You are on page 1of 119

AMSC PRODUCTIVITY RATE

Activity Activity SUB Unit QTY Prod. Rate Days


Item
ID Description ACTIVITY (unit/day)
SITEWORKS

Z0U34-0000 Site Clearing M2 1,502.00 4,200.00 0.36

Z0U34-0010 Setting-out / Layout M 160.08 76.00 2.11

SUBSTRUCTURE

For
Z0U34-0020 Excavation for footings + Disposal of Materials M3 953.00 409.50 2.33
Excavation

For
M3 555.00 345.60 1.61
Disposal

Z0U34-0030 Formation Level & Compaction M3 238 252.00 0.94

Z0U34-0040 Anti-Termite Applications (Under PCC Footings) M2 571 202.50 2.82

Z0U34-0050 Backfill & Compaction upto bot. of PCC Tie-Beam M3 268 252.00 1.06

Z0U34-0060 Anti-Termite Applications (Under PCC Tie-Beam) M2 37 202.50 0.18

Page 1 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-0070 Backfill & Compaction up to bot of PCC Grd. Slab M3 2,332.00 252.00 9.25

Z0U34-0080 Anti-Termite Applications (Under PCC Grade Slab) M2 894 202.50 4.41

Z0U34-0090 Shutters + 50mm Thk. PCC Under Footings M2 982 270.00 3.64

Z0U34-0100 50mm Protection Screed (Over W.P. Membrane-Ftg.) M2 2,246.00 270.00 8.32

Z0U34-0110 RCC For Footings Casting M3 244 180.00 1.36

Formworks M2 976.00 12.00 81.33

Rebars kg 43,920.00 250.00 175.68

Deshutterin
M2 976.00 35.00 27.89
g

Page 2 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-0120 RCC Necks Columns / Walls + MEP Sleeves Casting M3 154 81.00 1.90

Formworks M2 616.00 4.00 154.00

Rebars kg 27,720.00 200.00 138.60

Deshutterin
M2 616.00 28.00 22.00
g

Z0U34-0130 Shutters + 50mm Thk. PCC Under Tie-Beams M2 63 270.00 0.23

Z0U34-0140 50mm Screed (Over W.P. Membrane-T.B.) M2 144 270.00 0.53

Z0U34-0150 RCC Tie Beams + MEP Sleeves Casting M3 33 180.00 0.18

Page 3 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Formworks M2 132.00 4.00 33.00

Rebars kg 5,940.00 250.00 23.76

Deshutterin
M2 132.00 28.00 4.71
g

Z0U34-0160 RCC Kickers Over Tie-Beam Casting M3 1 180.00 0.01

Formworks M2 4.00 4.00 1.00

Rebars kg 180.00 250.00 0.72

Page 4 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Deshutterin
M2 4.00 28.00 0.14
g

Z0U34-0170 50mm Thk. PCC Under Grade Slab M2 1,537.00 270.00 5.69

Z0U34-0180 Mesh + Filler Board & RCC For Grade Slab M3 208 180.00 1.16

Z0U34-0190 50mm Thk. PCC Steps & Ramps M2 10 270.00 0.04

Z0U34-0200 Steps & Ramps Works + Place Conc. M3 5 180.00 0.03

Z0U34-0210 Waterproofing Membrane (Over PCC Footings) M2 1,047.00 152.00 6.89

Z0U34-0220 Water Proofing For Neck Column & Wall & Footing M2 2,021.00 152.00 13.30

Z0U34-0230 Waterproofing Membrane (Over PCC Tie-beams) M2 67 152.00 0.44

Page 5 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-0240 Waterproofing Membrane For Tie Beams M2 121 152.00 0.80

Z0U34-0250 50mm Thk. PCC Under Base of Tank M2 77 270.00 0.29

Z0U34-0260 Waterproofing Membrane (Over PCC - Base) M2 82 152.00 0.54

Z0U34-0270 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 176 270.00 0.65

Z0U34-0280 RCC Water Tank Base + Deshuttering Casting M3 38 180.00 0.21

Formworks M2 152.00 12.00 12.67

Rebars kg 6,840.00 250.00 27.36

Deshutterin
M2 152.00 35.00 4.34
g

Page 6 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-0290 RCC Wall W/MEP Pipes & Water Stop + Deshuttering Casting M3 34 81.00 0.42

Formworks M2 136.00 4.00 34.00

Rebars kg 6,120.00 200.00 30.60

Deshutterin
M2 136.00 28.00 4.86
g

Z0U34-0300 RCC Top Slab + Deshuttering for Water Tank Casting M3 8.00 180.00 0.04

Formworks M2 40.00 16.00 2.50

Page 7 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Rebars kg 1,440.00 200.00 7.20

Deshutterin
M2 40.00 32.00 1.25
g

Z0U34-0310 Water Proofing Membrane all around outside surfc M2 172 152.00 1.13

Z0U34-0320 Protection Board all around outside surface M2 172 152.00 1.13

Z0U34-0330 Backfill around Water tank walls M3 6 252.00 0.02

Z0U34-0340 G.R.P. Lining around inside + S.S. Lader & Door M2 221 20.00 11.05

Z0U34-0350 50mm Thk. PCC Under Base of Elevator Shaft M2 14 270.00 0.05

Z0U34-0360 Waterproofing Membrane (Over PCC - Base) M2 15 152.00 0.10

Z0U34-0370 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 32 270.00 0.12

Page 8 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-0380 RCC Elevator Shaft Base + Deshuttering Casting M3 7 180.00 0.04

Formworks M2 28.00 12.00 2.33

Rebars kg 1,260.00 250.00 5.04

Deshutterin
M2 28.00 35.00 0.80
g

Z0U34-0390 RCC Wall W/ MEP Cond. + Deshuttering Casting M3 4 81.00 0.05

Formworks M2 16.00 4.00 4.00

Page 9 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Rebars kg 720.00 200.00 3.60

Deshutterin
M2 16.00 28.00 0.57
g

Z0U34-0400 Water Proofing Membrane all around outside surfc M2 60 152.00 0.39

Z0U34-0410 Protection Board all around outside surface M2 216 152.00 1.42

Z0U34-0420 Backfill around the Lift's Pit wall M3 9.89 252.00 0.04

Z0U34-0430 RCC For Wall/Col. From Top of Grade Slab-1L Casting M3 251 81.00 3.10

Formworks M2 1,004.00 4.00 251.00

Page 10 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Rebars kg 45,180.00 200.00 225.90

Deshutterin
M2 1,004.00 28.00 35.86
g

Z0U34-0440 Columns From Top of Grade Slab-1L (Canopy) Casting M3 1 81.00 0.01

Formworks M2 4.00 4.00 1.00

Rebars kg 180.00 200.00 0.90

Deshutterin
M2 4.00 28.00 0.14
g

Page 11 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-0450 RCC Slab / Beam - 1L Casting M3 231.00 180.00 1.28

Formworks M2 1,155.00 16.00 72.19

Rebars kg 41,580.00 200.00 207.90

Deshutterin
M2 1,155.00 32.00 36.09
g

Z0U34-0460 RCC For Stair/Landings @ G.L. - 1L Casting M3 8 81.00 0.10

Formworks M2 40.00 4.00 10.00

Page 12 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Rebars kg 1,440.00 200.00 7.20

Deshutterin
M2 40.00 28.00 1.43
g

Z0U34-0470 RCC Canopy Casting M3 8.00 180.00 0.04

Formworks M2 40.00 16.00 2.50

Rebars kg 1,440.00 200.00 7.20

Deshutterin
M2 40.00 32.00 1.25
g

Page 13 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-0480 RCC For Wall/Col. From Top of 1L-2L Casting M3 237 81.00 2.93

Formworks M2 948.00 4.00 237.00

Rebars kg 42,660.00 200.00 213.30

Deshutterin
M2 948.00 28.00 33.86
g

Z0U34-0490 RCC Slab / Beam - 2L Casting M3 234.00 180.00 1.30

Formworks M2 1,170.00 16.00 73.13

Page 14 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Rebars kg 42,120.00 200.00 210.60

Deshutterin
M2 1,170.00 32.00 36.56
g

Z0U34-0500 RCC for Stair/Landings @ 1L-2L Casting M3 7 81.00 0.09

Formworks M2 35.00 4.00 8.75

Rebars kg 1,260.00 200.00 6.30

Deshutterin
M2 35.00 28.00 1.25
g

FINISHES

Page 15 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-2710 I. Hollow Block Works + Lintels @ Grnd Flr. M2 1,879.00 10.00 187.90

Z0U34-2720 I. Internal Plaster Accessories & Rush @ GL M2 347.00 48.46 7.16

Z0U34-2730 I. Internal Plaster Works @ GL M2 2,413.00 20.00 120.65

Z0U34-2740 I. Glazed Ceramic Tile @ GL M2 826 12.00 68.83

Z0U34-2750 I. Block Works For Ducts @ Grnd Flr. M2 113 10.00 11.30

Z0U34-2760 I. Install False Ceiling (Susp. + Boarding) @ GL M2 509 7.20 70.69

Z0U34-2770 I. Screed + Ceramic Tiles & Skirtings @ GL M2 1572 12.00 131.00

Z0U34-2780 I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL M2 354 32.00 11.06

Z0U34-2790 I. Water Proofing + Screed on Wet Areas - GL M2 683 64.00 10.67

Page 16 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-2800 I. Frames Installations @ GL Nos. 59 4.80 12.29

Z0U34-2810 I. Doors w/ Ironmongery @ GL Nos. 59 4.80 12.29

Z0U34-2820 I. Frames Installation Works @ GL M2 108 4.80 22.50

Z0U34-2830 I.Aluminum + Glass & Other Associated Works @ GL M2 108 1.60 67.50

Z0U34-2840 I. Kitchen Cabinets @ GL Nos. 14 0.60 23.33

Z0U34-2850 I. Wardrobes @ GL Nos. 17 0.75 22.67

Z0U34-2860 I. Primer Application Works @ GL M2 864.00 54.60 15.82


Z0U34-2870 I. Stucco Application Works @ GL M2 864.00 16.40 52.68
Z0U34-2880 I. Emulsion Paint Works @ GL M2 1,626.00 32.20 50.50

Page 17 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)
Z0U34-2890 O. Plaster Accessories & Rush @ GL M2 52 48.46 1.07

Z0U34-2900 O. Plaster Works @ GL M2 316 20.00 15.80

Z0U34-2910 O. Polished Marble & Ceramic for Wall @ GL M2 37 10.00 3.70

Z0U34-2920 O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr. M2 16 10.00 1.60

Z0U34-2930 O. Gypsum Board +Washable Paint @ GL M2 66 16.00 4.13

Z0U34-2940 O. Semi Recessed G.R.G. Tiles @ GL M2 36 16.00 2.25

Z0U34-2950 O. Sreed + Graniti Tiles & Skirtings @ GL M2 514 12.00 42.83

Z0U34-2960 O. Screed + Polished Marble & Skirtings @ GL M2 148 12.00 12.33

Page 18 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-2970 O. G. Stl, Powdr coated Railin to Staircase @ GL LM 24 20.00 1.20

Z0U34-2980 O. Primer ApplicationWorks @ GL. M2 109 54.60 2.00


Z0U34-2990 O. Stucco Application Works @ GL M2 109 16.40 6.65
Z0U34-3000 O. Emulsion Paint Works @ GL M2 58 32.20 1.80

Z0U34-3010 I. Hollow Block Works + Lintels @ 1st Flr. M2 1,950.00 10.00 195.00

Z0U34-3020 I. Internal Plaster Accessories & Rush @ 1L M2 347.00 48.46 7.16

Z0U34-3030 I. Internal Plaster Works @ 1L M2 2,581.00 20.00 129.05

Z0U34-3040 I. Glazed Ceramic Tile @ 1L M2 735 12.00 61.25

Z0U34-3050 I. Block Works For Ducts @ 1st Flr. M2 93 10.00 9.30

Z0U34-3060 I. Install False Ceiling (Susp. + Boarding) @ 1L M2 476 7.20 66.11

Z0U34-3070 I. Screed + Ceramic Tiles & Skirtings @ 1L M2 1746 12.00 145.50

Page 19 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-3080 I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L M2 269 32.00 8.41

Z0U34-3090 I. Water Proofing + Screed on Wet Areas - 1L M2 683 64.00 10.67

Z0U34-3100 I. Frames Installations @ 1L Nos. 72 4.80 15.00

Z0U34-3110 I. Doors w/ Ironmongery @ 1L Nos. 72 4.80 15.00

Z0U34-3120 I. Frames Installation Works @ GL M2 100 4.80 20.83

Z0U34-3130 I. Aluminum+Glass & Other Associated Works @ 1L M2 100 1.60 62.50

Z0U34-3140 I. Wardrobes @ 1L Nos. 17 0.75 22.67

Page 20 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-3150 I. Kitchen Cabinets @ 1L Nos. 15 0.60 25.00

Z0U34-3160 I. Primer Application Works @ 1L M2 855.00 54.60 15.66


Z0U34-3170 I. Stucco Application Works @ 1L M2 855.00 16.40 52.13
Z0U34-3180 I. Emulsion Paint Works @ 1L M2 1,649.00 32.20 51.21
Z0U34-3190 O. Plaster Accessories & Rush @ 1L M2 52 48.46 1.07

Z0U34-3200 O. Plaster Works @ 1L M2 297 20.00 14.85

Z0U34-3210 O. Polished Marble & Ceramic for Wall @ 1L M2 36 10.00 3.60

Z0U34-3220 O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr. M2 14 10.00 1.40

Z0U34-3230 O. Gypsum Board +Washable Paint @ 1L M2 66 16.00 4.13

Z0U34-3240 O. Semi Recessed G.R.G. Tiles @ 1L M2 36 16.00 2.25

Z0U34-3250 O. Sreed + Graniti Tiles & Skirtings @ 1L M2 425 12.00 35.42

Page 21 of 119
AMSC PRODUCTIVITY RATE
Activity Activity SUB Unit QTY Prod. Rate Days
Item
ID Description ACTIVITY (unit/day)

Z0U34-3260 O. Screed + Polished Marble & Skirtings @ 1L M2 48 12.00 4.00

Z0U34-3270 O. G. Stl, Powdr coated Railin to Staircase @ 1L LM 26 20.00 1.30

Z0U34-3280 O. Primer Application Works @ 1L M2 103 54.60 1.89


Z0U34-3290 O. Stucco Application Works @ 1L M2 103 16.40 6.28
Z0U34-3300 O. Emulsion Paint Works @ 1L M2 58 32.20 1.80

Page 22 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Operator
2.000 1 Helper
0.72 1 0.72

2 Carpenter
3.000 1 Helper
6.32 1 6.32

1 Operator
2.000 1 Helper
4.65 2 2.33

0.75
Operator
8.250 6 Driver
13.25 3 4.42
1.5 Helper

.75
Operator
6.250 4 Driver 5.90 2 2.95
1.5 Helper

1.000 2 Technican 2.82 1 2.82

0.75
Operator
8.250 6 Driver
8.77 7 1.25
1.5 Helper

1.000 2 Technican 0.18 1 0.18

Page 23 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

0.75
Operator
8.250 6 Driver
76.35 3 25.45
1.5 Helper

1.000 2 Technican 4.41 1 4.41

1 Mason
11.000 10 Helper
40.01 2 20.00

1 Mason
11.000 10 Helper
91.50 2 45.75

1 Carpenter
18 Helper
26.000 6 Mason 35.24 1 35.24
1 Steel
Fixer

2 Carpenter
1 Helper .
3.056 056
248.55 4 62.14
Operator

1 Steel
Fixer 1
2.056 Helper . 361.20 3 120.40
056
Operator

2 Carpenter
1 Helper .
3.056 056
85.22 2 42.61
Operator

10

Page 24 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

2 Carpenter
16 Helper
22.000 4 Mason
41.83 1 41.83

2 Carpenter
1 Helper .
3.056 056
470.62 5 94.12
Operator

1 Steel
Fixer 1
2.056 Helper . 284.96 4 71.24
056
Operator

2 Carpenter
1 Helper .
3.056 056
67.23 2 33.62
Operator

12
1 Mason
11.000 10 Helper
2.57 2 1.28

1 Mason
11.000 10 Helper
5.87 2 2.93

1 Carpenter
16 Helper
22.000 4 Mason 4.03 1 4.03
1 Steel
Fixer

Page 25 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

2 Carpenter
1 Helper .
3.056 056
100.85 4 25.21
Operator

1 Steel
Fixer 1
2.056 Helper . 48.85 3 16.28
056
Operator

2 Carpenter
1 Helper .
3.056 056
14.41 2 7.20
Operator

10

1 Carpenter
16 Helper
22.000 4 Mason 0.12 1 0.12
1 Steel
Fixer

2 Carpenter
1 Helper .
3.056 056
3.06 1 3.06
Operator

1 Steel
Fixer 1
2.056 Helper . 1.48 1 1.48
056
Operator

Page 26 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

2 Carpenter
1 Helper .
3.056 056
0.44 1 0.44
Operator

4
1 Mason
11.000 10 Helper
62.62 2 31.31

1 Carpenter
18 Helper
26.000 6 Mason 30.04 3 10.01
1 Steel
Fixer

1 Mason
11.000 10 Helper
0.41 2 0.20

1 Carpenter
18 Helper
26.000 6 Mason 0.72 8 0.09
1 Steel
Fixer

4
6.000 Waterproofe 41.33 2 20.66
r 2 Helper

4
6.000 Waterproofe 79.78 3 26.59
r 2 Helper

4
6.000 Waterproofe 2.64 2 1.32
r 2 Helper

Page 27 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

4
6.000 Waterproofe 4.78 3 1.59
r 2 Helper

1 Mason
11.000 10 Helper
3.14 1 3.14

4
6.000 Waterproofe 3.24 1 3.24
r 2 Helper

1 Mason
11.000 10 Helper
7.17 1 7.17

1 Carpenter
18 Helper
26.000 6 Mason 5.49 1 5.49
1 Steel
Fixer

2 Carpenter
1 Helper .
3.056 056
38.71 1 38.71
Operator

1 Steel
Fixer 1
2.056 Helper . 56.25 1 56.25
056
Operator

2 Carpenter
1 Helper .
3.056 056
13.27 1 13.27
Operator

Page 28 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

2 Carpenter
16 Helper
22.000 4 Mason
9.23 1 9.23

2 Carpenter
1 Helper .
3.056 056
103.90 2 51.95
Operator

1 Steel
Fixer 1
2.056 Helper . 62.91 1 62.91
056
Operator

2 Carpenter
1 Helper .
3.056 056
14.84 1 14.84
Operator

1 Carpenter
18 Helper
26.000 6 Mason 1.16 1 1.16
1 Steel
Fixer

2 Carpenter
1 Helper .
3.056 056
7.64 2 3.82
Operator

Page 29 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Steel
Fixer 1
2.056 Helper . 14.80 1 14.80
056
Operator

