OBRAS EMERGENTES DEL PROYECTO HIDROELECTRICO QUIJOS

VIA A TOMA QUIJOS


FECHA: 07/06/2016
DISTRIBUCION DE LOS PERNOS DE ANCLAJE
TOTAL TOTAL DE LONGITUD
ABSCISA ABSCISA PERNOS
BLOQUE 1,70 PERNOS DE TOTAL DE COSTO ($)
INICIAL FINAL M 3M ANCLAJE (m)

1 6+836 6+846 151 7 277.7 20005.51


2 6+846 6+856 120 10 234 16857.36
3 6+856 6+866 133 10 256.1 18449.44
4 6+866 6+876 118 5 215.6 15531.82
5 6+876 6+886 0 0 0 0.00
6 6+886 6+896 0 0 0 0.00
7 6+896 6+906 0 0 0 0.00
8 6+906 6+916 0 0 0 0.00
9 6+916 6+926 0 0 0 0.00
10 6+926 6+936 0 0 0 0.00
11 6+936 6+946 0 0 0
12 6+946 6+956 0 0 0
TOTAL: 522 32 983.4 70844.14

6+650 6+660
6+660 6+670
6+670 6+680
MES DE JUNIO PARA PLANILLAR
TOTAL PERNOS LONGITUD
TOTAL PERNOS TOTAL DE TOTAL DE
1,70 M TOTAL DE COSTO ($) LIBERACION
1,70 M PERNOS DE 3M SOBRANTES PERNOS DE 3M ANCLAJE (m)

71 70 80 63 189 13615.56 12 Y 16
109 41 91 31 93 6699.72 12,13 Y 17
114 35 110 25 75 5403.00 13,14 Y 18
100 37 128 32 96 6915.84 14 Y 19
102 33 26 33 99 7131.96 14,15 Y 20
93 38 67 38 227.9 16417.92 15.21
96 36 96 36 271.2 19537.25 22
52 21 52 21 151.4 10906.86 23
0 4 0 4 12 864.48 24
4 4 4 4 18.8 1354.35 25
28 13 28 13 86.6 6238.66 26
7 6 7 6 29.9 2154.00 27
522 SUBTOTAL 1 254 306 1349.8 97239.59

30 17 30 17 102 7348.08 28
25 6 25 6 60.5 4358.42 29
5 24 5 24 80.5 5799.22 30
SUBTOTAL 2 60 47 243 17505.72

TOTAL A PAG 314 353 1592.8 114745.31

TOTAL 1592.8 114745.31


OBSERVACIONES

LIB 16 OCUPO 71 DE 1,7 DE LOS 151 LIB 12 SOBRAN 80


LIB 17 OCUPO109 DE 1,7 CUALES 80 DE LIB 12 Y 29 DE LIB 13 SOBRAN 91 DE LIB 13
LIB 18 OCUPO 114 DE 1,7, CUALES 91 DE LIB 13 Y 23 DE LIB 14, SOBRAN 110 DE LIB 14
LIB 19 OCUPO100 DE 1,7 DE LA LIB 14, SOBRAN 10 DE LA LIB 14
LIB20 OCUPO 102DE 1,7, CUALES10 DE LIB 14 Y 92 DE LIB 15,SOBRA 26 DE LIB 15
LIB 21 OCUPO 93 DE 1,7 , 26 DE LIB 15 Y 67 PARA PLANILLAR EN LIB 21
LIB 22 OCUPO TODOS
LIB 23 OCUPO TODOS
LIB 24 OCUPO TODOS
LIB 25 OCUPO TODOS
LIB 26 OCUPO TODOS
LIB 27 OCUPO TODOS

LIB 28 OCUPO TODOS


LIB 29 OCUPO TODOS
LIB 30 OCUPO TODOS