN $0.59

APLANADO DE MEZCLA BASICO N2 UNIDAD COSTO


(M2)
MORTERO CEMENTO-MORTERO-
BASICO M3 $1,412.05
ARENA 1:1:5
BASICO ANDAMIO UN $0.59

APLANADO DE MEZCLA BASICO N3 UNIDAD COSTO


(M2)
MORTERO CEMENTO-MORTERO-
BASICO $1,412.05
ARENA 1:1:5
BASICO ANDAMIO $0.59

CURADO DE LOSA (M2) UNIDAD COSTO


CEMENTANTE CEMENTO GRIS TN $2,931.03
COMPLEMENTO CURA CRETO LT $17.39
COMPLEMENTO AGUA M3 $43.10
COMPLEMENTO DIESSEL LT $17.29

RELLENO Y COMPACTADO (M3) UNIDAD COSTO


PETREOS RELLENO M3 $122.72

PLANTILLA DE CONCRETO (M3) UNIDAD COSTO


BASICO CONCRETO F´C=100 KG/CM2 M3 $1,150.41
CANTIDAD PRECIO
0.26 $578.28
1.08 $356.90
0.27 $11.64

TOTAL $946.81

CANTIDAD PRECIO
0.17 $498.28
0.14 $311.38
1.123 $371.11
0.35 $15.09

TOTAL $1,195.85

CANTIDAD PRECIO
0.35 $1,025.86
1.123 $371.11
0.35 $15.09

TOTAL $1,412.05

CANTIDAD PRECIO
0.25 $732.76
0.531 $175.47
0.7 $231.32
0.252 $10.86

TOTAL $1,150.41

CANTIDAD PRECIO
0.3 $879.31
0.532 $175.80
0.7 $231.32
0.252 $10.86

TOTAL $1,297.30

CANTIDAD PRECIO
0.35 $1,025.86
0.665 $219.76
0.76 $251.15
0.23 $9.91

TOTAL $1,506.68
CANTIDAD PRECIO
0.4 $1,172.41
0.77 $254.45
0.7 $231.32
0.21 $9.05

TOTAL $1,667.24

CANTIDAD PRECIO
0.01 $0.59

TOTAL $0.59

CANTIDAD PRECIO
0.33 $40.08
2.5 $148.70
1 $41.81

TOTAL $230.59

CANTIDAD PRECIO
2 $83.62

TOTAL $83.62
CANTIDAD PRECIO
4 $167.24

TOTAL $167.24

CANTIDAD PRECIO
0.09 $116.76
0.05 $4.18

TOTAL $120.94

CANTIDAD PRECIO

0.0515 $72.72
1 $0.59
55 $237.05

TOTAL $310.37

CANTIDAD PRECIO
0.0309 $43.63
1 $0.59
13.125 $118.78

TOTAL $163.01

CANTIDAD PRECIO

0.0355 $50.13
1 $0.59

TOTAL $50.72

CANTIDAD PRECIO

0.0355 $50.13
2 $1.19

TOTAL $51.32

CANTIDAD PRECIO

0.0355 $50.13
3 $1.78

TOTAL $51.91

CANTIDAD PRECIO

0.0355 $50.13
4 $2.38

TOTAL $52.51

CANTIDAD PRECIO
0.0013 $3.81
0.1667 $2.90
0.001 $0.04
0.0556 $0.96

TOTAL $7.71

CANTIDAD PRECIO
1.35 $165.67

TOTAL $165.67

CANTIDAD PRECIO
1 $1,150.41

TOTAL $1,150.41
CMO-001 1.0 Oficial albañil + 1.0 ayudante
Costo Rendimiento
Elemento: Unidad Cantidad unitario Costo Total
Oficial albañil Jor 1 436.83 1 $ 436.83
Ayudante Jor 1 $ 281.44 1 $ 281.44
Subtotal $ 718.27
Herrramienta % 5% $ 718.27 1 $ 35.91
Total: $ 754.18

CMO-002 2.0 Oficial albañil + 3.0 ayudante


Costo Rendimiento
Elemento: Unidad Cantidad unitario Costo Total
Oficial albañil Jor 2 436.83 1 $ 873.65
Ayudante Jor 3 $ 281.44 1 $ 844.33
Subtotal $ 1,717.98
Herrramienta % 5% $ 1,717.98 1 $ 85.90
Total: $ 1,803.88

CMO-002 Topografo + 1 auxiliar topografo


Costo
Elemento: Unidad Cantidad unitario Rendimiento Costo Total
Topógrafo Jor 1 $ 574.44 1 $ 574.44
Auxiliar
topógrafo Jor 2 $ 299.20 1 $ 598.40
Subtotal $ 1,172.84
Herrramienta % 5% $ 1,172.84 1 $ 58.64
Total: $ 1,231.48

CMO-003 Oficial plomero + Auxiliar plomero


Costo
Elemento: Unidad Cantidad unitario Rendimiento Costo Total

Oficial plomero Jor 1 $ 574.44 1 $ 574.44


Auxiliar
plomero Jor 1 $ 384.89 1 $ 384.89
Subtotal $ 959.32
Herrramienta % 5% $ 959.32 1 $ 47.97
Total: $ 1,007.29

CMO-004 Velador
Costo
Elemento: Unidad Cantidad unitario Rendimiento Costo Total
Velador Jor 1 $ 459.01 1 $ 459.01
Subtotal $ 459.01
Herrramienta % 5% $ 459.01 1 $ 22.95
Total: $ 481.96

CMO-006 1.0 Oficial Carpintero + 1.5 Ayudante


Costo
Elemento: Unidad Cantidad unitario Rendimiento Costo Total
Carpintero Jor 1 $ 481.21 1 $ 481.21
Ayudante Jor 1.5 $ 309.48 1 $ 464.21
Subtotal $ 945.43
Herrramienta % 5% $ 945.43 1 $ 47.27
Total: $ 992.70
CMO-008 Pintor + Ayudante
Unidad Cantidad Costo
Elemento: unitario Rendimiento Costo Total
Pintor Jor 1 $ 414.62 1 $ 414.62
Ayudante Jor 1 $ 267.41 1 $ 267.41
Subtotal $ 682.04
Herrramienta % 5% $ 682.04 1 $ 34.10
Total: $ 716.14

CMO-009 1.0 OFICIAL ELECTRICISTA + 1.0 AYUDANTE


Unidad Cantidad Costo
Elemento: unitario Rendimiento Costo Total
Pintor Jor 1 $ 480.00 1 $ 480.00
Ayudante Jor 1 $ 281.44 1 $ 281.44
-0.9 Subtotal $ 761.44
Herrramienta % 6% $ 761.44 1 $ 45.69
Total: $ 807.13

CMO-010 1.0 Oficial fierrero + 2.0 Ayudantes fierreros


Costo
Elemento: Unidad Cantidad unitario Rendimiento Costo Total
Oficial fierrero Jor 1 $ 481.21 1 $ 481.21
Ayudante
fierrero Jor 2 $ 314.74 1 $ 629.47
Subtotal $ 1,110.69
Herrramienta % 5% $ 1,110.69 1 $ 55.53
Total: $ 1,166.22

CMO-012 1.0 Oficial albañil + 2.0 ayudantes


Costo Rendimiento
Elemento: Unidad Cantidad unitario Costo Total

Oficial albañil Jor 1 436.83 1 $ 436.83


Ayudante Jor 2 281.44 1 $ 562.88
Subtotal $ 999.71
Herrramienta % 5% $ 999.71 1 $ 49.99
Total: $ 1,049.69

CMO-005 1.0 CABO + 1.0 PEON


Costo
Elemento: Unidad Cantidad unitario Rendimiento Costo Total
Cabo Jor 1 $ 481.21 1 $ 481.21
Peón Jor 1 $ 299.20 1 $ 299.20
Subtotal $ 780.41
Herrramienta % 5% $ 780.41 1 $ 39.02
Total: $ 819.44
Camion de volteo KENWORTH, 7 m3. Modelo: T-300. Motor: CATERPILLAR 250 HP
Costo de maquina (Cm)= $ 540,000.00 CARGOS FIJOS
Valor llantas (Pn)= $ 18,144.00 Depreciacion D=(Vm-Vr)/Ve
Valor Piezas esp. (Pa)= $ - Inversion Im=(Vm+Vr)*i/(2*Hea)
Valor de maquina (Vm)= $ 521,856.00 Seguros Sm=(Vm+Vr)*s/(2*Hea)
Horas efec. al año (Hea)= 2000.00 Mantenimiento Mn=Ko*D
Vida economica (V)= 8.00
Tasa seguro (s)= 3% Total de cargos Fijos:
% Mantenimiento (ko)= 100%
% Rescate (r)= 20%
Tasa interes (i)= 16%
Vr=Vm*r $ 104,371.20
Ve=V*Hea 16000.00
CONSUMOS
Descripcion Unidad Cantidad Costo
Diesel l 23.25 $ 17.29
Aceite Lubricante l 0.545 $ 44.83
6 llantas 11R24.5 Jgo 0.0005 $ 18,144.00
Total de Consumo:
OPERACION
Descripcion Unidad Cantidad Costo
Operador de Camión Jor 0.125 $ 311.58
Total de Operacion:
TOTAL DE COSTO HORARIO: $ 556.38