2 Carpenter
1 Helper .
3.056 056
3.82 1 3.82
Operator

4
6.000 Waterproofe 6.79 2 3.39
r 2 Helper

4
6.000 Waterproofe 6.79 2 3.39
r 2 Helper

0.75
Operator
8.250 6 Driver
0.20 3 0.07
1.5 Helper

1 Mason
2.000 1 Helper
22.10 3 7.37

1 Mason
11.000 10 Helper
0.57 1 0.57

4
6.000 Waterproofe 0.59 1 0.59
r 2 Helper

1 Mason
11.000 10 Helper
1.30 1 1.30

Page 30 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Carpenter
18 Helper
26.000 6 Mason 1.01 1 1.01
1 Steel
Fixer

2 Carpenter
1 Helper .
3.056 056
7.13 1 7.13
Operator

1 Steel
Fixer 1
2.056 Helper . 10.36 1 10.36
056
Operator

2 Carpenter
1 Helper .
3.056 056
2.44 1 2.44
Operator

4
2 Carpenter
16 Helper
22.000 4 Mason
1.09 1 1.09

2 Carpenter
1 Helper .
3.056 056
12.22 2 6.11
Operator

Page 31 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Steel
Fixer 1
2.056 Helper . 7.40 1 7.40
056
Operator

2 Carpenter
1 Helper .
3.056 056
1.75 1 1.75
Operator

4
6.000 Waterproofe 2.37 3 0.79
r 2 Helper

4
6.000 Waterproofe 8.53 2 4.26
r 2 Helper

0.75
Operator
8.250 6 Driver
0.32 3 0.11
1.5 Helper

2 Carpenter
16 Helper
22.000 4 Mason
68.17 1 68.17

2 Carpenter
1 Helper .
3.056 056
767.06 5 153.41
Operator

Page 32 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Steel
Fixer 1
2.056 Helper . 464.45 4 116.11
056
Operator

2 Carpenter
1 Helper .
3.056 056
109.58 2 54.79
Operator

12
2 Carpenter
16 Helper
22.000 4 Mason
0.27 1 0.27

2 Carpenter
1 Helper .
3.056 056
3.06 2 1.53
Operator

1 Steel
Fixer 1
2.056 Helper . 1.85 2 0.93
056
Operator

2 Carpenter
1 Helper .
3.056 056
0.44 1 0.44
Operator

Page 33 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Carpenter
18 Helper
26.000 6 Mason 33.37 1 33.37
1 Steel
Fixer

2 Carpenter
1 Helper .
3.056 056
220.61 6 36.77
Operator

1 Steel
Fixer 1
2.056 Helper . 427.44 5 85.49
056
Operator

2 Carpenter
1 Helper .
3.056 056
110.30 2 55.15
Operator

14
2 Carpenter
16 Helper
22.000 4 Mason
2.17 1 2.17

2 Carpenter
1 Helper .
3.056 056
30.56 4 7.64
Operator

Page 34 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Steel
Fixer 1
2.056 Helper . 14.80 3 4.93
056
Operator

2 Carpenter
1 Helper .
3.056 056
4.37 2 2.18
Operator

10

1 Carpenter
18 Helper
26.000 6 Mason 1.16 1 1.16
1 Steel
Fixer

2 Carpenter
1 Helper .
3.056 056
7.64 4 1.91
Operator

1 Steel
Fixer 1
2.056 Helper . 14.80 3 4.93
056
Operator

2 Carpenter
1 Helper .
3.056 056
3.82 1 3.82
Operator

Page 35 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

2 Carpenter
16 Helper
22.000 4 Mason
64.37 1 64.37

2 Carpenter
1 Helper .
3.056 056
724.27 5 144.85
Operator

1 Steel
Fixer 1
2.056 Helper . 438.54 4 109.64
056
Operator

2 Carpenter
1 Helper .
3.056 056
103.47 2 51.73
Operator

12

1 Carpenter
18 Helper
26.000 6 Mason 33.80 1 33.80
1 Steel
Fixer

2 Carpenter
1 Helper .
3.056 056
223.47 6 37.25
Operator

Page 36 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Steel
Fixer 1
2.056 Helper . 432.99 5 86.60
056
Operator

2 Carpenter
1 Helper .
3.056 056
111.74 2 55.87
Operator

14
2 Carpenter
16 Helper
22.000 4 Mason
1.90 1 1.90

2 Carpenter
1 Helper .
3.056 056
26.74 4 6.69
Operator

1 Steel
Fixer 1
2.056 Helper . 12.95 3 4.32
056
Operator

2 Carpenter
1 Helper .
3.056 056
3.82 2 1.91
Operator

Page 37 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Mason
1 Helper .
2.056 056 386.32 14 27.59
Operator

1 Mason
2.000 1 Helper 14.32 7 2.05

1 Mason
2.000 1 Helper 241.30 12 20.11

1 Mason
1 Helper .
2.056 056 141.52 14 10.11
Operator

1 Mason
1 Helper .
2.056 056 23.23 2 11.62
Operator

1 Carpenter
1 Helper .
2.056 056 145.35 14 10.38
Operator

1 Mason
1 Helper .
2.056 056 269.34 14 19.24
Operator

1 Mason
1 Helper .
2.056 056 22.74 14 1.62
Operator

4Waterproof
6.000 er 64.03 10 6.40
2 Helper

Page 38 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Carpenter
1 Helper .
2.056 056 25.27 14 1.81
Operator

1 Carpenter
1 Helper .
2.056 056 25.27 12 2.11
Operator

1 Carpenter
1 Helper .
2.056 056 46.26 14 3.30
Operator

1 Alum.
Tech 1
2.056 Helper . 138.78 12 11.57
056
Operator

1 Carpenter
1 Helper .
2.056 056 47.97 14 3.43
Operator

1 Carpenter
1 Helper .
2.056 056 46.60 14 3.33
Operator

1.000 1 Painter 15.82 10 1.58


1.000 1 Painter 52.68 14 3.76
1.000 1 Painter 50.50 12 4.21

Page 39 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Mason
2.000 1 Helper 2.15 7 0.31

1 Mason
2.000 1 Helper 31.60 12 2.63

1 Mason
1 Helper .
2.056 056 7.61 14 0.54
Operator

1 Mason
1 Helper .
2.056 056 3.29 2 1.64
Operator

1 Carpenter
1 Helper .
2.056 056 8.48 14 0.61
Operator

1 Carpenter
1 Helper .
2.056 056 4.63 14 0.33
Operator

1 Mason
1 Helper .
2.056 056 88.07 14 6.29
Operator

1 Mason
1 Helper .
2.056 056 25.36 14 1.81
Operator

Page 40 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Alum.
Tech 1
2.056 Helper . 2.47 10 0.25
056
Operator

1.000 1 Painter 2.00 8 0.25


1.000 1 Painter 6.65 12 0.55
1.000 1 Painter 1.80 10 0.18
1 Mason
1 Helper .
2.056 056 400.92 14 28.64
Operator

1 Mason
2.000 1 Helper 14.32 7 2.05

1 Mason
2.000 1 Helper 258.10 12 21.51

1 Mason
1 Helper .
2.056 056 125.93 14 9.00
Operator

1 Mason
1 Helper .
2.056 056 19.12 2 9.56
Operator

1 Carpenter
1 Helper .
2.056 056 135.92 14 9.71
Operator

1 Mason
1 Helper .
2.056 056 299.15 14 21.37
Operator

Page 41 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Mason
1 Helper .
2.056 056 17.28 8 2.16
Operator

4Waterproof
6.000 er 64.03 10 6.40
2 Helper

1 Carpenter
1 Helper .
2.056 056 30.84 14 2.20
Operator

1 Carpenter
1 Helper .
2.056 056 30.84 12 2.57
Operator

1 Carpenter
1 Helper .
2.056 056 42.83 14 3.06
Operator

1 Alum.
Tech 1
2.056 Helper . 128.50 12 10.71
056
Operator

1 Carpenter
1 Helper .
2.056 056 46.60 14 3.33
Operator

Page 42 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Carpenter
1 Helper .
2.056 056 51.40 14 3.67
Operator

1.000 1 Painter 15.66 12 1.30


1.000 1 Painter 52.13 14 3.72
1.000 1 Painter 51.21 14 3.66
1 Mason
2.000 1 Helper 2.15 7 0.31

1 Mason
2.000 1 Helper 29.70 12 2.48

1 Mason
1 Helper .
2.056 056 7.40 14 0.53
Operator

1 Mason
1 Helper .
2.056 056 2.88 2 1.44
Operator

1 Carpenter
1 Helper .
2.056 056 8.48 14 0.61
Operator

1 Carpenter
1 Helper .
2.056 056 4.63 14 0.33
Operator

1 Mason
1 Helper .
2.056 056 72.82 14 5.20
Operator

Page 43 of 119
RODUCTIVITY RATE
Crew Tot. M- Manpower
Tot. Man OD (O)
Desc. days /day

1 Mason
1 Helper .
2.056 056 8.22 14 0.59
Operator

1 Alum.
Tech 1
2.056 Helper . 2.67 10 0.27
056
Operator

1.000 1 Painter 1.89 8 0.24


1.000 1 Painter 6.28 10 0.63
1.000 1 Painter 1.80 12 0.15

Page 44 of 119
Tot.
Tot. M-days Manpower/da Eqmt Tot. E-
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) Tot. Man (I) Crew Desc. OD (O) M A N - D A Y S Eqmt E Q M T - D A Y S
(K) y Desc. days (Z)
(X)
Item
Steel Operato Techni Alum. Waterpr Dump B. S. M. Excavat Tower
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason Helper Driver Painter (H x I) Dozer Shovel B. Cat Vibrator
Fixer r cian Tech oofer T. Roller Roller Crane or Crane

SITEWORKS
1 Operator 1
Z0U34-0000 Site Clearing M2 1,502.00 4,200.00 0.36 2.000 0.72 1 0.72 0.36 0.36 1.000 1 Dozer 0.36 0.36
Helper
2 Carpenter 1
Z0U34-0010 Setting-out / Layout M 160.08 76.00 2.11 3.000 6.32 1 6.32 4.21 2.11
Helper
SUBSTRUCTURE
1 Operator 1
Z0U34-0020 Excavation for footings + Disposal of Materials For Excavation M3 953.00 409.50 2.33 2.000 4.65 2 2.33 0.47 0.47 1.000 1 Dozer 2.33 0.47
Helper
0.75 Operator 6
0.75 Shovel
For Disposal M3 555.00 345.60 1.61 8.250 Driver 1.5 13.25 3 4.42 0.48 0.24 1.93 6.750 10.84 0.24 1.93
6 D. Truck
Helper
5 - - - 0.95 0.71 1.93 - - - - 0.47 0.24 1.93 - - - - - - -

0.5 Shovel
.75 Operator 4
4 D. Truck
Z0U34-0030 Formation Level & Compaction M3 238 252.00 0.94 6.250 Driver 1.5 5.90 2 2.95 0.71 0.35 1.89 4.750 4.49 0.24 1.89 0.12
.25 B.
Helper
Roller

Z0U34-0040 Anti-Termite Applications (Under PCC Footings) M2 571 202.50 2.82 1.000 2 Technican 2.82 1 2.82 2.82

0.5 Shovel
0.75 Operator
6 D. Truck
Z0U34-0050 Backfill & Compaction upto bot. of PCC Tie-Beam M3 268 252.00 1.06 8.250 6 Driver 1.5 8.77 7 1.25 0.23 0.11 0.91 6.750 7.18 0.11 0.86 0.05
.25 B.
Helper
Roller

Z0U34-0060 Anti-Termite Applications (Under PCC Tie-Beam) M2 37 202.50 0.18 1.000 2 Technican 0.18 1 0.18 0.18

0.5 Shovel
0.75 Operator 6
6 D. Truck
Z0U34-0070 Backfill & Compaction up to bot of PCC Grd. Slab M3 2,332.00 252.00 9.25 8.250 Driver 1.5 76.35 3 25.45 4.63 2.31 18.51 6.750 62.46 2.19 17.53 1.10
.25 B.
Helper
Roller

Z0U34-0080 Anti-Termite Applications (Under PCC Grade Slab) M2 894 202.50 4.41 1.000 2 Technican 4.41 1 4.41 4.41
1 Mason 10
Z0U34-0090 Shutters + 50mm Thk. PCC Under Footings M2 982 270.00 3.64 11.000 40.01 2 20.00 1.82 18.19
Helper
1 Mason 10
Z0U34-0100 50mm Protection Screed (Over W.P. Membrane-Ftg.) M2 2,246.00 270.00 8.32 11.000 91.50 2 45.75 4.16 41.59
Helper
1 Carpenter
18 Helper 6
Z0U34-0110 RCC For Footings Casting M3 244 180.00 1.36 26.000 35.24 1 35.24 0.500 .5 Vibrator 0.68 0.07
Mason 1
Steel Fixer
2 Carpenter 1
.056 M.
Formworks M2 976.00 12.00 81.33 3.056 Helper .056 248.55 4 62.14 16.27 8.13 0.46 0.056 4.55 0.46
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 43,920.00 250.00 175.68 2.056 Helper .056 361.20 3 120.40 17.57 17.57 0.98 0.056 9.84 0.98
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 976.00 35.00 27.89 3.056 Helper .056 85.22 2 42.61 5.58 2.79 0.16 0.056 1.56 0.16
Crane
Operator
10 21.84 - 17.57 28.49 1.60 - - - - - - - - - - - 1.60 0.07 - -
2 Carpenter 16
Z0U34-0120 RCC Necks Columns / Walls + MEP Sleeves Casting M3 154 81.00 1.90 22.000 Helper 4 41.83 1 41.83 1.000 1 Vibrator 1.90 0.16
Mason
2 Carpenter 1
.056 M.
Formworks M2 616.00 4.00 154.00 3.056 Helper .056 470.62 5 94.12 25.67 12.83 0.72 0.056 8.62 0.72
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 27,720.00 200.00 138.60 2.056 Helper .056 284.96 4 71.24 11.55 11.55 0.65 0.056 7.76 0.65
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 616.00 28.00 22.00 3.056 Helper .056 67.23 2 33.62 3.67 1.83 0.10 0.056 1.23 0.10
Crane
Operator
12 29.33 - 11.55 26.22 1.47 - - - - - - - - - - - 1.47 0.16 - -
1 Mason 10
Z0U34-0130 Shutters + 50mm Thk. PCC Under Tie-Beams M2 63 270.00 0.23 11.000 2.57 2 1.28 0.12 1.17
Helper
1 Mason 10
Z0U34-0140 50mm Screed (Over W.P. Membrane-T.B.) M2 144 270.00 0.53 11.000 5.87 2 2.93 0.27 2.67
Helper
1 Carpenter
16 Helper 4
Z0U34-0150 RCC Tie Beams + MEP Sleeves Casting M3 33 180.00 0.18 22.000 4.03 1 4.03 0.500 .5 Vibrator 0.09 0.01
Mason 1
Steel Fixer
2 Carpenter 1
.056 M.
Formworks M2 132.00 4.00 33.00 3.056 Helper .056 100.85 4 25.21 6.60 3.30 0.18 0.056 1.85 0.18
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 5,940.00 250.00 23.76 2.056 Helper .056 48.85 3 16.28 2.38 2.38 0.13 0.056 1.33 0.13
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 132.00 28.00 4.71 3.056 Helper .056 14.41 2 7.20 0.94 0.47 0.03 0.056 0.26 0.03
Crane
Operator
10 7.54 - 2.38 6.15 0.34 - - - - - - - - - - - 0.34 0.01 - -
1 Carpenter 16
Helper 4
Z0U34-0160 RCC Kickers Over Tie-Beam Casting M3 1 180.00 0.01 22.000 0.12 1 0.12 0.500 .5 Vibrator 0.00 0.001
Mason 1
Steel Fixer
2 Carpenter 1
.056 M.
Formworks M2 4.00 4.00 1.00 3.056 Helper .056 3.06 1 3.06 0.50 0.25 0.01 0.056 0.06 0.01
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 180.00 250.00 0.72 2.056 Helper .056 1.48 1 1.48 0.18 0.18 0.01 0.056 0.04 0.01
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 4.00 28.00 0.14 3.056 Helper .056 0.44 1 0.44 0.07 0.04 0.00 0.056 0.01 0.00
Crane
Operator
4 0.57 - 0.18 0.47 0.03 0.02608 0.00069
1 Mason 10
Z0U34-0170 50mm Thk. PCC Under Grade Slab M2 1,537.00 270.00 5.69 11.000 62.62 2 31.31 2.85 28.46
Helper
1 Carpenter
18 Helper 6
Z0U34-0180 Mesh + Filler Board & RCC For Grade Slab M3 208 180.00 1.16 26.000 30.04 3 10.01 0.39 2.31 0.39 6.93 1.000 1 Vibrator 1.16 0.39
Mason 1
Steel Fixer
1 Mason 10
Z0U34-0190 50mm Thk. PCC Steps & Ramps M2 10 270.00 0.04 11.000 0.41 2 0.20 0.02 0.19
Helper
1 Carpenter 18
Helper 6
Z0U34-0200 Steps & Ramps Works + Place Conc. M3 5 180.00 0.03 26.000 0.72 8 0.09 0.01 0.02 0.00 0.06 1.000 1 Vibrator 0.03 0.01
Mason 1
Steel Fixer
4 Waterproofer 2
Z0U34-0210 Waterproofing Membrane (Over PCC Footings) M2 1,047.00 152.00 6.89 6.000 41.33 2 20.66 6.89 13.78 -
Helper
4 Waterproofer 2
Z0U34-0220 Water Proofing For Neck Column & Wall & Footing M2 2,021.00 152.00 13.30 6.000 79.78 3 26.59 8.86 17.73 -
Helper
4 Waterproofer 2
Z0U34-0230 Waterproofing Membrane (Over PCC Tie-beams) M2 67 152.00 0.44 6.000 2.64 2 1.32 0.44 0.88 -
Helper
4 Waterproofer 2
Z0U34-0240 Waterproofing Membrane For Tie Beams M2 121 152.00 0.80 6.000 4.78 3 1.59 0.53 1.06 -
Helper
1 Mason 10
Z0U34-0250 50mm Thk. PCC Under Base of Tank M2 77 270.00 0.29 11.000 3.14 1 3.14 0.29 2.85 -
Helper
4 Waterproofer 2
Z0U34-0260 Waterproofing Membrane (Over PCC - Base) M2 82 152.00 0.54 6.000 3.24 1 3.24 1.08 2.16 -
Helper
1 Mason 10
Z0U34-0270 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 176 270.00 0.65 11.000 7.17 1 7.17 0.65 6.52 -
Helper
1 Carpenter 18
Helper 6
Z0U34-0280 RCC Water Tank Base + Deshuttering Casting M3 38 180.00 0.21 26.000 5.49 1 5.49 0.500 .5 Vibrator 0.11 0.03
Mason 1
Steel Fixer
2 Carpenter
.056 M.
Formworks M2 152.00 12.00 12.67 3.056 1 Helper .056 38.71 1 38.71 6.33 3.17 0.18 0.056 0.71 0.18
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 6,840.00 250.00 27.36 2.056 Helper .056 56.25 1 56.25 6.84 6.84 0.38 0.056 1.53 0.38
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 152.00 35.00 4.34 3.056 Helper .056 13.27 1 13.27 2.17 1.09 0.06 0.056 0.24 0.06
Crane
Operator
4 8.50 - 6.84 11.09 0.62 - - - - - - - - - - - 0.62 0.03 - -
2 Carpenter 16
Z0U34-0290 RCC Wall W/MEP Pipes & Water Stop + Deshuttering Casting M3 34 81.00 0.42 22.000 Helper 4 9.23 1 9.23 1.000 1 Vibrator 0.42 0.08
Mason
2 Carpenter 1
.056 M.
Formworks M2 136.00 4.00 34.00 3.056 Helper .056 103.90 2 51.95 13.60 6.80 0.38 0.056 1.90 0.38
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 6,120.00 200.00 30.60 2.056 Helper .056 62.91 1 62.91 6.12 6.12 0.34 0.056 1.71 0.34
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 136.00 28.00 4.86 3.056 Helper .056 14.84 1 14.84 1.94 0.97 0.05 0.056 0.27 0.05
Crane
Operator
5 15.54 - 6.12 13.89 0.78 - - - - - - - - - - - 0.78 0.08 - -
1 Carpenter 18
Helper 6
Z0U34-0300 RCC Top Slab + Deshuttering for Water Tank Casting M3 8.00 180.00 0.04 26.000 1.16 1 1.16 1.000 1 Vibrator 0.04 0.01
Mason 1
Steel Fixer
2 Carpenter 1
.056 M.
Formworks M2 40.00 16.00 2.50 3.056 Helper .056 7.64 2 3.82 1.00 0.50 0.03 0.056 0.14 0.03
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 1,440.00 200.00 7.20 2.056 Helper .056 14.80 1 14.80 1.44 1.44 0.08 0.056 0.40 0.08
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 40.00 32.00 1.25 3.056 Helper .056 3.82 1 3.82 0.50 0.25 0.01 0.056 0.07 0.01
Crane
Operator
5 1.50 - 1.44 2.19 0.12 - - - - - - - - - - - 0.12 0.01 - -
4 Waterproofer 2
Z0U34-0310 Water Proofing Membrane all around outside surfc M2 172 152.00 1.13 6.000 6.79 2 3.39 1.13 2.26 -
Helper
4 Waterproofer 2
Z0U34-0320 Protection Board all around outside surface M2 172 152.00 1.13 6.000 6.79 2 3.39 1.13 2.26 -
Helper

