JUMLAH HARGA
NO.
URAIAN
BAB
[ Rp ]
C TOTAL 190,162,613.0
PEMBULATAN 190,163,000.0
Binsar Siagian
YA
PRASARANA KAWASAN
AH HARGA
[ Rp ]
2,000,000.00
169,098,852.80
1,776,250.00
172,875,102.80
17,287,510.28
190,162,613.08
190,163,000.00
Binsar Siagian SE
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KAWASAN RTH PUSAT PEME
NAMA KEGIATAN : PEMBANGUNAN GAZEBO [ BESAR ]
LOKASI : KOTA BONTANG
TAHUN ANGGARAN 2012
HARGA
SATUAN
NO KOMPONEN SAT VOL
[ Rp ]
I PEKERJAAN PENDAHULUAN
1 Papan Nama Ls 1.00 500,000.00
2 Administrasi dan Dokumentasi Ls 1.00 1,500,000.00
JUMLAH TOTA
4960000
6600000
ARGA
SAN RTH PUSAT PEMERINTAHAN
JUMLAH TOTAL
HARGA
[ Rp ] [ Rp ]
500,000.00
1,500,000.00
2,000,000.00
1,518,000.00 ok
120,420.00 ok
60,948.00 ok
838,389.60 ok
18,356,029.44 ok
2,880,275.76 ok
3,894,000.00
3,904,000.00
13,821,600.00
12,258,400.00
40,552,820.00
3,354,400.00
7,196,000.00
1,090,350.00
16,945,600.00
37,183,300.00
2,104,320.00
2,000,000.00
480,000.00
540,000.00
###
2,439,450.00
2,596,000.00
1,952,000.00
6,910,800.00
4,392,000.00
6,129,200.00
20,276,410.00
1,677,200.00
3,598,000.00
545,175.00
6,942,720.00
8,472,800.00
18,591,650.00
1,000,000.00
240,000.00
270,000.00
86,033,405.00
1,776,250.00
1,776,250.00
JUMLAH TOTAL ###
DAFTAR ANALISA HARGA SATUAN
HARGA
BIAYA UPAH BIAYA
SATUAN
N0 URAIAN PEKERJAAN BAHAN
[ RP.] [ RP.]
[ RP.]
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 1 M2 Membersihkan Lapangan dan Perataan
Tenaga
0.1000 Oh Pekerja 80,000.00 8,000.00
0.0500 Oh Mandor 130,000.00 6,500.00
14,500.00
II PEKERJAAN TANAH
1 1 M3 Galian Tanah Biasa Sedalam 1 Meter
Tenaga
0.7500 Oh Pekerja 80,000.00 60,000.00
0.0250 Oh Mandor 130,000.00 3,250.00
63,250.00
2 1 M3 Urugan Tanah Dipadatkan
Bahan
1.2000 M3 Tanah Urug 100,000.00 120,000.00
Tenaga dan Alat
0.8400 Jam Stamper 28,571.43 24,000.00
0.2500 Oh Pekerja 80,000.00 20,000.00
0.0250 Oh Mandor 130,000.00 3,250.00
47,250.00 120,000.00
3 1 M Urugan Pasir dan Penyiraman
3
Bahan
1.2000 M3 Pasir Urug 120,000.00 144,000.00
Tenaga dan Alat
0.3000 Oh Pekerja 80,000.00 24,000.00
0.0100 Oh Mandor 130,000.00 1,300.00
25,300.00 144,000.00
III PEKERJAAN BETON
1 1 M3 Cor Lantai Kerja Mutu [ K-100 ]
Bahan
247.000 Kg Semen 50 Kg 1,600.00 395,200.00
0.621 M3 Pasir Beton 430,000.00 267,030.00
0.740 M3 Koral Beton 450,000.00 333,000.00
215.000 Ltr Air 200.00 43,000.00
Tenaga dan Alat
0.2000 Oh Tukang 100,000.00 20,000.00
1.2000 Oh Pekerja 80,000.00 96,000.00
DAFTAR ANALISA HARGA SATUAN
Bahan
0.045 M3 Kayu Bekisting 2,500,000.00 112,500.00
0.300 Kg Paku Biasa 15,000.00 4,500.00
0.100 Kg Minyak Bekisting 15,000.00 1,500.00
Tenaga dan Alat
0.2600 Oh Tukang 100,000.00 26,000.00
0.5200 Oh Pekerja 80,000.00 41,600.00
0.0260 Oh Kepala Tukang 120,000.00 3,120.00
0.0260 Oh Mandor 130,000.00 3,380.00
74,100.00 118,500.00
7 1 M2 Memasang Bekisting Untuk Kolom
Bahan
0.040 M3 Kayu Bekisting 2,500,000.00 100,000.00
0.400 Kg Paku Biasa 15,000.00 6,000.00
0.200 Kg Minyak Bekisting 15,000.00 3,000.00
0.015 M3 Balok Meranti Balok 3,000,000.00 45,000.00
0.350 Lbr Plywood 9 MM 130,000.00 45,500.00
2.000 Btg Dolken 15,000.00 30,000.00
Tenaga dan Alat
0.3300 Oh Tukang 100,000.00 33,000.00
