You are on page 1of 1

U

Institut
Teknologi
Sepuluh Nopember

PROGRAM STUDI DIPLOMA IV TEKNIK SIPIL


DEPARTEMEN TEKNIK INFRASTRUKTUR SIPIL
FAKULTAS VOKASI
1 2 3 4 5 6 INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA
MATA KULIAH
30000
PROYEK AKHIR TERAPAN
6000 6000 6000 6000 6000 RC146599

A A JUDUL TUGAS AKHIR TERAPAN

1575 1575
SHAFT
SHAFT SAMPAH

3150
PERHITUNGAN STRUKTUR DAN
A1 WC
- 0.06
WC
- 0.06
A1 METODE PELAKSANAAN GEDUNG AT-TAUHID
UNIVERSITAS MUHAMMADIYAH SURABAYA
B WC
B DENGAN KONSTRUKSI BAJA
SISTEM RANGKA BRESING EKSENTRIS (SRBE)

3000
- 0.06

WC
- 0.06

Mengetahui :

B1 8150 SHAFT
B1 DOSEN PEMBIMBING
3000 R.PANEL
± 0.00

JANITOR
- 0.03

B2 B2
2150

Ir. Munarus Suluch, MS.


NIP. 19550408 198203 1 003
C C DOSEN PENGUJI I
3000

C1 C1
24450
8150
3000

Prof. Ir. M. Sigit D., M.EngSc., PhD


NIP. 19630726 198903 1 003
C2 C2
2150

DOSEN PENGUJI II

D D
3000

Ir. Sungkono, CES


D1 D1 NIP. 19591130 198601 1 001
8150
3000

DIGAMBAR OLEH
Prawidya Khairina Dianamoko
D2 D2 NRP. 3113041028
1700 1900 2150

KETERANGAN
E E Material Profil : JIS G3101 - SS 400
Mutu Baja : Fy = 250 MPa
E1 E1 Mutu Baut : A325, Fub = 830 MPa
Mutu Las : E60xx , FExx = 430 MPa
Mutu Beton : - Plat ( Fc' = 20 MPa )
F F - Pondasi ( Fc' =35 MPa )

1 2 3 4 5 6
NAMA GAMBAR SKALA
DENAH LANTAI 1
DENAH LANTAI 1 1:200

KODE JUMLAH
NO. LBR
GAMBAR GAMBAR

ARS
1 46

You might also like