Professional Documents
Culture Documents
BA4-MTB-E-CS-ECLPB-005
PT. BUKIT ASAM (PERSERO) Tbk. ELECTRICAL LOAD LIST
SWITCHGEAR/MCC : SUBSTATION 6
REV. DATE DESCRIPTION BY CHK. APR. PROJECT NO.
0 11/02/2015 Issued for Review OKT FRD FRD
Utility Factor
Circuit Type
Load Type
Motor or
Absorbed
Equipment Tag Voltage Rating Data Validity Load Factor Full Load
Bus
Rev. No P&ID Number Description Load Eff. Power Factor Continuous Intermittent Standby Remarks
No. (Volt) Equipment Current (FLC)
kW kW Rev. Type Dec Dec A Cos α kW kVAR kVA A kW kVAR kVA A kW kVAR kVA A
SWITCHGEAR / MCC : SUBSTATION 6
TOTAL 360.00 223.11 423.53 643.49 0.00 0.00 0.00 0.00 315.00 195.22 370.59 563.05
Normal Load / Average Load = (1.00 x Total Continuous Load) + (0.50 x Total Intermittent Load) LOAD SUMMARY
Peak Load = Normal Load + (0.10 x Total Standby Load) Normal/Average Load = 360.00 kW 223.11 kVAR 423.53 kVA 643.49 A
Demand Load = Peak Load + (Peak Load * 0.20) Peak Load = 391.50 kW 242.63 kVAR 460.59 kVA 699.79 A
Demand Load = 469.80 kW 291.16 kVAR 552.71 kVA 839.75 A