You are on page 1of 36

HEAT-RECOVERY

STEAM-GENERATORS
for steam-gas plants and
gas-turbine power plants
Large potential of group of companies “ZiO-Podolsk” and “ZIOMAR” enables today to
carry out a broad spectrum of works in power engineering.
Being a leader of Russian industry JSC “The Machine-Building Plant “ZiO-Podolsk”
(ZiO) carry on its history since 1919. In May 2, 2014 ZiO will be 95.

JSC “The Machine-Building Plant JSC “Engineering Company “ZIOMAR”


“ZiO-Podolsk” means production and is one of the leading engineering Russian
technological base for manufacture of companies, and its specialists carry out
high-technology equipment, competitive complex designing, equipment setup,
heat exchanging equipment. Modern examination of the operational projects for
management and industrial engineering their reconstruction and modernization.
as well as highly skilled personnel ensure
quality and reliability of equipment being
made.

The major power engineering companies JSC “Inter RAO”, “Gazprom energoholding
ltd.” as well as another generating and heat and power engineering companies are our
customers.

Being the customer-liable the guidance principle of our companies’ strategy is a stable
economic development as well as creation and realization of competitive equipment.

We appreciate if our acquaintance grows into constructive and mutually beneficial


cooperation
ENGINEERING

Unified research and development to create - modern gaseous masout hot water boilers and is one of the most modern and effective
and upgrade equipment for thermal power with capacity 70 and 120 gigacal/hrs. were in Russia. Thermal efficiency of power unit
engineering is conducted by specialists of developed and being manufactured. and HRSG designed by JSC “EC “ZIOMAR”
JSC “EC “ZIOMAR” boiler building office. is over 58%.
- since 1995 boiler building office carried
out 43 projects, and JSC “ZiO-Podolsk” - three-circuits HRSG for steam gas plant
Using design experience of thermal power manufactured more than 100 HRSG, ПГУ-800 (Kirishi hydroelectric power plant)
equipment in the course of the last years including 5 HRSG of 3 pressures with was manufactured in 2012 (the most powerful
intermediate steam overheating; 2-circiuts
boiler building office: steam gas plant in Russia), and others.
HRSG to generate 2-pressure steam and
hot water under operation integrated into - in 2009 a license agreement was signed
- successfully solved the problems of boilers two steam gas plants – Noyabrskaya with with the first-rate supplier of HRSG in
upgrade that were installed previously. Such capacity 60 MW each (in 2012 Noyabrskaya Europe – NEM b. v. company (Netherlands),
projects were carried out in Russia, Greece, plant was acknowledged as the most effective
that enables application of modern western
Yugoslavia, Poland, Bulgaria, and Ukraine. generating plant in Russia).
technologies in HRSG designing for
- in 2011 the first Russian tree-circuits HRSG Novomoskovskaya and Nizhnevartovskaya
- within the ecological projects for domestic GRES, Uzhnouralskaya GRES-2. In 2013
was set into commercial operation at TETS-
waste utilization HRSG draft designs for 26 (Mosenergo). It was integrated into steam boiler П-142 for steam gas unit ПГУ-190 MW
combustion plants in Russia and Germany gas power unit with capacity 420 MW. Power of Novomoskovskaya GRES was put into
were developed. unit was made using ALSTOM technology operation.

PRODUCTION
At present HRSG production for gas of diesel electric power plants engines was deaerators, built into LP drum, stationary
turbine for modern steam gas plants with mastered. pipelines, water-to-water heat exchangers,
capacity 2,5 – 800 MW is online. HRSG are feed and circulation pumps, non-metallic
both horizontal and vertical with natural or All HRSG use tubes with spiral band condensators, burn-up devices etc.
forced circulation in evaporating circuits. To solid or serrated finning.
meet customer requirements these may be The base target of JSC “ZiO-Podolsk”
steam boilers with built gas heater of heating We offer factory-assembled heat and JSC “EC “ZIOMAR” group of
system water or hot water HRSG. Besides recovery plants including HRSG with inlet companies is creation of next-generation
manufacture of hot water HRSG with capacity and outlet gas ducts and chimney flue, competitive equipment for thermal power
0,1 – 2 MW for utilization of exhausted gases auxiliary equipment and blowoff expanders, engineering.

2
GAS HEATER FOR HEATING SYSTEM WATER

ГПСВ

In 1992 JSC “ZiO-Podolsk” designed and of tubes with transverse band finning. Gas simplicity and bundle repairing and possibility
implemented to production original design of heater has its own framework, metal gas of tubes and tube sheets expansion. All coil
a gas heater unit for heating system water proof casing thermal insulation. It is installed bends are out of the last tube sheets of the
(ГПСВ) intended to heat water in a closed on base metalwares of a building post diffusor
bundle in “warm boxes” to simplify access for
circulation circuit of thermal power plant due after gas turbine. From above a confusor is
to exhausted gases of gas turbine unit – 16 mounted on a gas heater connecting heat inspection and repair.
MW. exchanger block with gas duct that goes to Gas heater set consists of:
Introduction of gas heater unit for a chimney pipe. • heat exchanger block;
heating system water into gas turbine Gas heater heat exchanging surface is • diffusor and confusor shields;
hydroelectric power plant enables provision a horizontal coil bundle with tubes disposed • compensators;
of the consumers with hot water, decrease in staggered order. Application of the
• stop valves.
in natural gas consumption, and enhance finned tubes instead of plain ones enables
High level of gas heater blockiness,
ecological indexes. to decrease the heat exchanger overalls
Gas heater unit for heating system approximately 30% down. Tube sheets transportability, mounting and maintaining
water is a type of transportable block and specify distancing of the tubes in the bundle. simplicity give a good base for gas heater
represents a horizontal heat exchanger made Tube sheets structure enables assembling application as a utilized in a gas turbine plant.

Specification
Nominal output, gigacal per hrs. 24,7
Water temperature, °С:
Inlet 70
Outlet 158
Outlet water pressure, MPa 2,1
Combustion product temperature, °С:
Inlet 345
Outlet 99
One block mass, ton 50
Overalls, mm 8750x3230x3050
3
HRSG WITH CAPCACITY 16 MW OR INSTALLATION POST GAS TURBINE UNI

П-86 (П-86-1)

Drum HRSG is intended to generate HRSG is gas proof due to metal casing. HRSG heating surfaces are made
steam and hot water using heat recovery of tubes with outer spiral finning and are
To increase steam capacity gas
supplied as modules of complete factory
of exhausted gases of gas turbine unit with temperature in front of HRSG is increased up
make; they do not require site enlargement.
capacity 16 MW; gas turbine unit to be to 6000C due to natural gas combustion in a
Operating range of HRSG load control is
installed at thermal power plants. Natural gas special burn-up device.
100%...60% of nominal one.
is both main and reserve gas turbine unit fuel. HRSG water-steam circuit consists
HRSG is equipped with systems of control
of economizing, evaporating and steam-
HRSG is vertical of single furnace with of technological parameters, protection and
superheating surfaces. To enhance a drop of blocking, automatic adjustment necessary
forced medium circulation in evaporating
outgoing gases a condensate gas heater is for in-line control, safety operation, economic
circuit and has self-supporting structure with installed on HRSG; it operates in a separate efficiency and analyses of reliability and
installation on a crosstops of a boiler house. circuit. efficiency.

