You are on page 1of 10

Gambar 1. Skematik pengujian PDA.

Lampiran-PDA-Tahap2-JalurGandaJembatanBH-101&BH109 Kedunggalur-Walikukut-EkaSuryaAlam
Gambar 2. Lokasi tiang yang diuji PDA.

Lampiran-PDA-Tahap2-JalurGandaJembatanBH-101&BH109 Kedunggalur-Walikukut-EkaSuryaAlam
PT Geo-Pondasi Testing
ALUR GANDA JEMBATAN BH-109 PILE DRIVING ANALYZER ®
KEDUNGGALUR WALIKUKUT Version 2013.117
JGJ-BH109-A1-5
PDA OP: FIKAR H.(TESTING ENGINEER) DROP HAMMER 2.5 TON
BN 1
2/24/2018 5:19:08 PM
500 0.76 RMX 266 tn
tn m/s FMX 244 tn
CTN 0 tn
F V EMX 0.13 tn-m
DMX 2 mm
DMX 2 mm
STK 0.0 m
BPM 1.9 bpm
BTA 100.0 (%)
LE 5.7 m
204.8ms AR 7647.20cm^2
EM 300 t/cm2
3.40 ms SP 2.40 t/m3
WS 3500.0 m/s
500 500 EA/C 655.8 tn-s/m
tn tn LP 5.3 m
WD WU

204.8ms

KODE KETERANGAN Tiang: JGJ-BH109-A1-5


BN Pukulan 1
RMX Daya dukung tiang [ton] 266
FMX Gaya tekan maksimum [ton] 244
CTN Gaya tarik maksimum [ton] 0
EMX Enerji maksimum yang ditransfer [tonm] 0,13
DMX Penurunan maksimum [mm] 2
DFN Penurunan permanen [mm] 2
STK Tinggi jatuh palu [m], drop hammer 0
BPM Pukulan per menit, drop hammer 1,9
BTA Nilai keutuhan tiang [%] 100
LE Panjang tiang dibawah instrumen [m] 5,7
LP Panjang tiang tertanam [m] 5,3
AR Luas penampang tiang [cm²] 7647,2

Gambar 5a. Hasil pengujian PDA untuk tiang: JGJ-BH109-A1-5

Lampiran-PDA-Tahap2-JalurGandaJembatanBH-101&BH109 Kedunggalur-Walikukut-EkaSuryaAlam
ALUR GANDA JEMBATAN BH-109 KEDUNGGALUR WALIKUKUT; Pile: JGJ-BH109-A1-5; DROP HAMMER 2.5 TON; Blow: 1 (Test: 24-Feb-2018 17:19:) 05-Mar-2018
PT Geo-Pondasi Testing CAPWAP(R) 2006-3

300 tons 300 tons


Force Msd Force Msd
Force Cpt Velocity Msd

150 150

0 90 ms 0 90 ms
0 0
39 L/c 39 L/c

Pile
-150 -150

)
m
Load (tons) 36
Pile Top

( m
0 75 150 225 300 Shaft Resistance
Bottom

t
0.000 27 Distribution

s / m

n
n

e
18
Ru = 260.0 tons

t o

m
0.750 Rs = 140.0 tons
Rb = 120.0 tons 9
Dy = 0.9 mm

c e
Dx = 2.9 mm 0

l a
Pile Force

Lampiran-PDA-Tahap2-JalurGandaJembatanBH-101&BH109 Kedunggalur-Walikukut-EkaSuryaAlam
1.500
s

70 at Ru
n

i s p
140
t o

D
2.250

Gambar 5b. Hasil Analisis CAPWAP untuk tiang: JGJ-BH109-A1-5


210

280
3.000

CAPWAP(R) 2006-3 Licensed to PT Geo-Pondasi Testing


ALUR GANDA JEMBATAN BH-109 KEDUNGGALUR WALIKUKUT; Pile: JGJ-BH109-A1-5
Test: 24-Feb-2018 17:19:
DROP HAMMER 2.5 TON; Blow: 1 CAPWAP(R) 2006-3
PT Geo-Pondasi Testing OP: FIKAR H.(TESTING ENGINEER)
CAPWAP SUMMARY RESULTS
Total CAPWAP Capacity: 260.0; along Shaft 140.0; at Toe 120.0 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith Quake
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m mm

