Professional Documents
Culture Documents
Content ....................................................................................................................................... 1
Smart Grid Trainer / Electrical Power Engineering ..................................................................... 3
Basics of electrical power engineering ................................................................................................ 4
Fundamentals of power engineering (UniTrain-I) ........................................................................................... 4
EUB Current and voltage transformers .......................................................................................................... 9
EUB 1 Current transformers for protective installations ............................................................................................ 10
EUB 2 Voltage transformers for protective installations ............................................................................................ 13
Power generation .............................................................................................................................. 16
EUG Generator control and synchronising circuits ....................................................................................... 16
EUG 1 Manually operated synchronising circuits ...................................................................................................... 17
EUG 2 Automatic synchronising circuits, automatic power control and automatic power factor control ..................... 22
EUG 3 Pumped storage power plant ........................................................................................................................ 25
EGP Generator protection ........................................................................................................................... 29
EGP 1 Basic generator protection equipment set ..................................................................................................... 31
EGP 2 Generator differential protection .................................................................................................................... 34
EGP 3 Rotor earth-fault protection ........................................................................................................................... 38
Renewable Energies ......................................................................................................................... 42
EWG 1 Wind power plants .......................................................................................................................... 43
EWG 2 Small wind power plant ................................................................................................................... 47
Photovoltaics (UniTrain-I) ............................................................................................................................ 52
EPH 2 Advanced photovoltaics .................................................................................................................... 54
EPH 2.1 Investigating solar modules ....................................................................................................................... 54
EPH 2.2 Design of PV systems in an isolated power network ................................................................................... 56
EPH 2.3 Design of PV systems in parallel network operation ................................................................................... 59
Fuel cell technology (UniTrain-I) .................................................................................................................. 62
EHY 1 Advanced fuel cell technology .......................................................................................................... 64
Transformers ..................................................................................................................................... 66
EUT Transformers ....................................................................................................................................... 67
ETP Transformer protection ......................................................................................................................... 70
ETP 1 Transformer differential protection ................................................................................................................. 70
ETP 2 Time overcurrent protection ........................................................................................................................... 73
Power transmission ........................................................................................................................... 76
EUL High-voltage transmission lines ............................................................................................................ 77
EUL 1 Investigations on Three-phase Transmission Lines ........................................................................................ 79
EUL 2 Parallel and series connection of transmission lines ...................................................................................... 82
EUL 3 Transmission Line with Earth-fault Compensation ......................................................................................... 85
EUL 4 Transmission Systems with a Synchronous Generator .................................................................................. 88
EUL 5 Investigations on three phase cables ............................................................................................................. 91
EUL 6 Combined networks of cables and lines ......................................................................................................... 94
EUL 7 Controlling flow of power in meshed networks ............................................................................................... 97
ELP Protective systems for high-voltage transmission lines ....................................................................... 100
ELP 1 Overcurrent time protection for lines ............................................................................................................ 100
ELP 2 Directional overcurrent time protection for lines ........................................................................................... 104
ELP 3 Overvoltage and undervoltage protection ..................................................................................................... 107
ELP 4 Directional power protection ......................................................................................................................... 110
ELP 5 Earth-fault voltage protection ....................................................................................................................... 113
ELP 6 Protection of Parallel-connected Lines ......................................................................................................... 116
ELP 7 High-speed distance protection .................................................................................................................... 119
Electric power distribution ............................................................................................................... 123
EPD Busbar systems ................................................................................................................................. 124
EDP Protection for Busbars systems .......................................................................................................... 127
Energy management ....................................................................................................................... 131
EUC Energy management ......................................................................................................................... 131
EUC 1 Complex loads, power consumption measurement and peak load monitoring ............................................. 133
EUC 2 Dynamic loads ........................................................................................................................................... 136
EUC 3 Manual and automatic compensation of reactive power .............................................................................. 139
ECP Protection for electrical consumers .................................................................................................... 142
EEM 4.6 Protection for electrical machines ............................................................................................................ 142
EDT 51 Motor management relays ......................................................................................................................... 145
"Smart Grid" - Power with Brains .................................................................................................... 148
ESG 1 Smart Grid ..................................................................................................................................... 149
ESG 1.1 ................................................................................................................................................................ 151
The Lucas-Nülle training systems have been designed in anticipation of the newest developments:
Smart measuring instruments which avail of various communication interfaces (e.g. LAN, RS485, USB)
and control elements
SCADA Power Engineering Lab software for the intelligent control and evaluation of the "Smart Grid" with
soft plc
Permits investigation of dynamically alternating loads and power generation inside the laboratory
Modular integration of renewable energies into the smart grid using protective engineering
Wind power plant with doubly-fed asynchronous generator (DFIG) with mains sychronisation
With the aid of numerous experiments and animations, the UniTrain-I multimedia course gives the student
insight into the latest important issues relating to power engineering. The fundamentals of DC, AC and three-
phase technology as well as processes in distribution networks are some of the subjects dealt with in the
various courses. Typical processes that occur in the generation and distribution of electrical power receive
particularly close attention and are reproduced in the experiments using safe extra-low voltages.
