Professional Documents
Culture Documents
I. BARANG
1). Material Langsung (bahan baku) 1,453,019,175 - 1,453,019,175 100.00% 65.00% 50.70%
2). Peralatan Barang Jadi 782,394,941 - 782,394,941 100.00% 35.00% 27.30%
Sub Total I 2,235,414,116 - 2,235,414,116 100.00% 100.00% 78.00%
II. JASA
3). Menejemen proyek dan perekayasaan 151,893,523 - 151,893,523 24.09% 24.09% 5.30%
4). Alat kerja/ Fasilitas kerja 235,005,074 - 235,005,074 0.00% 37.27% 8.20%
5). Jasa umum 243,602,820 - 243,602,820 100.00% 38.64% 8.50%
Sub Total II 630,501,417 - 630,501,417 100.00% 100.00% 22.00%