Specification
П-86 П-86-1
Steam capacity, ton per hrs. 72 60
Condensate gas heater heat productivity, gigacal per hrs. 7,9 9,2
Steam pressure, MPa, kgf/sm2 2,5 (25,5) 4,0 (40,0)
Steam temperature, °C 255 450
Aerodynamic drag, kgf/sm2 266 310
4
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 325 MW, 490 MW

П-88 (П-87)

HRSG (П-88) is intended to operate gas turbine exhaust. Both boilers steam is - low pressure evaporator;
integrated into steam-gas plant of 325 MW delivered to a single steam turbine. - condensate gas heater.
capacity. Steam-gas plant consists of two HRSG is designed to seismicity of 8 per All heating surfaces are counter-
gas-turbine plants of GTE-110, two recycling MSK scale and is installed indoors. current switched and suspended to a
boiler plants and a steam-turbine plant of Boiler is gas-proof due to installation of boiler framework through the intermediate
K-110-6,5. Natural gas is a main and reserve metalwares disposed in the boiler “warm
metal covering plates.
fuel. box”.
Recycling boiler heating surfaces are Recycling boiler is equipped with the
Recycling boiler (П-87) is designed to made of the tubes having outer finning. At control systems of process-dependent
operate integrated with steam gas plant of
that HP steam superheater uses alloyed parameters, protection and blocking, distance
490 MW in capacity, consisting of 2 gas-
steel tubes, and the latter heating surfaces – control and control system of technological
turbine plants GTE-150 with capacity 163
carbon steel ones. parameters.
MW, two recycling boilers and a steam gas HRSG design and delivery blockiness
The following gas flow heating surfaces
turbine K-180-80. Natural gas is a main and provides with mounting basically in the form
reserve fuel. are located in a consecutive order:
of delivery blockiness without application of
Drum HRSG is horizontal with natural - high pressure steam superheater;
open assembly-and-enlargement area as
circulation in the evaporating circuits of high - high pressure evaporator; well as conditions for mechanized repair
and low pressure. They are independent of - high pressure economizer; of its units in compliance with standard
each other. Each boiler is gas-feeded due to - low pressure steam superheater; requirements.

Specification
Steam capacity, ton per hour: П-88 П-87
High pressure 154,6x2=308 251x2=502
Low pressure 39,6x2=79,2 79,5x2=139
Steam pressure, MPa:
High pressure 7,3 8,4
Low pressure 0,7 0,7
Steam temperature, °C:
High pressure 504 489
Low pressure 228 323
Inlet gas temperature (into boiler), °C 533 510
5
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 450 MW

П-90

HRSG П-90 operating as a part of steam- HRSG is gas-proof due to installation of Operating range of load control is 100%...
gas plant of 450 MW capacity was designed metal covering plates. 50% of nominal one.
per Belgium company CMI. Water-steam circuit consists of separate Pressure and steam temperature
Drum HRSG is intended to generate HP HP and LP circuits. HP circuit includes control in a boiler unit is not provided due to
and LP steam and hot water due to exhausted economizing, evaporating and steam operation at moving steam parameters, which
gases recovery going into recovery boiler superheating surfaces. LP circuit includes are specified with gas consumption and gas
evaporating and steam superheating
after gas turbine plant V-94.2 with capacity temperature delivering into HRSG out of gas
surfaces.
150 MW. Natural gas is both main and turbine unit, and steam turbine.
A self-contained condensate gas heater
reserve fuel. HRSG is equipped with systems of control
is mounted on HRSG to reduce exhausted
Vertical HRSG is a single-furnace boiler gases temperature. of technological parameters, protection and
with forced circulation of medium in HP and Recycling boiler heating surfaces are blocking, automatic adjustment necessary
LP evaporating circuits with heating surfaces made of the tubes having outer spiral finning. for in-line control, safety operation, economic
suspension to its own frameworks through They are delivered as modules, and their efficiency and analyses of reliability and
intermediate metalwares. dimensions are limited with railroad ones. efficiency.

Specification
Steam capacity, ton per hour:
High pressure 242
Low pressure 56
Steam pressure, MPa:
High pressure 8
Low pressure 560,65
Steam temperature, °С:
High pressure 515
Low pressure 200
Aerodynamic drag, kgs/m3 306
Outlet water temperature (out of condensate gas heater), °С 150
6
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 150 MW

П-91

Drum HRSG is intended to generate evaporating and steam superheating HRSG is equipped with systems of control
process steam and hot water due to surfaces. of technological parameters, protection and
exhausted gases recovery going into Recycling boiler heating surfaces are blocking, automatic adjustment necessary
recovery boiler after gas turbine plant V-94.2 made of the tubes having outer spiral finning. for in-line control, safety operation, economic
with capacity 150 MW. Natural gas is both They are delivered as modules having efficiency and analyses of reliability and
main and reserve fuel. maximum overalls, taking into account the
efficiency.
Vertical HRSG is a single-furnace conditions of transportation.
HRSG design and delivery blockiness
boiler with forced circulation of medium in Operating range of load control is 100%...
provides with mounting basically in the form
evaporating circuit with heating surfaces 50% of nominal one.
suspension to its own frameworks through Pressure and steam temperature control of delivery blockiness without application of
intermediate metalwares. in a boiler unit is not provided due to operation open assembly-and-enlargement area as
HRSG is gas-proof due to installation of at steam parameters, which are specified well as conditions for mechanized repair
metal covering plates. with gas consumption and gas temperature of its units in compliance with standard
Main circuit includes economizing, delivering into HRSG out of gas turbine unit. requirements.

Specification
Steam capacity, ton per hour 310
Steam pressure, MPa 15
Steam temperature, °С: 275
Aerodynamic drag, Pa 316
Inlet gas temperature (into recycling boiler), °С 549
Outgoing gas temperature, °С 110
7
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 20 MW

П-92

Drum HRSG with forced circulation metal elements, rotary gas pipe with leveling Operating range of load control is 100%...
in evaporating circuits, a single heated elements, vertical gas pipe with heating 50% of nominal one.
water-steam duct, tower-type arrangement surfaces: HRSG is equipped with the systems
of heating surfaces and top withdrawal of - convection superheater; of control of technological parameters,
combustion gases. Recycling boiler may - 1-st stage evaporator; protection and blocking, automatic adjustment
have open arrangement and be installed - 2-nd stage evaporator; necessary for in-line control, safety operation,
indoors. - Water economizer. economic efficiency and analyses of reliability
Recycling boiler has its own framework All heating surfaces are counter-current and efficiency.
being a base bearing structure for heating switched, made of tubes having outer finning HRSG design and delivery blockiness
surfaces, drum and chimney. (excluding convection superheater), and provide with mounting basically in the form
HRSG is gas-proof due to installation of delivered as completed modules. of delivery blockiness without application
metal covering plates. Behind heating surfaces a confusor with of open assembly-and-enlargement area
Along gas travel after gas turbine in a muffler is located. Diesel oil or natural gas as well as conditions for mechanized repair
tandem are located: lens metal compensator, are main, reserve and emergency fuel for gas of its units in compliance with standard
diffusor, compensator with flexible non- turbine plant having capacity 20 MW. requirements.