Experiment with current and voltage transformers form the basis for experiments with protective relays.
The UniTrain-I system is a computer-based training and experimentation system for vocational and further
training and education in the areas of basic and advanced electrical engineering and electronics. Its multimedia
courses combine cognitive and hands-on (haptic) training units into a comprehensive unified concept,
specifically enabling students to acquire skills in the handling of equipment. Starting with basic courses and
advancing to cover a huge variety of electrical engineering and electronics topics, a wide range of multimedia
courses is available for study in school or in professional and advanced training courses.
The UniTrain-I system is completely self-contained and can be used anywhere at any time. The multimedia
learning environment the system provides high degrees of motivation, and maximum learning effectiveness in
laboratories, at work or at home. It thus becomes a guarantor for effective and efficient study.
Access to the multimedia courses and control of virtual instruments and experiment hardware is provided by
LabSoft, the system's open experiment platform. The courses teach the theoretical building blocks and provide
experiments to be carried out using the course-specific experiment hardware. The intelligent measurement
interface supplies the analog and digital measuring and control I/O and represents, in combination with the
system's virtual instruments, a high quality item of laboratory equipment. In addition, students' progress can be
monitored and electronically documented on the basis of fault finding experiments with faults simulated by the
hardware as well as tests of knowledge. The electrical and electronic circuits needed for the experiments are
connected to the system with the aid of an Experimenter module.
A host of multimedia courses are available for the UniTrain-I system in the areas of electrical engineering and
electronics. Each of the courses consists of the training program, specific circuitry on one or more experiment
cards and a browser (LabSoft) for the control, management and display of the training course. UniTrain-I courses
convey practical skills by providing a theoretical basis then guiding students through numerous experimental
measurements. Experiment cards are linked to the Interface and the training program via Experimenters. With
the help of virtual instruments and power sources included with the system, circuits can be analysed and results
of measurements stored directly within the training program.
Hardware
Experiment cards with specific circuits and components allowing the measurements in the course to be
made as well as permitting unguided experimentation.
Modifiable, open experiment set-up on experiment cards allow experiments to be started quickly
Systematic fault simulation, faults can be switched on and off by relays via the UniTrain-I bus
Software
Interactive, HTML-based multimedia courses to provide theoretical knowledge and practical skills
LabSoft: browser with menu, navigation and display windows for display and conduct of all UniTrain-I
courses
Virtual instruments (VIs) are made available for real-time measurement or for generating output signals.
Optional integration of circuit simulator, course editor, etc. into the menu structure.
Additionally required:
Optionally available: multi user license with 5 or 10 dongles and update to version 4.0
16 Software, LabSoft Classroom Manager 4.0, single licence (D, GB, F, SO2001-5A 1
E, RU, PT)
A wide spectrum of current and voltage transformers are used for various requirements in electrical power
engineering. The experiments include a practical hands-on investigation of transfer response, over-current factor,
absolute and phase angle error, as, for example, under varying loads. In addition to this, standard operation
requirements, short-circuit and asymmetrical faults can also be explored.
The protection of system facilities and components is not only dependent on selective protection equipment but
also on the detection and measurement of the lowest fault currents and voltages. Various types of measurement
circuits have to be used for different star-point circuit configurations in order to correctly detect and localise
potential fault types.
Training contents
Software:
Power supply:
28 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
30 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
42 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents
Software:
Power supply:
52 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
54 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
66 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Power generation
Electrical power is mainly produced by three-phase generators. This applies to power stations as well as to
standby power supplies and wind generators. In addition to the basic experiments dealing with three-phase
synchronous generators, the experiments involving the "EUG" module include manual and automatic
synchronising circuits as well as experiments on the automatic power factor control (cos-phi control) and power
control. Thus, the ”EUG“ module can be used to simulate power station operation in stand-alone (isolated) or
interconnected operation.
Training contents
70 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Media:
Software:
Power supply:
Measuring instruments:
85 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
94 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
EUG 2 Automatic synchronising circuits, automatic power control and automatic power factor control
Training contents
Additionally required - Machine test bench equipment set for servo-drive/braking system:
97 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Media:
Software:
Power supply:
Measuring instruments:
112 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
120 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
121 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
In pumped storage power stations electric energy is stored by converting the potential energy of water and then
converting this potential energy into electrical power which is then fed back into the grid. Thanks to the growth in
regenerative energy generation these so-called hydroelectric power storage stations are not only necessary but
indispensible in smart power grids with high grid quality.
