Vale Inco NC Nickel Project

FIELD ENGINEERING QUERY (FEQ) Sheet / Fiche □ of /de □


DEMANDES DE CLARIFICATION FEQ NO:
D'INGENIERIE DE TERRAIN (FEQ)
CONTRACTOR / ENTREPRENEUR : FACILITY / INSTALLATION: Leaching - Commissioning
CONTRACT NO / NO DU CONTRAT : AREA / ZONE : 220 Train 1
CONTRACT TITLE / TITRE DU CONTRAT : SUB-SYSTEM / SOUS SYSTEMES : 220 1102
Equipment No / No d'Equipement : Sulphuric Acid Feed DATE : 26 January 2010
Pumps Train 1 220-PPD-103/ 104/105
P&ID GCT01-220-8820-25-1110 Rev S3 DISCIPLINE : Mechanical / Piping
VINC FEQs to be submitted to Technical Support Group / Contractor FEQs to be submitted Priority / Priorité
to VINC Document Group Group / Les FEQ de VINC à être soumises au Groupe de
Support Technique / Les FEQ des Entrepreneurs à être soumises au Groupe de High / Haute
Contrôle des Documents de VINC Medium / Moyenne
Document Reference / Référence du document : GCT01-220-8820-25-1110 Low / Faible

Query / Question :
The screwed drain connections into the bodies of the pump check valves are leaking in operation. The system is fully
butt welded and flanges are rated at 600#. It appears the system may be subject to pressures in excess of design
pressure.
Please advise if: (a) current operating conditions will allow retention of the screwed nipple with seal welding, or (b) if
installation of a butt welded fitting, i.e. weldolet, is required.
Note that the valve body and nipple materials can be readily welded with currently qualified welding procedures, however
all seal welding of threaded connections must fully cover all threads to comply with code requirements. In either event
for (a) or (b) the drain assembly must be disassembled for cleaning prior to welding, completed welds will be subject
to NDT and hydrotesting of the valve with the internals removed is mandatory.
Prepared By / Préparé par : T L Andrews QAQC Dept. Respond by date / Date échéante de la réponse : Urgent
Signature: Date: 26 January2010
Technical Services Manager / Responsable des services Signature:
techniques
Project Response / Réponse de Projet:

Prepared By / Préparé par :................................................................................................. Date:


Signature:

Signature:
Approved for Issue /
Approuvé pour émission:
Date:

Attachments / Pièces jointes :

Post-Distribution / Post-distribution :
 Facility Commissioning Manager / Responsable de la mise  Originator / Originateur
en service des installations
 Startup Director / Directeur de mise en route  Contractor / Entrepreneur
 Technical Services Manager / Responsable des services  Technical Support Coordinator / Coordinateur de
techniques soutien technique
 Other / Autre

GCT01-000-8710-FM-0009 [D] Rev F6.............................................................Page 1 of 1