260.0
1 1.1 0.7 16.0 244.0 16.0 21.66 6.99 3.568 0.500
2 2.3 1.9 24.4 219.6 40.4 21.40 6.90 3.568 0.332
3 3.4 3.0 30.1 189.5 70.5 26.41 8.52 3.568 0.253
4 4.6 4.2 34.7 154.8 105.2 30.44 9.82 3.568 0.205
5 5.7 5.3 34.8 120.0 140.0 30.49 9.84 3.568 0.196
Avg. Shaft 28.0 26.42 8.52 3.568 0.269
Toe 120.0 156.92 5.916 0.274
Soil Model Parameters/Extensions Shaft Toe
Case Damping Factor 0.762 1.083
Unloading Quake (% of loading quake) 36 45
Reloading Level (% of Ru) 100 100
Soil Plug Weight (tons) 1.29
Soil Support Dashpot 1.000 0.000
Soil Support Weight (tons) 1.80 0.00

CAPWAP match quality = 12.65 (Wave Up Match) ; RSA = 0


Observed: final set = 2.000 mm; blow count = 500 b/m
Computed: final set = 0.100 mm; blow count = 9999 b/m
Replay Factor: F3:1.000; F4:0.600; V3:1.000; V4:1.000;
max. Top Comp. Stress = 0.034 tons/cm2 (T= 27.4 ms, max= 1.000 x Top)
max. Comp. Stress = 0.034 tons/cm2 (Z= 1.1 m, T= 27.4 ms)
max. Tens. Stress = -0.012 tons/cm2 (Z= 1.1 m, T= 35.2 ms)
max. Energy (EMX) = 0.26 tonne-m; max. Measured Top Displ. (DMX)= 2.05 mm

Page 1 Analysis: 05-Mar-2018

Lampiran-PDA-Tahap2-JalurGandaJembatanBH-101&BH109 Kedunggalur-Walikukut-EkaSuryaAlam
ALUR GANDA JEMBATAN BH-109 KEDUNGGALUR WALIKUKUT; Pile: JGJ-BH109-A1-5
Test: 24-Feb-2018 17:19:
DROP HAMMER 2.5 TON; Blow: 1 CAPWAP(R) 2006-3
PT Geo-Pondasi Testing OP: FIKAR H.(TESTING ENGINEER)
EXTREMA TABLE
Pile Dist. max. min. max. max. max. max. max.
Sgmnt Below Force Force Comp. Tens. Trnsfd. Veloc. Displ.
No. Gages Stress Stress Energy
m tons tons tons/cm2 tons/cm2 tonne-m m/s mm
1 1.1 262.3 -93.0 0.034 -0.012 0.26 0.2 0.636
2 2.3 259.0 -74.6 0.034 -0.010 0.22 0.2 0.508
3 3.4 238.9 -52.7 0.031 -0.007 0.18 0.2 0.436
4 4.6 221.4 -37.1 0.029 -0.005 0.14 0.2 0.385
5 5.7 205.7 -25.5 0.027 -0.003 0.07 0.1 0.338
Absolute 1.1 0.034 (T = 27.4 ms)
1.1 -0.012 (T = 35.2 ms)

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 293.8 286.9 280.0 273.1 266.2 259.3 252.4 245.5 238.6 231.7
RX 298.6 287.5 280.0 273.1 266.2 259.3 252.4 245.5 238.6 231.7
RU 346.4 344.8 343.1 341.5 339.8 338.2 336.5 334.9 333.2 331.6
RAU = 0.0 (tons); RA2 = 268.3 (tons)
Current CAPWAP Ru = 260.0 (tons); Corresponding J(RP)= 0.49; J(RX) = 0.49

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
0.31 26.06 203.3 159.6 244.0 2.049 2.046 2.000 0.1 64.0

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 7647.20 300.1 2.403 3.100
5.70 7647.20 300.1 2.403 3.100
Toe Area 0.765 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.14 655.77 0.00 0.000 0.000 -0.000 0.000 3.100


2 2.28 455.77 -30.50 0.000 0.000 -0.000 0.000 3.100
3 3.42 755.77 15.25 0.000 0.000 -0.000 0.000 3.100
4 4.56 955.77 45.75 0.000 0.000 -0.000 0.000 3.100
5 5.70 955.77 45.75 0.000 0.000 -0.000 0.000 3.100
Pile Damping 2.0 %, Time Incr 0.326 ms, Wave Speed 3500.0 m/s, 2L/c 3.3 ms