0.5 Shovel
0.75 Operator 6
6 D. Truck
Z0U34-0330 Backfill around Water tank walls M3 6 252.00 0.02 8.250 Driver 1.5 0.20 3 0.07 0.01 0.01 0.05 6.750 0.16 0.01 0.05 0.00
.25 B.
Helper
Roller

1 Mason 1
Z0U34-0340 G.R.P. Lining around inside + S.S. Lader & Door M2 221 20.00 11.05 2.000 22.10 3 7.37 3.68 3.68
Helper
1 Mason 10
Z0U34-0350 50mm Thk. PCC Under Base of Elevator Shaft M2 14 270.00 0.05 11.000 0.57 1 0.57 0.05 0.52 -
Helper
4 Waterproofer 2
Z0U34-0360 Waterproofing Membrane (Over PCC - Base) M2 15 152.00 0.10 6.000 0.59 1 0.59 0.20 0.39 -
Helper
1 Mason 10
Z0U34-0370 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 32 270.00 0.12 11.000 1.30 1 1.30 0.12 1.19 -
Helper
1 Carpenter 18
Helper 6
Z0U34-0380 RCC Elevator Shaft Base + Deshuttering Casting M3 7 180.00 0.04 26.000 1.01 1 1.01 0.500 .5 Vibrator 0.02 0.00
Mason 1
Steel Fixer
2 Carpenter 1
.056 M.
Formworks M2 28.00 12.00 2.33 3.056 Helper .056 7.13 1 7.13 1.17 0.58 0.03 0.056 0.13 0.03
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 1,260.00 250.00 5.04 2.056 Helper .056 10.36 1 10.36 1.26 1.26 0.07 0.056 0.28 0.07
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 28.00 35.00 0.80 3.056 Helper .056 2.44 1 2.44 0.40 0.20 0.01 0.056 0.04 0.01
Crane
Operator
4 1.57 - 1.26 2.04 0.11 - - - - - - - - - - - 0.11 0.00 - -
2 Carpenter 16
Z0U34-0390 RCC Wall W/ MEP Cond. + Deshuttering Casting M3 4 81.00 0.05 22.000 Helper 4 1.09 1 1.09 1.000 1 Vibrator 0.05 0.01
Mason
2 Carpenter 1
.056 M.
Formworks M2 16.00 4.00 4.00 3.056 Helper .056 12.22 2 6.11 1.60 0.80 0.04 0.056 0.22 0.04
Crane
Operator
1 Steel Fixer
.056 M.
Rebars kg 720.00 200.00 3.60 2.056 1 Helper .056 7.40 1 7.40 0.72 0.72 0.04 0.056 0.20 0.04
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 16.00 28.00 0.57 3.056 Helper .056 1.75 1 1.75 0.23 0.11 0.01 0.056 0.03 0.01
Crane
Operator
Tot.
Tot. M-days Manpower/da Eqmt Tot. E-
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) Tot. Man (I) Crew Desc. OD (O) M A N - D A Y S Eqmt E Q M T - D A Y S
(K) y Desc. days (Z)
(X)
Item
Steel Operato Techni Alum. Waterpr Dump B. S. M. Excavat Tower
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason Helper Driver Painter (H x I) Dozer Shovel B. Cat Vibrator
Fixer r cian Tech oofer T. Roller Roller Crane or Crane

5 1.83 - 0.72 1.63 0.09 - - - - - - - - - - - 0.09 0.01 - -


4 Waterproofer 2
Z0U34-0400 Water Proofing Membrane all around outside surfc M2 60 152.00 0.39 6.000 2.37 3 0.79 0.26 0.53 -
Helper
4 Waterproofer 2
Z0U34-0410 Protection Board all around outside surface M2 216 152.00 1.42 6.000 8.53 2 4.26 1.42 2.84 -
Helper

0.5 Shovel
0.75 Operator
6 D. Truck
Z0U34-0420 Backfill around the Lift's Pit wall M3 9.89 252.00 0.04 8.250 6 Driver 1.5 0.32 3 0.11 0.02 0.01 0.08 6.750 0.26 0.01 0.07 0.00
.25 B.
Helper
Roller

2 Carpenter 16
Z0U34-0430 RCC For Wall/Col. From Top of Grade Slab-1L Casting M3 251 81.00 3.10 22.000 Helper 4 68.17 1 68.17 1.000 1 Vibrator 3.10 0.26
Mason
2 Carpenter 1
.056 M.
Formworks M2 1,004.00 4.00 251.00 3.056 Helper .056 767.06 5 153.41 41.83 20.92 1.17 0.056 14.06 1.17
Crane
Operator
1 Steel Fixer
.056 M.
Rebars kg 45,180.00 200.00 225.90 2.056 1 Helper .056 464.45 4 116.11 18.83 18.83 1.05 0.056 12.65 1.05
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 1,004.00 28.00 35.86 3.056 Helper .056 109.58 2 54.79 5.98 2.99 0.17 0.056 2.01 0.17
Crane
Operator
12 47.81 - 18.83 42.73 2.39 - - - - - - - - - - - 2.39 0.26 - -
2 Carpenter 16
Z0U34-0440 Columns From Top of Grade Slab-1L (Canopy) Casting M3 1 81.00 0.01 22.000 Helper 4 0.27 1 0.27 1.000 1 Vibrator 0.01 0.00
Mason
2 Carpenter 1
.056 M.
Formworks M2 4.00 4.00 1.00 3.056 Helper .056 3.06 2 1.53 0.33 0.17 0.01 0.056 0.06 0.01
Crane
Operator
1 Steel Fixer
.056 M.
Rebars kg 180.00 200.00 0.90 2.056 1 Helper .056 1.85 2 0.93 0.15 0.15 0.01 0.056 0.05 0.01
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 4.00 28.00 0.14 3.056 Helper .056 0.44 1 0.44 0.05 0.02 0.00 0.056 0.01 0.00
Crane
Operator
6 0.38 - 0.15 0.34 0.02 - - - - - - - - - - - 0.02 0.00 - -
1 Carpenter 18
Helper 6
Z0U34-0450 RCC Slab / Beam - 1L Casting M3 231.00 180.00 1.28 26.000 33.37 1 33.37 1.000 1 Vibrator 1.28 0.09
Mason 1
Steel Fixer
2 Carpenter 1
.056 M.
Formworks M2 1,155.00 16.00 72.19 3.056 Helper .056 220.61 6 36.77 10.31 5.16 0.29 0.056 4.04 0.29
Crane
Operator
1 Steel Fixer
.056 M.
Rebars kg 41,580.00 200.00 207.90 2.056 1 Helper .056 427.44 5 85.49 14.85 14.85 0.83 0.056 11.64 0.83
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 1,155.00 32.00 36.09 3.056 Helper .056 110.30 2 55.15 5.16 2.58 0.14 0.056 2.02 0.14
Crane
Operator
14 15.47 - 14.85 22.58 1.26 - - - - - - - - - - - 1.26 0.09 - -
2 Carpenter 16
Z0U34-0460 RCC For Stair/Landings @ G.L. - 1L Casting M3 8 81.00 0.10 22.000 Helper 4 Mason 2.17 1 2.17 1.000 1 Vibrator 0.10 0.01

2 Carpenter 1
.056 M.
Formworks M2 40.00 4.00 10.00 3.056 Helper .056 30.56 4 7.64 2.00 1.00 0.06 0.056 0.56 0.06
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 1,440.00 200.00 7.20 2.056 Helper .056 14.80 3 4.93 0.72 0.72 0.04 0.056 0.40 0.04
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 40.00 28.00 1.43 3.056 Helper .056 4.37 2 2.18 0.29 0.14 0.01 0.056 0.08 0.01
Crane
Operator
10 2.29 - 0.72 1.86 0.10 - - - - - - - - - - - 0.10 0.01 - -

1 Carpenter 18
Z0U34-0470 RCC Canopy Casting M3 8.00 180.00 0.04 26.000 Helper 6 Mason 1.16 1 1.16 1.000 1 Vibrator 0.04 0.00
1 Steel Fixer

2 Carpenter 1
.056 M.
Formworks M2 40.00 16.00 2.50 3.056 Helper .056 7.64 4 1.91 0.56 0.28 0.02 0.056 0.14 0.02
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 1,440.00 200.00 7.20 2.056 Helper .056 14.80 3 4.93 0.80 0.80 0.04 0.056 0.40 0.04
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 40.00 32.00 1.25 3.056 Helper .056 3.82 1 3.82 0.28 0.14 0.01 0.056 0.07 0.01
Crane
Operator
9 0.83 - 0.80 1.22 0.07 - - - - - - - - - - - 0.07 0.00 - -
2 Carpenter 16
Z0U34-0480 RCC For Wall/Col. From Top of 1L-2L Casting M3 237 81.00 2.93 22.000 Helper 4 Mason 64.37 1 64.37 1.000 1 Vibrator 2.93 0.24

2 Carpenter 1
.056 M.
Formworks M2 948.00 4.00 237.00 3.056 Helper .056 724.27 5 144.85 39.50 19.75 1.11 0.056 13.27 1.11
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 42,660.00 200.00 213.30 2.056 Helper .056 438.54 4 109.64 17.78 17.78 1.00 0.056 11.94 1.00
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 948.00 28.00 33.86 3.056 Helper .056 103.47 2 51.73 5.64 2.82 0.16 0.056 1.90 0.16
Crane
Operator
12 45.14 - 17.78 40.35 2.26 - - - - - - - - - - - 2.26 0.24 - -

1 Carpenter 18
Z0U34-0490 RCC Slab / Beam - 2L Casting M3 234.00 180.00 1.30 26.000 Helper 6 Mason 33.80 1 33.80 1.000 1 Vibrator 1.30 0.09
1 Steel Fixer

2 Carpenter 1
.056 M.
Formworks M2 1,170.00 16.00 73.13 3.056 Helper .056 223.47 6 37.25 10.45 5.22 0.29 0.056 4.10 0.29
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 42,120.00 200.00 210.60 2.056 Helper .056 432.99 5 86.60 15.04 15.04 0.84 0.056 11.79 0.84
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 1,170.00 32.00 36.56 3.056 Helper .056 111.74 2 55.87 5.22 2.61 0.15 0.056 2.05 0.15
Crane
Operator
14 15.67 - 15.04 22.88 1.28 - - - - - - - - - - - 1.28 0.09 - -
2 Carpenter 16
Z0U34-0500 RCC for Stair/Landings @ 1L-2L Casting M3 7 81.00 0.09 22.000 Helper 4 Mason 1.90 1 1.90 1.000 1 Vibrator 0.09 0.01

2 Carpenter 1
.056 M.
Formworks M2 35.00 4.00 8.75 3.056 Helper .056 26.74 4 6.69 1.75 0.88 0.05 0.056 0.49 0.05
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 1,260.00 200.00 6.30 2.056 Helper .056 12.95 3 4.32 0.63 0.63 0.04 0.056 0.35 0.04
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 35.00 28.00 1.25 3.056 Helper .056 3.82 2 1.91 0.25 0.13 0.01 0.056 0.07 0.01
Crane
Operator
10 2.00 - 0.63 1.63 0.09 - - - - - - - - - - - 0.09 0.01 - -
Z0U34-0510 RCC For Wall/Col. From Top of 2L-3L M3 237 12
Z0U34-0520 RCC Slab / Beam - 3L M3 234 14
Z0U34-0530 RCC For Stair/Landings @ 2L-3L M3 7 10
2 Carpenter 16
Z0U34-0540 RCC For Wall/Col. From Top of 3L-4L Casting M3 236 81.00 2.91 22.000 Helper 4 Mason 64.10 1 64.10 1.000 1 Vibrator 2.91 0.24

2 Carpenter 1
.056 M.
Formworks M2 944.00 4.00 236.00 3.056 Helper .056 721.22 5 144.24 39.33 19.67 1.10 0.056 13.22 1.10
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 42,480.00 200.00 212.40 2.056 Helper .056 436.69 4 109.17 17.70 17.70 0.99 0.056 11.89 0.99
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 944.00 28.00 33.71 3.056 Helper .056 103.03 2 51.52 5.62 2.81 0.16 0.056 1.89 0.16
Crane
Operator
12 44.95 - 17.70 40.18 2.25 - - - - - - - - - - - 2.25 0.24 - -

1 Carpenter 18
Z0U34-0550 RCC Slab / Beam - 4L Casting M3 237.00 180.00 1.32 26.000 Helper 6 Mason 34.23 1 34.23 1.000 1 Vibrator 1.32 0.09
1 Steel Fixer

2 Carpenter 1
.056 M.
Formworks M2 1,185.00 16.00 74.06 3.056 Helper .056 226.34 6 37.72 10.58 5.29 0.30 0.056 4.15 0.30
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 42,660.00 200.00 213.30 2.056 Helper .056 438.54 5 87.71 15.24 15.24 0.85 0.056 11.94 0.85
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 1,185.00 32.00 37.03 3.056 Helper .056 113.17 2 56.58 5.29 2.65 0.15 0.056 2.07 0.15
Crane
Operator
14 15.87 - 15.24 23.17 1.30 - - - - - - - - - - - 1.30 0.09 - -
Z0U34-0560 RCC For Stair/Landings @ 3L-4L M3 7 10
2 Carpenter 16
Z0U34-0570 RCC For Wall/Col. From Top of 4L-RoofL Casting M3 148 81.00 1.83 22.000 Helper 4 Mason 40.20 1 40.20 1.000 1 Vibrator 1.83 0.18

2 Carpenter 1
.056 M.
Formworks M2 592.00 4.00 148.00 3.056 Helper .056 452.29 4 113.07 29.60 14.80 0.83 0.056 8.29 0.83
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 26,640.00 200.00 133.20 2.056 Helper .056 273.86 3 91.29 13.32 13.32 0.75 0.056 7.46 0.75
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 592.00 28.00 21.14 3.056 Helper .056 64.61 2 32.31 4.23 2.11 0.12 0.056 1.18 0.12
Crane
Operator
10 33.83 - 13.32 30.23 1.69 - - - - - - - - - - - 1.69 0.18 - -

2 Carpenter 16
Z0U34-0580 RCC Wall/Col. For Staircase From Top of 4L-RoofL Casting M3 3 81.00 0.04 22.000 Helper 4 Mason 0.81 1 0.81 1.000 1 Vibrator 0.04 0.01

2 Carpenter 1
.056 M.
Formworks M2 12.00 4.00 3.00 3.056 Helper .056 9.17 2 4.58 1.00 0.50 0.03 0.056 0.17 0.03
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 540.00 200.00 2.70 2.056 Helper .056 5.55 2 2.78 0.45 0.45 0.03 0.056 0.15 0.03
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 12.00 28.00 0.43 3.056 Helper .056 1.31 1 1.31 0.14 0.07 0.00 0.056 0.02 0.00
Crane
Operator
6 1.14 - 0.45 1.02 0.06 - - - - - - - - - - - 0.06 0.01 - -

1 Carpenter 18
Z0U34-0590 RCC Slab / Beam - RoofL Casting M3 152.00 180.00 0.84 26.000 Helper 6 Mason 21.96 1 21.96 1.000 1 Vibrator 0.84 0.07
1 Steel Fixer

2 Carpenter 1
.056 M.
Formworks M2 760.00 16.00 47.50 3.056 Helper .056 145.16 5 29.03 7.92 3.96 0.22 0.056 2.66 0.22
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 27,360.00 200.00 136.80 2.056 Helper .056 281.26 4 70.32 11.40 11.40 0.64 0.056 7.66 0.64
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 760.00 32.00 23.75 3.056 Helper .056 72.58 2 36.29 3.96 1.98 0.11 0.056 1.33 0.11
Crane
Operator
12 11.88 - 11.40 17.34 0.97 - - - - - - - - - - - 0.97 0.07 - -
2 Carpenter 16
Z0U34-0600 RCC For Stair/Landings @ 4L-RoofL Casting M3 3 81.00 0.04 22.000 Helper 4 Mason 0.81 1 0.81 1.000 1 Vibrator 0.04 0.00