0.6600 Oh Pekerja 80,000.00 52,800.00
0.0330 Oh Kepala Tukang 120,000.00 3,960.00
0.0330 Oh Mandor 130,000.00 4,290.00
94,050.00 229,500.00
IV PEKERJAAN KAYU
1 1 M1 Memasang Balok Gelagar 5/10
Bahan
1.100 M3 Kayu Kapur 5/10 4,000,000.00 4,400,000.00
3.500 Kg Paku Biasa 15,000.00 52,500.00
DAFTAR ANALISA HARGA SATUAN
Bahan
0.0130 M3 Lantai papan 3/30 7,000,000.00 91,000.00
0.050 Kg Paku Biasa 15,000.00 750.00
Tenaga dan Alat
DAFTAR ANALISA HARGA SATUAN
Bahan
1.100 Bh Bubungan Sirap 85,000.00 93,500.00
0.200 Kg Paku Sirap 25,000.00 5,000.00
Tenaga dan Alat
0.1250 Oh Tukang 100,000.00 12,500.00
0.0840 Oh Pekerja 80,000.00 6,720.00
0.0130 Oh Kepala Tukang 120,000.00 1,560.00
0.0040 Oh Mandor 130,000.00 520.00
21,300.00 98,500.00
4 1 M Memasang Listplank Uk. 3 x 20 Cm
1
Bahan
0.0108 M3 Kayu Papan 3/20 7,000,000.00 75,600.00
0.100 Kg Paku Biasa 15,000.00 1,500.00
Tenaga dan Alat
DAFTAR ANALISA HARGA SATUAN
JUMLAH
HARGA
[ RP.]
6
8,000.00
6,500.00
14,500.00
60,000.00
3,250.00
63,250.00
120,000.00
24,000.00
20,000.00
3,250.00
167,250.00
144,000.00
24,000.00
1,300.00
169,300.00
395,200.00
267,030.00
333,000.00
43,000.00
20,000.00
96,000.00
A HARGA SATUAN
2,400.00
7,800.00
1,164,430.00
593,600.00
214,570.00
349,200.00
43,000.00
1,966,692.00
1,439,504.00 13,086.40
27,500.00
132,000.00
3,360.00
10,790.00
4,780,216.00
593,600.00
214,570.00
349,200.00
43,000.00
1,186,859.00
1,439,504.00
27,500.00
132,000.00
3,360.00
10,790.00
4,000,383.00
126,000.00
3,000.00
700.00
560.00
84.00
520.00
130,864.00
A HARGA SATUAN
100,000.00
4,500.00
1,500.00
26,000.00
41,600.00
3,120.00
3,380.00
180,100.00
112,500.00
4,500.00
1,500.00
26,000.00
41,600.00
3,120.00
3,380.00
192,600.00
100,000.00
6,000.00
3,000.00
45,000.00
45,500.00
30,000.00
33,000.00
52,800.00
3,960.00
4,290.00
323,550.00
4,400,000.00
52,500.00
A HARGA SATUAN
1,650,000.00
440,000.00
198,000.00
35,750.00
6,776,250.00
270,000.00
2,000.00
32,000.00
12,000.00
2,600.00
85,714.29
404,314.29
60,000.00
15,000.00
4,000.00
1,800.00
325.00
81,125.00
20,000.00
750.00
1,650,000.00
440,000.00
198,000.00
35,750.00
1,500.00
2,346,000.00
91,000.00
750.00
A HARGA SATUAN
12,000.00
9,600.00
1,440.00
390.00
115,180.00
56,000.00
3,750.00
10,000.00
8,000.00
1,200.00
650.00
79,600.00
231,000.00
5,000.00
10,000.00
16,000.00
1,200.00
130.00
263,330.00
93,500.00
5,000.00
12,500.00
6,720.00
1,560.00
520.00
119,800.00
75,600.00
1,500.00
A HARGA SATUAN
10,000.00
8,000.00
1,200.00
6,500.00
102,800.00
21,000.00
3,750.00
30,000.00
16,000.00
3,600.00
1,300.00
75,650.00
82,500.00
150.00
80,000.00
64,000.00
9,600.00
5,200.00
241,450.00
6,300.00
150.00
5,000.00
4,000.00
600.00
390.00
16,440.00
240,000.00
150.00
A HARGA SATUAN
20,000.00
8,000.00
2,400.00
650.00
271,200.00
13,500.00
3,000.00
2,700.00
1,500.00
9,000.00
5,600.00
720.00
325.00
36,345.00
DAFTAR HARGA SATUAN DASAR UPAH,
BAHAN DAN PERALATAN
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KAWASAN RTH PUSAT PEM
NAMA KEGIATAN : PEMBANGUNAN GAZEBO [ BESAR ]
LOKASI : KOTA BONTANG
TAHUN ANGGARAN : 2012
JUMLAH HARGA
NO URAIAN SATUAN
[ Rp ]
B BAHAN ATAP
1 Sirap M2 210,000.00
2 Bubungan Sirap Andalas Lbr 85,000.00
C BAHAN LISTRIK
1 Titik Lampu + Instalasi Bh 180,000.00