Specification
Steam capacity, ton per hour 42
Steam pressure, MPa 14,5
Steam temperature, °С: 275
Aerodynamic drag, Pa 250
Inlet gas temperature (into recycling boiler), °С 508
Outgoing gas temperature, °С 140
8
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 450 MW

П-96

HRSG is intended to operate integrated Boiler is gas-proof due to installation of Operating range of a boiler load change
into steam-gas plant of 450 MW capacity. metal covering plates. is 100-50% of nominal.
Steam-gas plant consists of two gas-turbine Recycling boiler heating surfaces are Steam pressure and temperature control
plants of GTE-160 type with capacity of made of the tubes having outer serrated and in the recycling boiler is not provided due to
150 MW, a stationary recycling boiler plant solid finning. operation at floating parameters of steam.
(two recycling boilers P-96 with additional The following gas flow heating surfaces Recycling boiler is equipped with the
equipment), and a steam-turbine plant of are located in consecutive order: control systems of process-dependent
T-150-7,7 type.
- high pressure steam superheater; parameters, protection and blocking,
Recycling boiler is of a drum type with
- high pressure evaporator; automatic control that are necessary for
natural circulation in the evaporating circuits
- high pressure economizer; operative scheduling, safety maintenance
of high and low pressure, of a single furnace,
horizontal with suspension to its own framework - low pressure steam superheater; and low-consumption operation.
through the intermediate metalwares. - low pressure evaporator; Supply of a boiler is carried out on the
Boiler has open arrangements. It is - condensate gas heater. block basis; factory-made blocks have
provided with ladders and zinc floors areas To reduce evacuated gas temperature maximal overalls and maximal factory
for equipment and accessories maintenance. the boiler is equipped with a water-to- completeness with parts, taking into account
Framework is supplied with high-strength water heat exchanger installed on a line of condition of handling, transportation,
bolts. recirculation of the condensate gas heater. mounting.

Specification
Steam capacity, ton per hour:
High pressure 232,6x2 = 465,2
Low pressure 45,7x2 = 91,4
Steam pressure, MPa:
High pressure 7,85
Low pressure 0,6
Steam temperature, °С:
High pressure 510
Low pressure 226
Aerodynamic drag, kgs/m3 3300
Inlet gas temperature (into boiler), °С 537
Outlet gas temperature (heat-extraction mode), °С 106
9
HEAT RECOVERY STEAM GENERATOR FOR GAS-TURBINE PLANT HAVING CAPACITY 16 MW

П-97

Drum-type HRSG with forced ventilation non-metallic elements, pivot gas pipe, vertical operative switchover to steam generation
in a steam-generating circuit, steam and gas pipe having heating surfaces: mode with pressure 2,0 MPa.
water heating ducts, tower-type arrangement - convection superheater;
of the heating surfaces with top withdrawal of - evaporator; HRSG is equipped with the control
combustion gases. - water economizer;
systems of process-dependent parameters,
Boiler has open arrangements. - heating system water gas heater.
protection and blocking, automatic control
HRSG matches seismicity of the area Heating surfaces are made of tubes that are necessary for operative scheduling,
of 7 as per MSK-64 and wind load of 55 having serrated spiral band finning (excluding safety maintenance and low-consumption
kg/m2. It has its own framework that is a convection superheater) and are supplied as operation.
basic supporting frame for heating surfaces, completed units.
pipelines, drum and chimney. HRSG architecture and supply
There are a confusor with a suppressor,
blockiness provides mounting using the
HRSG has an inner gas-proof casing. a cut-off valve and a chimney behind the
heating surfaces. supplied blocks (of no open assembly site
On a gas flow after gas turbine A natural gas is a fuel for a gas- joint), as well as conditions for mechanical
compensator in a sequential order are turbine plant. Operating range of loading is repair of its elements in compliance with the
located: diffusor, compensator with flexible 100…50% of nominal one. Boiler enables standards regular requirements.

Specification
Steam capacity, ton per hour 26,6
Steam pressure, MPa 3,4
Steam temperature, °С: 320
Aerodynamic drag, Pa 3300
Inlet gas temperature (into recycling boiler), °С 530
Outlet gas temperature (heating system water gas heater mode, gas-turbine plant
110
nominal load and outdoor air 190C), °С
10
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 230 MW

П-100

HRGS П-100(КУ) is intended to operate HRSG is gas-proof due to installation of finning. They are supplied as modules of
integrated into steam-gas plant having metal coating. maximum overalls on the transportation
capacity 230 MW, consisting of gas turbine Steam-water duct consists of HP and conditions basis.
GTE-160, recycling boiler and steam turbine LP circuits. HP circuit includes economizer,
K-80-7,0. evaporator, and steam superheater surfaces.
Operation range for HRSG regulation is
LP circuit includes evaporator and steam
Drum recycling boiler is intended to superheater surfaces. 100%-50% of nominal one.
generate HP and LP steam due to utilization
of combustion gas heat after gas turbine Condensate gas heater is installed Steam pressure and temperature control
plant. Natural gas is taken as a main and on HRSG to reduce excavated gases in HRSG is not provided due to operation at
reserve fuel. temperature. floating parameters of steam.
HRSG is equipped with the control
Recycling boiler is vertical, of drum- Heating surfaces are suspended to their
systems of process-dependent parameters,
type having forced ventilation in evaporating own framework through the intermediate
circuits of high and low pressure. metalwares. protection and blocking, automatic control
that are necessary for operative scheduling,
HRSG of open arrangements matches Heating surfaces are made of the tubes safety maintenance and low-consumption
seismicity of the area of 7 as per MSK-64. having outer spiral-band serrated and solid operation.