2 Carpenter 1
.056 M.
Formworks M2 15.00 4.00 3.75 3.056 Helper .056 11.46 3 3.82 0.94 0.47 0.03 0.056 0.21 0.03
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 540.00 200.00 2.70 2.056 Helper .056 5.55 3 1.85 0.34 0.34 0.02 0.056 0.15 0.02
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 15.00 28.00 0.54 3.056 Helper .056 1.64 1 1.64 0.13 0.07 0.00 0.056 0.03 0.00
Crane
Operator
8 1.07 - 0.34 0.87 0.05 - - - - - - - - - - - 0.05 0.00 - -
Tot.
Tot. M-days Manpower/da Eqmt Tot. E-
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) Tot. Man (I) Crew Desc. OD (O) M A N - D A Y S Eqmt E Q M T - D A Y S
(K) y Desc. days (Z)
(X)
Item
Steel Operato Techni Alum. Waterpr Dump B. S. M. Excavat Tower
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason Helper Driver Painter (H x I) Dozer Shovel B. Cat Vibrator
Fixer r cian Tech oofer T. Roller Roller Crane or Crane

1 Carpenter 18
Z0U34-0610 RCC Slab / Beam for Staircase - RoofL Casting M3 4.00 180.00 0.02 26.000 Helper 6 Mason 0.58 1 0.58 1.000 1 Vibrator 0.02 0.00
1 Steel Fixer

2 Carpenter 1
.056 M.
Formworks M2 20.00 16.00 1.25 3.056 Helper .056 3.82 3 1.27 0.36 0.18 0.01 0.056 0.07 0.01
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 720.00 200.00 3.60 2.056 Helper .056 7.40 2 3.70 0.51 0.51 0.03 0.056 0.20 0.03
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 20.00 32.00 0.63 3.056 Helper .056 1.91 1 1.91 0.18 0.09 0.01 0.056 0.04 0.01
Crane
Operator
7 0.54 - 0.51 0.78 0.04 - - - - - - - - - - - 0.04 0.00 - -
2 Carpenter 16
Z0U34-0620 RCC For Lower Parapet Casting M3 24 81.00 0.30 22.000 Helper 4 Mason 6.52 1 6.52 1.000 1 Vibrator 0.30 0.03

2 Carpenter 1
.056 M.
Formworks M2 96.00 4.00 24.00 3.056 Helper .056 73.34 4 18.34 4.80 2.40 0.13 0.056 1.34 0.13
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 4,320.00 200.00 21.60 2.056 Helper .056 44.41 3 14.80 2.16 2.16 0.12 0.056 1.21 0.12
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 96.00 28.00 3.43 3.056 Helper .056 10.48 2 5.24 0.69 0.34 0.02 0.056 0.19 0.02
Crane
Operator
10 5.49 - 2.16 4.90 0.27 - - - - - - - - - - - 0.27 0.03 - -
2 Carpenter 16
Z0U34-0630 RCC For Wall/Col. From Roof L-Top of Roof L Casting M3 10 81.00 0.12 22.000 Helper 4 Mason 2.72 1 2.72 1.000 1 Vibrator 0.12 0.02

2 Carpenter 1
.056 M.
Formworks M2 40.00 4.00 10.00 3.056 Helper .056 30.56 2 15.28 3.33 1.67 0.09 0.056 0.56 0.09
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 1,800.00 200.00 9.00 2.056 Helper .056 18.50 2 9.25 1.50 1.50 0.08 0.056 0.50 0.08
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 40.00 28.00 1.43 3.056 Helper .056 4.37 1 4.37 0.48 0.24 0.01 0.056 0.08 0.01
Crane
Operator
6 3.81 - 1.50 3.40 0.19 - - - - - - - - - - - 0.19 0.02 - -

1 Carpenter 18
Z0U34-0640 RCC Slab / Beam Top Roof Level Casting M3 17.00 180.00 0.09 26.000 Helper 6 Mason 2.46 1 2.46 1.000 1 Vibrator 0.09 0.01
1 Steel Fixer

2 Carpenter 1
.056 M.
Formworks M2 85.00 16.00 5.31 3.056 Helper .056 16.24 3 5.41 1.52 0.76 0.04 0.056 0.30 0.04
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 3,060.00 200.00 15.30 2.056 Helper .056 31.46 2 15.73 2.19 2.19 0.12 0.056 0.86 0.12
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 85.00 32.00 2.66 3.056 Helper .056 8.12 1 8.12 0.76 0.38 0.02 0.056 0.15 0.02
Crane
Operator
7 2.28 - 2.19 3.32 0.19 - - - - - - - - - - - 0.19 0.01 - -
2 Carpenter 16
Z0U34-0650 RCC For Upper Parapet Casting M3 15 81.00 0.19 22.000 Helper 4 Mason 4.07 1 4.07 1.000 1 Vibrator 0.19 0.02

2 Carpenter 1
.056 M.
Formworks M2 60.00 4.00 15.00 3.056 Helper .056 45.84 3 15.28 3.75 1.88 0.11 0.056 0.84 0.11
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 2,700.00 200.00 13.50 2.056 Helper .056 27.76 3 9.25 1.69 1.69 0.09 0.056 0.76 0.09
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 60.00 28.00 2.14 3.056 Helper .056 6.55 1 6.55 0.54 0.27 0.02 0.056 0.12 0.02
Crane
Operator
8 4.29 - 1.69 3.83 0.21 - - - - - - - - - - - 0.21 0.02 - -

1 Carpenter 18
Z0U34-0660 RCC Eqmt. Pads + Railing Casting M3 3 180.00 0.02 26.000 Helper 6 Mason 0.43 1 0.43 0.500 .5 Vibrator 0.01 0.00
1 Steel Fixer

2 Carpenter 1
.056 M.
Formworks M2 12.00 12.00 1.00 3.056 Helper .056 3.06 4 0.76 0.20 0.10 0.01 0.056 0.06 0.01
Crane
Operator
1 Steel Fixer 1
.056 M.
Rebars kg 540.00 250.00 2.16 2.056 Helper .056 4.44 3 1.48 0.22 0.22 0.01 0.056 0.12 0.01
Crane
Operator
2 Carpenter 1
.056 M.
Deshuttering M2 12.00 35.00 0.34 3.056 Helper .056 1.05 2 0.52 0.07 0.03 0.00 0.056 0.02 0.00
Crane
Operator
10 0.27 - 0.22 0.35 0.02 - - - - - - - - - - - 0.02 0.00 - -

MEP
FINISHES
1 Mason 1
.056 T.
Z0U34-2710 I. Hollow Block Works + Lintels @ Grnd Flr. M2 1,879.00 10.00 187.90 2.056 Helper .056 386.32 14 27.59 13.42 13.42 0.75 0.056 10.52 0.75
Crane
Operator
1 Mason 1
Z0U34-2720 I. Internal Plaster Accessories & Rush @ GL M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02
Helper
1 Mason 1
Z0U34-2730 I. Internal Plaster Works @ GL M2 2,413.00 20.00 120.65 2.000 241.30 12 20.11 10.05 10.05
Helper
1 Mason 1
.056 T.
Z0U34-2740 I. Glazed Ceramic Tile @ GL M2 826 12.00 68.83 2.056 Helper .056 141.52 14 10.11 4.92 4.92 0.28 0.056 3.85 0.28
Crane
Operator
1 Mason 1
.056 T.
Z0U34-2750 I. Block Works For Ducts @ Grnd Flr. M2 113 10.00 11.30 2.056 Helper .056 23.23 2 11.62 5.65 5.65 0.32 0.056 0.63 0.32
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-2760 I. Install False Ceiling (Susp. + Boarding) @ GL M2 509 7.20 70.69 2.056 Helper .056 145.35 14 10.38 5.05 5.05 0.28 0.056 3.96 0.28
Crane
Operator
1 Mason 1
.056 T.
Z0U34-2770 I. Screed + Ceramic Tiles & Skirtings @ GL M2 1572 12.00 131.00 2.056 Helper .056 269.34 14 19.24 9.36 9.36 0.52 0.056 7.34 0.52
Crane
Operator
1 Mason 1
.056 T.
Z0U34-2780 I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL M2 354 32.00 11.06 2.056 Helper .056 22.74 14 1.62 0.79 0.79 0.04 0.056 0.62 0.04
Crane
Operator
4Waterproofer
Z0U34-2790 I. Water Proofing + Screed on Wet Areas - GL M2 683 64.00 10.67 6.000 64.03 10 6.40 2.13 4.27
2 Helper
1 Carpenter 1
.056 T.
Z0U34-2800 I. Frames Installations @ GL Nos. 59 4.80 12.29 2.056 Helper .056 25.27 14 1.81 0.88 0.88 0.05 0.056 0.69 0.05
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-2810 I. Doors w/ Ironmongery @ GL Nos. 59 4.80 12.29 2.056 Helper .056 25.27 12 2.11 1.02 1.02 0.06 0.056 0.69 0.06
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-2820 I. Frames Installation Works @ GL M2 108 4.80 22.50 2.056 Helper .056 46.26 14 3.30 1.61 1.61 0.09 0.056 1.26 0.09
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-2830 I.Aluminum + Glass & Other Associated Works @ GL M2 108 1.60 67.50 2.056 Helper .056 138.78 12 11.57 5.63 0.32 5.63 0.056 3.78 0.32
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-2840 I. Kitchen Cabinets @ GL Nos. 14 0.60 23.33 2.056 Helper .056 47.97 14 3.43 1.67 1.67 0.09 0.056 1.31 0.09
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-2850 I. Wardrobes @ GL Nos. 17 0.75 22.67 2.056 Helper .056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09
Crane
Operator
Z0U34-2860 I. Primer Application Works @ GL M2 864.00 54.60 15.82 1.000 1 Painter 15.82 10 1.58 1.58
Z0U34-2870 I. Stucco Application Works @ GL M2 864.00 16.40 52.68 1.000 1 Painter 52.68 14 3.76 3.76
Z0U34-2880 I. Emulsion Paint Works @ GL M2 1,626.00 32.20 50.50 1.000 1 Painter 50.50 12 4.21 4.21
1 Mason 1
Z0U34-2890 O. Plaster Accessories & Rush @ GL M2 52 48.46 1.07 2.000 2.15 7 0.31 0.15 0.15
Helper
1 Mason 1
Z0U34-2900 O. Plaster Works @ GL M2 316 20.00 15.80 2.000 31.60 12 2.63 1.32 1.32
Helper
1 Mason 1
.056 T.
Z0U34-2910 O. Polished Marble & Ceramic for Wall @ GL M2 37 10.00 3.70 2.056 Helper .056 7.61 14 0.54 0.26 0.26 0.01 0.056 0.21 0.01
Crane
Operator
1 Mason 1
.056 T.
Z0U34-2920 O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr. M2 16 10.00 1.60 2.056 Helper .056 3.29 2 1.64 0.80 0.80 0.04 0.056 0.09 0.04
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-2930 O. Gypsum Board +Washable Paint @ GL M2 66 16.00 4.13 2.056 Helper .056 8.48 14 0.61 0.29 0.29 0.02 0.056 0.23 0.02
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-2940 O. Semi Recessed G.R.G. Tiles @ GL M2 36 16.00 2.25 2.056 Helper .056 4.63 14 0.33 0.16 0.16 0.01 0.056 0.13 0.01
Crane
Operator
1 Mason 1
.056 T.
Z0U34-2950 O. Sreed + Graniti Tiles & Skirtings @ GL M2 514 12.00 42.83 2.056 Helper .056 88.07 14 6.29 3.06 3.06 0.17 0.056 2.40 0.17
Crane
Operator
1 Mason 1
.056 T.
Z0U34-2960 O. Screed + Polished Marble & Skirtings @ GL M2 148 12.00 12.33 2.056 Helper .056 25.36 14 1.81 0.88 0.88 0.05 0.056 0.69 0.05
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-2970 O. G. Stl, Powdr coated Railin to Staircase @ GL LM 24 20.00 1.20 2.056 Helper .056 2.47 10 0.25 0.12 0.01 0.12 0.056 0.07 0.01
Crane
Operator
Z0U34-2980 O. Primer ApplicationWorks @ GL. M2 109 54.60 2.00 1.000 1 Painter 2.00 8 0.25 0.25
Z0U34-2990 O. Stucco Application Works @ GL M2 109 16.40 6.65 1.000 1 Painter 6.65 12 0.55 0.55
Z0U34-3000 O. Emulsion Paint Works @ GL M2 58 32.20 1.80 1.000 1 Painter 1.80 10 0.18 0.18
1 Mason 1
.056 T.
Z0U34-3010 I. Hollow Block Works + Lintels @ 1st Flr. M2 1,950.00 10.00 195.00 2.056 Helper .056 400.92 14 28.64 13.93 13.93 0.78 0.056 10.92 0.78
Crane
Operator
1 Mason 1
Z0U34-3020 I. Internal Plaster Accessories & Rush @ 1L M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02
Helper
1 Mason 1
Z0U34-3030 I. Internal Plaster Works @ 1L M2 2,581.00 20.00 129.05 2.000 258.10 12 21.51 10.75 10.75
Helper
1 Mason 1
.056 T.
Z0U34-3040 I. Glazed Ceramic Tile @ 1L M2 735 12.00 61.25 2.056 Helper .056 125.93 14 9.00 4.38 4.38 0.25 0.056 3.43 0.25
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3050 I. Block Works For Ducts @ 1st Flr. M2 93 10.00 9.30 2.056 Helper .056 19.12 2 9.56 4.65 4.65 0.26 0.056 0.52 0.26
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3060 I. Install False Ceiling (Susp. + Boarding) @ 1L M2 476 7.20 66.11 2.056 Helper .056 135.92 14 9.71 4.72 4.72 0.26 0.056 3.70 0.26
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3070 I. Screed + Ceramic Tiles & Skirtings @ 1L M2 1746 12.00 145.50 2.056 Helper .056 299.15 14 21.37 10.39 10.39 0.58 0.056 8.15 0.58
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3080 I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L M2 269 32.00 8.41 2.056 Helper .056 17.28 8 2.16 1.05 1.05 0.06 0.056 0.47 0.06
Crane
Operator
4Waterproofer
Z0U34-3090 I. Water Proofing + Screed on Wet Areas - 1L M2 683 64.00 10.67 6.000 64.03 10 6.40 2.13 4.27
2 Helper
1 Carpenter 1
.056 T.
Z0U34-3100 I. Frames Installations @ 1L Nos. 72 4.80 15.00 2.056 Helper .056 30.84 14 2.20 1.07 1.07 0.06 0.056 0.84 0.06
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3110 I. Doors w/ Ironmongery @ 1L Nos. 72 4.80 15.00 2.056 Helper .056 30.84 12 2.57 1.25 1.25 0.07 0.056 0.84 0.07
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3120 I. Frames Installation Works @ GL M2 100 4.80 20.83 2.056 Helper .056 42.83 14 3.06 1.49 1.49 0.08 0.056 1.17 0.08
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-3130 I. Aluminum+Glass & Other Associated Works @ 1L M2 100 1.60 62.50 2.056 Helper .056 128.50 12 10.71 5.21 0.29 5.21 0.056 3.50 0.29
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3140 I. Wardrobes @ 1L Nos. 17 0.75 22.67 2.056 Helper .056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3150 I. Kitchen Cabinets @ 1L Nos. 15 0.60 25.00 2.056 Helper .056 51.40 14 3.67 1.79 1.79 0.10 0.056 1.40 0.10
Crane
Operator
Z0U34-3160 I. Primer Application Works @ 1L M2 855.00 54.60 15.66 1.000 1 Painter 15.66 12 1.30 1.30
Z0U34-3170 I. Stucco Application Works @ 1L M2 855.00 16.40 52.13 1.000 1 Painter 52.13 14 3.72 3.72
Z0U34-3180 I. Emulsion Paint Works @ 1L M2 1,649.00 32.20 51.21 1.000 1 Painter 51.21 14 3.66 3.66
Tot.
Tot. M-days Manpower/da Eqmt Tot. E-
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) Tot. Man (I) Crew Desc. OD (O) M A N - D A Y S Eqmt E Q M T - D A Y S
(K) y Desc. days (Z)
(X)
Item
Steel Operato Techni Alum. Waterpr Dump B. S. M. Excavat Tower
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason Helper Driver Painter (H x I) Dozer Shovel B. Cat Vibrator
Fixer r cian Tech oofer T. Roller Roller Crane or Crane