Training content:
Media:
Additionally required - Machine test bench equipment set for servo-drive/braking system:
129 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Media:
Power supply:
Measuring instruments:
144 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
152 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
153 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Effective protection of generators against internal and external faults requires that a wide variety of protective
devices be deployed.
Generator differential protection covers the internal faults like short-circuit fault, interturn and interwinding faults
or phase-earth-phase faults and serves as the primary protection.
The time overcurrent protection constitutes the reserve protection for the generator and can also be used for the
detection of external faults, such as short circuits and overload, for example. Earth-fault occurrences are
detected with the stator-earth fault protection. The investigation of reverse power and unbalanced load protection
as well as overvoltage/undervoltage protection concludes the experiment series titled “EGP“ on generator
protection.
Detection and disabling of the generator in the case of reverse power flow
Detection of system voltages under normal operating conditions or stator-earth fault occurrence
156 Three-phase synchronous machine with smooth core rotor, 1kW SE2662-5Q 1
Additionally required - Machine test bench equipment set for servo-drive/braking system:
158 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Media:
Power supply:
Measuring instruments:
173 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
181 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
182 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Testing tripping and reset for faults occurring inside and outside the protection range
Measurement of the operating (pick-up) currents of the protection device for symmetrical and
asymmetrical faults
185 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Media:
Software:
Measuring instruments:
200 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
208 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
209 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
213 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Media:
Software:
Measuring instruments:
228 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
236 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
237 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Renewable Energies
Renewable Energies
The move away from coal, oil and nuclear power to renewable forms of energy is gaining momentum. Today,
technology has evolved to a point where solar energy, wind power, hydrogen fuel and biomass can be exploited
as environmentally friendly energy sources.
Throughout the world well-qualified technicians and engineers are being sought after to help keep this trend
moving forward. Today, technologies are undergoing rapid change. This trend is being compounded by rising
expectations in training and education. Lucas-Nülle has developed the appropriate training systems needed to
cope with the ever more complex world of training and education.
This equipment set is used to investigate the design and operation of modern wind power stations.
The effect of wind force and the mechanical design of wind power stations can be emulated down to precise
detail using the servo machine testing stand and the WindSim software. The control unit for the double-feed
asynchronous machine (as a generator for the wind power plant) permits user-friendly operation and visualisation
during the experiments. The corresponding Interactive Lab Assistant Multimedia course is designed to convey
knowledge and provide interactive support for the experiment set-ups and allows for PC-assisted evaluation of
the measured data.
Training content:
Operate the generator with varying wind force levels and regulate the output voltage and frequency
Investigate the operating response during mains malfunctions “Fault ride through”
Your benefits:
Exact emulation of the technology of the current multi-megawatt wind power generators
A fully working and functional training system for wind turbines with Double-fed Induction Generator
(DFIG)
A wind simulation, which exactly mathematically emulates the wind at the shaft
239 Control unit for wind turbine double-fed asynchronous generator CO3208-3A 1
241 3-phase isolation transformer, 1kW for wind power plants CO3208-3B 1
Training content:
Representing variables in the dynamic range as well as with positive phase sequence and negative phase
sequence
Additionally required - Machine test bench equipment set for servo-drive/braking system:
244 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Media:
248 Interactive Lab Assistant: Wind power plants with DFIG SO2800-3D 1
249 Interactive Lab Assistant: Fault Ride-Through of wind power plants SO2800-3E 1
Power supply:
Measuring instruments:
Accessories:
259 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
260 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Optionally available: multi user license with 5 or 10 dongles and update to version 4.0
262 Software, LabSoft Classroom Manager 4.0, single licence (D, GB, F, SO2001-5A 1
E, RU, PT)
Small wind power plants up to approx. 5 kW power are being deployed today for decentralised power supplies.
These systems are used for the supply of objects that do not avail over central power supplies, for example,
remotely located mobile radio converters or vacation homes. These plants generate DC voltage. The energy can
be stored in accumulators using charge controllers. AC voltages are generated via inverters for operation of loads
connected to a grid. The effects of wind power and the mechanical design of wind power stations can be
emulated down to the last detail using the servo machine test stand and the software WindSim. The
corresponding Interactive Lab Assistant Multimedia course imparts knowledge, provides interactive experiment
setup support and allows for PC-assisted evaluation of the measurement data.
Training content:
Understand the design and operation of modern small wind power stations
Explore hybrid systems for off-grid power supply using wind power and photovoltaic systems
265 Synchronous generator 12V for small wind power plant with SE2673-1M 1
permanent magnets
Additionally required - Machine test bench equipment set for servo-drive/braking system:
270 Servo machine test stand for 0.3kW machines incl. software CO3636-6V 1
ActiveServo (D,GB,F,E)
Measuring instruments:
Accessories:
281 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
282 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training content:
Understand the design and operation of modern, small wind power plants
How to set up, put into operation and operate an authentic small wind power plant
Outdoor operation
Optionally available: multi user license with 5 or 10 dongles and update to version 4.0
286 Software, LabSoft Classroom Manager 4.0, single licence (D, GB, F, SO2001-5A 1
E, RU, PT)
Photovoltaics (UniTrain-I)
With the UniTrain-I Photovoltaic course the function and operating principle of solar cells are vividly
demonstrated and made understandable.