Page 2 Analysis: 05-Mar-2018

Lampiran-PDA-Tahap2-JalurGandaJembatanBH-101&BH109 Kedunggalur-Walikukut-EkaSuryaAlam
PT Geo-Pondasi Testing
JALUR GANDA JEMBATAN BH-109 PILE DRIVING ANALYZER ®
KEDUNGGALAR WALIKUKUT Version 2013.117
PDA OP: FIKAR H.(TESTING ENGINEER) JGJ-BH109-A2-5
DROP HAMMER 2.5 TON
BN 1
2/24/2018 4:06:12 PM
400 0.81 RMX 285 tn
tn m/s FMX 243 tn
CTN 0 tn
F V EMX 0.20 tn-m
DMX 3 mm
DMX 3 mm
STK 0.0 m
BPM 1.9 bpm
BTA 100.0 (%)
LE 6.0 m
204.8ms AR 5792.30cm^2
EM 300 t/cm2
3.40 ms SP 2.40 t/m3
WS 3500.0 m/s
400 400 EA/C 496.7 tn-s/m
tn tn LP 5.8 m
WD WU

204.8ms

KODE KETERANGAN Tiang; JGJ-BH109-A2-5


BN Pukulan 1
RMX Daya dukung tiang [ton] 285
FMX Gaya tekan maksimum [ton] 243
CTN Gaya tarik maksimum [ton] 0
EMX Enerji maksimum yang ditransfer [tonm] 0,20
DMX Penurunan maksimum [mm] 3
DFN Penurunan permanen [mm] 3
STK Tinggi jatuh palu [m], drop hammer 0
BPM Pukulan per menit, drop hammer 1,9
BTA Nilai keutuhan tiang [%] 100
LE Panjang tiang dibawah instrumen [m] 6
LP Panjang tiang tertanam [m] 5,8
AR Luas penampang tiang [cm²] 5792,3

Gambar 6a. Hasil pengujian PDA untuk tiang: JGJ-BH109-A2-5

Lampiran-PDA-Tahap2-JalurGandaJembatanBH-101&BH109 Kedunggalur-Walikukut-EkaSuryaAlam
JALUR GANDA JEMBATAN BH-109 KEDUNGGALAR WALIKUKUT; Pile: JGJ-BH109-A2-5; DROP HAMMER 2.5 TON; Blow: 1 (Test: 24-Feb-2018 16:06:) 05-Mar-2018
PT Geo-Pondasi Testing CAPWAP(R) 2006-3

400 tons 400 tons


Force Msd Force Msd
Force Cpt Velocity Msd

200 200

0 100 ms 0 100 ms
0 0
42 L/c 42 L/c

Pile
-200 -200

)
m
Load (tons) 28
Pile Top

( m
0 90 180 270 360 Shaft Resistance
Bottom

t
0.000 21 Distribution

s / m

n
n

e
14
Ru = 317.6 tons

t o

m
0.750 Rs = 101.3 tons
Rb = 216.3 tons 7
Dy = 1.8 mm

c e
Dx = 2.8 mm 0

l a
Pile Force

Lampiran-PDA-Tahap2-JalurGandaJembatanBH-101&BH109 Kedunggalur-Walikukut-EkaSuryaAlam
1.500
s

90 at Ru
n

i s p
180
t o

D
2.250

Gambar 6b. Hasil Analisis CAPWAP untuk tiang: JGJ-BH109-A2-5


270

360
3.000

CAPWAP(R) 2006-3 Licensed to PT Geo-Pondasi Testing


JALUR GANDA JEMBATAN BH-109 KEDUNGGALAR WALIKUKUT; Pile: JGJ-BH109-A2-5
Test: 24-Feb-2018 16:06:
DROP HAMMER 2.5 TON; Blow: 1 CAPWAP(R) 2006-3
PT Geo-Pondasi Testing OP: FIKAR H.(TESTING ENGINEER)
CAPWAP SUMMARY RESULTS
Total CAPWAP Capacity: 317.6; along Shaft 101.3; at Toe 216.3 tons
Soil Dist. Depth Ru Force Sum Unit Unit Smith Quake
Sgmnt Below Below in Pile of Resist. Resist. Damping
No. Gages Grade Ru (Depth) (Area) Factor
m m tons tons tons tons/m tons/m2 s/m mm

317.6
1 1.0 0.8 8.4 309.1 8.4 10.54 3.90 3.995 0.807
2 2.0 1.8 13.5 295.7 21.9 13.49 5.00 3.995 0.719
3 3.0 2.8 20.8 274.8 42.7 20.81 7.71 3.995 0.602
4 4.0 3.8 23.2 251.7 65.9 23.16 8.58 3.995 0.504
5 5.0 4.8 20.3 231.4 86.2 20.31 7.52 3.995 0.477
6 6.0 5.8 15.1 216.3 101.3 15.12 5.60 3.995 0.441
Avg. Shaft 16.9 17.47 6.47 3.995 0.563
Toe 216.3 373.36 0.855 0.601
Soil Model Parameters/Extensions Shaft Toe
Case Damping Factor 0.815 0.372
Unloading Quake (% of loading quake) 30 30
Reloading Level (% of Ru) 100 100
Unloading Level (% of Ru) 24
Resistance Gap (included in Toe Quake) (mm) 0.017
Soil Plug Weight (tons) 4.18
Soil Support Dashpot 1.000 0.000
Soil Support Weight (tons) 1.38 0.00