Specification
Steam capacity, ton per hour:
High pressure 222,5
Low pressure 55,3
Steam pressure, MPa:
High pressure 7,31
Low pressure 0,62
Steam temperature, °С:
High pressure 510
Low pressure 206
Aerodynamic drag, kgs/m3 3140
Inlet gas temperature (into boiler), °С 543
Outlet gas temperature (heat-extraction mode), °С 112
11
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS POWER UNIT MES-60
HAVING CAPACITY 60 MW

П-101

Drum HRSG П-101 is intended to multiple forced ventilation in evaporation temperature HRSG is equipped with injecting
generate HP steam and heating-system circuit and single-stage evaporation pattern. steam superheater.
water heating utilizing the heat of steam-gas Main circuit includes economizer, Gas-turbine plant is allowed to operate
mixture exhausted in gas-turbine plant. evaporator, and steam superheater surfaces. under “dry boiler mode” at gas temperature
Exhausted steam is intended to provide HRSG is equipped with heating-system out of gas-turbine plant to 4000C and excess
gas-turbine plant auxiliaries. water gas heater to reduce temperature of
pressure in boiler gas-duct 6600 Pa.
Nature gas is a main and reserve fuel in outgoing gases.
Operation range for HRSG regulation is
gas-turbine plant. Heating surfaces are made of the tubes
100%-50% of nominal one.
HRSG may be installed on newly having outer spiral-band serrated and solid
HRSG is equipped with the control
designed, upgraded and reconstructed heat finning. They are suspended to their own
power stations intergraded into power unit framework through intermediate metalware. systems of process-dependent parameters,
MES-60. Heating surfaces are supplied as protection and blocking, automatic control
HRSG is vertical and has plated gas- modules of maximum overalls on the that are necessary for operative scheduling,
proof internal coating. transportation conditions basis. safety maintenance and low-consumption
HRSG has steam-water duct with To maintain superheated steam operation.

Specification
Steam capacity, ton per hour 64
Steam pressure, MPa, kgf/sm2 9,8
Steam temperature, °С: 540
Aerodynamic drag, Pa 2800
Inlet gas temperature (into boiler), °С 612
Outlet gas temperature (heating system water gas heater mode, gas-turbine plant
122
nominal load and outdoor air ±150C), °С
12
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 38 MW

П-103

HRSG (КУ) is intended to operate MSK-64 and wind load of 55 kg/m2. having outer spiral-band serrated and solid
integrated into steam gas unit having capacity finning. They are supplied as modules of
38 MW and consisting of gas turbine, HRSG is gas-proof due to metal casing. maximum overalls on the transportation
recycling boiler and steam turbine. Steam-water duct consists of HP and conditions basis.
Drum HRSG П-101 is intended to LP circuits. HP circuit includes economizer, Operation range for HRSG regulation is
generate HP and LP due to utilization of the evaporator, and steam superheater surfaces.
100%-50% of nominal one.
heat of combustion gases after gas turbine LP circuit has evaporator and steam
Steam pressure and temperature control
unit. Natural gas is the main and reserve fuel superheater surfaces. Deaerator is built into
in HRSG is not provided due to operation at
for gas turbine unit. LP drum.
floating parameters of steam.
HRSG is vertical, of drum-type with HRSG is equipped with condensate gas
forced ventilation in evaporation circuit. heater to reduce temperature of outgoing HRSG is equipped with the control
HRSG has steam-water duct with gases. systems of process-dependent parameters,
multiple forced ventilation in HP and LP Heating surfaces are suspended to their protection and blocking, automatic control
evaporation circuit. own framework through the intermediate that are necessary for operative scheduling,
HRSG has an open arrangements and metalwares. safety maintenance and low-consumption
matches seismicity of the area of 9 as per Heating surfaces are made of the tubes operation.

Specification
Steam capacity, ton per hour:
High pressure 39,6
Low pressure 8,0
Steam pressure, MPa:
High pressure 5,5
Low pressure 0,58
Steam temperature, °С:
High pressure 487
Low pressure 212
Aerodynamic drag, kgs/m3 2800
Inlet gas temperature (into boiler), °С 523
Outlet gas temperature (heat-extraction mode), °С 100
13
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 450 MW

П-107

Steam double-circuit HRSG Пр-224/51- furnace boiler, vertical, LP drum is combined HRSG is equipped with relief, stop and
7,70/0,58-590/206 (G-107) having auxiliary with deaerator, suspended to its own control valves, feed and circulation pumps,
equipment is intended to operate integrated framework through intermediate metalwares. recirculation pumps, and expanders of
into steam gas unit ПГУ-450Т consisting of continuous and cycling blowoffs.
two gas turbine units ГТЭ-160, two HRSG Condensate gas preheater is mounted
П-107 and a steam turbine T-125/150,7,4. on a boiler; deaerator is built in LP drum. 4 HRSG were manufactured and
Condensate duct has a heating unit for water supplied to heat electropower station No. 27
HRSG (КУ) is of drum-type with forced heating consisting of a water-to-water apron- of JSC “Mosenergo”. The station commenced
circulation in HP and LP circuits; it is single- type heat exchanger. operation in 2007-2008.

Specification
Outdoor temperature, °С -2,5
Gas turbine unit load, % 100
HP circuit:
-steam capacity, ton per hour 230,1
-outlet steam pressure (from HRSG), Mpa 7,8
-outlet steam temperature, °С 502,6
LP circuit:
-steam capacity, ton per hour 55,2
-outlet steam pressure (from HRSG), Mpa 0,58
-outlet steam temperature, °С 206,4
Outgoing gas temperature, °С 102,0
Water-to-water apron-type heat exchanger loading, MW 4,0
Aerodynamic drag, Pa 3250
14
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 130 MW

П-108

Steam double-circuit HRSG Пр-58/12- HRSG is gas-proof due to metal casing HP steam temperature control is provid-
7,4/0,7-525/209 (П-108) having auxiliary and non-metal sealing. Heating surfaces are ed with injecting steam cooler installed be-
equipment is intended to operate integrated horizontal blocks made of the tubes having
into steam gas unit ПГУ-130 consisting of tween the steam superheater stages.
outer serrated finning.
two gas turbine units SGT-800, two HRSG
П-108 and a steam turbine SST-PAC400.
Condensate gas preheater is mounted HRSG is equipped with relief, stop and
HRSG (КУ) is vertical with two drums and on a boiler; deaerator is built in LP drum.
control valves, feed and circulation pumps,
forced circulation in HP and LP evaporation Condensate duct has a heating unit for water
heating consisting of a water-to-water apron recirculation pumps, and expanders of con-
circuits; it is suspended to its own framework
through intermediate metalwares. type heat exchanger. tinuous and cycling blowoffs.

