You are on page 1of 1

TOP PARAPET LEVEL

TOP PARAPET LEVEL TOP PARAPET LEVEL TOP PARAPET LEVEL


+8995.0cm FFL +8995.0cm FFL TOP PARAPET LEVEL
+8995.0cm FFL +8995.0cm FFL
+8995.0cm FFL

TOP
TOP
+8762.5.0cm FL TOP
+8735.0cm FL +8762.5.0cm FL
+8735.0cm FL
+8735.0cm FL
TOP
TOP
TOP
UPPER ROOF LEVEL +8485.0cm FL TOP
UPPER ROOF LEVEL +8485.0cm FL
+8405.0cm FFL
+8405.0cm FFL
TOP
+8305.0cm FL TOP
TOP +8305.0cm FL
+8235.0cm FL
TOP
+8185.0cm FL
TOP
+8125.0cm FL
TERRACE FLOOR LEVEL TOP TOP
R +8045.0cm FL +8045.0cm FL TERRACE FLOOR LEVEL
+8005.0cm FFL R
+8005.0cm FFL

TWENTYTEENTH FLOOR LEVEL


20 TWENTYTEENTH FLOOR LEVEL
+7645.0cm FFL 20
+7645.0cm FFL

NINETEENTH FLOOR LEVEL


19 NINETEENTH FLOOR LEVEL
+7285.0cm FFL 19
+7285.0cm FFL

EIGHTEENTH FLOOR LEVEL


18 EIGHTEENTH FLOOR LEVEL
+6925.0cm FFL 18
+6925.0cm FFL

SEVENTEENTH FLOOR LEVEL


17 SEVENTEENTH FLOOR LEVEL
+6565.0cm FFL 17
+6565.0cm FFL

SIXTEENTH FLOOR LEVEL


16 SIXTEENTH FLOOR LEVEL
+6205.0cm FFL 16
+6205.0cm FFL

FIFTEENTH FLOOR LEVEL


15 FIFTEENTH FLOOR LEVEL
+5845.0cm FFL 15
+5845.0cm FFL

FOURTEENTH FLOOR LEVEL


14 FOURTEENTH FLOOR LEVEL
+5485.0cm FFL 14
+5485.0cm FFL

THIRTEENTH FLOOR LEVEL


13 THIRTEENTH FLOOR LEVEL
+5125.0cm FFL 13
+5125.0cm FFL

TWELFTH FLOOR LEVEL


12 TWELFTH FLOOR LEVEL
+4765.0cm FFL 12
+4765.0cm FFL

ELEVENTH FLOOR LEVEL


11 ELEVENTH FLOOR LEVEL
+4405.0cm FFL 11
+4405.0cm FFL

ELEVATION FRONT VIEW


TENTH FLOOR LEVEL
10 TENTH FLOOR LEVEL
+4045.0cm FFL 10
+4045.0cm FFL

NINTH FLOOR LEVEL


09 NINTH FLOOR LEVEL
+3685.0cm FFL 09
+3685.0cm FFL

EIGHTH FLOOR LEVEL


+3325.0cm FFL 08 EIGHTH FLOOR LEVEL
08
PLAN 3D VIEW WITH POINT LOAD
+3325.0cm FFL

SEVENTH FLOOR LEVEL


07 SEVENTH FLOOR LEVEL
+2965.0cm FFL 07
+2965.0cm FFL

SIXTH FLOOR LEVEL


06 SIXTH FLOOR LEVEL
+2605.0cm FFL 06
+2605.0cm FFL

FIFTH FLOOR LEVEL


05 FIFTH FLOOR LEVEL
+2245.0cm FFL 05
+2245.0cm FFL

FOURTH FLOOR LEVEL


04 FOURTH FLOOR LEVEL
+1885.0cm FFL 04
+1885.0cm FFL D:\Vinod Proposal\5147-Al Ali const\SHOP DRAWING\untitled.png

THIRD FLOOR LEVEL


03 THIRD FLOOR LEVEL
+1525.0cm FFL 03
+1525.0cm FFL

SECOND FLOOR LEVEL


02 SECOND FLOOR LEVEL
+1165.0cm FFL 02
+1165.0cm FFL

FIRST FLOOR LEVEL


01 FIRST FLOOR LEVEL
+805.0cm FFL 01
+805.0cm FFL

MEZZANINE FLOOR LEVEL


M MEZZANINE FLOOR LEVEL
+475.0cm FFL M
+475.0cm FFL

GROUND FLOOR LEVEL


G GROUND FLOOR LEVEL
+45.0cm FFL G
+45.0cm FFL

GROUND LEVEL
GROUND LEVEL
FIRST BASEMENT LEVEL
B1 FIRST BASEMENT LEVEL
-315.0cm FFL B1
-315.0cm FFL

SECOND BASEMENT LEVEL


Client Mohd. Ahmd Ali Hassan Ruqait Al Ali
B2 SECOND BASEMENT LEVEL
-630.0cm FFL B2
-630.0cm FFL
LIFT PIT LEVEL
LIFT PIT LEVEL Project Twin Tower (2B+G+M+20 Typical +Terrace Floor)
-765.0cm FFL
-765.0cm FFL
Drg.Title WINDOW CLEANING SYSTEM - ELEVATIONS 1 & 2

1 Elevation 01 Area Dafan, R.A.K. Floortype R


1 Elevation 02
A-129
A-130
Case ID. 96897 Draw. Type. SHOP DRAWING

Sec No. 3 Com. No.


Block No. Plot No. 314030028
Bldg. No. BLD-15-16556 Floor No. -
Date 04.03.2018 Sht. No. PM-ES-5147-003

Scale NTC Job No.


G.Manager Architect Drawn by
- - VK

You might also like