1 Mason 1
Z0U34-3190 O. Plaster Accessories & Rush @ 1L M2 52 48.46 1.07 2.000 2.15 7 0.31 0.15 0.15
Helper
1 Mason 1
Z0U34-3200 O. Plaster Works @ 1L M2 297 20.00 14.85 2.000 29.70 12 2.48 1.24 1.24
Helper
1 Mason 1
.056 T.
Z0U34-3210 O. Polished Marble & Ceramic for Wall @ 1L M2 36 10.00 3.60 2.056 Helper .056 7.40 14 0.53 0.26 0.26 0.01 0.056 0.20 0.01
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3220 O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr. M2 14 10.00 1.40 2.056 Helper .056 2.88 2 1.44 0.70 0.70 0.04 0.056 0.08 0.04
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3230 O. Gypsum Board +Washable Paint @ 1L M2 66 16.00 4.13 2.056 Helper .056 8.48 14 0.61 0.29 0.29 0.02 0.056 0.23 0.02
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3240 O. Semi Recessed G.R.G. Tiles @ 1L M2 36 16.00 2.25 2.056 Helper .056 4.63 14 0.33 0.16 0.16 0.01 0.056 0.13 0.01
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3250 O. Sreed + Graniti Tiles & Skirtings @ 1L M2 425 12.00 35.42 2.056 Helper .056 72.82 14 5.20 2.53 2.53 0.14 0.056 1.98 0.14
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3260 O. Screed + Polished Marble & Skirtings @ 1L M2 48 12.00 4.00 2.056 Helper .056 8.22 14 0.59 0.29 0.29 0.02 0.056 0.22 0.02
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-3270 O. G. Stl, Powdr coated Railin to Staircase @ 1L LM 26 20.00 1.30 2.056 Helper .056 2.67 10 0.27 0.13 0.01 0.13 0.056 0.07 0.01
Crane
Operator
Z0U34-3280 O. Primer Application Works @ 1L M2 103 54.60 1.89 1.000 1 Painter 1.89 8 0.24 0.24
Z0U34-3290 O. Stucco Application Works @ 1L M2 103 16.40 6.28 1.000 1 Painter 6.28 10 0.63 0.63
Z0U34-3300 O. Emulsion Paint Works @ 1L M2 58 32.20 1.80 1.000 1 Painter 1.80 12 0.15 0.15
1 Mason 1
.056 T.
Z0U34-3310 I. Hollow Block Works + Lintels @ 2nd Flr. M2 1,950.00 10.00 195.00 2.056 Helper .056 400.92 14 28.64 13.93 13.93 0.78 0.056 10.92 0.78
Crane
Operator
1 Mason 1
Z0U34-3320 I. Internal Plaster Accessories & Rush @ 2L M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02
Helper
1 Mason 1
Z0U34-3330 I. Internal Plaster Works @ 2L M2 2,581.00 20.00 129.05 2.000 258.10 12 21.51 10.75 10.75
Helper
1 Mason 1
.056 T.
Z0U34-3340 I. Glazed Ceramic Tile @ 2L M2 735 12.00 61.25 2.056 Helper .056 125.93 14 9.00 4.38 4.38 0.25 0.056 3.43 0.25
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3350 I. Block Works For Ducts @ 2nd Flr. M2 93 10.00 9.30 2.056 Helper .056 19.12 2 9.56 4.65 4.65 0.26 0.056 0.52 0.26
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3360 I. Install False Ceiling (Susp. + Boarding) @ 2L M2 476 7.20 66.11 2.056 Helper .056 135.92 14 9.71 4.72 4.72 0.26 0.056 3.70 0.26
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3370 I. Screed + Ceramic Tiles & Skirtings @ 2L M2 1746 12.00 145.50 2.056 Helper .056 299.15 14 21.37 10.39 10.39 0.58 0.056 8.15 0.58
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3380 I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L M2 269 32.00 8.41 2.056 Helper .056 17.28 8 2.16 1.05 1.05 0.06 0.056 0.47 0.06
Crane
Operator
4Waterproofer
Z0U34-3390 I. Water Proofing + Screed on Wet Areas - 2L M2 683 64.00 10.67 6.000 64.03 10 6.40 2.13 4.27
2 Helper
1 Carpenter 1
.056 T.
Z0U34-3400 I. Frames Installations @ 2L Nos. 72 4.80 15.00 2.056 Helper .056 30.84 14 2.20 1.07 1.07 0.06 0.056 0.84 0.06
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3410 I. Doors w/ Ironmongery @ 2L Nos. 72 4.80 15.00 2.056 Helper .056 30.84 12 2.57 1.25 1.25 0.07 0.056 0.84 0.07
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3420 I. Frames Installation Works @ 2L M2 100 4.80 20.83 2.056 Helper .056 42.83 14 3.06 1.49 1.49 0.08 0.056 1.17 0.08
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-3430 I. Aluminum+Glass & Other Associated Works @ 2L M2 100 1.60 62.50 2.056 Helper .056 128.50 12 10.71 5.21 0.29 5.21 0.056 3.50 0.29
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3440 I. Wardrobes @ 2L Nos. 17 0.75 22.67 2.056 Helper .056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3450 I. Kitchen Cabinets @ 2L Nos. 15 0.60 25.00 2.056 Helper .056 51.40 14 3.67 1.79 1.79 0.10 0.056 1.40 0.10
Crane
Operator
Z0U34-3460 I. Primer Application Works @ 2L M2 855.00 54.60 15.66 1.000 1 Painter 15.66 12 1.30 1.30
Z0U34-3470 I. Stucco Application Works @ 2L M2 855.00 16.40 52.13 1.000 1 Painter 52.13 14 3.72 3.72
Z0U34-3480 I. Emulsion Paint Works @ 2L M2 1,649.00 32.20 51.21 1.000 1 Painter 51.21 14 3.66 3.66
1 Mason 1
Z0U34-3490 O. Plaster Accessories & Rush @ 2L M2 52 48.46 1.07 2.000 2.15 7 0.31 0.15 0.15
Helper
1 Mason 1
Z0U34-3500 O. Plaster Works @ 2L M2 297 20.00 14.85 2.000 29.70 12 2.48 1.24 1.24
Helper
1 Mason 1
.056 T.
Z0U34-3510 O. Polished Marble & Ceramic for Wall @ 2L M2 36 10.00 3.60 2.056 Helper .056 7.40 14 0.53 0.26 0.26 0.01 0.056 0.20 0.01
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3520 O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr. M2 17 10.00 1.70 2.056 Helper .056 3.50 2 1.75 0.85 0.85 0.05 0.056 0.10 0.05
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3530 O. Gypsum Board +Washable Paint @ 2L M2 66 16.00 4.13 2.056 Helper .056 8.48 14 0.61 0.29 0.29 0.02 0.056 0.23 0.02
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3540 O. Semi Recessed G.R.G. Tiles @ 2L M2 36 16.00 2.25 2.056 Helper .056 4.63 14 0.33 0.16 0.16 0.01 0.056 0.13 0.01
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3550 O. Sreed + Graniti Tiles & Skirtings @ 2L M2 425 12.00 35.42 2.056 Helper .056 72.82 14 5.20 2.53 2.53 0.14 0.056 1.98 0.14
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3560 O. Screed + Polished Marble & Skirtings @ 2L M2 48 12.00 4.00 2.056 Helper .056 8.22 14 0.59 0.29 0.29 0.02 0.056 0.22 0.02
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-3570 O. G.Steel, Powder coated Railin to Staircase@2L LM 26 20.00 1.30 2.056 Helper .056 2.67 10 0.27 0.13 0.01 0.13 0.056 0.07 0.01
Crane
Operator
Z0U34-3580 O. Primer Application Works @ 2L M2 103 54.60 1.89 1.000 1 Painter 1.89 8 0.24 0.24
Z0U34-3590 O. Stucco Application Works @ 2L M2 103 16.40 6.28 1.000 1 Painter 6.28 10 0.63 0.63
Z0U34-3600 O. Emulsion Paint Works @ 2L M2 58 32.20 1.80 1.000 1 Painter 1.80 12 0.15 0.15
1 Mason 1
.056 T.
Z0U34-3610 I. Hollow Block Works + Lintels @ 3rd Flr. M2 1,950.00 10.00 195.00 2.056 Helper .056 400.92 14 28.64 13.93 13.93 0.78 0.056 10.92 0.78
Crane
Operator
1 Mason 1
Z0U34-3620 I. Internal Plaster Accessories & Rush @ 3L M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02
Helper
1 Mason 1
Z0U34-3630 I. Internal Plaster Works @ 3L M2 2,581.00 20.00 129.05 2.000 258.10 12 21.51 10.75 10.75
Helper
1 Mason 1
.056 T.
Z0U34-3640 I. Glazed Ceramic Tile @ 3L M2 735 12.00 61.25 2.056 Helper .056 125.93 14 9.00 4.38 4.38 0.25 0.056 3.43 0.25
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3650 I. Block Works For Ducts @ 3rd Flr. M2 93 10.00 9.30 2.056 Helper .056 19.12 2 9.56 4.65 4.65 0.26 0.056 0.52 0.26
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3660 I. Install False Ceiling (Susp. + Boarding) @ 3L M2 476 7.20 66.11 2.056 Helper .056 135.92 14 9.71 4.72 4.72 0.26 0.056 3.70 0.26
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3670 I. Screed + Ceramic Tiles & Skirtings @ 3L M2 1746 12.00 145.50 2.056 Helper .056 299.15 14 21.37 10.39 10.39 0.58 0.056 8.15 0.58
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3680 I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L M2 269 32.00 8.41 2.056 Helper .056 17.28 8 2.16 1.05 1.05 0.06 0.056 0.47 0.06
Crane
Operator
4Waterproofer
Z0U34-3690 I. Water Proofing + Screed on Wet Areas - 3L M2 683 64.00 10.67 6.000 64.03 10 6.40 2.13 4.27
2 Helper
1 Carpenter 1
.056 T.
Z0U34-3700 I. Frames Installations @ 3L Nos. 72 4.80 15.00 2.056 Helper .056 30.84 14 2.20 1.07 1.07 0.06 0.056 0.84 0.06
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3710 I. Doors w/ Ironmongery @ 3L Nos. 72 4.80 15.00 2.056 Helper .056 30.84 12 2.57 1.25 1.25 0.07 0.056 0.84 0.07
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3720 I. Frames Installation Works @ 3L M2 100 4.80 20.83 2.056 Helper .056 42.83 14 3.06 1.49 1.49 0.08 0.056 1.17 0.08
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-3730 I. Aluminum+Glass & Other Associated Works @ 3L M2 100 1.60 62.50 2.056 Helper .056 128.50 12 10.71 5.21 0.29 5.21 0.056 3.50 0.29
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3740 I. Wardrobes @ 3L Nos. 17 0.75 22.67 2.056 Helper .056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3750 I. Kitchen Cabinets @ 3L Nos. 15 0.60 25.00 2.056 Helper .056 51.40 14 3.67 1.79 1.79 0.10 0.056 1.40 0.10
Crane
Operator
Z0U34-3760 I. Primer Appilcation Works @ 3L M2 855.00 54.60 15.66 1.000 1 Painter 15.66 12 1.30 1.30
Z0U34-3770 I. Stucco Application Works @ 3L M2 855.00 16.40 52.13 1.000 1 Painter 52.13 14 3.72 3.72
Z0U34-3780 I. Emulsion Paint Works @ 3L M2 1,649.00 32.20 51.21 1.000 1 Painter 51.21 14 3.66 3.66
1 Mason 1
Z0U34-3790 O. Plaster Accessories & Rush @ 3L M2 52 48.46 1.07 2.000 2.15 7 0.31 0.15 0.15
Helper
1 Mason 1
Z0U34-3800 O. Plaster Works @ 3L M2 297 20.00 14.85 2.000 29.70 12 2.48 1.24 1.24
Helper
1 Mason 1
.056 T.
Z0U34-3810 O. Polished Marble & Ceramic for Wall @ 3L M2 36 10.00 3.60 2.056 Helper .056 7.40 14 0.53 0.26 0.26 0.01 0.056 0.20 0.01
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3820 O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr. M2 17 10.00 1.70 2.056 Helper .056 3.50 2 1.75 0.85 0.85 0.05 0.056 0.10 0.05
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3830 O. Gypsum Board +Washable Paint @ 3L M2 66 16.00 4.13 2.056 Helper .056 8.48 14 0.61 0.29 0.29 0.02 0.056 0.23 0.02
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3840 O. Semi Recessed G.R.G. Tiles @ 3L M2 36 16.00 2.25 2.056 Helper .056 4.63 14 0.33 0.16 0.16 0.01 0.056 0.13 0.01
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3850 O. Screed + Polished Marble & Skirtings @ 3L M2 48 12.00 4.00 2.056 Helper .056 8.22 14 0.59 0.29 0.29 0.02 0.056 0.22 0.02
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3860 O. Sreed + Graniti Tiles & Skirtings @ 3L M2 425 12.00 35.42 2.056 Helper .056 72.82 14 5.20 2.53 2.53 0.14 0.056 1.98 0.14
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-3870 O. G.Steel, Powder coated Railin to Staircase@3L LM 26 20.00 1.30 2.056 Helper .056 2.67 10 0.27 0.13 0.01 0.13 0.056 0.07 0.01
Crane
Operator
Z0U34-3880 O. Primer Application Works @ 3L M2 103 54.60 1.89 1.000 1 Painter 1.89 8 0.24 0.24
Z0U34-3890 O. Stucco Application Works @ 3L M2 103 16.40 6.28 1.000 1 Painter 6.28 10 0.63 0.63
Z0U34-3900 O. Emulsion Paint Works @ 3L M2 58 32.20 1.80 1.000 1 Painter 1.80 12 0.15 0.15
1 Mason 1
.056 T.
Z0U34-3910 I. Hollow Block Works + Lintels @ 4th Flr. M2 1,188.00 10.00 118.80 2.056 Helper .056 244.25 12 20.35 9.90 9.90 0.55 0.056 6.65 0.55
Crane
Operator
1 Mason 1
Z0U34-3920 I. Internal Plaster Accessories & Rush @ 4L M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02
Helper
1 Mason 1
Z0U34-3930 I. Internal Plaster Works @ 4L M2 1,252.00 20.00 62.60 2.000 125.20 10 12.52 6.26 6.26
Helper
1 Mason 1
.056 T.
Z0U34-3940 I. Glazed Ceramic Tile @ 4L M2 808.00 12.00 67.33 2.056 Helper .056 138.44 12 11.54 5.61 5.61 0.31 0.056 3.77 0.31
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3950 I. Block Works For Ducts @ 4th Flr. M2 51 10.00 5.10 2.056 Helper .056 10.49 2 5.24 2.55 2.55 0.14 0.056 0.29 0.14
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-3960 I. Install False Ceiling (Susp. + Boarding) @ 4L M2 303 7.20 42.08 2.056 Helper .056 86.52 12 7.21 3.51 3.51 0.20 0.056 2.36 0.20
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3970 I. Screed + Ceramic Tiles & Skirtings @ 4L M2 669 12.00 55.75 2.056 Helper .056 114.62 12 9.55 4.65 4.65 0.26 0.056 3.12 0.26
Crane
Operator
1 Mason 1
.056 T.
Z0U34-3980 I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L M2 422 32.00 13.19 2.056 Helper .056 27.11 6 4.52 2.20 2.20 0.12 0.056 0.74 0.12
Crane
Operator
4Waterproofer
Z0U34-3990 I. Water Proofing + Screed on Wet Areas - 4L M2 379 64.00 5.92 6.000 35.53 8 4.44 1.48 2.96
2 Helper
1 Carpenter 1
.056 T.
Z0U34-4000 I. Frames Installations @ 4L Nos. 45 4.80 9.38 2.056 Helper .056 19.28 10 1.93 0.94 0.94 0.05 0.056 0.53 0.05
Crane
Operator
Tot.
Tot. M-days Manpower/da Eqmt Tot. E-
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) Tot. Man (I) Crew Desc. OD (O) M A N - D A Y S Eqmt E Q M T - D A Y S
(K) y Desc. days (Z)
(X)
Item
Steel Operato Techni Alum. Waterpr Dump B. S. M. Excavat Tower
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason Helper Driver Painter (H x I) Dozer Shovel B. Cat Vibrator
Fixer r cian Tech oofer T. Roller Roller Crane or Crane

1 Carpenter 1
.056 T.
Z0U34-4010 I. Doors w/ Ironmongery @ 4L Nos. 45 4.80 9.38 2.056 Helper .056 19.28 8 2.41 1.17 1.17 0.07 0.056 0.53 0.07
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-4020 I. Frames Installation Works @ 4L M2 61 4.80 12.71 2.056 Helper .056 26.13 12 2.18 1.06 1.06 0.06 0.056 0.71 0.06
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-4030 I. Aluminum+Glass & Other Associated Works @ 4L M2 61 1.60 38.13 2.056 Helper .056 78.39 10 7.84 3.81 0.21 3.81 0.056 2.14 0.21
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-4040 I. Kitchen Cabinets @ 4L Nos. 7 0.75 9.33 2.056 Helper .056 19.19 12 1.60 0.78 0.78 0.04 0.056 0.52 0.04
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-4050 I. Wardrobes @ 4L Nos. 8 0.60 13.33 2.056 Helper .056 27.41 12 2.28 1.11 1.11 0.06 0.056 0.75 0.06
Crane
Operator
Z0U34-4060 I. Primer Application Works @ 4L M2 387.00 54.60 7.09 1.000 1 Painter 7.09 10 0.71 0.71
Z0U34-4070 I. Stucco Installation Works @ 4L M2 387.00 16.40 23.60 1.000 1 Painter 23.60 12 1.97 1.97
Z0U34-4080 I. Emulsion Paint Works @ 4L M2 876.00 32.20 27.20 1.000 1 Painter 27.20 12 2.27 2.27
1 Mason 1
Z0U34-4090 O. Plaster Accessories & Rush @ 4L M2 1 48.46 0.02 2.000 0.04 7 0.01 0.003 0.003
Helper
1 Mason 1
.056 T.
Z0U34-4100 O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr. M2 14 10.00 1.40 2.056 Helper .056 2.88 2 1.44 0.70 0.70 0.04 0.056 0.08 0.04
Crane
Operator
1 Mason 1
Z0U34-4110 O. Plaster Works @ 4L M2 114 20.00 5.70 2.000 11.40 10 1.14 0.57 0.57
Helper
1 Mason 1
.056 T.
Z0U34-4120 O. Polished Marble & Ceramic for Wall @ 4L M2 42 10.00 4.20 2.056 Helper .056 8.64 12 0.72 0.35 0.35 0.02 0.056 0.24 0.02
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-4130 O. Gypsum Board + Washable Paint @ 4L M2 37 16.00 2.31 2.056 Helper .056 4.75 12 0.40 0.19 0.19 0.01 0.056 0.13 0.01
Crane
Operator
1 Carpenter 1
.056 T.
Z0U34-4140 O. Semi Recessed G.R.G. Tiles @ 4L M2 20 16.00 1.25 2.056 Helper .056 2.57 12 0.21 0.10 0.10 0.01 0.056 0.07 0.01
Crane
Operator
1 Mason 1
.056 T.
Z0U34-4150 O. Screed + Polished Marble & Skirtings @ 4L M2 42 12.00 3.50 2.056 Helper .056 7.20 12 0.60 0.29 0.29 0.02 0.056 0.20 0.02
Crane
Operator
1 Mason 1
.056 T.
Z0U34-4160 O. Sreed + Graniti Tiles & Skirtings @ 4L M2 172 12.00 14.33 2.056 Helper .056 29.47 12 2.46 1.19 1.19 0.07 0.056 0.80 0.07
Crane
Operator
1 Alum. Tech 1
.056 T.
Z0U34-4170 O. G.Steel, Powder coated Railin to Staircase@4L LM 12 20.00 0.60 2.056 Helper .056 1.23 8 0.15 0.08 0.00 0.08 0.056 0.03 0.00
Crane
Operator
Z0U34-4180 O. Primer Application Works @ 4L M2 56 54.60 1.03 1.000 1 Painter 1.03 7 0.15 0.15
Z0U34-4190 O. Stucco Application Works @ 4L M2 56 16.40 3.41 1.000 1 Painter 3.41 8 0.43 0.43
Z0U34-4200 O. Emulsion Paint Works @ 4L M2 32 32.20 0.99 1.000 1 Painter 0.99 10 0.10 0.10
1 Mason 1
.056 T.
Z0U34-4210 Hollow Block Works + Lintels @ Roof Floor M2 194 10.00 19.40 2.056 Helper .056 39.89 10 3.99 1.94 1.94 0.11 0.056 1.09 0.11
Crane
Operator
1 Mason 1
Z0U34-4220 Plaster Accessories & Rush @ Roof Floor M2 52 48.46 1.07 2.000 2.15 5 0.43 0.215 0.215
Helper
1 Mason 1
Z0U34-4230 Plastering Works @ Roof Deck Floor M2 148 20.00 7.40 2.000 14.80 8 1.85 0.93 0.93
Helper
Z0U34-4240 Roof Drain & Access.+ Lightweight Concrete M2 281.00 7
Z0U34-4250 One Coat Cold Bituminous Primer M2 13.00 2
Z0U34-4260 2 Layers of SBS W.P. Membrane + Water Test M2 268.00 6
Z0U34-4270 Alum. Foil Covering Fixed to Upstand w/ Sealant LM 107 3
Z0U34-4280 50mm Thk. Extruded Polystyrene Insulation M2 268.00 2
Z0U34-4290 Protection Layer M2 268.00 2
Z0U34-4300 18mm-25mm Round Aggregates (50mm Thk.) M2 268.00 4
Z0U34-4310 1mm Thk. Alum. Flashing Fixed into Conc. Upstand M2 107 3
Z0U34-4320 Sealant Application Around top of Alum. Flashing M2 107 2
Z0U34-4330 Channel & Rails Installation for Lifts Items 2 14
Z0U34-4340 Cabin Assembly / Installation for lifts Items 2 10
Z0U34-4350 Machine Installation for lifts Items 2 7
Z0U34-4360 Doors Installation for lifts Items 2 10
Z0U34-4370 Connections To Ele + Finishing Touches for lifts Items 2 12
Z0U34-4380 Installation of Chute Tubes and Intake Throats Item 1 8
Z0U34-4390 Install Intake Doors, Chute Vent & Accessories Item 1 4
Z0U34-4400 Install Ground Floor Offset + Fire Shutter Door Item 1 2
Z0U34-4410 Install Compactor with MCP Item 1 1
Z0U34-4420 Installation of Garbage Container Item 1 1
Z0U34-4430 Final Test & Comm. Item 1 3
Z0U34-4440 Installation of Window Cleaning Eqmt. Item 1 14
Z0U34-4450 Primer Application Works @ Roof Deck M2 50 54.60 0.92 1.000 1 Painter 0.92 8 0.11 0.11
Z0U34-4460 Stucco Application Works @ Roof Deck M2 50 16.40 3.05 1.000 1 Painter 3.05 10 0.30 0.30
Z0U34-4470 Emulsion / Epoxy Paint Works @ Roof Deck M2 55 32.20 1.71 1.000 1 Painter 1.71 12 0.14 0.14
1 Operator 1 1
Z0U34-4480 Excavation Works External M3 7,137.50 315.00 22.66 2.000 45.32 5 9.06 4.53 4.53 1.000 22.66 4.53
Helper Excavator
2 Carpenter 1
Z0U34-4490 RCC Manholes / Gully Traps Nos. 54 5.63 9.60 5.000 Mason 1 Helper 48.00 14 3.43 1.37 0.69 0.69 0.69 1.000 1 M. Crane 9.60 0.69
1 Operator
4Waterproofer
Z0U34-4500 Water Proofing M2 91.07 76.00 1.20 6.000 7.19 12 0.60 0.20 0.40
2 Helper
1 Helper 0.25 .25 Bob
Z0U34-4510 Sand Bedding M2 13.21 60.00 0.22 1.250 0.28 10 0.03 0.02 0.01 0.250 0.06 0.01
Operator Cat