Bailarina Apisonador Hyundai Motor Hyundai 4 Hp Hybk850


Costo de maquina (Cm)= $ 23,996.00 CARGOS FIJOS
Valor llantas (Pn)= $ - Depreciacion D=(Vm-Vr)/Ve
Valor Piezas esp. (Pa)= $ - Inversion Im=(Vm+Vr)*i/(2*Hea)
Valor de maquina (Vm)= $ 23,996.00 Seguros Sm=(Vm+Vr)*s/(2*Hea)
Horas efec. al año (Hea)= 1000.00 Mantenimiento Mn=Ko*D
Vida economica (V)= 3.00
Tasa seguro (s)= 0% Total de cargos Fijos:
% Mantenimiento (ko)= 8%
% Rescate (r)= 8%
Tasa interes (i)= 16%
Vr=Vm*r $ 1,919.68
Ve=V*Hea 3000.00
CONSUMOS
Descripcion Unidad Cantidad Costo
Gasolina l 2.2 $ 16.98
Aceite Lubricante l 0.1 $ 44.83

Total de Consumo:

Vibrador De Concreto 1400W CHICOT 12830G Bosch


Costo de maquina (Cm)= $ 16,346.00 CARGOS FIJOS
Valor llantas (Pn)= $ - Depreciacion D=(Vm-Vr)/Ve
Valor Piezas esp. (Pa)= $ - Inversion Im=(Vm+Vr)*i/(2*Hea)
Valor de maquina (Vm)= $ 16,346.00 Seguros Sm=(Vm+Vr)*s/(2*Hea)
Horas efec. al año (Hea)= 1200.00 Mantenimiento Mn=Ko*D
Vida economica (V)= 3.00
Tasa seguro (s)= 2% Total de cargos Fijos:
% Mantenimiento (ko)= 8%
% Rescate (r)= 9%
Tasa interes (i)= 16%
Vr=Vm*r $ 1,471.14
Ve=V*Hea 3600.00
CONSUMOS
Descripcion Unidad Cantidad Costo
Gasolina l 3 $ 16.98
Aceite Lubricante l 0.1 $ 44.83

Total de Consumo:
: CATERPILLAR 250 HP Camion Pipa de Agua FREIGHTLINER M2, Motor M. Benz 210 HP, Tanqu
Costo de maquina (Cm)= $ 520,000.00
Vm-Vr)/Ve $ 26.09 Valor llantas (Pn)= $ 17,136.00
+Vr)*i/(2*Hea) $ 25.05 Valor Piezas esp. (Pa)= $ -
Vr)*s/(2*Hea) $ 4.70 Valor de maquina (Vm)= $ 502,864.00
n=Ko*D $ 26.09 Horas efec. al año (Hea)= 2000.00
Vida economica (V)= 8.00
$ 81.93 Tasa seguro (s)= 3%
% Mantenimiento (ko)= 100%
% Rescate (r)= 20%
Tasa interes (i)= 16%
Vr=Vm*r $ 100,572.80
Ve=V*Hea 16000.00
CONSUMOS
Importe Descripcion Unidad
$ 401.99 Diesel l
$ 24.43 Aceite Lubricante l
$ 9.07 6 llantas 11R 22.5 Jgo
$ 435.50
OPERACION
Importe Descripcion Unidad
$ 38.95 Operador de Camión Jor
$ 38.95
TOTAL DE COSTO HORARIO:

p Hybk850 Revolvedora De Cemento 1 Saco Ecomaqmx Con


Costo de maquina (Cm)= $ 22,700.00
Vm-Vr)/Ve $ 7.36 Valor llantas (Pn)= $ -
+Vr)*i/(2*Hea) $ 2.07 Valor Piezas esp. (Pa)= $ -
Vr)*s/(2*Hea) $ - Valor de maquina (Vm)= $ 22,700.00
n=Ko*D $ 0.59 Horas efec. al año (Hea)= 1000.00
Vida economica (V)= 3.00
$ 10.02 Tasa seguro (s)= 0%
% Mantenimiento (ko)= 10%
% Rescate (r)= 10%
Tasa interes (i)= 16%
Vr=Vm*r $ 2,270.00
Ve=V*Hea 3000.00
CONSUMOS
Importe Descripcion Unidad
$ 37.36 Gasolina l
$ 4.48 Aceite Lubricante l

$ 41.84

G Bosch

Vm-Vr)/Ve $ 4.13
+Vr)*i/(2*Hea) $ 1.19
Vr)*s/(2*Hea) $ 0.15
n=Ko*D $ 0.33

$ 5.80

Importe
$ 50.94
$ 4.48

$ 55.42
M2, Motor M. Benz 210 HP, Tanque de Agua de 10,000 L Cal. 10
CARGOS FIJOS
Depreciacion D=(Vm-Vr)/Ve $ 25.14
Inversion Im=(Vm+Vr)*i/(2*Hea) $ 24.14
Seguros Sm=(Vm+Vr)*s/(2*Hea) $ 4.53
Mantenimiento Mn=Ko*D $ 25.14

Total de cargos Fijos: $ 78.95

Cantidad Costo Importe


20 $ 17.29 $ 345.80
0.615 $ 44.83 $ 27.57
0.0005 $ 17,136.00 $ 8.57
Total de Consumo: $ 381.94

Cantidad Costo Importe


0.125 $ 311.58 $ 38.95
Total de Operacion: $ 38.95
$ 499.84

e Cemento 1 Saco Ecomaqmx Con 9.3hp


CARGOS FIJOS
Depreciacion D=(Vm-Vr)/Ve $ 6.81
Inversion Im=(Vm+Vr)*i/(2*Hea) $ 2.00
Seguros Sm=(Vm+Vr)*s/(2*Hea) $ -
Mantenimiento Mn=Ko*D $ 0.68

Total de cargos Fijos: $ 9.49


Cantidad Costo Importe
3 $ 16.98 $ 50.94
0.1 $ 44.83 $ 4.48

Total de Consumo: $ 55.42


CATALOGO DE CONCEPTOS

PRELIMINARES

CLAVE DESCRIPCION UNIDAD CANTIDAD P.U.

TRAZO PARA DESPLANTE DE ESTRUCTURA,


V01.042 M2 67.7 0.38488598
ESTABLECIENDO EJES DE REFERENCIA

DEMOLICION DE LOSA EXISTENTES CON 10


CM DE ESPESOR POR MEDIOS MANUALES,
INCLUYE: MANO DE OBRA, EQUIPO, M2 120.7267 27.314513963
HERRAMIENTA Y TODO LO NECESARIO PARA
SU EJECUCION

CARGA Y ACARREO DE MATERIAL PRODUCTO


DE LAS DEMOLICIONES HASTA EL LUGAR DE
M3 12.07 37.48488462
TIRO AUTORIZADO. INCLUYE: CARGA,
DESCARGA Y ACARREO 1ER KM

ACARREO DE MATERIAL PRODUCTO DE


M3 12.07 3.9741124429
DEMOLICIÓN KM SUBSECUENTE
REGISTRO SANITARIO DE 80X 60 CM,
PROFUNDIDAD VARIABLE, DE TABIQUE
COMUN, CON APLANADO DE MEZCLA CON PZA 1 1108.7547248
ACABADO PULIDO, INCLUYE MARCO Y
CONTRAMARCO
SUBTOTAL

CIMENTACION
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U

EXCAVACIÓN EN CEPA PARA DESPLANTE DE


CIMENTACIÓN INCLUYE AFINE DE TALUDES,
M3 34.56 50.278717102
MANO DE OBRA, HERAMIENTA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCIÓN.

PLANTILLA DE CONCRETO POBRE CON UN


F'c=100kg/cm2 Y ESPESOR DE 5 A 7 cm. HECHO
EN OBRA. INCLUYE: MATERIALES, MANO DE M2 86.99 117.39890426
OBRA, EQUIPO, HERRAMIENTAS Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN CIMENTACIÓN


DE MAMPOSTERÍA; INCLUYE: PIEDRA
BRAZA,MORTERO CEMENTO ARENA 1:5 , M3 88.64 969.99441485
MANO DE OBRA, HERRAMIENTA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCIÓN.

CADENA DE DESPLANTE; INCLUYE:


CONCRETO F'C=200KG/CM2, CIMBRA,
ARMADO, MANO DE OBRA, HERRMIENTA Y ML 88.64 166.31
TODO LO NECESARIO PARA SU CORRECTA
EJECUCIÓN.