Specification
Outdoor temperature, °С +15
Gas turbine unit load, % 100
HP circuit:
-steam capacity, ton per hour 115,0
-outlet steam pressure (from HRSG), Mpa 7,4
-outlet steam temperature, °С 525,2
LP circuit:
-steam capacity, ton per hour 24,5
-outlet steam pressure (from HRSG), Mpa 0,71
-outlet steam temperature, °С 209,1
Outgoing gas temperature, °С 105
Water-to-water heat exchanger loading, MW 3,0
15
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT
HAVING CAPACITY 25 MW, TYPE MSS001N GE

П-110

Drum-type HRSG with forced ventilation Diffusor, vertical gas pipes with heating HRSG operating range of loading
in a steam-generating circuit, steam and surfaces, confusor with muffler, cut-off corresponds to loading range of gas turbine
water heating ducts, tower-type arrangement valve and compensator before chimney are plant and is 100…60% of nominal one.
of the heating surfaces with top withdrawal of located in a sequential order after gas turbine
combustion gases. compensator. HRSG is equipped with the control
systems of process-dependent parameters,
protection, blocking, and automatic control.
Boiler has open arrangements. HRSG Heating surfaces are made of tubes
shall be located in a closed area. Gas pipe having serrated spiral band finning (excluding
HRSG architecture and supply
and heating surfaces are suspended to the convection superheater) and are supplied as blockiness provides mounting using the
hot bars. The hot bars are rest on a building completed units. supplied blocks (of no open assembly site
frame. Gas pipes have inner gas-proof joint), as well as conditions for mechanical
casing, outer thermal and sound insulation Natural gas is the main and reserve fuel repair of its elements in compliance with the
and molding casing. for gas turbine plant. standards regular requirements.

Specification
Steam capacity, ton per hour 56
Steam pressure, MPa 3,5
Steam temperature, °С: 300±20
Aerodynamic drag, Pa 3500
Inlet gas temperature (into boiler), °С 480
Outgoing gas temperature, °С 117
16
SET OF EQUIPMENT FOR HEAT RECOVERY
for diesel-engine power plant with 1650 kW electric power

KUT-1000/90

A set is intended for water heating using exchanger where it is cooled at that heating set includes water-to water heat exchanger,
heat of diesel exhausted gases. water of net circuit. circulating and charging pumps, pipelines,
Recovered heat of exhausted gases may Bypass gas pipe is built into HRSG for stop and control valves.
be used in thermal nets of user for heating or passing of smoke bypass of heating surface Set is equipped with automatic control
hot water supply. when recovery system is switched-off. HRSG system providing control and regulation
Heat recovery system is double-loop inlet has a manual drive flue dampfer that of operating parameters in automatic and
circuit. Closed circuit is intended for water switches gas stream to gas pipe with heating manual modes. Control system provides
heating in water-tube HRSG using exhausted surface or to bypass gas pipe. HRSG is with automatic shutdown of Set when there
gases of operating diesel. Water heated in a supplied as a factory assembled single unit in i.e. departure of operating parameters from
boiler goes into laminar water-to-water heat insulation and decorative casing. Also supply maximum permissible ones.

Water-to-water
HRSG specification heat exchanger specifi-
cation
Description of parameters Flue gas path Closed circuit Net circuit
Diesel fuel
Operating medium Water (heating) Water (being heated)
combustion products
Operating medium flow ton per hrs. 14,8 21,5 25
Operating medium pressure (abs.) bar:
nominal operating 1,05 5,0 5,0
design 1,1 16 14,3
at hydro test – 20 18,6
Operating medium temperature, °С:
operating at inlet 360 70 60
operating at outlet 129 110 95
design 450 250 150
Heating capacity, kW 1020 1020
21,1 (heating medium)
Water space, dm3 134 21,1 (medium being
heated)
Heat exchange surface area, m3 105,6 15,1
Apparatus mass filled with water, kg 3614 662
17
HOT WATER HEAT RECOVERY STEAM GENERATOR

KUV-5,5/110

Hot water HRSG KUV-5,5/110 is intended two-staged muffler, chimney flue; it is rested HRSG is in-room installed and is of
to operate with gas turbine type GTU-6/6,3 of on its own frame. purpose-climate version UHL 4 per GOST
JSC “Motor Sich” (6 MW). 15150.

Hot water HRSG operates for thermal net HRSG surface is made of spiral band HRSG heating surface is supplied as a
and is intended to generate hot water using finned tubes. Heating surface is drainable. single unit. During repair heating surface may
heat recovery of combustion gases after GTU be entirely pulled out of gas pipe to repair
(gas turbine unit). Basic fuel is accompanying HRSG is equipped with bypass gas area.
gas.
pipe. Control valves designed to regulate
Chimney shaft is based on a frame
Boiler is vertical, has gas proof outer boiler heating load are installed on main and combined with boiler frame and has a device
casing, internal thermal and sound insulation, bypass gas pipe. to damp resonance oscillation.

Specification
Thermal capacity, MW (gigacal per hrs.) 0,3-6,4 (0,25-5)
Gas temperature, °С:
at boiler inlet 303-462
at boiler outlet 138-451
Gas flow rate out of gas turbine unit, kg/sec
Water temperature, °С:
at KUV outlet 110-70
at KUV inlet 70-50
Water flow rate through KUV, ton per hrs. 90-137,9
Water pressure at KUV inlet (operating), mPa 1,1
18
HOT WATER HEAT RECOVERY STEAM GENERATOR

KUV-13,0/150

Hot water HRSG KUV-13,0/150 is HRSG surface is made of outer solid to damp resonance oscillation. Boiler is
intended to operate with gas turbine type spiral band finned tubes. Heating surface is equipped with bypass gas pipe.
GTA-6PM of NPO “Saturn” (6 MW). drainable.

Hot water HRSG operates for thermal net Control valves designed to regulate
HRSG is supplied as block version.
and is intended to generate hot water using boiler heating load are installed on main
Heating surface block, muffler blocks of
heat recovery of combustion gases after GTU
all stages and chimney sections are made and bypass gas pipe. Main gas pipe before
(gas turbine unit). Basic fuel is accompanying
gas. as modules as high factory readiness with heating surface and bypass gas pipe have
installed inner thermal insulation and casing.
valves with electric drives.
Boiler is vertical, has gas proof outer When necessary a site joint is made.
casing, internal thermal and sound insulation,
tree-staged muffler, chimney flue; it is rested Chimney shaft is based on a frame HRSG is equipped with cut-off valve
on its own frame. combined with boiler frame and has a device (sprinkling valve) on inlet into chiemny.

Specification
GTU load, % 100
Thermal capacity, MW 12,1-19,2
Water temperature at KUV outlet, °С 150
Water temperature at KUV inlet, °С 70
Pressure water at KUV inlet (operating), mPa 1,4
KUV Hydraulic resistance (max), mPa 0,07
Aerodynamic resistance when operating through bypass gas pipe, Pa 500
Aerodynamic resistance under routine operation through HRSG surface, Pa <2000
19
HOT WATER HEAT RECOVERY STEAM GENERATOR

KUV-17,0/150

Hot water heat recovery steam generator HRSG is supplied as blocking make. The electric drive valves are installed on a

operates for thermal net and is intended to Heating surface block, muffler block of all main gas pipe before heating surface and on

generate hot water using heat of combustion three stages and of chimney section are a bypass gas pipe.

gases after gas turbine unit. manufactured in the form of modules of high Water temperature control on HRSG

HRSG is vertical. It has gas proof outer factory availability with mounted internal outlet is carried out using passing of gas

casing, inner thermal and sound insulation, thermal insulation and casing. portion skipping heating surface through

three-staged muffler, and chimney. It is Chimney shaft is based in a frame bypass gas pipe. Gas flow distribution

rested on its own frame. HRSG is equipped matched with boiler frame and has a device between gas pipe of heating surface and

with platforms and ladders for repair and to damp resonance vibration. bypass gas pipe is carried out by means of

maintenance of a muffler and heating surface. HRSG is equipped with bypass gas pipe. the valves of bypass and main gas pipes.