0.5 Shovel
3 Dump
1.5 Operator 3
Z0U34-4520 Backfilling Works M3 7,125.36 601.00 11.86 7.500 88.92 14 6.35 2.54 1.27 2.54 4.500 Truck .5 53.35 0.42 2.54 0.42 0.42
Driver 3 Helper
S. Roller .5
Bob Cat

Z0U34-4530 Instl Drainage Pipes &Con. To Existing Chambers Item 1 14


Z0U34-4540 Instl Water Supply Pipes&Con. To Existg Chambers Item 1 12
Z0U34-4550 Instl Chilled Water Pipes&Con. To Existg Chamber Item 1 14
Z0U34-4560 Instl Central Gas Pipes &Con. To Existg Chambers Item 1 12
Z0U34-4570 Instl Telephone Ducts &Con. To Existing Chambers Item 1 10
Z0U34-4580 Laying of Power cables (By Others) Item 1 7
Z0U34-4590 Hardscaping Works Item 1 14
Z0U34-4600 Landscaping Works Item 1 12
1 Mason 1
Z0U34-4610 Ext. Plaster Accessories & Rush on Front Elev. M2 1,484.00 48.46 30.62 2.000 61.25 2 30.62 15.31 15.31
Helper
1 Mason 1
Z0U34-4620 Ext. Plaster Works on Front Elevation M2 19.00 8.00 2.38 2.000 4.75 4 1.19 0.59 0.59
Helper
1 Mason 1
.25 M.
Z0U34-4630 Install Balcony Handrail on Front Elev. Nos. 35 15.00 2.33 2.250 Helper .25 5.25 12 0.44 0.19 0.19 0.05 0.250 0.58 0.05
Crane
Operator

1 Carpenter 1 ..5 M.
Z0U34-4640 Decorative GRC Panels W/ Epoxy Paint @ F. Elev. Nos. 17 2.00 8.50 2.500 21.25 10 2.13 0.85 0.85 0.43 0.500 4.25 0.43
Helper .5 Operator Crane

1 Carpenter 1 .5 M.
Z0U34-4650 Wooden Pergola on Front Elev. @ (1st & 2nd) Flr. LM 5 8.00 0.63 2.500 1.56 12 0.13 0.05 0.05 0.03 0.500 0.31 0.03
Helper .5 Operator Crane

Z0U34-4660 External Painting Works on Front Elevation M2 1,503.00 32.20 46.68 3.000 3 Painter 140.03 14 10.00 10.00
1 Mason 1
Z0U34-4670 Ext. Plaster Access. & Rush on Leftside Elev. M2 606 48.46 12.51 2.000 25.01 2 12.51 6.25 6.25
Helper
1 Mason 1
Z0U34-4680 Ext. Plaster Works on Left Side Elevation M2 19 8.00 2.38 2.000 4.75 4 1.19 0.59 0.59
Helper
1 Mason 1
.25 M.
Z0U34-4690 Install Balcony Handrail on Leftside Elev. Nos. 0 15.00 - 2.250 Helper .25 - 10 0.00 - - - 0.250 - -
Crane
Operator

1 Carpenter 1 ..5 M.
Z0U34-4700 Decorative GRC Panels W/ Epoxy Paint @ LS. Elev. Nos. 0 2.00 - 2.500 - 8 0.00 - - - 0.500 - -
Helper .5 Operator Crane

Z0U34-4710 External Painting Works on Left Side Elevation M2 625 32.20 19.41 3.000 3 Painter 58.23 12 4.85 4.85
1 Mason 1
Z0U34-4720 Ext. Plaster Accessories & Rush on Rear Elev. M2 1,503.00 48.46 31.02 2.000 62.03 2 31.02 15.51 15.51
Helper
1 Mason 1
Z0U34-4730 Ext. Plaster Works on Rear Elevation M2 19.00 8.00 2.38 2.000 4.75 4 1.19 0.59 0.59
Helper
1 Mason 1
.25 M.
Z0U34-4740 Install Balcony Handrail on Rear Elev. Nos. 35 15.00 2.33 2.250 Helper .25 5.25 12 0.44 0.19 0.19 0.05 0.250 0.58 0.05
Crane
Operator

1 Carpenter 1 ..5 M.
Z0U34-4750 Decorative GRC Panels W/ Epoxy Paint @ R. Elev. Nos. 17 2.00 8.50 2.500 21.25 10 2.13 0.85 0.85 0.43 0.500 4.25 0.43
Helper .5 Operator Crane

1 Carpenter 1 .5 M.
Z0U34-4760 Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr. LM 5 8.00 0.63 2.500 1.56 12 0.13 0.05 0.05 0.03 0.500 0.31 0.03
Helper .5 Operator Crane

Z0U34-4770 External Painting Works on Rear Elevation M2 1,503.00 32.20 46.68 3.000 3 Painter 140.03 14 10.00 10.00
1 Mason 1
Z0U34-4780 Ext. Plaster Access. & Rush on Rightside Elev. M2 606 48.46 12.51 2.000 25.01 2 12.51 6.25 6.25
Helper
1 Mason 1
Z0U34-4790 Ext. Plaster Works on Right Side Elevation M2 19 8.00 2.38 2.000 4.75 4 1.19 0.59 0.59
Helper
1 Mason 1
.25 M.
Z0U34-4800 Install Balcony Handrail on Rigthside Elev. Nos. 0 15.00 - 2.250 Helper .25 - 10 0.00 - - - 0.250 - -
Crane
Operator

1 Carpenter 1 ..5 M.
Z0U34-4810 Decorative GRC Panels W/ Epoxy Paint @ RS. Elev. Nos. 0 2.00 - 2.500 - 8 0.00 - - - 0.500 - -
Helper .5 Operator Crane

Z0U34-4820 External Painting Works on Right Side Elevation M2 625 32.20 19.41 3.000 3 Painter 58.23 12 4.85 4.85
Z0U34-4830 Snagging & Desnagging For Finishes @ GF Item 1 30
Z0U34-4840 Handing-Over For Finishes @ GF Item 1 10
Z0U34-4850 Snagging & Desnagging For Finishes @ 1F Item 1 30
Z0U34-4860 Handing-Over For Finishes @ 1F Item 1 10
Z0U34-4870 Snagging & Desnagging For Finishes @ 2F Item 1 30
Z0U34-4880 Handing-Over For Finishes @ 2F Item 1 10
Z0U34-4890 Snagging & Desnagging For Finishes @ 3F Item 1 30
Z0U34-4900 Handing-Over For Finishes @ 3F Item 1 10
Z0U34-4910 Snagging & Desnagging For Finishes @ 4F Item 1 30
Z0U34-4920 Handing-Over For Finishes @ 4F Item 1 10
Z0U34-4930 Snagging & Desnagging For Finishes @ Roof Floor Item 1 30
Z0U34-4940 Handing-Over For Finishes @ Roof Floor Item 1 10
Z0U34-4950 Power On (By DEWA) 0 1
Z0U34-4960 Precommissioning & Startup 0 21
Z0U34-4970 Availability of Chilled Water (By Others) 0 1
Z0U34-4980 Testing & Final Commissioning 0 35
Z0U34-4990 Snagging & Desnagging For External Finishes Item 1 12
Z0U34-5000 Handing-Over For External Finishes Item 1 2
Z0U34-5010 Completion of Fdn./Superstructure -Building # 34 Item 1 1
Z0U34-5020 Completion of External Works for Building # 34 Item 1 1
Z0U34-5030 Completion of MEP Works for Building # 34 0 1
Z0U34-5040 Completion of Finishes for Building # 34 Item 1 1
Z0U34-5050 Completion of Fdn./SuperStruc. for Phase-1 BLDG. Item 1 0
Z0U34-5060 Completion of External Works for Phase-1 BLDG. Item 1 0
Z0U34-5070 Completion of MEP Works for Phase-1 BLDG. 0 0
Z0U34-5080 Completion of Finishes for Phase-1 BLDG. Item 1 0
Z0U34-5090 Completion Milestone for Phase-1 Buildings Item 1 0
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer
SITEWORKS

1 Operator
Z2V33-0000 Site Clearing M2 1,597.00 4,200.00 0.38 2.000 0.76 1 0.76
1 Helper

2
Z2V33-0010 Setting-out / Layout M 163.88 76.00 2.16 3.000 Carpenter 6.47 1 6.47 4.31
1 Helper

SUBSTRUCTURE

1 Operator
Z2V33-0020 Excavation for footings + Disposal of Materials For Excavation M3 576.00 409.50 1.41 2.000 2.81 2 1.41
1 Helper

0.75
Operator
For Disposal M3 288.00 345.60 0.83 8.250 6.88 3 2.29
6 Driver
1.5 Helper

5 - - -

.75
Operator
Z2V33-0030 Formation Level & Compaction M3 194 252.00 0.77 6.250 4.81 2 2.41
4 Driver
1.5 Helper

2
Z2V33-0040 Anti-Termite Applications (Under PCC Footings) M2 629 202.50 3.11 1.000 3.11 1 3.11
Technican

0.75
Operator
Z2V33-0050 Backfill & Compaction upto bot. of PCC Tie-Beam M3 286 252.00 1.13 8.250 9.36 7 1.34
6 Driver
1.5 Helper

2
Z2V33-0060 Anti-Termite Applications (Under PCC Tie-Beam) M2 47 202.50 0.23 1.000 0.23 1 0.23
Technican

0.75
Operator
Z2V33-0070 Backfill & Compaction up to bot of PCC Grd. Slab M3 1,431.00 252.00 5.68 8.250 46.85 3 15.62
6 Driver
1.5 Helper

2
Z2V33-0080 Anti-Termite Applications (Under PCC Grade Slab) M2 921 202.50 4.55 1.000 4.55 1 4.55
Technican

1 Mason
Z2V33-0090 Shutters + 50mm Thk. PCC Under Footings M2 711 270.00 2.63 11.000 28.97 2 14.48 1.32
10 Helper

1 Mason
Z2V33-0100 50mm Protection Screed (Over W.P. Membrane-Ftg.) M2 2,209.00 270.00 8.18 11.000 90.00 2 45.00 4.09
10 Helper

1
Carpenter
18 Helper
Z2V33-0110 RCC For Footings Casting M3 296 180.00 1.64 26.000 42.76 1 42.76
6 Mason
1 Steel
Fixer
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

2
Carpenter
Formworks M2 1,184.00 12.00 98.67 3.056 1 Helper . 301.53 4 75.38 19.73
056
Operator

1 Steel
Fixer 1
Rebars kg 53,280.00 250.00 213.12 2.056 Helper . 438.17 3 146.06 21.31
056
Operator

2
Carpenter
Deshuttering M2 1,184.00 35.00 33.83 3.056 1 Helper . 103.38 2 51.69 6.77
056
Operator

10 26.50 - 21.31
2
Carpenter
Z2V33-0120 RCC Necks Columns / Walls + MEP Sleeves Casting M3 104 81.00 1.28 22.000 16 Helper 28.25 1 28.25
4 Mason

2
Carpenter
Formworks M2 416.00 4.00 104.00 3.056 1 Helper . 317.82 5 63.56 17.33
056
Operator

1 Steel
Fixer 1
Rebars kg 18,720.00 200.00 93.60 2.056 Helper . 192.44 4 48.11 7.80
056
Operator

2
Carpenter
Deshuttering M2 416.00 28.00 14.86 3.056 1 Helper . 45.40 2 22.70 2.48
056
Operator

12 19.81 - 7.80

1 Mason
Z2V33-0130 Shutters + 50mm Thk. PCC Under Tie-Beams M2 54 270.00 0.20 11.000 2.20 2 1.10 0.10
10 Helper

1 Mason
Z2V33-0140 50mm Screed (Over W.P. Membrane-T.B.) M2 167 270.00 0.62 11.000 6.80 2 3.40 0.31
10 Helper

1
Carpenter
16 Helper
Z2V33-0150 RCC Tie Beams + MEP Sleeves Casting M3 32 180.00 0.18 22.000 3.91 1 3.91
4 Mason
1 Steel
Fixer
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

2
Carpenter
Formworks M2 128.00 4.00 32.00 3.056 1 Helper . 97.79 4 24.45 6.40
056
Operator

1 Steel
Fixer 1
Rebars kg 5,760.00 250.00 23.04 2.056 Helper . 47.37 3 15.79 2.30
056
Operator

2
Carpenter
Deshuttering M2 128.00 28.00 4.57 3.056 1 Helper . 13.97 2 6.99 0.91
056
Operator

10 7.31 - 2.30

1
Carpenter
16 Helper
Z2V33-0160 RCC Kickers Over Tie-Beam Casting M3 1 180.00 0.01 22.000 0.12 1 0.12
4 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 4.00 4.00 1.00 3.056 1 Helper . 3.06 1 3.06 0.50
056
Operator

1 Steel
Fixer 1
Rebars kg 180.00 250.00 0.72 2.056 Helper . 1.48 1 1.48 0.18
056
Operator

2
Carpenter
Deshuttering M2 4.00 28.00 0.14 3.056 1 Helper . 0.44 1 0.44 0.07
056
Operator

4 0.57 - 0.18

1 Mason
Z2V33-0170 50mm Thk. PCC Under Grade Slab M2 1,041.00 270.00 3.86 11.000 42.41 2 21.21 1.93
10 Helper

1
Carpenter
18 Helper
Z2V33-0180 Mesh + Filler Board & RCC For Grade Slab M3 168 180.00 0.93 26.000 24.27 3 8.09 0.31 1.87 0.31
6 Mason
1 Steel
Fixer

1 Mason
Z2V33-0190 50mm Thk. PCC Steps & Ramps M2 17 270.00 0.06 11.000 0.69 2 0.35 0.03
10 Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1
Carpenter
18 Helper
Z2V33-0200 Steps & Ramps Works + Place Conc. M3 7 180.00 0.04 26.000 1.01 8 0.13 0.01 0.03 0.00
6 Mason
1 Steel
Fixer

4
Waterproo
Z2V33-0210 Waterproofing Membrane (Over PCC Footings) M2 1,754.00 152.00 11.54 6.000 69.24 2 34.62
fer 2
Helper

4
Waterproo
Z2V33-0220 Water Proofing For Neck Column & Wall & Footing M2 2,639.00 152.00 17.36 6.000 104.17 3 34.72
fer 2
Helper

4
Waterproo
Z2V33-0230 Waterproofing Membrane (Over PCC Tie-beams) M2 131 152.00 0.86 6.000 5.17 2 2.59
fer 2
Helper

4
Waterproo
Z2V33-0240 Waterproofing Membrane For Tie Beams M2 134 152.00 0.88 6.000 5.29 3 1.76
fer 2
Helper

1 Mason
Z2V33-0250 50mm Thk. PCC Under Base of Tank M2 68 270.00 0.25 11.000 2.77 1 2.77 0.25
10 Helper

4
Waterproo
Z2V33-0260 Waterproofing Membrane (Over PCC - Base) M2 121 152.00 0.80 6.000 4.78 1 4.78
fer 2
Helper

1 Mason
Z2V33-0270 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 210 270.00 0.78 11.000 8.56 1 8.56 0.78
10 Helper

1
Carpenter
18 Helper
Z2V33-0280 RCC Water Tank Base + Deshuttering Casting M3 39 180.00 0.22 26.000 5.63 1 5.63
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 156.00 12.00 13.00 3.056 1 Helper . 39.73 1 39.73 6.50
056
Operator

1 Steel
Fixer 1
Rebars kg 7,020.00 250.00 28.08 2.056 Helper . 57.73 1 57.73 7.02
056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

2
Carpenter
Deshuttering M2 156.00 35.00 4.46 3.056 1 Helper . 13.62 1 13.62 2.23
056
Operator

4 8.73 - 7.02
2
Carpenter
Z2V33-0290 RCC Wall W/MEP Pipes & Water Stop + Deshuttering Casting M3 35 81.00 0.43 22.000 16 Helper 9.51 1 9.51
4 Mason