2 Stop Kontak + Instalasi Bh 120,000.00
3 Sakelar Engkel Bh 350,000.00
4 Sakelar Double Bh 135,000.00
E BAHAN BESI
1 Besi Beton Polos Kg 12,000.00
2 Besi Beton Ulir Kg 12,500.00
3 Besi Strip Kg 18,000.00
4 Kawat Ikat Beton Kg 20,000.00
5 Kawat Nyamuk Plastik M1 35,000.00
DAFTAR HARGA SATUAN DASAR UPAH,
BAHAN DAN PERALATAN
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KAWASAN RTH PUSAT PEM
NAMA KEGIATAN : PEMBANGUNAN GAZEBO [ BESAR ]
LOKASI : KOTA BONTANG
TAHUN ANGGARAN : 2012
JUMLAH HARGA
NO URAIAN SATUAN
[ Rp ]
F BAHAN PAKU
1 Paku Kayu / Biasa Kg 15,000.00
2 Paku Sirap Kg 25,000.00
3 Paku Ulin Kg 20,000.00
4 Paku Seng Kg 25,000.00
5 Paku Plywood Kg 22,000.00
6 Paku Genteng Bh 750.00
7 Paku Sekrup Kg 55,000.00
G BAHAN KAYU
1 Kayu Bekisting M2 2,500,000.00
2 Balok Ulin M 3
6,000,000.00
3 Papan Ulin M3 7,000,000.00
4 Papan Siring M 3
5,500,000.00
5 Balok Bengkirai M 3
3,500,000.00
6 Papan Bengkirai M3 4,000,000.00
7 Balok Meranti M3 3,000,000.00
8 Papan Meranti M 3
3,500,000.00
9 Balok Kapur M 3
4,000,000.00
10 Papan Kapur M3 4,000,000.00
11 Dolken Kayu D 8 - 10 / 400 Cm Btg 15,000.00
12 Ornamen Onjong Atap ( Burung Kuntul Perak Bh 500,000.00
H BAHAN FINISHING
1 Amplas Kayu Lbr 3,000.00
2 Meny Kayu Kg 40,000.00
3 Meni Besi Kg 45,000.00
4 Dempul Kayu Kg 40,000.00
5 Plamir Tembok Kg 45,000.00
6 Minyak Cat Ltr 45,000.00
7 Cat Tembok Sekelas Mowilex Kg 80,000.00
DAFTAR HARGA SATUAN DASAR UPAH,
BAHAN DAN PERALATAN
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KAWASAN RTH PUSAT PEM
NAMA KEGIATAN : PEMBANGUNAN GAZEBO [ BESAR ]
LOKASI : KOTA BONTANG
TAHUN ANGGARAN : 2012
JUMLAH HARGA
NO URAIAN SATUAN
[ Rp ]
I UPAH ALAT
1 Stamper Jam 28,571.43
2 Mesin Pancang Ulin Jam 42,857.14
3 Alat Bantu Ls 1,500.00
J UPAH KERJA
1 Tukang Oh 100,000.00
2 Kepala Tukang Oh 120,000.00
3 Pekerja Oh 80,000.00
4 Mandor Oh 130,000.00
AH,
KETERANGAN
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
AH,
KETERANGAN
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi 0.03
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
AH,
KETERANGAN
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
Dilokasi
SKEDUL PELAKSANAAN
KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA KAWASAN RTH PUSAH PEMER
NAMA KEGIATAN : PEMBANGUNAN GAZEBO [ BESAR ]
: Err:509
LOKASI : KOTA BONTANG
TAHUN ANGGARAN : 2012
URAIAN PEKERJAAN BOBOT MING
NO
[%] I II
0.000
1 Papan Nama 0.000
Err:509
2 Err:509 Err:509
Err:509 Err:509
3 Err:509 Err:509
0.000
4 Galian Tanah 0.000
0.000
5 Tanah Urug 0.000
0.000
6 Pasir Urug 0.000
Binsar Siagian SE
MINGGU Ke
REMARKS
III IV V
0.000
0.000 0.000
0.000 0.000 0.000 %
Menyatakan bahwa :
Data Personil CV. BERTIO INDAH yang akan melaksanakan Pekerjaan ini adalah :
Bontang 12 Septembe
CV. Bertio Indah
Menyatakan bahwa :
Dalam Pelaksanaan Pekerjaan kami akan mempergunakan peralatan sebagai berikut :
TAHUN KONDISI
NO PERALATAN KAPASITAS
PEMBELIAN (%)
Bontang 12 Septembe
CV. Bertio Indah
Drs. Jonny Sinaga
Direktur
NIL INTI YANG AKAN MELAKSANAKAN
KETERANGAN
NC.20-010226
00435/07/DIII/2006
09 OC ou 0000884
09 OB on 0001027
944/02/DIII/2002
DN-09 Mk 0476209
KETERANGAN
MILIK
MILIK
MILIK
MILIK
MILIK
MILIK
MILIK
MILIK
MILIK