Specification
Boiler thermal capacity, MW 16,7-17,0
Water pressure (operating) at inlet into KUV, mPa 0,98
KUV hydraulic drag (max), mPa 0,15
Aerodynamic drag, when operating through bypass gas pipe, Pa 500
Aerodynamic drag, under regular operation through HRSG surface, Pa <3000
Outlet gas temperature, 0°С 110
20
HOT WATER HEAT RECOVERY STEAM GENERATOR

KUV-35,0/150

Hot water heat recovery steam generator Suspended HRSG is vertical. It has its precipitation and keeping HRSG hot under
KUV-35,0/150 is intended to generate hot own frame, inner gas-proof casing, outer stopping operation.
water utilizing heat of combustion gases thermal and sound insulation, decorative HRSG is UHL 3.1 climate-make per
after gas turbine unit (LM-2500GE, electric casing. GOST 15150.
capacity 35 MW). HRSG operates using 60 meters chimney pipe is mounted HRSG structure provides boiler mounting
closed circuit water and transmitting heat above HRSG. Chimney shaft has its own both in supply blocks and in mounting blocks
to heating system water in laminar heat frame matched with boiler frame. with following their enlargement at a site in
exchangers. Gas turbine unit fuel is natural In chimney shaft inlet a rain gate is compliance with installation provisions.
gas. installed. The rain gate is equipped with Delivery set includes equipment of the
Maximum allowable temperature of electric driver and drainer to protect a muffler closed circuit (pumps, heat exchangers,
combustion products is 5500C. and heating surface from atmospheric pipelines, fittings).

Specification
Thermal capacity, MW 36,3
Gas temperature, °С:
at boiler inlet 505,2
at boiler outlet 95
Gas flow rate out of gas turbine unit, kg/sec 80,8
Water temperature, °С:
at KUV outlet/direct heating system water 129,3-106,7
at KUV inlet/reverse heating system water 61/50
Water flow rate through KUV, ton per hrs. 454,7
Water pressure at KUV inlet (operating), mPa 1,57
21
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT
HAVING CAPACITY 450 MW

П-116

Steam double-circuit HRSG Пр-224/51- furnace boiler, vertical, suspended to its own HRSG is equipped with relief, stop and
7,70/0,58-509/206 (P-116) having auxiliary framework through intermediate metalwares. control valves, feed and circulation pumps,
equipment is intended to operate integrated recirculation pumps, and expanders of
into steam gas unit ПГУ-450Т consisting of Condensate duct has a heating unit for continuous and cycling blowoffs.
two gas turbine units ГТЭ-160, two HRSG water heating consisting of a water-to-water
П-116 and a steam turbine T-125/150,7,4. apron-type heat exchangers that heat water. 2 HRSG were manufactured and
Heating surfaces are constructed as supplied to heat electropower station No. 21
HRSG (КУ) is of drum-type with forced horizontal blocks made of tubes having outer of JSC “Mosenergo”. The station operates
circulation in HP and LP circuits; it is single- serrated finning. since 2008.

Specification
Outdoor temperature, °С -2,5
Gas turbine unit load, % 100
HP circuit:
-steam capacity, ton per hour 230,1
-outlet steam pressure (from HRSG), Mpa 7,8
-outlet steam temperature, °С 502,6
LP circuit:
-steam capacity, ton per hour 55,2
-outlet steam pressure (from HRSG), Mpa 0,58
-outlet steam temperature, °С 206,4
Outgoing gas temperature, °С 103
Water-to-water apron-type heat exchanger loading, MW 14,5
Aerodynamic drag, Pa 3240
22
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT
HAVING CAPACITY 52 MW

П-120

HRSG Пр-40-3,9-440 (П-120) is is installed. It burns natural gas in hot gases of horizontal blocks made of tubes with outer
intended to operate integrated with steam oxidizing medium after gas turbine engine. serrated finning.
gas plant ПГЭ-52 MW consisting of two gas
turbine units ГТУ-20С, two boiler-utilizer To increase effectiveness of exhaust HRSG is equipped with relief, stop and
П-120 and one steam turbine ПТ-12. HRSG gases heat utilization and temperature control valves, feed and circulation pumps,
has a single steam duct and water heating
reduction of outgoing gases a gas preheater recirculation pumps, and expanders of
bundle, burn-up device, horizontal tubes of
of heating system water is installed after continuous and cycling blowoffs.
heating surface; it vertical, suspended, gas
proof with outer thermal and sound insulation, boiler (95/650C schedule).
and auxiliary equipment. 2 HRSG were manufactured and
Operating range of HRSG loading control supplied to Elets heat electropower station
To provide with a designated steam is 100%...25% of nominal one. (city of Elets, Lipetsk region). The station
temperature at HRSG outlet a burn-up device HRSG heating surfaces are in the shape operates since 2009.

Specification
Outdoor temperature, °С +15
Gas turbine unit load, % 100
Outgoing gas temperature, °С 90
Nominal output, ton per hrs. 40
Steam pressure at outlet, MPa 3,9
Steam temperature at outlet, °С 440
Thermal capacity, MW
Aerodynamic drag, Pa 3300
Sound power level at a horizontal distance 1 m from chimney pipe section, dB
80
not more than
23
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT
HAVING CAPACITY 800 MW

П-132

Three-circuit HRSG Еп-258/310/35- turbine K-300-240-1, upgraded to operate in matched with deaerator. It is suspended to
15,0/3,13/0,44-540/535/263 (П-132) with ПГУ (steam gas plant) heating scheme. its own frameworks through intermediate
auxiliary equipment is intended to operate HRSG has natural ventilation in the metalwares.
integrated with steam gas plant ПГУ-800 HP, MP, LP evaporating circuits, with HRSG is intended to operate at Kirishi
that consists of two gas-turbine units SGT5- intermediate overheating, of single furnace, hydroelectric power plant. It operates since
4000F, two boiler-utilizer П-132 and a steam horizontal, suspended; it has a LP drum 2012.

