LOAD CHASE DOWN ON BEAM SSE-EXCEL SECTION

Job: W1 The author will not be responsible for any uses of this software!
v1.04

1. Inputs
Slab 1 2
e= 0.12 0.12 m slab thickness gc= 2.5 t/m3 Con. unit-weigth
L= 4 4.5 m L1, L2 btw axe L= 5 m [AB]
g= 0.2 0.2 t/m2 dead load choice= 1 1=linear loading (default) e1,3

L1

B1
q= 0.25 0.25 t/m2 live load 2=No
b= 0.2 m secondary beam La1
B1,2 B3,4 h= 0.5 m secondary beam
Beam AB
Coef Nord= coef of continuity:0; 0.33; 0.5 A B
Coef south= coef of continuity:0; 0.33; 0.5
1 2 L
La= 2 3m >> CAL La2 e2,4
Lb= 3 2 m if(La<L, Lb<>0)

B2
L2
Lc= m =L-La-Lb>0 OK
>> M0
2. Design:
Slab 1 2 3 4 5 6
>> PDF
Li= 4 4.5 4 4.5 4 4.5 m 6
SW= 0.3 0.3 0.3 0.3 0.3 0.3 t/m2
gt= 0.5 0.5 0.5 0.5 0.5 0.5 t/m2 Shema
q= 0.25 0.25 0.25 0.25 0.25 0.25 t/m2
α= 2 1 1.333 1 =Li/L
4
α= 1 1 1 1 =if(α<0.5,0,min(1,α))
Lx= 2 3 3 2 m =min(Li, L)

Result: Secondary beams 2


Loads on beam AB: B1 B2 B3 B4
w/o sw at x= 2 3 5 5m
g= 0.7 t/m G= 2.1 2.7 t
q= 0.3 t/m Q= 0.8 1.1 t
0 A B
-1 1.5 4

-2

gV, qV: loads for calculation of shear


gM, qM: loads for claculation of moment

-4

-6