2
Carpenter
Formworks M2 140.00 4.00 35.00 3.056 1 Helper . 106.96 2 53.48 14.00
056
Operator

1 Steel
Fixer 1
Rebars kg 6,300.00 200.00 31.50 2.056 Helper . 64.76 1 64.76 6.30
056
Operator

2
Carpenter
Deshuttering M2 140.00 28.00 5.00 3.056 1 Helper . 15.28 1 15.28 2.00
056
Operator

5 16.00 - 6.30

1
Carpenter
18 Helper
Z2V33-0300 RCC Top Slab + Deshuttering for Water Tank Casting M3 8.00 180.00 0.04 26.000 1.16 1 1.16
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 40.00 16.00 2.50 3.056 1 Helper . 7.64 2 3.82 1.00
056
Operator

1 Steel
Fixer 1
Rebars kg 1,440.00 200.00 7.20 2.056 Helper . 14.80 1 14.80 1.44
056
Operator

2
Carpenter
Deshuttering M2 40.00 32.00 1.25 3.056 1 Helper . 3.82 1 3.82 0.50
056
Operator

5 1.50 - 1.44
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer
4
Waterproo
Z2V33-0310 Water Proofing Membrane all around outside surfc M2 235 152.00 1.55 6.000 9.28 2 4.64
fer 2
Helper

4
Waterproo
Z2V33-0320 Protection Board all around outside surface M2 350 152.00 2.30 6.000 13.82 2 6.91
fer 2
Helper

0.75
Operator
Z2V33-0330 Backfill around Water tank walls M3 7 252.00 0.03 8.250 0.23 3 0.08
6 Driver
1.5 Helper

1 Mason
Z2V33-0340 G.R.P. Lining around inside + S.S. Lader & Door M2 252 20.00 12.60 2.000 25.20 3 8.40 4.20
1 Helper

1 Mason
Z2V33-0350 50mm Thk. PCC Under Base of Elevator Shaft M2 30 270.00 0.11 11.000 1.22 1 1.22 0.11
10 Helper

4
Waterproo
Z2V33-0360 Waterproofing Membrane (Over PCC - Base) M2 54 152.00 0.36 6.000 2.13 1 2.13
fer 2
Helper

1 Mason
Z2V33-0370 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 94 270.00 0.35 11.000 3.83 1 3.83 0.35
10 Helper

1
Carpenter
18 Helper
Z2V33-0380 RCC Elevator Shaft Base + Deshuttering Casting M3 14 180.00 0.08 26.000 2.02 1 2.02
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 56.00 12.00 4.67 3.056 1 Helper . 14.26 1 14.26 2.33
056
Operator

1 Steel
Fixer 1
Rebars kg 2,520.00 250.00 10.08 2.056 Helper . 20.72 1 20.72 2.52
056
Operator

2
Carpenter
Deshuttering M2 56.00 35.00 1.60 3.056 1 Helper . 4.89 1 4.89 0.80
056
Operator

4 3.13 - 2.52
2
Carpenter
Z2V33-0390 RCC Wall W/ MEP Cond. + Deshuttering Casting M3 6 81.00 0.07 22.000 16 Helper 1.63 1 1.63
4 Mason
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

2
Carpenter
Formworks M2 24.00 4.00 6.00 3.056 1 Helper . 18.34 2 9.17 2.40
056
Operator

1 Steel
Fixer 1
Rebars kg 1,080.00 200.00 5.40 2.056 Helper . 11.10 1 11.10 1.08
056
Operator

2
Carpenter
Deshuttering M2 24.00 28.00 0.86 3.056 1 Helper . 2.62 1 2.62 0.34
056
Operator

5 2.74 - 1.08
4
Waterproo
Z2V33-0400 Water Proofing Membrane all around outside surfc M2 522 152.00 3.43 6.000 20.61 3 6.87
fer 2
Helper

4
Waterproo
Z2V33-0410 Protection Board all around outside surface M2 50 152.00 0.33 6.000 1.97 2 0.99
fer 2
Helper

0.75
Operator
Z2V33-0420 Backfill around the Lift's Pit wall M3 7 252.00 0.03 8.250 0.23 3 0.08
6 Driver
1.5 Helper

2
Carpenter
Z2V33-0430 RCC For Wall/Col. From Top of Grade Slab-1L Casting M3 245 81.00 3.02 22.000 16 Helper 66.54 1 66.54
4 Mason

2
Carpenter
Formworks M2 980.00 4.00 245.00 3.056 1 Helper . 748.72 5 149.74 40.83
056
Operator

1 Steel
Fixer 1
Rebars kg 44,100.00 200.00 220.50 2.056 Helper . 453.35 4 113.34 18.38
056
Operator

2
Carpenter
Deshuttering M2 980.00 28.00 35.00 3.056 1 Helper . 106.96 2 53.48 5.83
056
Operator

12 46.67 - 18.38
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer
2
Carpenter
Z2V33-0440 Columns From Top of Grade Slab-1L (Canopy) Casting M3 1 81.00 0.01 22.000 16 Helper 0.27 1 0.27
4 Mason

2
Carpenter
Formworks M2 4.00 4.00 1.00 3.056 1 Helper . 3.06 2 1.53 0.33
056
Operator

1 Steel
Fixer 1
Rebars kg 180.00 200.00 0.90 2.056 Helper . 1.85 2 0.93 0.15
056
Operator

2
Carpenter
Deshuttering M2 4.00 28.00 0.14 3.056 1 Helper . 0.44 1 0.44 0.05
056
Operator

6 0.38 - 0.15

1
Carpenter
18 Helper
Z2V33-0450 RCC Slab / Beam - 1L Casting M3 181.00 180.00 1.01 26.000 26.14 1 26.14
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 905.00 16.00 56.56 3.056 1 Helper . 172.86 6 28.81 8.08
056
Operator

1 Steel
Fixer 1
Rebars kg 32,580.00 200.00 162.90 2.056 Helper . 334.92 5 66.98 11.64
056
Operator

2
Carpenter
Deshuttering M2 905.00 32.00 28.28 3.056 1 Helper . 86.43 2 43.21 4.04
056
Operator

14 12.12 - 11.64
2
Carpenter
Z2V33-0460 RCC For Stair/Landings @ G.L. - 1L Casting M3 9 81.00 0.11 22.000 16 Helper 2.44 1 2.44
4 Mason
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

2
Carpenter
Formworks M2 45.00 4.00 11.25 3.056 1 Helper . 34.38 4 8.60 2.25
056
Operator

1 Steel
Fixer 1
Rebars kg 1,620.00 200.00 8.10 2.056 Helper . 16.65 3 5.55 0.81
056
Operator

2
Carpenter
Deshuttering M2 45.00 28.00 1.61 3.056 1 Helper . 4.91 2 2.46 0.32
056
Operator

10 2.57 - 0.81

1
Carpenter
18 Helper
Z2V33-0470 RCC Canopy Casting M3 8.00 180.00 0.04 26.000 1.16 1 1.16
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 40.00 16.00 2.50 3.056 1 Helper . 7.64 4 1.91 0.56
056
Operator

1 Steel
Fixer 1
Rebars kg 1,440.00 200.00 7.20 2.056 Helper . 14.80 3 4.93 0.80
056
Operator

2
Carpenter
Deshuttering M2 40.00 32.00 1.25 3.056 1 Helper . 3.82 1 3.82 0.28
056
Operator

9 0.83 - 0.80
2
Carpenter
Z2V33-0480 RCC For Wall/Col. From Top of 1L-2L Casting M3 235 81.00 2.90 22.000 16 Helper 63.83 1 63.83
4 Mason

2
Carpenter
Formworks M2 940.00 4.00 235.00 3.056 1 Helper . 718.16 5 143.63 39.17
056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer
1 Steel
Fixer 1
Rebars kg 42,300.00 200.00 211.50 2.056 Helper . 434.84 4 108.71 17.63
056
Operator

2
Carpenter
Deshuttering M2 940.00 28.00 33.57 3.056 1 Helper . 102.59 2 51.30 5.60
056
Operator

12 44.76 - 17.63

1
Carpenter
18 Helper
Z2V33-0490 RCC Slab / Beam - 2L Casting M3 178.00 180.00 0.99 26.000 25.71 1 25.71
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 890.00 16.00 55.63 3.056 1 Helper . 169.99 6 28.33 7.95
056
Operator

1 Steel
Fixer 1
Rebars kg 32,040.00 200.00 160.20 2.056 Helper . 329.37 5 65.87 11.44
056
Operator

2
Carpenter
Deshuttering M2 890.00 32.00 27.81 3.056 1 Helper . 85.00 2 42.50 3.97
056
Operator

14 11.92 - 11.44
2
Carpenter
Z2V33-0500 RCC for Stair/Landings @ 1L-2L Casting M3 9 81.00 0.11 22.000 16 Helper 2.44 1 2.44
4 Mason

2
Carpenter
Formworks M2 45.00 4.00 11.25 3.056 1 Helper . 34.38 4 8.60 2.25
056
Operator

1 Steel
Fixer 1
Rebars kg 1,620.00 200.00 8.10 2.056 Helper . 16.65 3 5.55 0.81
056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

2
Carpenter
Deshuttering M2 45.00 28.00 1.61 3.056 1 Helper . 4.91 2 2.46 0.32
056
Operator

10 2.57 - 0.81
Z2V33-0510 RCC For Wall/Col. From Top of 2L-3L M3 237 12
Z2V33-0520 RCC Slab / Beam - 3L M3 234 14
Z2V33-0530 RCC For Stair/Landings @ 2L-3L M3 7 10
2
Carpenter
Z2V33-0540 RCC For Wall/Col. From Top of 3L-4L Casting M3 237 81.00 2.93 22.000 16 Helper 64.37 1 64.37
4 Mason

2
Carpenter
Formworks M2 948.00 4.00 237.00 3.056 1 Helper . 724.27 5 144.85 39.50
056
Operator

1 Steel
Fixer 1
Rebars kg 42,660.00 200.00 213.30 2.056 Helper . 438.54 4 109.64 17.78
056
Operator

2
Carpenter
Deshuttering M2 948.00 28.00 33.86 3.056 1 Helper . 103.47 2 51.73 5.64
056
Operator

12 45.14 - 17.78

1
Carpenter
18 Helper
Z2V33-0550 RCC Slab / Beam - 4L Casting M3 178.00 180.00 0.99 26.000 25.71 1 25.71
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 890.00 16.00 55.63 3.056 1 Helper . 169.99 6 28.33 7.95
056
Operator

1 Steel
Fixer 1
Rebars kg 32,040.00 200.00 160.20 2.056 Helper . 329.37 5 65.87 11.44
056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

2
Carpenter
Deshuttering M2 890.00 32.00 27.81 3.056 1 Helper . 85.00 2 42.50 3.97
056
Operator

14 11.92 - 11.44
Z2V33-0560 RCC For Stair/Landings @ 3L-4L M3 9 10
2
Carpenter
Z2V33-0570 RCC For Wall/Col. From Top of 4L-RoofL Casting M3 235 81.00 2.90 22.000 16 Helper 63.83 1 63.83
4 Mason

2
Carpenter
Formworks M2 940.00 4.00 235.00 3.056 1 Helper . 718.16 4 179.54 47.00
056
Operator

1 Steel
Fixer 1
Rebars kg 42,300.00 200.00 211.50 2.056 Helper . 434.84 3 144.95 21.15
056
Operator

2
Carpenter
Deshuttering M2 940.00 28.00 33.57 3.056 1 Helper . 102.59 2 51.30 6.71
056
Operator

10 53.71 - 21.15

2
Carpenter
Z2V33-0580 RCC Wall/Col. For Staircase From Top of 4L-RoofL Casting M3 2 81.00 0.02 22.000 16 Helper 0.54 1 0.54
4 Mason

2
Carpenter
Formworks M2 8.00 4.00 2.00 3.056 1 Helper . 6.11 2 3.06 0.67
056
Operator

1 Steel
Fixer 1
Rebars kg 360.00 200.00 1.80 2.056 Helper . 3.70 2 1.85 0.30
056
Operator

2
Carpenter
Deshuttering M2 8.00 28.00 0.29 3.056 1 Helper . 0.87 1 0.87 0.10
056
Operator

6 0.76 - 0.30
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1
Carpenter
18 Helper
Z2V33-0590 RCC Slab / Beam - RoofL Casting M3 176.00 180.00 0.98 26.000 25.42 1 25.42
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 880.00 16.00 55.00 3.056 1 Helper . 168.08 5 33.62 9.17
056
Operator

1 Steel
Fixer 1
Rebars kg 31,680.00 200.00 158.40 2.056 Helper . 325.67 4 81.42 13.20
056
Operator

2
Carpenter
Deshuttering M2 880.00 32.00 27.50 3.056 1 Helper . 84.04 2 42.02 4.58
056
Operator

12 13.75 - 13.20
2
Carpenter
Z2V33-0600 RCC For Stair/Landings @ 4L-RoofL Casting M3 9 81.00 0.11 22.000 16 Helper 2.44 1 2.44
4 Mason

2
Carpenter
Formworks M2 45.00 4.00 11.25 3.056 1 Helper . 34.38 3 11.46 2.81
056
Operator

1 Steel
Fixer 1
Rebars kg 1,620.00 200.00 8.10 2.056 Helper . 16.65 3 5.55 1.01
056
Operator

2
Carpenter
Deshuttering M2 45.00 28.00 1.61 3.056 1 Helper . 4.91 1 4.91 0.40
056
Operator

8 3.21 - 1.01

1
Carpenter
18 Helper
Z2V33-0610 RCC Slab / Beam for Staircase - RoofL Casting M3 4.00 180.00 0.02 26.000 0.58 1 0.58
6 Mason
1 Steel
Fixer
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

2
Carpenter
Formworks M2 20.00 16.00 1.25 3.056 1 Helper . 3.82 3 1.27 0.36
056
Operator

1 Steel
Fixer 1
Rebars kg 720.00 200.00 3.60 2.056 Helper . 7.40 2 3.70 0.51
056
Operator

2
Carpenter
Deshuttering M2 20.00 32.00 0.63 3.056 1 Helper . 1.91 1 1.91 0.18
056
Operator

7 0.54 - 0.51
2
Carpenter
Z2V33-0620 RCC For Lower Parapet Casting M3 19 81.00 0.23 22.000 16 Helper 5.16 1 5.16
4 Mason

2
Carpenter
Formworks M2 76.00 4.00 19.00 3.056 1 Helper . 58.06 4 14.52 3.80
056
Operator

1 Steel
Fixer 1
Rebars kg 3,420.00 200.00 17.10 2.056 Helper . 35.16 3 11.72 1.71
056
Operator

2
Carpenter
Deshuttering M2 76.00 28.00 2.71 3.056 1 Helper . 8.29 2 4.15 0.54
056
Operator

10 4.34 - 1.71
2
Carpenter
Z2V33-0630 RCC For Wall/Col. From Roof L-Top of Roof L Casting M3 33 81.00 0.41 22.000 16 Helper 8.96 1 8.96
4 Mason

2
Carpenter
Formworks M2 132.00 4.00 33.00 3.056 1 Helper . 100.85 2 50.42 11.00
056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer
1 Steel
Fixer 1
Rebars kg 5,940.00 200.00 29.70 2.056 Helper . 61.06 2 30.53 4.95
056
Operator

2
Carpenter
Deshuttering M2 132.00 28.00 4.71 3.056 1 Helper . 14.41 1 14.41 1.57
056
Operator

6 12.57 - 4.95

1
Carpenter
18 Helper
Z2V33-0640 RCC Slab / Beam Top Roof Level Casting M3 38.00 180.00 0.21 26.000 5.49 1 5.49
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 190.00 16.00 11.88 3.056 1 Helper . 36.29 3 12.10 3.39
056
Operator

1 Steel
Fixer 1
Rebars kg 6,840.00 200.00 34.20 2.056 Helper . 70.32 2 35.16 4.89
056
Operator

2
Carpenter
Deshuttering M2 190.00 32.00 5.94 3.056 1 Helper . 18.15 1 18.15 1.70
056
Operator

7 5.09 - 4.89
2
Carpenter
Z2V33-0650 RCC For Upper Parapet Casting M3 24 81.00 0.30 22.000 16 Helper 6.52 1 6.52
4 Mason

2
Carpenter
Formworks M2 96.00 4.00 24.00 3.056 1 Helper . 73.34 3 24.45 6.00
056
Operator

1 Steel
Fixer 1
Rebars kg 4,320.00 200.00 21.60 2.056 Helper . 44.41 3 14.80 2.70
056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

2
Carpenter
Deshuttering M2 96.00 28.00 3.43 3.056 1 Helper . 10.48 1 10.48 0.86
056
Operator

8 6.86 - 2.70

1
Carpenter
18 Helper
Z2V33-0660 RCC Eqmt. Pads + Railing Casting M3 1 180.00 0.01 26.000 0.14 1 0.14
6 Mason
1 Steel
Fixer

2
Carpenter
Formworks M2 4.00 12.00 0.33 3.056 1 Helper . 1.02 4 0.25 0.07
056
Operator

1 Steel
Fixer 1
Rebars kg 180.00 250.00 0.72 2.056 Helper . 1.48 3 0.49 0.07
056
Operator

2
Carpenter
Deshuttering M2 4.00 35.00 0.11 3.056 1 Helper . 0.35 2 0.17 0.02
056
Operator

10 0.09 - 0.07

MEP
FINISHES

1 Mason
1 Helper
Z2V33-3090 I. Hollow Block Works + Lintels @ Grnd Flr. M2 1,512.00 10.00 151.20 2.056 310.87 14 22.20 10.80
.056
Operator
1 Mason
Z2V33-3100 I. Internal Plaster Accessories & Rush @ GL M2 72.00 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-3110 I. Internal Plaster Works @ GL M2 2,436.00 20.00 121.80 2.000 243.60 12 20.30 10.15
1 Helper

1 Mason
1 Helper
Z2V33-3120 I. Glazed Ceramic Tile @ GL M2 712 12.00 59.33 2.056 121.99 14 8.71 4.24
.056
Operator

1 Mason
1 Helper
Z2V33-3130 I. Block Works For Ducts @ Grnd Flr. M2 54 10.00 5.40 2.056 11.10 2 5.55 2.70
.056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1
Carpente
r1
Z2V33-3140 I. Install False Ceiling (Susp. + Boarding) @ GL M2 373 7.20 51.81 2.056 106.51 14 7.61 3.70
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-3150 I. Screed + Ceramic Tiles & Skirtings @ GL M2 1212 12.00 101.00 2.056 207.66 14 14.83 7.21
.056
Operator