Specification
Outdoor air temperature, °С +15
Gas turbine unit load, % 100
HP circuit:
–steam capacity, ton per hrs. 258,4
–outlet steam pressure, MPa 14,99
–outlet steam temperature, °С 540
MP circuit:
–steam capacity, ton per hrs. 58,1
–outlet steam pressure, MPa 3,55
–outlet steam temperature, °С 345,2
Intermediate overheating:
–inlet steam consumption, ton per hrs. 250,7
–outlet steam consumption, ton per hrs. 309,3
–outlet steam pressure, MPa 3,14
–inlet steam temperature, °С 534,6
LP circuit:
–steam capacity, ton per hrs. 35,1
–outlet steam pressure, MPa 0,44
–outlet steam temperature, °С 263,2
Outgoing gases temperature from water-to-water heat exchanger, °С 100,5
Water-to-water heat exchanger loading, MW 25,0
Aerodynamic drag of all gas duct within the design limits, kPa (not more, than) 3199
24
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT
HAVING CAPACITY 420 MW

П-133

Three-circuit HRSG Еп-315/44,3/30,9- installed on a boiler framework through HRSG is equipped with relief, stop and
13,9/2,98/0,47-567/566/284 (П-133) with intermediate base metalwares. The control valves, feed and circulation pumps,
auxiliary equipment is intended to operate framework is made using high strength studs. recirculation pumps, and expanders of
integrated with steam gas plant ПГУ-420, HRSG is installed indoors. The ladders continuous and cycling blowoffs
consisting of gas turbine unit KA26-1 (Alstom and floors are installed in the required places HRSG is designed per ALSTOM base
supply), a boiler-utilizer and a steam turbine to maintain equipment included in HRSG engineering.
(Alstom supply). delivery set. JSC “EC “ZIOOMAR” conducts execution
HRSG of drum type with natural HRSG heating surfaces are made of plan in compliance with Russian regulations.
ventilation in HP, MP, LP evaporating circuits, tubes with outer spiral band finning. Tubes HRSG is manufactured for thermal
single furnace, horizontal, suspended. arrangement of HRSG heating surfaces is power plant TETS-26 of JSC “Mosenergo”. It
HRSG has HP, MP, LP drums that vertical. operates since 2011.

Specification
Outdoor air temperature, °С –3,1
Gas turbine unit load, % 100
Boiler inlet gas temperature, °С 618,1
Boiler inlet gas consumption, kg\sec 645,61
Outgoing gas temperature, °С 78
Pressure drop inside gas duct, Pa 4584
HP circuit:
–steam capacity, ton per hrs. 315
–outlet steam temperature, °С 567
–steam pressure beyond boiler, MPa 13,9
MP circuit:
–steam capacity, ton per hrs. 44,3
–outlet steam temperature, °С 566
–steam pressure beyond boiler, MPa 2,98
LP circuit:
–steam capacity, ton per hrs. 30,9
–outlet steam temperature, 0C 284
–steam pressure beyond boiler, MPa 0,47
25
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 230 MW

П-134

Two-circuit HRSG Пр-224/52-7,6/0,58- HRSG has LP drum matched with HRSG is equipped with relief, stop and
503/203 (П-134) with auxiliary equipment is deaerator, is suspended to its own frameworks
control valves, feed and circulation pumps,
intended to operate integrated with steam through intermediate metalwares.
recirculation pumps, and expanders of
gas plant ПГУ-230T, consisting of gas turbine Installation of water-to water heat
unit ГТЭ-160, a boiler-utilizer П-134 and a exchangers that heat heating system water continuous and cycling blowoffs
steam turbine T-50/70-6,8/0,12. water is provided inside condensate duct.
HRSG is manufactured for thermal
HRSG of drum type with forced HRSG heating surfaces are made as
power plant Chelyabinskaya TETS-3 of JSC
circulation in HP and LP evaporating circuits, horizontal blocks of tubes with outer serrated
single furnace, vertical, suspended. finning. “Mosenergo”. It operates since 2011.

Specification
Outdoor air temperature, °С +15
Gas turbine unit load, % 100
HP circuit:
-steam capacity, ton per hour 224
-outlet steam pressure (out of HRSG), Mpa 7,6
-outlet steam temperature, °С 503
LP circuit:
-steam capacity, ton per hour 52
-outlet steam pressure (out of HRSG), Mpa 0,68
-outlet steam temperature, °С 202
Outgoing gas temperature, °С 102
Water-to-water apron-type heat exchanger loading, MW 10,2
Aerodynamic drag, Pa 3250
26
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 210 MW

П-137

Two-circuit HRSG Пр-223/52-9,6/0,89- deaerator, is suspended to its own frameworks Tubes arrangement of HRSG heating
509/217 (П-137) with auxiliary equipment is through intermediate metalwares. surfaces is horizontal.
intended to operate integrated with steam Condensate gas heater is installed on a HRSG is equipped with relief, stop and
gas plant ПГУ-210, consisting of gas turbine
boiler. It is preliminary switched to deaerator control valves, feed and circulation pumps,
unit ГТЭ-160, a boiler-utilizer П-137 and a
that is integrated into LP drum. recirculation pumps, and expanders of
steam turbine ПТ-50 (turbine ПТ-60-130/13
Installation of water-to water heat continuous and cycling blowoffs
upgraded to operate with boiler-utilizer).
exchangers that heat heating system water is HRSG is intended to operate at thermal
HRSG of drum type with forced
circulation in HP and LP evaporating circuits, provided inside condensate duct. power plant Novgorodskaya TETS (operates
single furnace, vertical, suspended. HRSG heating surfaces are made of since 2012), Kostromskaya TETS-2 and
HRSG has LP drum matched with tubes with outer serrated spiral band finning. Tverskaya TETS-3.

Specification
Outdoor air temperature, °С +15
Gas turbine unit load, % 100
HP circuit:
-steam capacity, ton per hour 223
-outlet steam pressure (out of HRSG), Mpa 9,6
-outlet steam temperature, °С 508
LP circuit:
-steam capacity, ton per hour 52,0
-outlet steam pressure (out of HRSG), Mpa 0,89
-outlet steam temperature, °С 206,4
Outgoing gas temperature, °С 103
Water-to-water apron-type heat exchanger loading, MW 9,4
Aerodynamic drag, Pa 3300
27
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 420 MW

П-140

HRSG is intended to operate integrated HP, MP, LP drums and intermediate HRSG is equipped with relief, stop and
with one-shaft steam gas plant Siemens overheating circuit. control valves, feed and circulation pumps,
SCC5-4000F, having capacity 420 MW, HRSG is installed indoors. The ladders recirculation pumps, and expanders of
consisting of gas turbine unit Siemens SGT5- and floors are installed in the required places continuous and cycling blowoffs
HRSG is designed per NEM b. v. base
4000F with capacity 280 MW, a boiler-utilizer to maintain equipment included in HRSG
engineering.
with auxiliary equipment, and a steam turbine delivery set. JSC “EC “ZIOOMAR” conducts execution
unit Siemens SST5-5000. HRSG heating surfaces are made of plan in compliance with Russian regulations.
Three-drum HRSG with natural tubes with outer spiral band finning. Tubes HRSG is manufactured for thermal
circulation, single furnace, horizontal, arrangement of HRSG heating surfaces is power plant Yuzhnouralskaya GRES-2. It
suspended. It consists of vertical. operates since 2013.