RELLENO EN CEPAS POR CUALQUIER MEDIO,


CON PRODUCTO DE EXCAVACION, INLCLUYE:
M3 9.3072 166.60
HUMEDAD OPTIMA, HERRAMIENTA, MANO DE
OBRA.
SUBTOTAL=
ALBAÑILERIA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U

FIRME DE CONCRETO CON F´C= 150 KG/CM2


CON 10 CM DE ESPESOR HECHO A MANO,
INCLUYE: MANO DE OBRA, HERRAMIENTA, M2 87 281.42
ARMADO DE ACERO Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCIÓN

MURO DE TABIQUE COMUN ACABADO


SIMPLE, ASENTADO CON MORTERO CEMENTO
ARENA 1:5 CON JUNTA DE 1 CM INCLUYE:
M2 147.25 340.97
MATERIALES, MANO DE OBRA, HERRAMIENTA,
EQUIPO ANDAMIOS CORTES, DESPERDICIOS
Y ACARREOS ELEVACION A CUALQUIER NIVEL

CASTILLOS DE 15X15, INCLUYE:CONCRETO


F'C=250KG/CM2, 4 VARILLAS CORRUGADA DE
3/8", ESTRIBOS #2 @ 15 CM, CIMBRA Y ML 79.25 193.11
DESCIMBRADO, MANO DE OBRA Y LO
NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE LOSA DE


CONCRETO EN AZOTEA CON F´C=250 KG/CM2,
CON UN ESPESOR DE 12 CM, ACERO DE
REFUERO DE FY=4200 DE 3/8" @30 CM
M2 87 484.20
INCLUYE: MANO DE OBRA, HERRAMIENTA,
ARMADO DE ACERO, CIMBRA Y
DESCIMBRADO, Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCIÓN.

SUBTOTAL

INSTALACIONES HIDROSANITARIAS
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U
MUEBLES PARA BAÑO (INCLUYE SANITARIO,
JGO 1 3,210.33
LAVABO Y ACCESORIOS)

SUMINISTRO Y COLOCACIÓN DE TUBERIA DE


CPVC DE 1", INCLUYE: MATERIAL, MANO DE
ML 10.65 82.37
OBRA, ACCESORIOS Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACIÓN DE TUBERIA DE


CPVC DE 1 1/4", INCLUYE: MATERIAL, MANO
ML 1.8412 69.49
DE OBRA, ACCESORIOS Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACIÓN DE TUBERIA DE


CPVC DE 1/2", INCLUYE: MATERIAL, MANO DE
ML 22.8 75.20
OBRA, ACCESORIOS Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACION DE BOMBA


CENTRIFUGA DE 1/2 HP, INCLUYE:
PZA 1 1,007.95
MATERIALES, MANO DE OBRA Y
HERRAMIENTA

SUBTOTAL

INSTALACIÓN ELÉCTRICA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U
SALIDA ELÉCTRICA CON POLIDUCTO DE 1" DE
DIÁMETRO INCLUYE CABLEADO DE CALIBRE SALIDA 23 257.64
12 TWH

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE


POLIDUCTO 1" INCLUYE: CANALIZACIÓN,
ML 95 85.53
CABLE Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE SOCKET


INCLUYE HERRAJER, TORNILLERÍA Y TODO LO PZA 9 22.19
NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACIÓN DE LUMINARIA


ENCANDECENTE DE 60 W, INCLUYE TODO LO PZA 9 33.28
NECESARIO PARA SU CORRECTA EJECUCIÓN

SUMINISTRO Y COLOCACIÓN DE
PZA 8 99.72
INTERRUPTORES Y PLACAS

SUMINISTRO Y COLOCACIÓN DE
PZA 14 60.72
RECEPTÁCULOS Y PLACAS.
SUBTOTAL

ACABADOS INTERIORES
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U
TAPADO DE RANURAS DE INSTALACIONES
ML 78.53 56.30
OCULTAS

REPELLADO PARA RECIBIR AZULEJO CON


MORTERO CEMENTO-CAL-ARENA CON 1 CM
DE ESPESOR, INCLUYE: MATERIAL, MANO DE M2 54 130.73
OBRA, HERRAMIENTA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCION

SUMINISTRO Y COLOCACIÓN DE VITROPISO


DE 30X30 CM, INCLUYE MANO DE OBRA,
M2 77.41 190.87
HERRAMIENTA, PEGAPISO Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCIÓN.

SUMINISTRO Y COLOCACION DE ZOCLO ML 95.78 97.37

SUMINISTRO Y COLOCACIÓN DE AZULEJO DE


31X61 CM, INCLUYE MANO DE OBRA,
HERRAMIENTA, MORTERO CEMENTO-CAL- M2 54 273.35
ARENA 1:1:5 Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCIÓN.

APLANADOS INTERIORES CON YESO EN


MUROS Y PLAFONES. INCLUYE: MATERIAL, M2 239 69.47
MANO DE OBRA
SUBTOTAL

ACABADOS EXTERIORES
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U

REPELLADO EN MUROS MORTERO CEM-ARE


1:5 COLOCADO CON 2 cm. DE ESPESOR,
INCLUYE: PLOMO, NIVEL, REGLA, M2 285 155.22
DESPERDICIO, RECORTES EN AREAS
MAYORES DE 1.00 m2. EN CUALQUIER NIVEL
APLANADO EN MUROS DE 1.5 CM CON
MORTERO CEM-CAL-ARE 1:1:5 ACABADO
M2 285 65.07
FINO. INCLUYE: MATERIAL, MANO DE OBRA,
HERRAMIENTA
EMBOQUILLADO EN ARISTAS DE APLANADOS
DE MEZCLA INCLUYE: MANO DE OBRA Y ML 150 33.50
HERRAMIENTA

PINTURA VINILICA COMEX O SIMILAR,


LIMPIANDO LA SUPERFICIE, CON DOS
APLICACIONES COMO MINIMO A CUALQUIER
ALTURA Y CUALQUIER COLOR. EN MUROS Y M2 147 30.90
PLAFONES TEXTURA LISA EN INTERIOR Y
EXTERIORES, INCLUYE: MANO DE OBRA,
SELLADOR VINILICO, HERRAMIENTA

SUBTOTAL

CARPINTERIA Y HERRERIA
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U
COLOCACION DE PUERTA DE MADERA DE 0.85
x 1.98 MTS. PARA OFICINAS, INCLUYE: MARCO
PZA 6 2,648.49
DE MADERA,FIJACION CON BISAGRAS Y
COLOCACION DE CHAPA.

COLOCACION DE PUERTA DE ALUMINIO DE


0.85 x 1.98 MTS. PARA BAÑOS, INCLUYE
PZA 2 1,858.49
MARCO DE MADERA,FIJACION CON BISAGRAS
Y COLOCACION DE CHAPA.

SUMINISTRO Y COLOCACION DE CANCELERIA


JGO 7 9,233.70
DE ALUMINIO.
SUBTOTAL

LIMPIEZA GENERAL
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U.
LIMPIEZA GENERAL M2 466 14.35

SUBTOTAL

REMODELACION
CLAVE DESCRIPCION UNIDAD CANTIDAD P.U
REPARACION DE LOSA (REALIZACION DE
ENTORTADOS) CON MORTERO CAL-ARENA
PROPORCION 1:3, INCLUYE: MATERIALES, M2 345 74.91
REALIZACION DE PENDIENTE, MANO DE OBRA
Y HERRAMIENTA

IMPERMEABILIZACION EN LOSA,
INCLUYE:MATERIAL ( IMPERMEABILIZANTE
M2 345 44.86
ECOLOGICO), HERRAMIENTA, MANO DE OBRA
Y LIMPIEZA DE LA SUPERFICIE.
PINTURA DE CAL O ECOLOGICA,
LIMPIANDO LA SUPERFICIE, CON DOS
APLICACIONES COMO MINIMO A CUALQUIER
M2 690 38.06
ALTURA, INCLUYE: MANO DE OBRA,
HERRAMIENTA Y TODO LO NECESARIO PARA
SU EJECUCION

SUMINISTRO Y COLOCACION DE MUEBLES


SANITARIOS (SANITARIO, LAVABO, Y
JGO 1 3,210.33
ACCESORIOS), INCLUYE: MANO DE OBRA Y
HERRAMIENTAS
SUBTOTAL

CISTERNA

CLAVE DESCRIPCION UNIDAD CANTIDAD P.U


EXCAVACION A MANO EN CEPAS EN
MATERIAL COMPACTADO AL 95%
PROCTOR, HASTA 2.00 M. DE
PROFUNDIDAD, INCLUYE RETIRO DE M3 6.48 $ 53.30
MATERIAL HASTA 4.00 m. DE DISTANCIA
HORIZONTAL, AFINE DE FONDO Y
TALUDES.