UniTrain-I Energy Engineering course uses numerous experiments and animations to provide insight into current
issues affecting electrical power engineering. The various courses cover the generation of electric power from
regenerative energies as well as the processes involved in distribution networks. Typical generation and
distribution processes requiring special treatment are dealt with and explored in experiments using safe extra-
low voltages.
List of articles:
The UniTrain-I system is a computer-based training and experimentation system for vocational and further
training and education in the areas of basic and advanced electrical engineering and electronics. Its multimedia
courses combine cognitive and hands-on (haptic) training units into a comprehensive unified concept,
specifically enabling students to acquire skills in the handling of equipment. Starting with basic courses and
advancing to cover a huge variety of electrical engineering and electronics topics, a wide range of multimedia
courses is available for study in school or in professional and advanced training courses. The UniTrain-I system
is completely self-contained and can be used anywhere at any time. The multimedia learning environment the
system provides high degrees of motivation, and maximum learning effectiveness in laboratories, at work or at
home. It thus becomes a guarantor for effective and efficient study. Access to the multimedia courses and
control of virtual instruments and experiment hardware is provided by LabSoft, the system's open experiment
platform. The courses teach the theoretical building blocks and provide experiments to be carried out using the
course-specific experiment hardware. The intelligent measurement interface supplies the analog and digital
measuring and control I/O and represents, in combination with the system's virtual instruments, a high quality
item of laboratory equipment. In addition, students' progress can be monitored and electronically documented on
the basis of fault finding experiments with faults simulated by the hardware as well as tests of knowledge. The
electrical and electronic circuits needed for the experiments are connected to the system with the aid of an
Experimenter module.
Additionally recommended
Optionally available: multi user license with 5 or 10 dongles and update to version 4.0
294 Software, LabSoft Classroom Manager 4.0, single licence (D, GB, F, SO2001-5A 1
E, RU, PT)
The Advanced Photovoltaics course enables project work to be carried out with industrial components.
The system permits realistic simulation of the progression of the sun. Emulators make it possible to carry out
the experiments in the laboratory without the sun.
The Interactive Lab Assistant Advanced Photovoltaic multimedia course is designed to convey the theoretical
information and practical know-how, and performs the PC-supported evaluation of measurement data.
Training content:
Learning about various types of wiring and connection configurations for solar modules
Media:
Measuring instruments:
Accessories:
310 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
311 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Optionally available: multi user license with 5 or 10 dongles and update to version 4.0
313 Software, LabSoft Classroom Manager 4.0, single licence (D, GB, F, SO2001-5A 1
E, RU, PT)
Training content:
Installation of PV systems
Design and testing of a standalone PV system for the generation of 230 V AC voltage
Media:
Accessories:
331 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
332 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Optionally available: multi user license with 5 or 10 dongles and update to version 4.0
334 Software, LabSoft Classroom Manager 4.0, single licence (D, GB, F, SO2001-5A 1
E, RU, PT)
Training content:
Installation of PV systems
338 Single-phase mains supply with switch, circuit breaker and earth- CO3211-1A 1
contact socket
Media:
Measuring instruments:
Accessories:
351 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
352 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Optionally available: multi user license with 5 or 10 dongles and update to version 4.0
354 Software, LabSoft Classroom Manager 4.0, single licence (D, GB, F, SO2001-5A 1
E, RU, PT)
With the UniTrain-I fuel cell technology course fuel cell operating principles and functions are explained in
graphic detail.
UniTrain-I Energy Engineering course uses numerous experiments and animations to provide insight into current
issues affecting electrical power engineering. The various courses cover the generation of electric power from
regenerative energies as well as the processes involved in distribution networks. Typical generation and
distribution processes requiring special treatment are dealt with and explored in experiments using safe extra-
low voltages.
List of articles:
The UniTrain-I system is a computer-based training and experimentation system for vocational and further
training and education in the areas of basic and advanced electrical engineering and electronics. Its multimedia
courses combine cognitive and hands-on (haptic) training units into a comprehensive unified concept,
specifically enabling students to acquire skills in the handling of equipment. Starting with basic courses and
advancing to cover a huge variety of electrical engineering and electronics topics, a wide range of multimedia
courses is available for study in school or in professional and advanced training courses. The UniTrain-I system
is completely self-contained and can be used anywhere at any time. The multimedia learning environment the
system provides high degrees of motivation, and maximum learning effectiveness in laboratories, at work or at
home. It thus becomes a guarantor for effective and efficient study. Access to the multimedia courses and
control of virtual instruments and experiment hardware is provided by LabSoft, the system's open experiment
platform. The courses teach the theoretical building blocks and provide experiments to be carried out using the
course-specific experiment hardware. The intelligent measurement interface supplies the analog and digital
measuring and control I/O and represents, in combination with the system's virtual instruments, a high quality
item of laboratory equipment. In addition, students' progress can be monitored and electronically documented on
the basis of fault finding experiments with faults simulated by the hardware as well as tests of knowledge. The
electrical and electronic circuits needed for the experiments are connected to the system with the aid of an
Experimenter module.
