You are on page 1of 10

SDRL Sequence Company

No. Contractor Document Number Code Number Revision Document Title STATUS
Number DT R01 Date

112 870310-S-1150102-CST-C31-0003 C31 001 01 Piping Isometric Waste Water Tie In (Pioneer Camp) A 0031 16-Mar-18
113 870310-S-1150102-CST-C31-0003 C31 002 01 Piping Isometric Waste Water Tie In (Pioneer Camp) A 0031 16-Mar-18
114 870310-S-1150102-CST-C31-0003 C31 003 01 Piping Isometric Waste Water Tie In (Pioneer Camp) A 0031 16-Mar-18
115 870310-S-1150102-CST-C31-0003 C31 004 01 Piping Isometric Waste Water Tie In (Treated Water Collection Pit) B 0036 8-May-18
01
116 870310-S-1150102-CST-C31-0003 C31 005 Piping Isometric Waste Water Tie In (Treated Water Collection Pit) A 0036 8-May-18
01
117 870310-S-1150102-CST-C31-0003 C31 006 Piping Isometric Waste Water Tie In (Treated Water Collection Pit) A 0036 8-May-18
01
118 870310-S-1150102-CST-C31-0003 C31 007 Piping Isometric Waste Water Tie In (Treated Water Collection Pit) A 0036 8-May-18
119 870310-S-1150102-CST-C31-0003 C31 008 01 Piping Isometric Waste Water Tie In - - -
120 870310-S-1150102-CST-C31-0003 C31 009 01 Piping Isometric Waste Water Tie In - - -
MASTER DOCUMENT REGISTER LIST

SUBMITED DOCUMENT ( 870310-DTR-SPLR-CSTS-1150102-xxxx )

DT R02 Date DT R03 Date DT R04 Date DT R05 Date DT R06 Date DT R07 Date DT R08 Date DT R09

- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -

- - - - - - - - - - - - - - -

- - - - - - - - - - - - - - -

- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
RETURN DOC ( 870310-DTR-CSTS-SPLR-1150102-xxxx )

Date DT R10 Date DT R01 Date DT R02 Date DT R03 Date DT R04 Date DT R05 Date

- - - 0037 17-Mar-18 - - - - - - - -
- - - 0037 17-Mar-18 - - - - - - - -
- - - 0037 17-Mar-18 - - - - - - - -
- - - 0044 17-May-18 - - - - - - - -

- - - 0044 17-May-18 - - - - - - - -

- - - 0044 17-May-18 - - - - - - - -

- - - 0044 17-May-18 - - - - - - - -
- - - - - - - - - - - - -
- - - - - - - - - - - - -
DETIL DOCUMENT
NO. TRANSMITTAL DATE
NO. DOCUMENT Seq. NAMA DOKUMEN STATUS

870310-DTR-SPLR-CSTS-1150102-0001 7-Feb-17 870310-S-1150102-CST-A01-0001 - 01 Supplier Deliverables Document (SDR)


870310-DTR-SPLR-CSTS-1150102-0002 14-Feb-17 870310-S-1150102-CST-S02-0001 - 01 HSE Plan
870310-S-1150102-CST-H03-0001 - 01 Project Inspection and Test Plan Temporary Utility System
870310-DTR-SPLR-CSTS-1150102-0003 14-Feb-17 870310-S-1150102-CST-P02-0001 - 01 NDE Penetrant Test
870310-S-1150102-CST-P02-0002 - 01 NDE Radiography Test
870310-S-1150102-CST-C31-0001 001 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 002 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 003 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 004 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 005 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 006 01 Piping Isometric Fuel Diesel Tie-In
870310-DTR-SPLR-CSTS-1150102-0004 21-Feb-17 870310-S-1150102-CST-C31-0001 007 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 008 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 009 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 010 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 011 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 012 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-C31-0001 013 01 Piping Isometric Fuel Diesel Tie-In
870310-S-1150102-CST-H02-0001 - 01 Project Quality Plan Procedure
870310-S-1150102-CST-H04-0001 - 01 Pressure Test Procedure
870310-S-1150102-CST-H99-0001 - 01 Installation, Fabrication and Testing Procedure
870310-S-1150102-CST-H99-0002 - 01 Installation, Fabrication For Underground Pipe
870310-S-1150102-CST-H99-0003 - 01 Butt Fusion Joining Procedure
870310-S-1150102-CST-H99-0004 - 01 Electrofusion Joining Procedure
870310-S-1150102-CST-H99-0005 - 01 Installation of Mechanical Static Procedure
870310-DTR-SPLR-CSTS-1150102-0005 20-Feb-17
870310-S-1150102-CST-H99-0006 - 01 Installation of Mechanical Rotating Equipment
870310-S-1150102-CST-H99-0007 - 01 Surface Preparation and Painting
870310-S-1150102-CST-H99-0008 - 01 Flange Management
870310-S-1150102-CST-H99-0009 - 01 Method Statement Installation Underground HDPE and Carbon Steel Replace
870310-S-1150102-CST-H99-0010 - 01 Method Statement Installation Aboveground HDPE and Carbon Steel Replace
870310-S-1150102-CST-H99-0011 - 01 Material Handling
870310-S-1150102-CST-P01-0001 - 01 Welding Procedure Specification
870310-S-1150102-CST-S99-0001 - 01 Excavation Procedure
870310-S-1150102-CST-S99-0002 - 01 Working at Hight Procedure
870310-S-1150102-CST-S99-0003 - 01 House Keeping Procedure
870310-DTR-SPLR-CSTS-1150102-0006 14-Feb-17 870310-S-1150102-CST-S99-0004 - 01 Manual Handling Procedure
870310-S-1150102-CST-S99-0005 - 01 Safe Use of Tools Procedure
870310-DTR-SPLR-CSTS-1150102-0006 14-Feb-17