PLANTILLA DE CONCRETO POBRE DE


f'c=100 kg/cm2, RESISTENCIA NORMAL Y
TAMAÑO MAXIMO DEL AGREGADO DE 38 M2 3.24 $ 73.40
mm., HECHO EN OBRA, DE 5 cm. DE
ESPESOR

SUMINISTRO Y COLOCACION DE CISTERNA


ROTOPLAS O SIMILAR DE 2800 LTS DE
PZA 1.00 $ 5,824.90
CAPACIDAD, INCLUYE: MANO DE OBRA Y
HERRAMIENTA
RELLENO COMPACTADO PRODUCTO DE
M3 3.24 $ 65.74
EXCAVACION
ELABORACION DE LOSA DE CONCRETO
CON 8 CM DE ESPESOR CON F`C=150
KG/CM2 ARMADA CON MALLA
ELECTROSOLDADA 6X6-6/6, INCLUYE]: M2 3.24 $ 121.23
MATERIAL, MANO DE OBRA Y TODO LO
NECESARIO PARA SU CORRECTA
EJECUCION
COLOCACION DE TAPA METALICA PARA
PZA 1.00 $ 329.10
CISTERNA
SUBTOTAL

COSTO DIRECTO

COSTO INDIRECTO
COSTO CON UTILIDAD DEL 8%
TOTAL

$ 26.06

$ 3,297.59

$ 452.44

$ 47.97

$ 1,108.75

$ 4,932.81

TOTAL

$ 1,737.63

$ 10,212.53

$ 85,980.30

$ 14,742.00

$ 1,550.61

$ 114,223.08
TOTAL

$ 24,483.30

$ 50,207.40

$ 15,304.04

$ 42,125.03

$ 132,119.77

TOTAL

$ 3,210.33

$ 877.22

$ 127.94

$ 1,714.48

$ 1,007.95

$ 6,937.93
TOTAL

$ 5,925.64

$ 8,125.03

$ 199.71

$ 299.54

$ 797.76

$ 850.08

$ 16,197.76

TOTAL

$ 4,420.86

$ 7,059.32

$ 14,775.56

$ 9,326.25

$ 14,761.04

$ 16,602.44

$ 66,945.46

TOTAL

$ 44,237.44
$ 18,546.09

$ 5,025.50

$ 4,542.17

$ 72,351.20

TOTAL

$ 15,890.94

$ 3,716.98

$ 64,635.88

$ 84,243.80

TOTAL
$ 6,688.75

$ 6,688.75

TOTAL

$ 25,843.46

$ 15,476.04
$ 26,261.74

$ 3,210.33

$ 70,791.57

TOTAL

$ 345.40

$ 237.81

$ 5,824.90

$ 213.01

$ 392.77

$ 329.10
$ 7,343.00

$ 582,775.12

$ 669,124.39
$ 722,654.35
1.- HONORARIOS, SUELDOS Y PRESTACIONES
1.1 PERSONAL DIRECTIVO $ 10,807.01
1.2 PERSONAL TECNICO $ 3,227.18
1.3 PERSONAL ADMINISTRATIVO $ 2,474.17
1.4 PERSONAL EN TRANSITO
1.5 CUOTA IMSS $ 2,552.70
1.6 PASAJES Y VIATICOS $ 1,304.32
1.7 CONSULTORES Y ASESORES
1.8 ESTUDIOS E INVESTIGACIONES

2.- DEPRECIACION, MANTENIMIENTO Y RENTAS


2.1 EDIFICIOS Y LOCALES $ 5,209.63
2.2 CAMPAMENTOS
2.3 TALLERES
2.4 BODEGAS
2.5 INSTALACIONES GENERALES
2.6 MUEBLES Y ENSERES $ 664.23

3.- SEVICIOS
3.1 DEPRECIACION O RENTA Y OPERACION $ 4,200.27
DE VEHICULOS
3.2 LABORATORIO DE CAMPO

4.- FLETES Y ACARREOS


4.1 DE CAMPAMENTOS
4.2 DE EQUIPO DE CONSTRUCCION
4.3 DE PLANTAS Y ELEMENTOS PARA
INSTALACIONES
4.4 DE MOBILIARIO

5.-GASTOS DE OFICINA
5.1 PAPELERIA Y UTILES DE ESCRITORIO $ 651.20
5.2 CORREOS, TELEFONOS, TELEGRAFOS,
RADIO Y MENSAJERIA $ 192.11
5.3 SITUACION DE FONDOS
5.4 COPIAS Y DUPLICADOS $ 390.72
5.5 LUZ, GAS Y OTROS CONSUMOS $ 260.48
5.6 GASTOS DE CONCURSO $ -

6.- SEGUROS $ 976.81

7.- FIANZAS $ 1,187.35

8.- TRABAJOS PREVISO Y AUXILIARES


8.1 CONSTRUCCION Y CONSERVACION DE
CAMINOS DE ACCESO
8.2 MONTAJES Y DESMANTELAMIENTOS
DE EQUIPO, CUANDO ASI PROCEDA

SUMAS (1) Y (2) $ 34,098.17


TOTAL (1) + (2) $ 86,349.27
COSTO TOTAL DIRECTO DE LA OBRA $ 582,775.12

CARGO INDIRECTO 14.82%


0.825950783
$ 269.08
$ 269.12 0.7821782178
$ 2,323.57
$ 8,055.84
$ 1,707.71 1.2079207921

$ 4,232.83
$ -
$ 2,116.41
$ 2,393.18
$ 651.20
$ 996.34

$ 17,582.52
$ 3,907.23

$ 1,006.11

$ 488.40

$ 3,256.02

$ 976.81

$ 976.81
$ 1,041.93

$ -

$ -

$ 52,251.10
2
AUX-01 CIMBRA DE ACABADO COMUN PARA CASTILLO DE 15 X 15 CM ML
CLAVE DESCRIPCIÓN UNIDAD CANTIDAD COSTO IMPORTE
MATERIALES
DUELA PZA 0.9 41.81 37.629
TRIPLAY M2 0.45 121.45 54.6525
DIESEL LT 0.3 17.29 5.187
CLAVO KG 0.0533 14.22 0.757926
ALAMBRE RECOCIDO KG 0.035 43.1 1.5085
SUBTOTAL 99.734926
MANO DE OBRA
CARPINTERO JOR 0.0124 481.214291 5.96705721
AYUDANTE DE CARPINTERO JOR 0.0124 309.475672 3.83749834
SUBTOTAL 9.80455555
MANO DE OBRA
HERRAMIENTA %MO 0.02 9.80455555 0.19609111
SUBTOTAL 0.19609111
TOTAL 109.735573

ACERO DE REFUERZO ESTRUCTURAL N. 3 (3/8"), INCLUYE:


AUX-02 HABILITADO Y ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS Y KG
ACARREOS
CLAVE DESCRIPCIÓN UNIDAD CANTIDAD COSTO IMPORTE
MATERIALES
ALAMBRE RECOCIDO KG 0.035 25.86 0.9051
VARILLA CORRUGADA 3/8" KG 1.07 15.52 16.6064
SUBTOTAL 17.5115
MANO DE OBRA
M-003 FIERRERO JOR 0.008 481.214291 3.84971433
M-005 AYUDANTE DE FIERRERO JOR 0.008 314.737218 2.51789774
SUBTOTAL 6.36761207
MANO DE OBRA
HERRAMIENTA %MO 0.02 6.36761207 0.12735224
SUBTOTAL 0.12735224
TOTAL 24.0064643
AUX-03 CIMBRA PARA LOSA MACIZA M2
CLAVE DESCRIPCIÓN UNIDAD CANTIDAD COSTO IMPORTE
MATERIALES
POLÍN 3"X3"-8" PZA 0.5 $ 59.48 $ 29.74
TRIPLAY DE PINO (4X8) X 9MM M2 0.3 $ 121.45 $ 36.44
DUELA DE 1/2´´x 4´´x 8´´ PZA 0.01 $ 41.81 $ 0.42
ALAMBRE RECOCIDO KG 0.045 $ 25.86 $ 1.16
CLAVO DE 2 1/2" KG 0.8 $ 14.22 $ 11.38
DIESEL LT 0.25 $ 17.29 $ 4.32
SUBTOTAL $ 83.46
TOTAL $ 83.46

MALLA ELECTROSOLDADA 6-6, 6/6. COMPRENDE ENDEREZADO,


AUX-04 M2
TRAZO, CORTE, DOBLADO, ARMADO Y COLOCADO, DESPERDICIO

CLAVE DESCRIPCIÓN UNIDAD CANTIDAD COSTO IMPORTE


MATERIALES
MALLA ELECTROSOLDADA 6-6,
6/6 M2 1.05 $ 121.31 $ 127.38
ALAMBRE RECOCIDO KG 0.15 $ 25.86 $ 3.88
SUBTOTAL $ 131.25
MANO DE OBRA
M-003 OFICIAL FIERRERO JOR 0.0125 $ 481.21 $ 6.02
M-005 AYUDANTE DE FIERRERO JOR 0.0125 $ 314.74 $ 3.93
SUBTOTAL $ 9.95
MANO DE OBRA
HERRAMIENTA %MO 0.02 $ 9.95 $ 0.20
SUBTOTAL $ 0.20
TOTAL $ 141.40
PRELIMINARES