Additionally recommended
Optionally available: multi user license with 5 or 10 dongles and update to version 4.0
362 Software, LabSoft Classroom Manager 4.0, single licence (D, GB, F, SO2001-5A 1
E, RU, PT)
The generation of electrical energy using fuel cells continues to develop into a significant area with diverse
application potential in electrical engineering and automotive technology. The training panel system permits a
safe experimenting environment in connection with hydrogen and fuel cells. At the same it permits interesting
investigations and is well suited for both practical lab work as well as demonstrations. Animated theory,
experiment guidelines and information including results are supplied using the “Interactive Lab Assistant”.
Training content
Efficiency
Media:
368 Interactive Lab Assistant: Fuel cell technology - Advanced course SO2800-3B 1
Accessories:
375 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Optionally available: multi user license with 5 or 10 dongles and update to version 4.0
377 Software, LabSoft Classroom Manager 4.0, single licence (D, GB, F, SO2001-5A 1
E, RU, PT)
Transformers
Transformers
In power engineering, transformers are used to connect the various voltage echelons of the power grid to each
other. In transformer stations, electricity from the regional distribution grid with a medium voltage level of 10 to 36
kV is transformed to supply power to low-voltage end customers in the local grid where 400 V or 230 V is used.
The heart of a transformer station is the transformer itself which also requires protective equipment. By carrying
out hands-on measurements and fault simulations with the training system, it is possible to gain an
understanding of these complex systems in the classroom.
EUT Transformers
Training contents:
Media:
Software:
Power supply:
390 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
392 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
400 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
401 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Differential protection for transformers (starting from approx. 1 MVA), combined with time overcurrent protection,
can be investigated using measurement techniques in normal operation, fault occurrences in various winding
circuit configurations (star, delta), in various vector groups and as a function of star-point treatment (floating,
direct or earthed using earth coils). In the case of differential currents, the tripping criteria is determined based
on characteristic sensitivity.
The time overcurrent protection supplements the safety protection measures contained in transformer differential
protection. It protects the transformers against short circuits outside the protection range and against
overloading.
Training contents:
Software:
Power supply:
416 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
418 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
426 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
427 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Setting the parameters of the time overcurrent relay while taking the current transformation into
consideration
Media:
Power supply:
438 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
440 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
448 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
449 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Power transmission
High-voltage networks are usually operated with voltages in the region of 110 kV to 380 kV, whereby urban areas
and large-scale industrial facilities are supplied with 110 kV, and 380 kV is used for long-distance transmission
lines. The line simulation system is designed for operation at model voltages between 110 V and 380 V. Various
voltage levels and line lengths can be selected via corresponding overlay masks. Examinations with the training
system can be performed off-load, in normal operating mode, in the presence of a short-circuit or earth fault, with
or without earth-fault compensation. The system also permits assembly of complex networks by connecting the
line simulation models in parallel or series. The voltage can be supplied via a fixed grid or synchronous
generator.
Restricted to three-phase systems, earth-fault compensation makes use of a special Petersen coil named after
its inventor and which is also known as an earth-fault quenching coil. This coil compensates the electric current
at the earth-fault point, thereby preventing consequential malfunctions in the electrical system.
The objective here is to measure characteristic power transmission parameters on simulated, three-phase,
parallel-connected lines fed via a fixed network or a generator, and perform quantitative as well as qualitative
assessments of operational relationships.