CAPWAP match quality = 24.08 (Wave Up Match) ; RSA = 0


Observed: final set = 1.000 mm; blow count = 1000 b/m
Computed: final set = 0.100 mm; blow count = 9999 b/m
Replay Factor: F3:0.900; F4:0.500; V3:1.000; V4:1.000;
max. Top Comp. Stress = 0.045 tons/cm2 (T= 28.3 ms, max= 1.009 x Top)
max. Comp. Stress = 0.045 tons/cm2 (Z= 2.0 m, T= 28.6 ms)
max. Tens. Stress = -0.009 tons/cm2 (Z= 2.0 m, T= 31.7 ms)
max. Energy (EMX) = 0.21 tonne-m; max. Measured Top Displ. (DMX)= 3.32 mm

Page 1 Analysis: 05-Mar-2018

Lampiran-PDA-Tahap2-JalurGandaJembatanBH-101&BH109 Kedunggalur-Walikukut-EkaSuryaAlam
JALUR GANDA JEMBATAN BH-109 KEDUNGGALAR WALIKUKUT; Pile: JGJ-BH109-A2-5
Test: 24-Feb-2018 16:06:
DROP HAMMER 2.5 TON; Blow: 1 CAPWAP(R) 2006-3
PT Geo-Pondasi Testing OP: FIKAR H.(TESTING ENGINEER)
EXTREMA TABLE
Pile Dist. max. min. max. max. max. max. max.
Sgmnt Below Force Force Comp. Tens. Trnsfd. Veloc. Displ.
No. Gages Stress Stress Energy
m tons tons tons/cm2 tons/cm2 tonne-m m/s mm
1 1.0 259.6 -51.3 0.045 -0.009 0.21 0.4 0.988
2 2.0 261.8 -53.8 0.045 -0.009 0.19 0.4 0.867
3 3.0 254.4 -42.0 0.044 -0.007 0.16 0.3 0.757
4 4.0 234.5 -22.1 0.040 -0.004 0.13 0.3 0.676
5 5.0 209.4 -16.0 0.036 -0.003 0.10 0.3 0.637
6 6.0 180.6 -11.4 0.031 -0.002 0.08 0.3 0.601
Absolute 2.0 0.045 (T = 28.6 ms)
2.0 -0.009 (T = 31.7 ms)

CASE METHOD
J = 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
RP 301.9 285.0 268.0 251.1 234.1 217.2 200.2 183.3 166.3 149.4
RX 301.9 285.0 268.0 251.1 234.1 217.2 200.2 183.3 166.3 149.4
RU 401.7 394.7 387.7 380.8 373.8 366.8 359.8 352.9 345.9 338.9
RAU = 0.0 (tons); RA2 = 123.9 (tons)
Current CAPWAP Ru = 317.6 (tons); Corresponding J(RP)= 0.00; J(RX) = 0.00

VMX TVP VT1*Z FT1 FMX DMX DFN SET EMX QUS
m/s ms tons tons tons mm mm mm tonne-m tons
0.47 27.71 231.2 240.2 243.3 3.316 0.985 1.000 0.2 91.6

PILE PROFILE AND PILE MODEL


Depth Area E-Modulus Spec. Weight Perim.
m cm2 tons/cm2 tons/m3 m
0.00 5792.30 300.1 2.403 2.700
6.00 5792.30 300.1 2.403 2.700
Toe Area 0.579 m2

Segmnt Dist. Impedance Imped. Tension Compression Perim.


Number B.G. Change Slack Eff. Slack Eff.
m tons/m/s % mm mm m

1 1.00 496.71 0.00 0.000 0.000 -0.000 0.000 2.700


2 2.00 396.71 -20.13 0.000 0.000 -0.000 0.000 2.700
5 5.00 496.71 0.00 0.000 0.000 -0.000 0.000 2.700
6 6.00 496.71 0.00 0.000 0.000 -0.000 0.000 2.700
Pile Damping 2.0 %, Time Incr 0.286 ms, Wave Speed 3500.0 m/s, 2L/c 3.4 ms