1 Process Data
2 Fluid Name -- hexanediol STEAM
3 Vapor kg/h 80
Tot. Fluid Quantity
4 Liquid kg/h 48250
5 Operating Temperature min / norm / max °C 50/55/80 128/132/136
6 Operating Pressure min / norm / max bar(a) 1.000/1.005/1.015 2.8/3/3.2
3
7 Vapor kg/m -- 1.65
Density 3
8 Liquid kg/m 965 --
9 Construction Data
10 Nominal Volume m3 50 0.17
3
11 max. Operating Volume m 47.7 --
12 Nominal liquid level (LH) mm 3981 --
13 Nominal Diameter mm 4000 --
14 Design Temperature (min./max.) °C 50/90 120/160
15 Internal design pressure mbar(g) -5/20+LH FV/4000
16 External design pressure mbar(g)
17 Material
18 shell & bottom & roof -- 1.4301 1.0345(PIPE)
19 nozzle flange -- 1.4301 1.0426
20 nozzle neck -- 1.4301 1.0345
21 bolt -- A4-70 8.8/Zn
22 nut -- A2 8/Zn
23 gaskets -- PTFE FSP-4
24 internals --
25 Corrosion Allowance mm 0 1.5
26 Protective Inside Lining / -Thickness -- / mm
27 Painting (on C.S. only) --
28 Insulation Type/Thickness -- / mm hot 150
29
30 Standards/Codes -- EN14015
31 Leak Test -- full water filling
32 Windload/Seismic Zone -- yes
33 Arrangement (refer to other equipment) --
34 Remarks
35 1. Bottom gradient 1/100
36 2. Accessories: name plate, earth lug, insulation pins, 3 pc's of pipe support,
37 ladder, self-closing door, handrail and platform
38 3. Nozzles under DN50 support with 2 ribs.
39 4. Heating trace offset is 250mm.
40 5. Single bottom with not fully supported construction
41 6. All flanges are weld-neck type except manhole
Storage Tank Specification 1 2018.11.09
Data Sheet 0 Wang Xinwei Zhang Fuxiao Gu Shengli 2017-11-15

PROJECT Borsodchem high performance material project REV. PREP'D CHK'D APP'D DATE

SECTION Raw material storage tank area(70) DWG NO.

DES.STAGE BASIC DESIGN Sheet 2 of 4


WH1716-70-B-010-4
SERVICE HDO STORAGE TANK TAG NO. S-7004 QUANTITY 1

1 Nozzle List Rev.


2 Item No. Description Size Rating Facing Length Remarks
3 a Process liquid inlet DN80 PN16 B (RF) 150 insert pipe
4 b Process liquid back inlet DN50 PN16 B (RF) 150 insert pipe
5 c Process gas outlet DN50 PN16 B (RF) 150
6 d Breather valve DN80 PN16 B (RF) 150
7 e1,2 Manhole DN600 PN6 B (RF) 200 with davit
8 f1 Thermometer DN25 PN16 B (RF) 150
9 f2 Local Thermometer DN25 PN16 B (RF) 150
10 g Process liquid outlet DN100 PN16 B (RF) 200
11 h Nitrogen inlet DN40 PN16 B (RF) 150 1
12 i Spare DN100 PN16 B (RF) 200 with blind flange
13 j1~j5 Steam inlet DN25 PN16 B (RF) 150
14 k1~k5 Steam condensate outlet DN25 PN16 B (RF) 150
with blind flange, insert
15 l Spare DN100 PN16 B (RF) 150 pipe

16 m Level transmitter DN80 PN16 B (RF) 150


17 n Pressure Gauge DN80 PN16 B (RF) 150
18 p1,2 Steam inlet DN25 PN16 B (RF) 150
19 q1,2 Steam condensate outlet DN25 PN16 B (RF) 150
20 s Drain DN80 PN16 B (RF) 200
21 t Level on-off switch DN50 PN16 B (RF) 150
22
23 Nozzle Orientation
24 preliminary
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39 Remark:
40 Insert pipes must have vent holes
Storage Tank Specification 1 2018.11.09
Data Sheet 0 Wang Xinwei Zhang Fuxiao Gu Shengli 2017-11-15

PROJECT Borsodchem high performance material project REV. PREP'D CHK'D APP'D DATE

SECTION Raw material storage tank area(70) DWG NO.

DES.STAGE BASIC DESIGN Sheet 3 of 4


WH1716-70-B-010-4
SERVICE HDO STORAGE TANK TAG NO. S-7004 QUANTITY 1

1 Rev.
2 Sketch not to scale
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Storage Tank Specification 1 2018.11.09
Data Sheet 0 Wang Xinwei Zhang Fuxiao Gu Shengli 2017-11-15

PROJECT Borsodchem high performance material project REV. PREP'D CHK'D APP'D DATE

SECTION Raw material storage tank area(70) DWG NO.

DES.STAGE BASIC DESIGN Sheet 4 of 4


WH1716-70-B-010-4
SERVICE HDO STORAGE TANK TAG NO. S-7004 QUANTITY 1

1 Rev.
2 Nozzle loadings
3
4 Unless otherwise stated in the equipment sketch, nozzles for piping connections (except
5 instrument nozzles) have to be able to transfer the following forces and moments
6
7
8
9
10 MC = 0.17 x DN² (Nm)
11 ML = 0.17 x DN² (Nm)
12 MT = 0.21 x DN² (Nm)
13
14 VC = 40 x DN (N)
15 VL = 40 x DN (N)
16 P = 40 x DN (N) where DN = nominal diameter in mm
17
18 Forces and moments may act simultaneously.
19 The stress proof has to be established by the vessel / heat exchanger manufacturer
20 in accordance with W. R. C. B. No. 107.
21
22
23
24 MT
25
26
27
28 P
29
30
31
32
33
34 VC MC
35 ML
36 VL
37
38
39
40

You might also like