870310-S-1150102-CST-S99-0006 - 01 Confined Space Entry Procedure


870310-S-1150102-CST-S99-0007 - 01 Safe Lifting Operation Procedure
870310-S-1150102-CST-A01-0001 - 02 Supplier Deliverables Document (SDR)
870310-DTR-SPLR-CSTS-1150102-0007 27-Feb-17 870310-S-1150102-CST-H99-0009 - 01 Tie in Work Procedure New Doc - SDR.02
870310-S-1150102-CST-H99-0010 - 01 General Construction Method New Doc - SDR.02
870310-S-1150102-CST-H02-0001 - 02 Project Quality Plan Procedure
870310-S-1150102-CST-H03-0001 - 02 Project Inspection and Test Plan Temporary Utility System
870310-S-1150102-CST-H99-0011 - 02 Material Handling
870310-DTR-SPLR-CSTS-1150102-0008 8-Mar-17
870310-S-1150102-CST-P01-0001 - 02 Welding Procedure Specification
870310-S-1150102-CST-P02-0001 - 02 NDE Penetrant Test
870310-S-1150102-CST-P02-0002 - 02 NDE Radiography Test
870310-DTR-SPLR-CSTS-1150102-0009 15-Mar-17 870310-S-1150102-CST-H02-0001 - 03 Project Quality Plan Procedure
DETIL DOCUMENT
NO. TRANSMITTAL DATE
NO. DOCUMENT Seq. Rev.No NAMA DOKUMEN STATUS

870310-DTR-CSTS-SPLR-1150102-0001 10-Feb-17 870310-S-1150102-CST-A01-0001 - 01 Supplier Deliverables Document (SDR) B


870310-DTR-CSTS-SPLR-1150102-0002 23-Feb-17 870310-S-1150102-CST-P01-0001 - 01 Welding Procedure Specification B
Transmittal Send
No.
Transmittal No. Transmittal Date Doc. Type

2 870310-GTR-SPLR-CSTS-1150102-0002 16-Feb-17 MRIR

MRIR
4 870310-GTR-SPLR-CSTS-1150102-0004 24-Feb-17

MRIR

6 870310-GTR-SPLR-CSTS-1150102-0006 23-Mar-17 MRIR

8 870310-GTR-SPLR-CSTS-1150102-0008 2-May-17 MRIR

17 870310-GTR-SPLR-CSTS-1150102-0017 19-Sep-17 MRIR


19 870310-GTR-SPLR-CSTS-1150102-0019 27-Oct-17 MRIR
Documents

No. Doc

R/TEP-MRIR/BPK/CSTS/005

R/TEP-MRIR/BPK/CSTS/004

R/TEP-MRIR/BPK/CSTS/006

R/TEP-MRIR/BPK/CSTS/007

R/TEP-MRIR/BPK/CSTS/008

R/TEP-MRIR/BPK/CSTS/009
R/TEP-MRIR/BPK/CSTS/010
Documents Return Document

Description Transmittal No.

1. Y-Strainer
2. Check Valve 0001
3. Gate Valve

1. Blind Flange
2. HDPE Pipe 0002
3. U-Bolt
HDPE Fitting 0002
1. Threadolet, 2. Ecc Reducer, 3. Con. Reducer, 4. Screw Flange, 5. Elbow, 6. Blind Flange, 7. 0009
Tee, 8. WN Flange, 9. Tee Reducer, 10. Hex. Plug, 11. Pipe Carbon Steel

1. Con. Reducer 2. Ecc Reducer 3.


Elbow 4. Hex. Plug 5. Tee Reducer 6. Tee 7. Sock-olet 8. WN Flange 0009
9. Pipe Carbon

Pipe Material Support -


1. Valve, 2. Strainer, 3. Aluminium -
Return Document
Remarks
Transmittal Date

23-Feb-17

28-Feb-17

28-Feb-17

13-Oct-17

13-Oct-17

-
-

You might also like