Training contents:
Software:
Power supply:
462 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
464 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
475 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
476 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Voltage distribution
Media:
Power supply:
485 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
487 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
498 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
499 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Earth-fault compensation
Media:
Power supply:
508 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
510 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
521 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
522 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
526 Three-phase synchronous machine with smooth core rotor, 1kW SE2662-5Q 1
Additionally required - Machine test bench equipment set for servo-drive/braking system:
527 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Media:
Software:
Power supply:
Measuring instruments:
540 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
551 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
552 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
554 Cable Model 12,5 km / 37,5 km (7.8 miles / 23.3 miles) CO3301-3C 1
Media:
Software:
Power supply:
562 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
564 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
576 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
578 Cable Model 12,5 km / 37,5 km (7.8 miles / 23.3 miles) CO3301-3C 1
580 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Media:
Software:
Power supply:
587 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
589 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
600 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
Training contents:
Variable transformers
In-phase control
First-quadrant control
Affect flow of power via two identical conductors parallel to one another
Comparison between theory and practice
605 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Software:
Power supply:
612 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
614 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Accessories:
625 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
Monitoring of protective features by means of SCADA (Supervisory Control and Data Acquisition)
Training contents
Determining the reset ratio in the case of single-, double- and triple-pole short circuit
Software:
Power supply:
640 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
642 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
650 Connection plugs for PROFIBUS with PG socket and terminating LM9182 5
resistor
656 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Determining the reset ratio in the case of single-, doubleand triple-pole short circuit
Software:
Power supply:
667 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
669 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
677 Connection plugs for PROFIBUS with PG socket and terminating LM9182 5
resistor
683 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Software:
Power supply:
694 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
696 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
704 Connection plugs for PROFIBUS with PG socket and terminating LM9182 5
resistor
710 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Software:
Power supply:
721 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
723 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
731 Connection plugs for PROFIBUS with PG socket and terminating LM9182 5
resistor
737 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Software:
Power supply:
749 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
751 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
759 Connection plugs for PROFIBUS with PG socket and terminating LM9182 5
resistor
764 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
765 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Media:
Software:
Power supply:
779 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
781 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
789 Connection plugs for PROFIBUS with PG socket and terminating LM9182 5
resistor
794 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
795 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Relay parameterisation
Tests of triggering characteristics in the event of various faults inside and outside the line‘s protective
domain
Tests of triggering characteristics in the event of various faults inside and outside the protective domain:
- Distance protection
- Voltage protection
Software:
Power supply:
809 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
811 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
819 Connection plugs for PROFIBUS with PG socket and terminating LM9182 5
resistor
824 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
825 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Electrical power at large switching stations is distributed almost exclusively using double busbar systems.
These stations incorporate switching matrices for connecting the two busbars, the incoming and outgoing feeder
cubicles as well as the measurement fields. The incoming and outgoing feeder cubicles as well as the switching
matrices are furnished with circuit breakers and one disconnector for each busbar terminal. For safety reasons,
a particular switching logic must be strictly adhered to here. The double busbar model incorporates all functions
of practical relevance. Integrated instruments for measuring currents and voltages permit direct analyses of
switching operations.
Training contents:
Basic circuits of a three-pole, double busbar system with incoming / outgoing feeder
Busbar coupling
Software:
Power supply:
838 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
840 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
847 Connection plugs for PROFIBUS with PG socket and terminating LM9182 5
resistor
853 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Optional Accessories:
Training contents:
Media:
865 Interactive Lab Assistant: Protection for bus bar systems SO2800-6M 1
Software:
Power supply:
Measuring instruments:
875 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Accessories:
881 Connection plugs for PROFIBUS with PG socket and terminating LM9182 5
resistor
886 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
887 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Energy management
Energy management
For economic and environmental reasons, a rational use of energy is becoming increasingly important.
Exercises on manual and automatic compensation of reactive power as well as experiments on reducing peak
loads through measurements with active-current and maximum-demand meters demonstrate how the load on a
mains supply network can be reduced and evenly distributed over a 24-hour period. An analysis of the power
supply grid and connected consumers (loads) is necessary for effective use of the involved measurement
techniques. Accordingly, each experiment permits a detailed investigation of static, dynamic, symmetric and
asymmetric loads. Protection of electrical consumers is another important training subject.
In this case, a three-phase asynchronous motor coupled with the servo machine test stand is used as a
dynamic load. The active and reactive powers (motor‘s cos-phi) depend on the motor load and are therefore not
constant. The servo machine test stand can be used to drive the asynchronous motor, thereby feeding active
power into the three-phase network.
Reactive power compensation in alternating voltage networks is designed to reduce undesirable reactive current
and resultant reactive power of consumers. In this process, capacitive loads are connected to all inductive loads
via a central feed point. The opposing, capacitive reactive power arising here is ideally of the same magnitude as
the installed, inductive reactive power. This reduces undesirable reactive currents, and none of the systems
needed to supply the reactive current has to be over-dimensioned.
EUC 1 Complex loads, power consumption measurement and peak load monitoring
Training contents:
Three-phase consumers with star and delta connections (R, L, C, RL, RC and RLC loads)
Power supply:
894 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
895 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Media:
Software:
Accessories:
910 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
911 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Additionally required - Machine test bench equipment set for servo-drive/braking system:
915 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Power supply:
922 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
923 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Media:
Accessories:
938 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
Training contents:
Power supply:
945 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
946 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Media:
Accessories:
961 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
Malfunctions in electrical systems resulting from short circuits, overload etc. must be prevented or at least
restricted by means of appropriate protective measures, and the faulty devices disconnected selectively from the
network. For the protective features to be properly implemented and correctly dimensioned, it is necessary to
know their trigger characteristics and times, as well as their operational characteristics.
