You are on page 1of 1

Phone: 0863 - 2338555

E Mail - dtc~_@ _gmail.com

Government of Andhra Pradesh


Town and Country Planning Department

Office of the Director of Town and


Country Planning, West Annapurna Nagar,
Gorantla, Guntur.

Circular Memo No.2~-SW-2002-P-1, Dt 20-02-2019_.

Sub: 0/o the DT&CP, AP, Guntur-Building Permissions-Implementation of provision


fore-intimation of commencement of construction - certain instructions-
Issued-Reg.

Ref:- Compliance of Reform No.27 under EoDB.


-0000-

The Government as a part of Reforms under EoDB have introduced "Development


Permission Management System". This enables citizens to upload plans, required documents and
upon auto scrutiny by the system and after payment of fees/charges through online, the proceedings
will be generated instantaneously without any human intervention.

If the construction is not commenced within 18 months from date of sanction as per Rule
3(24) of G.O.Ms.No.119 M.A., dt. 28-03-2017 of A.P. Building Rules 2017, Building Application shall be
submitted afresh duly paying the required building permit fee.

The provision for e-intimation of commencement of construction which is mandatory as per


Rule 3(29) (b) of G.O.Ms.No.119 M.A., dt. 28-03-2017 of A.P. Building Rules 2017 has been enabled in
the DPMS system. As development permissions are made through online, commencement notice as.
required under Rules shall be submitted through APDPMS only. E-lntimation for commencement of
construction shall be made within the validity period, if not intimated it will be presumed that the
construction is not commenced and will become invalid/expires. Manual intimations are not
acceptable and shall not be treated as official intimations unless it is done through DPMS.

In view of the above, all the LTPs, applicants are requested to avail the provision of e-
intimation enabled in the DPMS System without fail.

Sd/- V.Ramudu
Director of Town and
Country Planning.
To
All the LTPs.
All the applicants through mails.
All the Town Planning Staff in all ULBs and UDAs shall ensure the compliance of these instructions.
All the Commissioner of all Urban Local Bodies for necessary action.
Commissioner, APCRDA / Metropolitan Commissioner, VMRDA/VK-PCPIR-SDA
Vice Chairmen of all Urban Development Authorities.

~-~)17
For Director

You might also like