TRAZO PARA DESPLANTE DE ESTRUCTURA, ESTABLECIENDO EJES DE REFERENCIA


CLAVE DESCRIPCION UNIDAD CANTIDAD
MANO DE OBRA
1.0 TOPÓGRAFO + 1.0 AUX. TOPÓGRAFO JOR 1
SUBTOTAL

DEMOLICION DE LOSA EXISTENTES CON 10 CM DE ESPESOR POR MEDIOS MANUALES, INCLUYE: MANO DE OBR
EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU EJECUCION
CLAVE DESCRIPCIÓN UNIDAD CANTIDAD
MANO DE OBRA
1.0 CABO + 1.0 PEÓN JOR 1
SUBTOTAL
TOTAL

CARGA Y ACARREO DE MATERIAL PRODUCTO DE LAS DEMOLICIONES HASTA EL LUGAR DE TIRO AUTORIZADO
INCLUYE: CARGA, DESCARGA Y ACARREO 1ER KM
CLAVE DESCRIPCIÓN UNIDAD CANTIDAD
MANO DE OBRA
Operador de camion volteo JOR 1
SUBTOTAL
MAQUINARIA
CAMIÓN VOLTEO HR 0.05
SUBTOTAL
TOTAL

ACARREO DE MATERIAL PRODUCTO DE DEMOLICIÓN KM SUBSECUENTE


CLAVE DESCRIPCION UNIDAD CANTIDAD
MAQUINARIA
CAMIÓN VOLTEO HR 0.05
SUBTOTAL
TOTAL

REGISTRO SANITARIO DE 80X 60 CM, PROFUNDIDAD VARIABLE, DE TABIQUE COMUN, CON APLANADO DE MEZCLA
ACABADO PULIDO, INCLUYE MARCO Y CONTRAMARCO
CLAVE DESCRIPCION UNIDAD CANTIDAD
MAERIALES
LADRILLO PZA 114
CONRETO F'C= 150 KG/CM2 M3 0.016
MORTERO 1:5 PARA JUNTEADO DE LADRILLO M3 0.035
MARCO Y CONTRAMARCO COLADO PZA 1

ACABADO CEMENTO PULIDO INCLUYE MEDIA


CAÑA EN EL INTERIOR DEL REGISTRO. M2 2.16
SUBTOTAL
1.0 OFICIAL ALBAÑIL + 1.0 AYUDANTE JOR 1
SUBTOTAL
TOTAL

CIMENTACIÓN

EXCAVACIÓN EN CEPA PARA DESPLANTE DE CIMENTACIÓN INCLUYE AFINE DE TALUDES, MANO DE OBRA,
HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
CUADRILLA
1.0 OFICIAL ALBAÑIL + 1.0 AYUDANTE JOR 1
SUBTOTAL
TOTAL

PLANTILLA DE CONCRETO POBRE CON UN F'c=100kg/cm2 Y ESPESOR DE 5 A 7 cm. HECHO EN OBRA. INCLUYE:
MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
CONCRETO F'C=100KG/CM2 M3 0.05
SUBTOTAL
MAQUINARIA
REVOLVEDORA DE CEMENTO DE 1 SACO HR 8
SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN CIMENTACIÓN DE MAMPOSTERÍA; INCLUYE: PIEDRA BRAZA,MORTERO CEMENTO AR


1:5 , MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
PIEDRA BRAZA M3 1.5
SUBTOTAL
BASICOS
MORTERO CEMENTO-ARENA 1:5 M3 0.3
SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 1.0 AYUDANTES JOR 0.280581
SUBTOTAL
TOTAL

CADENA DE DESPLANTE; INCLUYE: CONCRETO F'C=200KG/CM2, CIMBRA, ARMADO, MANO DE OBRA, HERRMIENT
TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
CONCRETO F'C=150 KG/CM2 M3 0.0225

ACERO DE REFUERZO CON VARILLAS DEL No. 4 KG 2.228


ACERO DE REFUERZO PARA ESTRIBOS DEL No.
2 @ 15 KG 1.68
SUBTOTAL
MAQUINARIA
REVOLVEDORA DE CEMENTO DE 1 SACO HR 4
SUBTOTAL
CUADRILLA
1.0 OFICIAL FIERRERO + 2.0 AYUDANTES JOR 1
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

RELLENO EN CEPAS POR CUALQUIER MEDIO, CON PRODUCTO DE EXCAVACION, INLCLUYE: HUMEDAD OPTIMA
HERRAMIENTA, MANO DE OBRA.
CLAVE DESCRIPCION UNIDAD CANTIDAD
CUADRILLA
1.0 OFICIAL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

ALBAÑILERÍA
FIRME DE CONCRETO CON F´C= 150 KG/CM2 CON 10 CM DE ESPESOR HECHO A MANO, INCLUYE: MANO DE OBRA
HERRAMIENTA, ARMADO DE ACERO Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
CONCRETO F´C=150 KG/CM2 (M3) m3 0.104
SUBTOTAL
MATERIALES
ACERO DE REFUERZO DEL NO. 3, FY=4200
KG/CM2, INCLUYE SUMINISTRO, HABILITADO,
ARMADO, TRASLAPES GANCHOS, SILLETAS Y
DESPERDICIO. kg 7.49
ALAMBRE RECOCIDO kg 0.06
SUBTOTAL
MAQUINARIA
REVOLVEDORA DE CEMENTO DE UN SACO hr 8
SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
1.0 OFICIAL FIERRERO + 2.0 AYUDANTES JOR
SUBTOTAL
TOTAL

MURO DE TABIQUE COMUN ACABADO SIMPLE, ASENTADO CON MORTERO CEMENTO ARENA 1:5 CON JUNTA DE 1
INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA, EQUIPO ANDAMIOS CORTES, DESPERDICIOS Y ACARRE
ELEVACION A CUALQUIER NIVEL
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS

MORTERO CEMENTO-ARENA 1:5 (M3) M3 0.0097


SUBTOTAL
MATERIALES
LADRILLO DE CUÑA RECOCIDO M2 58
SUBTOTAL
CUADRILLA
1.0 Oficial albañil + 1.0 ayudante JOR 0.105263
SUBTOTAL
TOTAL

CASTILLOS DE 15X15, INCLUYE:CONCRETO F'C=250KG/CM2, 4 VARILLAS CORRUGADA DE 3/8", ESTRIBOS #2 @ 15 C


CIMBRA Y DESCIMBRADO, MANO DE OBRA Y LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
CONCRETO F'C= 250 KG/CM2 M3 0.0225

4 VARILLAS CORRUGADAS DE 3/8", INCLUYE


DESPERDICIO KG 2.3394
ESTRIBOS DE 2/8" @15 CM KG 1.16725
ALAMBRE RECOCIDO KG 0.05
CIMBRA DE ACABADO COMUN PARA CASTILLO
DE 15 X 15 CM ML 2
SUBTOTAL
MAQUINARIA
REVOLVEDORA DE CEMENTO DE 1 SACO HR 8
SUBTOTAL
CUADRILLA
1.0 OFICIAL + 1.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE LOSA DE CONCRETO EN AZOTEA CON F´C=250 KG/CM2, CON UN ESPESOR DE 12 C
ACERO DE REFUERO DE FY=4200 DE 3/8" @30 CM INCLUYE: MANO DE OBRA, HERRAMIENTA, ARMADO DE ACERO
CIMBRA Y DESCIMBRADO, Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
CONCRETO F'C=250 KG/CM2 M3 0.12

ACERO DE REFUERZO DE FY=4200 DE 3/8" @30


CM KG 3.7
ALAMBRE RECOCIDO KG 0.33
CIMBRA PARA LOSA M2 1.1
SUBTOTAL
MAQUINARIA
REVOLVEDORA DE 1 SACO DE CEMNETO HR 1
SUBTOTAL
CUADRILLA
1.0 CARPINTERO + 1.5 AYUDANTE JOR 2

1.0 OFICIAL FIERRERO + 2.0 AYUDANTES


FIERRREROS JOR 1

2.0 OFICIAL ALBAÑIL + 3.0 AYUDANTE JOR 0.5


SUBTOTAL
TOTAL

INSTALACIONES HIDROSANITARIAS

MUEBLES PARA BAÑO (INCLUYE SANITARIO, LAVABO Y ACCESORIOS)


CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS

LAVAMANOS PEDESTAL AUSTRIA 4" HUESO PZA 1

MANGUERA COFLEX VIN. LAV 1/2X1/2 A0CM PZA 1

SANITARIO WC PZA 1

MANGUERA COFLEX VIN SANT 1/2X7/8 35 CM PZA 1


SUBTOTAL
CUADRILLA
1.0 OFICIAL PLOMERO +1.0 AYUDANTE JOR 1.5
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE TUBERIA DE CPVC DE 1", INCLUYE: MATERIAL, MANO DE OBRA, ACCESORIOS Y T
LO NECESARIO PARA SU CORRECTA EJECUCION
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
TUBERÍA - DN 1" MM PVC M 1
CODO 90° NORMAL - DN 1" PVC PZA 0.1666666667
SUBTOTAL
CUADRILLA
1.0 OFICIAL PLOMERO +1.0 AYUDANTE JOR 0.051824
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE TUBERIA DE CPVC DE 1 1/4", INCLUYE: MATERIAL, MANO DE OBRA, ACCESORIO
TODO LO NECESARIO PARA SU CORRECTA EJECUCION
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
TUBERÍA - DN 1 1/4" MM PVC ML 1
CODO 90° NORMAL - DN 1 1/4" PVC PZA 1
SUBTOTAL
CUADRILLA
1.0 OFICIAL PLOMERO +1.0 AYUDANTE JOR 0.051824
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE TUBERIA DE CPVC DE 1/2", INCLUYE: MATERIAL, MANO DE OBRA, ACCESORIOS
TODO LO NECESARIO PARA SU CORRECTA EJECUCION
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
TUBERÍA - DN 1/2" PVC ML 1
CODO 90° NORMAL - DN 1/2" PVC PZA 0.77
SUBTOTAL
CUADRILLA
1.0 OFICIAL PLOMERO +1.0 AYUDANTE JOR 0.051824
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACION DE BOMBA CENTRIFUGA DE 1/2 HP, INCLUYE: MATERIALES, MANO DE OBRA Y
HERRAMIENTA
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
BOMBA 1/2 hp PZA 1
SUBTOTAL
CUADRILLA
1.0 OFICIAL PLOMERO + 1.0 AYUDANTE JOR 0.5
SUBTOTAL
TOTAL

INSTALACIONES ELÉCTRICAS

SALIDA ELÉCTRICA CON POLIDUCTO DE 1" DE DIÁMETRO INCLUYE CABLEADO DE CALIBRE 12 TWH
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
POLIDUCTO NARANJA DE PVC DE 3/4" ML 3
CHALUPA PZA 0.3

CAJA CUADRADA GALVANIZADA 4X4 PZA 0.3

CABLE DESNUDO THW CALIBRE 12 PARA


TIERRA FÍSICA ML 3.1

CABLE TH CALIBRE 12 ML 6.2


SUBTOTAL
CUADRILLA
1.0 OFICIAL ELECTRICISTA + 1.0 AYUDANTE JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE TUBERÍA DE POLIDUCTO 1" INCLUYE: CANALIZACIÓN, CABLE Y TODO LO NECESA
PARA SU CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
POLIDUCTO NARANJA DE PVC DE 3/4" ML 1
CAJA CUADRADA GALVANIZADA 6X6 PZA 0.3
CABLE DESNUDO THW CALIBRE 12 PARA
TIERRA FÍSICA ML 1
CABLE TH CALIBRE 12 ML 2
SUBTOTAL
CUADRILLA
1.0 OFICIAL ELECTRICISTA + 1.0 AYUDANTE JOR 1
SUBTOTAL
TOTAL
SUMINISTRO Y COLOCACIÓN DE SOCKET INCLUYE HERRAJER, TORNILLERÍA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
SOCKET PZA 1
CINTA DE AISLAR PZA 0.005
SUBTOTAL
CUADRILLA
OFICIAL ELECTRICISTA, INCLUYE
HERRAMIENTA JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE LUMINARIA ENCANDECENTE DE 60 W, INCLUYE TODO LO NECESARIO PARA SU


CORRECTA EJECUCIÓN
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
FOCO 60 W PZA 1
SUBTOTAL
CUADRILLA

AYUDANTE ELECTRICISTA, INCLUYE


HERRAMIENTA JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE INTERRUPTORES Y PLACAS


CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
INTERRUPTOR PZA 1
SUBTOTAL
CUADRILLA
OFICIAL ELECTRICISTA JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE RECEPTÁCULOS Y PLACAS.


CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
RECEPTÁCULO CON PLACA PZA 1
SUBTOTAL
CUADRILLA
OFICIAL ELECTRICISTA JOR 1
SUBTOTAL
TOTAL

ACABADOS INTERIORES
TAPADO DE RANURAS DE INSTALACIONES OCULTAS
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
MORTERO CEMENTO ARENA 1:5 M3 0.025
SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

REPELLADO PARA RECIBIR AZULEJO CON MORTERO CEMENTO-CAL-ARENA CON 1 CM DE ESPESOR, INCLUYE:
MATERIAL, MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
MORTERO CEMENTO ARENA 1:5 M3 0.025
SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE VITROPISO DE 30X30 CM, INCLUYE MANO DE OBRA, HERRAMIENTA, PEGAPISO Y T
LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
VITROPISO M2 1.05
PEGAPISO TON 0.00333
SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACION DE ZOCLO


CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
VITROPISO M2 0.1
PEGAPISO TON 0.0003333
SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACIÓN DE AZULEJO DE 31X61 CM, INCLUYE MANO DE OBRA, HERRAMIENTA, MORTERO
CEMENTO-CAL-ARENA 1:1:5 Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
MORTERO CEMENTO-CAL-ARENA1:1:5 M3 0.025
SUBTOTAL
MATERIALES
AZULEJO 31X61 M2 1.1
SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

APLANADOS INTERIORES CON YESO EN MUROS Y PLAFONES. INCLUYE: MATERIAL, MANO DE OBRA
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
YESO TON 0.015
SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

ACABADOS EXTERIORES

REPELLADO EN MUROS MORTERO CEM-ARE 1:5 COLOCADO CON 2 cm. DE ESPESOR, INCLUYE: PLOMO, NIVEL, REG
DESPERDICIO, RECORTES EN AREAS MAYORES DE 1.00 m2. EN CUALQUIER NIVEL
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS

MORTERO CEMENTO-MORTERO-ARENA 1:1:5 M3 0.05


SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 2.0 AYUDANTES JOR 1
SUBTOTAL
TOTAL

APLANADO EN MUROS DE 1.5 CM CON MORTERO CEM-CAL-ARE 1:1:5 ACABADO FINO. INCLUYE: MATERIAL, MANO
OBRA, HERRAMIENTA
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
MORTERO 1:1:5 M3 0.015
SUBTOTAL
CUADRILLA
1 OFICIAL ALBAÑIL + 1 AYUDANTE JOR 1
SUBTOTAL
TOTAL

EMBOQUILLADO EN ARISTAS DE APLANADOS DE MEZCLA INCLUYE: MANO DE OBRA Y HERRAMIENTA


CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
AGUA M3 0.0055
YESO TON 0.0059
SUBTOTAL
CUADRILLA
1.0 OFICIAL PINTOR + 1.0AYUDANTE JOR 0.03136
SUBTOTAL
TOTAL

PINTURA VINILICA COMEX O SIMILAR, LIMPIANDO LA SUPERFICIE, CON DOS APLICACIONES COMO MINIMO
CUALQUIER ALTURA Y CUALQUIER COLOR. EN MUROS Y PLAFONES TEXTURA LISA EN INTERIOR Y EXTERIORE
INCLUYE: MANO DE OBRA, SELLADOR VINILICO, HERRAMIENTA
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
PINTURA VINÍLICA L 0.25
SUBTOTAL
CUADRILLA
1.0 OFICIAL PINTOR + 1.0 AYUDANTE JOR 0.03
SUBTOTAL
TOTAL

CARPINTERÍA Y HERRERÍA

COLOCACION DE PUERTA DE MADERA DE 0.85 x 1.98 MTS. PARA OFICINAS, INCLUYE: MARCO DE MADERA,FIJACIO
CON BISAGRAS Y COLOCACION DE CHAPA.
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
PUERTA INGLESA 6 TABLEROS 90X213 CM PZA 1

MARCO ROSY ROBLE 100 X 220 CM 3 BISAGRAS PZA 1


SUBTOTAL
CUADRILLA
1.0 Oficial Carpintero + 1.5 Ayudante JOR 1
SUBTOTAL
TOTAL

COLOCACION DE PUERTA DE ALUMINIO DE 0.85 x 1.98 MTS. PARA BAÑOS, INCLUYE MARCO DE MADERA,FIJACION
BISAGRAS Y COLOCACION DE CHAPA.
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
PUERTA DE ACERO LISA BLANCO C28 90 X 213
CM PZA 1
MARCO PARA PUERTA ACERO BLANCO 90 X 213
CM PZA 1
SUBTOTAL
CUADRILLA
1.0 OFICIAL CARPINTERO + 1.5 AYUDANTE JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACION DE CANCELERIA DE ALUMINIO.


CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES

VENTANA DE 1 X 1 DE ALUMINIO BLANCO PZA 1

VENTANA DE 1.20 X 1.0 DE ALUMINIO BLANCO PZA 1

VENTANA DE 2.25 X 0.59 DE ALUMINIO BLANCO PZA 1

VENTANA DE 1.50 X 0.40 DE ALUMINIO BLANCO PZA 1

VENTANA DE 0.70 X 1 DE ALUMINIO BLANCO PZA 1

VENTANA DE 0.65 X 0.50 DE ALUMINIO BLANCO PZA 1

VENTANA DE 1.30 X 1.0 DE ALUMINIO BLANCO PZA 1


SUBTOTAL
CUADRILLA
1.0 OFICIAL ALBAÑIL + 1.0 AYUDANTE JOR 1
SUBTOTAL
TOTAL
LIMPIEZA GENERAL
LIMPIEZA GENERAL
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
AYUDANTE JOR 2
SUBTOTAL
HERRAMIETA
HERRAMIENTA MENOR %MO 0.02
SUBTOTAL
TOTAL

REMODELACIÓN

REPARACION DE LOSA (REALIZACION DE ENTORTADOS) CON MORTERO CAL-ARENA PROPORCION 1:3, INCLUYE
MATERIALES, REALIZACION DE PENDIENTE, MANO DE OBRA Y HERRAMIENTA
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
AGUA M3 0.15
ARENA M3 0.0342
CAL TON 0.0225

SUBTOTAL
CUADRILLA
1 OFICIAL ALBAÑIL + 2 AYUDANTES JOR 1
SUBTOTAL
TOTAL

IMPERMEABILIZACION EN LOSA, INCLUYE:MATERIAL ( IMPERMEABILIZANTE ECOLOGICO), HERRAMIENTA, MANO


OBRA Y LIMPIEZA DE LA SUPERFICIE.
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
IMPERMEABILIZANTE CUBETA 1
SUBTOTAL
CUADRILLA
1 PINTOR + 1 AYUDANTE JOR 1
SUBTOTAL
TOTAL
PINTURA DE CAL O ECOLOGICA, LIMPIANDO LA SUPERFICIE, CON DOS APLICACIONES COMO MINIMO A CUALQ
ALTURA, INCLUYE: MANO DE OBRA, HERRAMIENTA Y TODO LO NECESARIO PARA SU EJECUCION
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIALES
PINTURA LT 1
SUBTOTAL
CUADRILLA
1 PINTOR + 1 AYUDANTE JOR 1
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACION DE MUEBLES SANITARIOS (SANITARIO, LAVABO, Y ACCESORIOS), INCLUYE: MANO


OBRA Y HERRAMIENTAS
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
LAVAMANOS PEDESTAL AUSTRIA 4" HUESO PZA 1
MANGUERA COFLEX VIN. LAV 1/2X1/2 A0CM PZA 1
SANITARIO WC PZA 1
MANGUERA COFLEX VIN SANT 1/2X7/8 35 CM PZA 1
SUBTOTAL
CUADRILLA
1.0 OFICIAL PLOMERO +1.0 AYUDANTE JOR 1.5
SUBTOTAL
TOTAL

CISTERNA

EXCAVACIÓN EN CEPA PARA DESPLANTE DE CIMENTACIÓN INCLUYE AFINE DE TALUDES, MANO DE


OBRA, HERAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
MANO DE OBRA
AYUDANTE GENERAL JOR 0.09
PEON JOR 0.09
SUBTOTAL
HERRAMIENTA
HERRAMIENTA %MO 0.02
SUBTOTAL
TOTAL

PLANTILLA DE CONCRETO POBRE CON UN F'c=100kg/cm2 Y ESPESOR DE 5 A 7 cm. HECHO EN OBRA.


INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTAS Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCIÓN.
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
CONCRETO DE F`C=100 KG/CM2 M3 0.052
SUBTOTAL
CUADRILLA
OFICIAL ALBAÑIL + AYUDANTE JOR 0.018
SUBTOTAL
TOTAL

SUMINISTRO Y COLOCACION DE CISTERNA ROTOPLAS O SIMILAR DE 2800 LTS DE CAPACIDAD, INCLUYE:


MANO DE OBRA Y HERRAMIENTA
CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIAL
CISTERNA ROTOPLAS DE 2800 LITS PZA 1
SUBTOTAL
MANO DE OBRA
PLOMERO JOR 1
AYUDANTE PLOMERO JOR 1
SUBTOTAL
HERRAMIENTA
HERRAMIENTA %MO 0.03
SUBTOTAL
TOTAL

RELLENO COMPACTADO PRODUCTO DE EXCAVACIÓN


CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIAL
AGUA M3 0.18
SUBTOTAL
MANO DE OBRA
PEON JOR 0.19
SUBTOTAL
HERRAMIENTA
HERRAMIENTA MENOR %MO 0.02
SUBTOTAL
TOTAL

ELABORACION DE LOSA DE CONCRETO CON 8 CM DE ESPESOR CON F`C=150 KG/CM2 ARMADA CON
MALLA ELECTROSOLDADA 6X6-6/6, INCLUYE]: MATERIAL, MANO DE OBRA Y TODO LO NECESARIO PARA
SU CORRECTA EJECUCION
CLAVE DESCRIPCION UNIDAD CANTIDAD
BASICOS
CONCRETO F`C=150KG/CM2 M3 0.0824
SUBTOTAL
AUXILIAR
MALLA ELECTROSOLDADA 6-6, 6/6.
COMPRENDE ENDEREZADO, TRAZO, CORTE,
DOBLADO, ARMADO Y COLOCADO,
DESPERDICIO M2 1.05
SUBTOTAL
CUADRILLA
OFICIAL ALBAÑIL + AYUDANTE JOR 0.019
SUBTOTAL
TOTAL

COLOCACION DE TAPA METALICA PARA CISTERNA


CLAVE DESCRIPCION UNIDAD CANTIDAD
MATERIAL
TAPA METÁLICA PARA CISTERNA 60X6 PZA 1
SUBTOTAL
MANO DE OBRA
OFICIAL ALBAÑIL JOR 0.012
SUBTOTAL
HERRAMIENTA
HERRAMIENTA %MO 0.02
SUBTOTAL
TOTAL
ES

O EJES DE REFERENCIA M3
RENDIMIENTO COSTO IMPORTE

1000 $ 384.89 0.38


0.38

ANUALES, INCLUYE: MANO DE OBRA,


A SU EJECUCION M2
RENDIMIENTO COSTO IMPORTE

30 $ 819.44 27.31
27.31
27.31

TA EL LUGAR DE TIRO AUTORIZADO.


ER KM M3
RENDIMIENTO COSTO IMPORTE

18 603.193899185 33.51
33.51

7 $ 556.38 3.97
3.97
37.48

M SUBSECUENTE M3-KM
RENDIMIENTO COSTO IMPORTE

7 $ 556.38 3.97
3.97
3.97

OMUN, CON APLANADO DE MEZCLA CON


AMARCO PZA
RENDIMIENTO COSTO IMPORTE

1 4.31 491.34
1 1297.29692 20.76
1 1412.05208 49.42
1 $ 310.00 310.00

1 $ 40.00 86.40
957.92
5 $ 754.18 150.84
150.84
1,108.75

INE DE TALUDES, MANO DE OBRA,


CTA EJECUCIÓN. ML
RENDIMIENTO COSTO IMPORTE

15 $ 754.18 50.28
50.28
50.28

A 7 cm. HECHO EN OBRA. INCLUYE:


ARIO PARA SU CORRECTA EJECUCIÓN. M2
RENDIMIENTO COSTO IMPORTE

1 1150.41496 57.52
57.52

20 $ 55.42 22.17
22.17

20 754.179125167 37.71
37.71
117.40

DRA BRAZA,MORTERO CEMENTO ARENA


A SU CORRECTA EJECUCIÓN. M3
RENDIMIENTO COSTO IMPORTE

1 223.18 334.77
334.77

1 $ 1,412.05 423.62
423.62

1 $ 754.18 211.61
211.61
969.99

MADO, MANO DE OBRA, HERRMIENTA Y


CUCIÓN. ML
RENDIMIENTO COSTO IMPORTE

1 1297.29692 29.19

1 15.52 34.58

1 24.14 40.56
104.32

55 $ 55.42 4.03
4.03

30 $ 1,166.22 38.87
55 $ 1,049.69 19.09
57.96
166.31

CION, INLCLUYE: HUMEDAD OPTIMA,


M3
RENDIMIENTO COSTO IMPORTE

7 $ 1,166.22 166.60
166.60
166.60

A
O A MANO, INCLUYE: MANO DE OBRA,
A SU CORRECTA EJECUCIÓN M2
RENDIMIENTO COSTO IMPORTE

1 1150.41496 119.64
119.64
1 15.52 116.24
1 25.86 1.55
117.80

25 $ 55.42 17.74
17.74

40 $ 1,049.69 26.24

26.24
281.42

EMENTO ARENA 1:5 CON JUNTA DE 1 CM


S CORTES, DESPERDICIOS Y ACARREOS
M2
RENDIMIENTO COSTO IMPORTE

1 1195.84628 11.60
11.60

1 $ 4.31 249.98
249.98

1 $ 754.18 79.39
79.39
340.97

RUGADA DE 3/8", ESTRIBOS #2 @ 15 CM,


A SU CORRECTA EJECUCIÓN. ML
RENDIMIENTO COSTO IMPORTE

1 1667.2392 37.51

1 15.52 36.31
1 15.52 18.12
1 25.86 1.29

8 109.735572658 27.43
120.66

20 $ 55.42 22.17
22.17
15 $ 754.18 50.28
50.28
193.11

50 KG/CM2, CON UN ESPESOR DE 12 CM,


, HERRAMIENTA, ARMADO DE ACERO,
CORRECTA EJECUCIÓN. M2
RENDIMIENTO COSTO IMPORTE

1 1506.679 180.80

1 15.52 57.42
1 24.14 7.97
1 $ 83.46 91.80
337.99

5 $ 55.42 11.08
11.08

30 $ 992.70 66.18

30 $ 1,166.22 38.87

30 $ 1,803.88 30.06
135.12
484.20

SANITARIAS

Y ACCESORIOS) PZA
RENDIMIENTO COSTO IMPORTE

1 999 999.00

1 39.9 39.90

1 619 619.00

1 41.5 41.50
1,699.40
1 $ 1,007.29 1,510.93
1,510.93
3,210.33

L, MANO DE OBRA, ACCESORIOS Y TODO


CION ML
RENDIMIENTO COSTO IMPORTE

1 26 26.00
1 25 4.17
30.17

1 $ 1,007.29 52.20
52.20
82.37

ERIAL, MANO DE OBRA, ACCESORIOS Y


CUCION ML
RENDIMIENTO COSTO IMPORTE

1 31 31.00
1.62 28 17.28
17.28

1 $ 1,007.29 52.20
52.20
69.49

ERIAL, MANO DE OBRA, ACCESORIOS Y


CUCION ML
RENDIMIENTO COSTO IMPORTE

1 12.6 12.60
1 13.5 10.40
23.00

1 $ 1,007.29 52.20
52.20
75.20

YE: MATERIALES, MANO DE OBRA Y


PZA
RENDIMIENTO COSTO IMPORTE

1 504.31 504.31
504.31

1 $ 1,007.29 503.64
503.64
1,007.95

CTRICAS

CABLEADO DE CALIBRE 12 TWH SAL


RENDIMIENTO COSTO IMPORTE

1 3.5 10.50
1 10 3.00

1 17.8 5.34

1 3.98 12.34

1 3.98 24.68
55.85

4 $ 807.13 201.78
201.78
257.64

IZACIÓN, CABLE Y TODO LO NECESARIO


ML
RENDIMIENTO COSTO IMPORTE

1 3.5 3.50
1 54.26 16.28

1 3.98 3.98
1 3.98 7.96
31.72

15 $ 807.13 53.81
53.81
85.53
RÍA Y TODO LO NECESARIO PARA SU
PZA
RENDIMIENTO COSTO IMPORTE

1 8 8.00
1 12.95 0.06
8.06

35 494.400891035 14.13
14.13
22.19

CLUYE TODO LO NECESARIO PARA SU

RENDIMIENTO COSTO IMPORTE

1 25 25.00
25.00

35 289.885057431 8.28
8.28
33.28

S Y PLACAS PZA
RENDIMIENTO COSTO IMPORTE

1 75 75.00
75.00

20 494.400891035 24.72
24.72
99.72

Y PLACAS. PZA
RENDIMIENTO COSTO IMPORTE

1 36 36.00
36.00
20 494.400891035 24.72
24.72
60.72

RIORES
CULTAS ML
RENDIMIENTO COSTO IMPORTE

1 1412.05208 35.30
35.30

50 $ 1,049.69 20.99
20.99
56.30

NA CON 1 CM DE ESPESOR, INCLUYE:


PARA SU CORRECTA EJECUCION M2
RENDIMIENTO COSTO IMPORTE

1 $ 1,412.05 35.30
35.30

11 $ 1,049.69 95.43
95.43
130.73

OBRA, HERRAMIENTA, PEGAPISO Y TODO


CIÓN. M2
RENDIMIENTO COSTO IMPORTE

1 88.77 93.21
1 3060.34 10.19
103.40

12 $ 1,049.69 87.47
87.47
190.87

O ML
RENDIMIENTO COSTO IMPORTE
1 88.77 8.88
1 3060.34 1.02
9.90

12 $ 1,049.69 87.47
87.47
97.37

DE OBRA, HERRAMIENTA, MORTERO


CORRECTA EJECUCIÓN. M2
RENDIMIENTO COSTO IMPORTE

1 1195.84628 29.90
29.90

1 $ 85.00 93.50
93.50

7 $ 1,049.69 149.96
149.96
273.35

YE: MATERIAL, MANO DE OBRA


RENDIMIENTO COSTO IMPORTE

1 1831.9 27.48
27.48

25 $ 1,049.69 41.99
41.99
69.47

RIORES

ESOR, INCLUYE: PLOMO, NIVEL, REGLA,


EN CUALQUIER NIVEL M2
RENDIMIENTO COSTO IMPORTE

1 1195.84628 59.79
59.79
11 $ 1,049.69 95.43
95.43
155.22

O FINO. INCLUYE: MATERIAL, MANO DE


M3
RENDIMIENTO COSTO IMPORTE

1 1195.84628 17.94
17.94

16 $ 754.18 47.14
47.14
65.07

MANO DE OBRA Y HERRAMIENTA ML


RENDIMIENTO COSTO IMPORTE

1 43.1 0.24
1 1831.9 10.81
11.05

1 $ 716.14 22.46
22.46
33.50

DOS APLICACIONES COMO MINIMO A


RA LISA EN INTERIOR Y EXTERIORES,
ERRAMIENTA
RENDIMIENTO COSTO IMPORTE

1 37.66 9.42
9.42

1 $ 716.14 21.48
21.48
30.90

RRERÍA

CLUYE: MARCO DE MADERA,FIJACION


PA. PZA
RENDIMIENTO COSTO IMPORTE

1 1929 1,929.00

1 539 539.00
2,468.00

5.5 $ 992.70 180.49


180.49
2,648.49

UYE MARCO DE MADERA,FIJACION CON


PZA
RENDIMIENTO COSTO IMPORTE

1 1299 1,299.00

1 379 379.00
1,678.00

5.5 $ 992.70 180.49


180.49
1,858.49

ALUMINIO.
RENDIMIENTO COSTO IMPORTE

1 1450 1,450.00

1 1198 1,198.00

1 1725 1,725.00

1 1400 1,400.00

1 1350 1,350.00

1 670 670.00

1 1315 1,315.00
9,108.00

6 $ 754.18 125.70
125.70
9,233.70
RAL

RENDIMIENTO COSTO IMPORTE

40 281.441803331 14.07
14.07

1 $ 14.07 0.28
0.28
14.35

ÓN

L-ARENA PROPORCION 1:3, INCLUYE:


RA Y HERRAMIENTA
RENDIMIENTO COSTO IMPORTE

1 43.1 6.47
1 330.46 11.30
1 1373.31 30.90

48.67

40 $ 1,049.69 26.24
26.24
74.91

ECOLOGICO), HERRAMIENTA, MANO DE


M2
RENDIMIENTO COSTO IMPORTE

76 $ 1,595.00 20.99
20.99

30 $ 716.14 23.87
23.87
44.86
CACIONES COMO MINIMO A CUALQUIER
CESARIO PARA SU EJECUCION
RENDIMIENTO COSTO IMPORTE

4 37.66 9.42
9.42

25 $ 716.14 28.65
28.65
38.06

O, Y ACCESORIOS), INCLUYE: MANO DE


JGO
RENDIMIENTO COSTO IMPORTE

1 999 999.00
1 39.9 39.90
1 619 619.00
1 41.5 41.50
1,699.40

1 $ 1,007.29 1,510.93
1,510.93
3,210.33

DE TALUDES, MANO DE
A EJECUCIÓN. M3
COSTO IMPORTE

$ 281.44 $ 25.33
$ 299.20 $ 26.93
$ 52.26

$ 52.26 $ 1.05
$ 1.05
$ 53.30

7 cm. HECHO EN OBRA.


LO NECESARIO PARA SU
M2
COSTO IMPORTE
$ 1,150.41 $ 59.82
$ 59.82

$ 754.18 $ 13.58
$ 13.58
$ 73.40

DE CAPACIDAD, INCLUYE:
PZA
COSTO IMPORTE

$ 4,836.80 $ 4,836.80
$ 4,836.80

$ 574.44 $ 574.44
$ 384.89 $ 384.89
$ 959.32

$ 959.32 $ 28.78
$ 28.78
$ 5,824.90

N M3
COSTO IMPORTE

$ 43.10 $ 7.76
$ 7.76

$ 299.20 $ 56.85
$ 56.85

$ 56.85 $ 1.14
$ 1.14
$ 65.74

0 KG/CM2 ARMADA CON


TODO LO NECESARIO PARA
M2
COSTO IMPORTE

$ 1,297.30 $ 106.90
$ 106.90
$ 141.40 $ 148.47
$ 148.47

$ 754.18 $ 14.33
$ 14.33
$ 121.23

PZA
COSTO IMPORTE

$ 329.00 $ 329.00
$ 329.00

$ 436.83 $ 5.24
$ 5.24

$ 5.24 $ 0.10
$ 0.10
$ 329.10