Squirrel cage motors are designed for operation with constant loading. Any change in load, or high currents
when starting up, may cause the nominal operating temperature to be exceeded. This training system conveys
how some of the most important protection circuits work.
Training contents:
Thermistor protection
Media:
967 Manual EEM 4.6, Protection for electrical machines with servo- SH5002-1U 1
brake
Additionally required - Machine test bench equipment set for servo-drive/braking system:
968 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Power supply:
Accessories:
982 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
983 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Load experiments
987 Manual EDT51, Controlling motors with motor management relays SH5002-3R 1
Additionally required - Machine test bench equipment set for servo-drive/braking system:
989 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Power supply:
Measuring instruments:
1003 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
1004 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
In the future, new technology will better equip the power grid for the demands of tomorrow. More flexible grid
management should make the increasing proportion of renewable energy sources compatible with conventional
infrastructures associated with power stations. The variety and number of these decentralised power plants
require a revision in how we manage power grids – the so-called intelligent or "Smart Grid":
Using modern IT technology, like the Internet, sensors, control systems and wireless transmission
devices
"Smart metering" – digital current meters measure current consumption at end points of the grid
Starting flexible applications such as washing machines outside peak load periods, at the initiation of a
utility provider
The Lucas-Nülle training systems have been designed in anticipation of these developments:
Smart measuring instruments which avail of various communication interfaces (e.g. LAN, RS485, USB)
and control elements
SCADA Power Engineering Lab software for the intelligent control and evaluation of the "Smart Grid" with
soft plc
Permits investigation of dynamically alternating loads and power generation inside the laboratory
Modular integration of renewable energies into the smart grid using protective engineering
Wind power plant with doubly-fed asynchronous generator (DFIG) with mains sychronisation
Training system on the generation, transmission, distribution, protection and management of electrical energy:
Electrical power at large switching stations is distributed almost exclusively using double busbar systems.
These stations incorporate switching matrices for connecting the two busbars, the incoming and outgoing feeder
cubicles as well as the measurement fields. The incoming and outgoing feeder cubicles as well as the switching
matrices are furnished with circuit breakers and one disconnector for each busbar terminal. For safety reasons,
a particular switching logic must be strictly adhered to here. The double busbar model incorporates all functions
of practical relevance. Integrated instruments for measuring currents and voltages permit direct analyses of
switching operations.
Transmission lines
For your safety, the 380kV transmission lines are investigated and connected at a low-voltage level without
detracting from the characteristics of a real high-voltage line. This realistic simulation of a 380kV transmission
line switches over automatically between line lengths of 300 km and 150 km once the overlay mask has been
put into place. Joint use of several line simulation models connected in parallel or series permits complex
networks to be assembled.
Line protection
In practice, medium-voltage and high-voltage networks are equipped with protective mechanisms connected via
current and voltage transformers.
Monitoring of protective features by means of SCADA (Supervisory Control and Data Acquisition)
Experiments on reducing peak loads through measurements with active-current and maximum-demand meters
demonstrate how the load on a mains supply network can be reduced and evenly distributed over a 24-hour
period. An analysis of the power supply grid and connected consumers (loads) is necessary for effective use of
the measurement techniques involved. Accordingly, each experiment permits a detailed investigation of static,
dynamic, symmetric and asymmetric loads.
In this case, a three-phase asynchronous motor coupled with the servo machine test stand is used as a
dynamic load. The active and reactive powers (motor‘s cos-phi) depend on the motor load and are therefore not
constant. The servo machine test stand can be used to drive the asynchronous motor, thereby feeding active
power into the three-phase network. Reactive power compensation in alternating voltage networks is designed to
reduce undesirable reactive current and resultant reactive power of consumers. In this process, capacitive loads
are connected to all inductive loads via a central feed point. The opposing, capacitive reactive power arising here
is ideally of the same magnitude as the installed, inductive reactive power. This reduces undesirable reactive
currents, and none of the systems needed to supply the reactive current has to be over-dimensioned.
Training contents:
Busbar coupling
Training contents:
Training contents:
Determining the reset ratio in the case of single-, double- and triple-pole short circuit
Power supply:
1012 Table-top housing for 72PU insert with CEE three-phase connector ST8008-7F 1
Measuring instruments:
1015 Three Phase Power Quality Meter with display and long-term CO5127-1S 2
memory
Media:
Accessories:
1032 Connection plugs for PROFIBUS with PG socket and terminating LM9182 10
resistor
1037 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
1038 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training contents:
Three-phase consumers with star and delta connections (R, L, C, RL, RC and RLC loads)
Dynamic loads
Training contents:
Training contents:
Additionally required - Machine test bench equipment set for servo-drive/braking system:
1048 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Power supply:
Measuring instruments:
1056 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Media:
Accessories:
1073 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
1074 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Supplementary to ESG 1
The following equipment sets on energy generation can be used optionally either individually or in combination to
supplement the "ESG 1 Smart Grid" equipment set. As such extensive experiments can be realised to explore
the "Smart Grid".
