Sif Group

Offshore foundations for wind turbines


and oil & gas platforms
Our history

2
Our history

3
1984: pressure and process vessels
Special projects
1980: 1999:
First tubulars Tubulars
for the locks of the London Eye
Oosterschelde
Storm Surge barrier
and
bridge piles for
workdock Neeltje
Jans

2015:
Tubulars for
Brighton Tower

5
First and recently completed wind projects

2002: Horns Rev - MT Hojgaard - 80 MP’s 2017: Galloper – Geosea / Deme – 56 MP’s + TP’s 6
First and recently completed
oil & gas projects

1996: Ekofisk – Aker / Kvaerner - piles 2017: Oseberg – Heerema – 12 piles 7


Key competences

• 1.700+ recommendations in oil & gas and offshore wind


• Highly automated production processes
• Early and high involvement with all customers
• Powerful partnerships
• Thorough health & safety and quality procedures and control systems
• Unique know-how and expertise in rolling and welding
• Financial stability
• 42 hectare assembly and coating facility including storage and a 400 meter long deep
sea quay side with 16,5 meter draught at Maasvlakte 2 (direct access to the North
Sea)
• Proven track record in on-time delivery, within specification and within budget
Tubulars for jacket structures,
sections and piles

Clair Ridge - Kvaerner 9


Monopiles & Transition Pieces
Direct access to the North Sea

11
Production facility Roermond
Production facility Rotterdam, Maasvlakte 2
Key data

• 4-5 XL monopiles and transition pieces per week


• Diameters up to 11 meters
• Max length: 120 meters
• Max weight: 2000 MT
• Annual capacity: 300.000 MT
• Max load out bearing capacity: 10 MT/m2
• Max wall thickness: 255 mm by cold rolling
• Stress relieving: max dimensions 25 x 7 x 7 meter, max 600 Celsius
• Storage and trans-shipment area: 42 hectares
• Deep sea quay of 400 meters length and 16,5 meters draught

14
Production layout in Roermond and Maasvlakte 2
Production layout in Roermond and Maasvlakte 2
Pile production line 1 (oil & gas and wind) Monopile production line 1 & 2 (wind)
• Max. 3.5 mtr diameter pile production • Max. 11 mtr diameter pile production
• Suitable for piles for oil & gas and wind • Suitable for monopiles and transition pieces
• (Sub)assemblies max. 27 mtr (dependent on mass) • (Sub)assemblies max. 100 mtr
• Max. Lg = 120 mtr • Max. Lg = 120 mtr

Production line 2 (oil & gas and wind)


• Max. 7 mtr diameter pile production
• Suitable for monopiles, transition pieces and oil & gas sections
• (Sub)assemblies max. 75 mtr
• Max. Lg = 120 mtr
Production process

• Plate bevelling
• Rolling
• Longitudinal welding and milling
• Circumferential welding and milling
• Shipment of sections, cans and cones to Maasvlakte 2
• Assembly of cans, cones and sections
• Coating
• Storage and trans-shipment at Maasvlakte 2
• Load-out onto installation vessel

17
Plate bevelling
Rolling
• We have 9 rolling machines
• > Capacity limits:
• Diameters up to 11.000 mm
• Maximum width 4.200 mm
• Maximum thickness 255 mm
• Maximum can weight 70 tons
Longitudinal welding & milling
Circumferential welding & milling

21
Cans, cones and sections to Maasvlakte 2

22
Assembly and coating

23
Storage

24
Load-out onto installation vessel

Load-out monopiles Galloper 25


Sif is manufacturer of all types of
steel foundations

31
Monopile

32
Jacket wind

33
Jacket oil & gas

34
Transition pieces
1.500+ Wind turbine foundations by Sif
Powerful players in the market
Where do we go from here?

• Sif will stay the front runner in manufacturing large diameter monopiles
• Increased weight range up to 2000 ton per piece and 11mtr diameter
• Automatic assembly line for conical sections
• High capacity lean manufacturing of pin-piles for wind jackets
• Frontrunner in new designs such as flanged connections and TP-less
• Integration of TP functionality in MP and/or bottom section of the tower
• Tubulars for floating foundations
Quality management system
Thank you
for your attention