Specification
Outdoor air temperature, °С +2,5
Gas turbine unit load, % 100
HP circuit:
–steam capacity, ton per hrs. 259,2
–outlet steam pressure (out of boiler), MPa 11,93
–outlet steam temperature, °С 542,8
Intermediate overheating:
–inlet steam consumption, ton per hrs. 311,4
–outlet steam pressure (out of boiler), MPa 2,9
–inlet steam temperature, °С 541,0
LP circuit:
–steam capacity, ton per hrs. 42,5
–outlet steam pressure (out of boiler), MPa 0,43
–outlet steam temperature, 234,0
Outgoing gases temperature, °С 102,0
Aerodynamic drag, Pa 3540
28
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 110 MW

П-141

HRSG is intended to operate integrated HRSG is installed indoors. The ladders HRSG is equipped with relief, stop and
with one-shaft steam gas plant, consisting of and floors are installed in the required places control valves, feed and circulation pumps,
gas turbine unit MS6111FA, a boiler-utilizer to maintain equipment included in HRSG recirculation pumps, and expanders of
with auxiliary equipment, and a steam turbine delivery set. continuous and cycling blowoffs
unit. HRSG heating surfaces are made of HRSG is designed per NEM b. v. base
Two-drum HRSG with natural circulation, tubes with outer spiral band finning. Tubes engineering.
single furnace, horizontal, suspended. It arrangement of HRSG heating surfaces is JSC “EC “ZIOOMAR” conducts execution
consists of HP and LP drums. vertical. plan in compliance with Russian regulations.

Specification
Outdoor air temperature, °С +15
Gas turbine unit load, % 100
HP circuit:
–steam capacity, ton per hrs. 114
–outlet steam pressure (out of boiler), MPa 10
–outlet steam temperature, °С 510
LP circuit:
–steam capacity, ton per hrs. 17,3
–outlet steam pressure (out of boiler), MPa 1,55
–outlet steam temperature, °С 296
Outgoing gas temperature, °С 110
Aerodynamic drag, Pa 3300
29
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 190 MW

П-142

HRSG E-186/39-7,5/0,7-515/229 combustion gases. Heating unit consists of a HRSG is equipped with relief, stop and
(П0142) is intended to operate integrated with single water-to-water laminar heat exchanger. control valves, feed and circulation pumps,
steam gas plant GUE-190 MW, consisting of recirculation pumps, and expanders of
HRSG is installed indoors. The ladders
gas turbine unit PG 9171 E (GE), a boiler- continuous and cycling blowoffs
and floors are installed in the required places HRSG is designed per NEM b. v. base
utilizer with auxiliary equipment, and a steam
to maintain equipment included in HRSG engineering.
turbine unit SST-600 (Siemens).
delivery set. JSC “EC “ZIOOMAR” conducts execution
Two-drum HRSG with natural circulation,
plan in compliance with Russian regulations.
HRSG heating surfaces are made of
single furnace, horizontal, suspended. It is HRSG is intended to operate at
intended to generate HP and LP steam. tubes with outer serrated spiral band finning.
Novovoronezhskaya hydroelectric power
HRSG is equipped with heating unit Tubes arrangement of HRSG heating plant (Novomoskovsk, Tula region, Russia).
to heat heating system water and to cool surfaces is vertical. Date of start-up is 2013.

Specification
Outdoor air temperature, °С +15
Gas turbine unit load, % 100
HP circuit:
–steam capacity, ton per hrs. 186,0
–outlet steam pressure (out of boiler), MPa 7,5
–outlet steam temperature, °С 515
LP circuit:
–steam capacity, ton per hrs. 39,0
–outlet steam pressure (out of boiler), MPa 0,725
–outlet steam temperature, °С 229
Water-to-water heat exchanger (WWHE) thermal capacity, MW 10
WWHE Outgoing gases temperature, °С 95
Aerodynamic drag, Pa 3300
30
HEAT RECOVERY STEAM GENERATOR FOR STEAM-GAS PLANT HAVING CAPACITY 400 MW

П-143

Heat recovery steam generator (КУ) is and intake of heating steam to deaerator. level the exhausted lines of steam safety valves
intended to operate integrated with steam gas HRSG is mounted indoors. The ladders are equipped with steam mufflers. To reduce
plant with capacity 400 MW, consisting of a and floors are installed in the required places to noise level of steam gas plant in boiler outlet gas
gas turbine plant (ГТУ) PG9351FA (General maintain equipment included in HRSG delivery pipe a gas muffler is installed. Chimney height
Electric), a HRSG and STEAM TURBINE set. is 120 m.
109D12 (General Electric). Recycling boiler heating surfaces are made HRSG is designed per NEM b. v. base
Horizontal suspended HRSG has three of the tubes having outer spiral band finning. engineering.
drums, natural circulation, and single furnace. It Heating surfaces tubes are horizontally-oriented. JSC “EC “ZIOOMAR” conducts execution
consists of HP, MP, and LP circuits, intermediate HRSG is equipped with relief, stop and plan in compliance with Russian regulations.
overheating circuit and circuit of condensate gas control valves, feed and circulation pumps, HRSG is integrated with steam gas plant
heater. Heat carrier intake is provided out of MP recirculation pumps, and expanders of ПГУ-400 of Nizhnevartovskaya hydro power
circuit in order to preheat fuel gas of Gas turbine continuous and cycling blowoffs. To reduce noise station, unit 3.1. It operates since 2013.

Specification
Outdoor air temperature, °С +15
Gas turbine unit load, % 100
HP circuit:
–steam capacity, ton per hrs. 277
–outlet steam pressure, MPa 10,66
–outlet steam temperature, 0C 566
Intermediate overheating:
– steam capacity, ton per hrs. 302,5
– outlet steam pressure, MPa 2,18
–outlet steam temperature, 0C 565
LP circuit:
–steam capacity, ton per hrs. 44
–outlet steam pressure, MPa 0,39
–outlet steam temperature, 0C 301
Outgoing gases temperature, °С 85,6
Aerodynamic drag, Pa <3100
31
NOTES:

32
ATOMENERGOMASH
ROSATOM GROUP OF COMPANIES

ZIO-PODOLSK
THE MACHINE-BUILDING PLANT

ZIOMAR
ENGINEERING COMPANY

www.aozio.ru

2, Zheleznodorozhnaya, Podolsk, Moscow Region, Russia, 142103


Tel.: + 7 (495) 747 10 17 (commercial directorate),
+7 (495) 747 10 25 (multi-channel)

E-mail: kd@eatom.ru; ziomar@eatom.ru