This equipment set is used to investigate the design and operation of modern wind power stations.
The effect of wind force and the mechanical design of wind power stations can be emulated down to precise
detail using the servo machine testing stand and the WindSim software. The control unit for the double-feed
asynchronous machine (as a generator for the wind power plant) permits user-friendly operation and visualisation
during the experiments. The corresponding Interactive Lab Assistant Multimedia course is designed to convey
knowledge and provide interactive support for the experiment set-ups and allows for PC-assisted evaluation of
the measured data.
Training content:
Operate the generator with varying wind force levels and regulate the output voltage and frequency
Investigate the operating response during mains malfunctions “Fault ride through”
Your benefits:
Exact emulation of the technology of the current multi-megawatt wind power generators
A fully working and functional training system for wind turbines with Double-fed Induction Generator
(DFIG)
A wind simulation, which exactly mathematically emulates the wind at the shaft
1076 Control unit for wind turbine double-fed asynchronous generator CO3208-3A 1
1078 3-phase isolation transformer, 1kW for wind power plants CO3208-3B 1
Training content:
Representing variables in the dynamic range as well as with positive phase sequence and negative phase
sequence
Additionally required - Machine test bench equipment set for servo-drive/braking system:
1081 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Media:
1085 Interactive Lab Assistant: Wind power plants with DFIG SO2800-3D 1
1086 Interactive Lab Assistant: Fault Ride-Through of wind power plants SO2800-3E 1
Power supply:
Measuring instruments:
1089 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Software:
Accessories:
1106 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
The Advanced Photovoltaics course enables project work to be carried out with industrial components.
The system permits realistic simulation of the progression of the sun. Emulators make it possible to carry out
the experiments in the laboratory without the sun.
The Interactive Lab Assistant Advanced Photovoltaic multimedia course is designed to convey the theoretical
information and practical know-how, and performs the PC-supported evaluation of measurement data.
Training content:
Learning about various types of wiring and connection configurations for solar modules
Measuring instruments:
1112 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Software:
Accessories:
1129 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
1130 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training content:
Installation of PV systems
Design and testing of a standalone PV system for the generation of 230 V AC voltage
Measuring instruments:
1138 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Media:
Software:
1155 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
1156 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Training content:
Installation of PV systems
1160 Single-phase mains supply with switch, circuit breaker and earth- CO3211-1A 1
contact socket
Measuring instruments:
1162 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Software:
Accessories:
1179 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
1180 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
Electrical power is mainly produced by three-phase generators. This applies to power stations as well as to
standby power supplies and wind generators. In addition to the basic experiments dealing with three-phase
synchronous generators, the experiments involving the "EUG" module include manual and automatic
synchronising circuits as well as experiments on the automatic power factor control (cos-phi control) and power
control. Thus, the ”EUG“ module can be used to simulate power station operation in stand-alone (isolated) or
interconnected operation.
Training contents
1183 Three-phase synchronous machine with smooth core rotor, 1kW SE2662-5Q 1
1184 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Power supply:
Measuring instruments:
1193 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Software:
Accessories:
1212 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
1213 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
EUG 2 Automatic synchronising circuits, automatic power control and automatic power factor control
Training contents
Additionally required - Machine test bench equipment set for servo-drive/braking system:
1216 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Power supply:
1225 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Media:
Software:
Accessories:
1244 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
1245 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
In pumped storage power stations electric energy is stored by converting the potential energy of water and then
converting this potential energy into electrical power which is then fed back into the grid. Thanks to the growth in
regenerative energy generation these so-called hydroelectric power storage stations are not only necessary but
indispensible in smart power grids with high grid quality.
Training content:
1253 Three-phase synchronous machine with smooth core rotor, 1kW SE2662-5Q 1
Additionally required - Machine test bench equipment set for servo-drive/braking system:
1254 Servo machine test bench for 1kW machines incl. ActiveServo CO3636-6W 1
software(D,GB,F,E)
Power supply:
Measuring instruments:
1263 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory
Additionally recommended
Software:
Accessories:
1284 PC holder for Syba experiment trolleys, height and width ST7200-5A 1
adjustable
1285 Monitor holder for flat screen monitor of weight up to 10kg, VESA ST8010-4L 1
75/100
With the following components you have the option to integrate additional existing external energy sources, like
e.g. a photovoltaic or wind power station into the "ESG 1 Smart Grid" training system.
The following prerequisites must be met:
Optional Accessories:
1289 Three Phase Power Quality Meter with display and long-term CO5127-1S 1
memory