1 Mason
1 Helper
Z2V33-3160 I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL M2 314 32.00 9.81 2.056 20.17 14 1.44 0.70
.056
Operator
4Waterpr
oofer
Z2V33-3170 I. Water Proofing + Screed on Wet Areas - GL M2 683 64.00 10.67 6.000 64.03 10 6.40
2
Helper

1
Carpente
r1
Z2V33-3180 I. Frames Installations @ GL Nos. 54 4.80 11.25 2.056 23.13 14 1.65 0.80
Helper .
056
Operator

1
Carpente
r1
Z2V33-3190 I. Doors w/ Ironmongery @ GL Nos. 54 4.80 11.25 2.056 23.13 12 1.93 0.94
Helper .
056
Operator

1
Carpente
r1
Z2V33-3200 I. Frames Installation Works @ GL M2 183 4.80 38.13 2.056 78.39 14 5.60 2.72
Helper .
056
Operator

1 Alum.
Tech 1
Z2V33-3210 I.Aluminum + Glass & Other Associated Works @ GL M2 183 1.60 114.38 2.056 Helper . 235.16 12 19.60
056
Operator

1
Carpente
r1
Z2V33-3220 I. Kitchen Cabinets @ GL Nos. 11 0.60 18.33 2.056 37.69 14 2.69 1.31
Helper .
056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1
Carpente
r1
Z2V33-3230 I. Wardrobes @ GL Nos. 14 0.75 18.67 2.056 38.38 14 2.74 1.33
Helper .
056
Operator

Z2V33-3240 I. Primer Application Works @ GL M2 788.00 54.60 14.43 1.000 1 Painter 14.43 10 1.44

Z2V33-3250 I. Stucco Application Works @ GL M2 788.00 16.40 48.05 1.000 1 Painter 48.05 14 3.43

Z2V33-3260 I. Emulsion Paint Works @ GL M2 971.00 32.20 30.16 1.000 1 Painter 30.16 12 2.51

1 Mason
Z2V33-3270 O. Plaster Accessories & Rush @ GL M2 72 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-3280 O. Plaster Works @ GL M2 370 20.00 18.50 2.000 37.00 12 3.08 1.54
1 Helper

1 Mason
1 Helper
Z2V33-3290 O. Polished Marble & Ceramic for Wall @ GL M2 351 10.00 35.10 2.056 72.17 14 5.15 2.51
.056
Operator

1 Mason
1 Helper
Z2V33-3300 O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr. M2 27 10.00 2.70 2.056 5.55 2 2.78 1.35
.056
Operator

1
Carpente
r1
Z2V33-3310 O. Gypsum Board +Washable Paint @ GL M2 61 16.00 3.81 2.056 7.84 14 0.56 0.27
Helper .
056
Operator

1
Carpente
r1
Z2V33-3320 O. Semi Recessed G.R.G. Tiles @ GL M2 50 16.00 3.13 2.056 6.43 14 0.46 0.22
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-3330 O. Sreed + Graniti Tiles & Skirtings @ GL M2 427 12.00 35.58 2.056 73.16 14 5.23 2.54
.056
Operator

1 Mason
1 Helper
Z2V33-3340 O. Screed + Polished Marble & Skirtings @ GL M2 196 12.00 16.33 2.056 33.58 14 2.40 1.17
.056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1 Alum.
Tech 1
Z2V33-3350 O. G. Stl, Powdr coated Railin to Staircase @ GL LM 24 20.00 1.20 2.056 Helper . 2.47 10 0.25
056
Operator

Z2V33-3360 O. Primer ApplicationWorks @ GL. M2 111 54.60 2.03 1.000 1 Painter 2.03 8 0.25

Z2V33-3370 O. Stucco Application Works @ GL M2 111 16.40 6.77 1.000 1 Painter 6.77 12 0.56

Z2V33-3380 O. Emulsion Paint Works @ GL M2 49 32.20 1.52 1.000 1 Painter 1.52 10 0.15

1 Mason
1 Helper
Z2V33-3390 I. Hollow Block Works + Lintels @ 1st Flr. M2 1,598.00 10.00 159.80 2.056 328.55 14 23.47 11.41
.056
Operator
1 Mason
Z2V33-3400 I. Internal Plaster Accessories & Rush @ 1L M2 72.00 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-3410 I. Internal Plaster Works @ 1L M2 2,395.00 20.00 119.75 2.000 239.50 12 19.96 9.98
1 Helper

1 Mason
1 Helper
Z2V33-3420 I. Glazed Ceramic Tile @ 1L M2 755 12.00 62.92 2.056 129.36 14 9.24 4.49
.056
Operator

1 Mason
1 Helper
Z2V33-3430 I. Block Works For Ducts @ 1st Flr. M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00
.056
Operator

1
Carpente
r1
Z2V33-3440 I. Install False Ceiling (Susp. + Boarding) @ 1L M2 400 7.20 55.56 2.056 114.22 14 8.16 3.97
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-3450 I. Screed + Ceramic Tiles & Skirtings @ 1L M2 1268 12.00 105.67 2.056 217.25 14 15.52 7.55
.056
Operator

1 Mason
1 Helper
Z2V33-3460 I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L M2 218 32.00 6.81 2.056 14.01 8 1.75 0.85
.056
Operator
4Waterpr
oofer
Z2V33-3470 I. Water Proofing + Screed on Wet Areas - 1L M2 547 64.00 8.55 6.000 51.28 10 5.13
2
Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1
Carpente
r1
Z2V33-3480 I. Frames Installations @ 1L Nos. 62 4.80 12.92 2.056 26.56 14 1.90 0.92
Helper .
056
Operator

1
Carpente
r1
Z2V33-3490 I. Doors w/ Ironmongery @ 1L Nos. 62 4.80 12.92 2.056 26.56 12 2.21 1.08
Helper .
056
Operator

1
Carpente
r1
Z2V33-3500 I. Frames Installation Works @ GL M2 119 4.80 24.79 2.056 50.97 14 3.64 1.77
Helper .
056
Operator

1 Alum.
Tech 1
Z2V33-3510 I. Aluminum+Glass & Other Associated Works @ 1L M2 119 1.60 74.38 2.056 Helper . 152.92 12 12.74
056
Operator

1
Carpente
r1
Z2V33-3520 I. Wardrobes @ 1L Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62
Helper .
056
Operator

1
Carpente
r1
Z2V33-3530 I. Kitchen Cabinets @ 1L Nos. 16 0.60 26.67 2.056 54.83 14 3.92 1.90
Helper .
056
Operator

Z2V33-3540 I. Primer Application Works @ 1L M2 758.00 54.60 13.88 1.000 1 Painter 13.88 12 1.16

Z2V33-3550 I. Stucco Application Works @ 1L M2 758.00 16.40 46.22 1.000 1 Painter 46.22 14 3.30

Z2V33-3560 I. Emulsion Paint Works @ 1L M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 14 3.01

1 Mason
Z2V33-3570 O. Plaster Accessories & Rush @ 1L M2 72 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-3580 O. Plaster Works @ 1L M2 397 20.00 19.85 2.000 39.70 12 3.31 1.65
1 Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1 Mason
1 Helper
Z2V33-3590 O. Polished Marble & Ceramic for Wall @ 1L M2 56 10.00 5.60 2.056 11.51 14 0.82 0.40
.056
Operator

1 Mason
1 Helper
Z2V33-3600 O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr. M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70
.056
Operator

1
Carpente
r1
Z2V33-3610 O. Gypsum Board +Washable Paint @ 1L M2 68 16.00 4.25 2.056 8.74 14 0.62 0.30
Helper .
056
Operator

1
Carpente
r1
Z2V33-3620 O. Semi Recessed G.R.G. Tiles @ 1L M2 51 16.00 3.19 2.056 6.55 14 0.47 0.23
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-3630 O. Sreed + Graniti Tiles & Skirtings @ 1L M2 453 12.00 37.75 2.056 77.61 14 5.54 2.70
.056
Operator

1 Mason
1 Helper
Z2V33-3640 O. Screed + Polished Marble & Skirtings @ 1L M2 50 12.00 4.17 2.056 8.57 14 0.61 0.30
.056
Operator

1 Alum.
Tech 1
Z2V33-3650 O. G. Stl, Powdr coated Railin to Staircase @ 1L LM 26 20.00 1.30 2.056 Helper . 2.67 10 0.27
056
Operator

Z2V33-3660 O. Primer Application Works @ 1L M2 119 54.60 2.18 1.000 1 Painter 2.18 8 0.27

Z2V33-3670 O. Stucco Application Works @ 1L M2 119 16.40 7.26 1.000 1 Painter 7.26 10 0.73

Z2V33-3680 O. Emulsion Paint Works @ 1L M2 55 32.20 1.71 1.000 1 Painter 1.71 12 0.14

1 Mason
1 Helper
Z2V33-3690 I. Hollow Block Works + Lintels @ 2nd Flr. 1,598.00 M2 1,598.00 10.00 159.80 2.056 328.55 14 23.47 11.41
.056
Operator
1 Mason
Z2V33-3700 I. Internal Plaster Accessories & Rush @ 2L 72.00 M2 72.00 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-3710 I. Internal Plaster Works @ 2L 2,395.00 M2 2,395.00 20.00 119.75 2.000 239.50 12 19.96 9.98
1 Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1 Mason
1 Helper
Z2V33-3720 I. Glazed Ceramic Tile @ 2L 755 M2 755 12.00 62.92 2.056 129.36 14 9.24 4.49
.056
Operator

1 Mason
1 Helper
Z2V33-3730 I. Block Works For Ducts @ 2nd Flr. 60 M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00
.056
Operator

1
Carpente
r1
Z2V33-3740 I. Install False Ceiling (Susp. + Boarding) @ 2L 400 M2 400 7.20 55.56 2.056 114.22 14 8.16 3.97
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-3750 I. Screed + Ceramic Tiles & Skirtings @ 2L 1268 M2 1268 12.00 105.67 2.056 217.25 14 15.52 7.55
.056
Operator

1 Mason
1 Helper
Z2V33-3760 I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L 218 M2 218 32.00 6.81 2.056 14.01 8 1.75 0.85
.056
Operator
4Waterpr
oofer
Z2V33-3770 I. Water Proofing + Screed on Wet Areas - 2L 547 M2 547 64.00 8.55 6.000 51.28 10 5.13
2
Helper

1
Carpente
r1
Z2V33-3780 I. Frames Installations @ 2L 62 Nos. 62 4.80 12.92 2.056 26.56 14 1.90 0.92
Helper .
056
Operator

1
Carpente
r1
Z2V33-3790 I. Doors w/ Ironmongery @ 2L 62 Nos. 62 4.80 12.92 2.056 26.56 12 2.21 1.08
Helper .
056
Operator

1
Carpente
r1
Z2V33-3800 I. Frames Installation Works @ 2L 119 M2 119 4.80 24.79 2.056 50.97 14 3.64 1.77
Helper .
056
Operator

1 Alum.
Tech 1
Z2V33-3810 I. Aluminum+Glass & Other Associated Works @ 2L 119 M2 119 1.60 74.38 2.056 Helper . 152.92 12 12.74
056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1
Carpente
r1
Z2V33-3820 I. Wardrobes @ 2L 17 Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62
Helper .
056
Operator

1
Carpente
r1
Z2V33-3830 I. Kitchen Cabinets @ 2L 16 Nos. 16 0.60 26.67 2.056 54.83 14 3.92 1.90
Helper .
056
Operator

Z2V33-3840 I. Primer Application Works @ 2L 758.00 M2 758.00 54.60 13.88 1.000 1 Painter 13.88 12 1.16

Z2V33-3850 I. Stucco Application Works @ 2L 758.00 M2 758.00 16.40 46.22 1.000 1 Painter 46.22 14 3.30

Z2V33-3860 I. Emulsion Paint Works @ 2L 1,356.00 M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 14 3.01

1 Mason
Z2V33-3870 O. Plaster Accessories & Rush @ 2L 72 M2 72 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-3880 O. Plaster Works @ 2L 397 M2 397 20.00 19.85 2.000 39.70 12 3.31 1.65
1 Helper

1 Mason
1 Helper
Z2V33-3890 O. Polished Marble & Ceramic for Wall @ 2L 56 M2 56 10.00 5.60 2.056 11.51 14 0.82 0.40
.056
Operator

1 Mason
1 Helper
Z2V33-3900 O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr. 14 M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70
.056
Operator

1
Carpente
r1
Z2V33-3910 O. Gypsum Board +Washable Paint @ 2L 68 M2 68 16.00 4.25 2.056 8.74 14 0.62 0.30
Helper .
056
Operator

1
Carpente
r1
Z2V33-3920 O. Semi Recessed G.R.G. Tiles @ 2L 51 M2 51 16.00 3.19 2.056 6.55 14 0.47 0.23
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-3930 O. Sreed + Graniti Tiles & Skirtings @ 2L 453 M2 453 12.00 37.75 2.056 77.61 14 5.54 2.70
.056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1 Mason
1 Helper
Z2V33-3940 O. Screed + Polished Marble & Skirtings @ 2L 45 M2 50 12.00 4.17 2.056 8.57 14 0.61 0.30
.056
Operator

1 Alum.
Tech 1
Z2V33-3950 O. G.Steel, Powder coated Railin to Staircase@2L 26 LM 26 20.00 1.30 2.056 Helper . 2.67 10 0.27
056
Operator

Z2V33-3960 O. Primer Application Works @ 2L 119 M2 119 54.60 2.18 1.000 1 Painter 2.18 8 0.27

Z2V33-3970 O. Stucco Application Works @ 2L 119 M2 119 16.40 7.26 1.000 1 Painter 7.26 10 0.73

Z2V33-3980 O. Emulsion Paint Works @ 2L 55 M2 55 32.20 1.71 1.000 1 Painter 1.71 12 0.14

1 Mason
1 Helper
Z2V33-3990 I. Hollow Block Works + Lintels @ 3rd Flr. 1,598.00 M2 1,598.00 10.00 159.80 2.056 328.55 14 23.47 11.41
.056
Operator
1 Mason
Z2V33-4000 I. Internal Plaster Accessories & Rush @ 3L 72.00 M2 72.00 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-4010 I. Internal Plaster Works @ 3L 2,395.00 M2 2,395.00 20.00 119.75 2.000 239.50 12 19.96 9.98
1 Helper

1 Mason
1 Helper
Z2V33-4020 I. Glazed Ceramic Tile @ 3L 755 M2 735 12.00 61.25 2.056 125.93 14 9.00 4.38
.056
Operator

1 Mason
1 Helper
Z2V33-4030 I. Block Works For Ducts @ 3rd Flr. 60 M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00
.056
Operator

1
Carpente
r1
Z2V33-4040 I. Install False Ceiling (Susp. + Boarding) @ 3L 400 M2 400 7.20 55.56 2.056 114.22 14 8.16 3.97
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-4050 I. Screed + Ceramic Tiles & Skirtings @ 3L 1268 M2 1268 12.00 105.67 2.056 217.25 14 15.52 7.55
.056
Operator

1 Mason
1 Helper
Z2V33-4060 I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L 218 M2 218 32.00 6.81 2.056 14.01 8 1.75 0.85
.056
Operator
4Waterpr
oofer
Z2V33-4070 I. Water Proofing + Screed on Wet Areas - 3L 547 M2 547 64.00 8.55 6.000 51.28 10 5.13
2
Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1
Carpente
r1
Z2V33-4080 I. Frames Installations @ 3L 62 Nos. 62 4.80 12.92 2.056 26.56 14 1.90 0.92
Helper .
056
Operator

1
Carpente
r1
Z2V33-4090 I. Doors w/ Ironmongery @ 3L 62 Nos. 62 4.80 12.92 2.056 26.56 12 2.21 1.08
Helper .
056
Operator

1
Carpente
r1
Z2V33-4100 I. Frames Installation Works @ 3L 119 M2 119 4.80 24.79 2.056 50.97 14 3.64 1.77
Helper .
056
Operator

1 Alum.
Tech 1
Z2V33-4110 I. Aluminum+Glass & Other Associated Works @ 3L 119 M2 119 1.60 74.38 2.056 Helper . 152.92 12 12.74
056
Operator

1
Carpente
r1
Z2V33-4120 I. Wardrobes @ 3L 17 Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62
Helper .
056
Operator

1
Carpente
r1
Z2V33-4130 I. Kitchen Cabinets @ 3L 16 Nos. 16 0.60 26.67 2.056 54.83 14 3.92 1.90
Helper .
056
Operator

Z2V33-4140 I. Primer Appilcation Works @ 3L 758.00 M2 758.00 54.60 13.88 1.000 1 Painter 13.88 12 1.16

Z2V33-4150 I. Stucco Application Works @ 3L 758.00 M2 758.00 16.40 46.22 1.000 1 Painter 46.22 14 3.30

Z2V33-4160 I. Emulsion Paint Works @ 3L 1,356.00 M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 14 3.01

1 Mason
Z2V33-4170 O. Plaster Accessories & Rush @ 3L 72 M2 72 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-4180 O. Plaster Works @ 3L 397 M2 397 20.00 19.85 2.000 39.70 12 3.31 1.65
1 Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1 Mason
1 Helper
Z2V33-4190 O. Polished Marble & Ceramic for Wall @ 3L 56 M2 56 10.00 5.60 2.056 11.51 14 0.82 0.40
.056
Operator

1 Mason
1 Helper
Z2V33-4200 O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr. 14 M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70
.056
Operator

1
Carpente
r1
Z2V33-4210 O. Gypsum Board +Washable Paint @ 3L 68 M2 68 16.00 4.25 2.056 8.74 14 0.62 0.30
Helper .
056
Operator

1
Carpente
r1
Z2V33-4220 O. Semi Recessed G.R.G. Tiles @ 3L 51 M2 51 16.00 3.19 2.056 6.55 14 0.47 0.23
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-4230 O. Screed + Polished Marble & Skirtings @ 3L 453 M2 453 12.00 37.75 2.056 77.61 14 5.54 2.70
.056
Operator

1 Mason
1 Helper
Z2V33-4240 O. Sreed + Graniti Tiles & Skirtings @ 3L 45 M2 50 12.00 4.17 2.056 8.57 14 0.61 0.30
.056
Operator

1 Alum.
Tech 1
Z2V33-4250 O. G.Steel, Powder coated Railin to Staircase@3L 26 LM 26 20.00 1.30 2.056 Helper . 2.67 10 0.27
056
Operator

Z2V33-4260 O. Primer Application Works @ 3L 119 M2 119 54.60 2.18 1.000 1 Painter 2.18 8 0.27

Z2V33-4270 O. Stucco Application Works @ 3L 119 M2 119 16.40 7.26 1.000 1 Painter 7.26 10 0.73

Z2V33-4280 O. Emulsion Paint Works @ 3L 55 M2 55 32.20 1.71 1.000 1 Painter 1.71 12 0.14

1 Mason
1 Helper
Z2V33-4290 I. Hollow Block Works + Lintels @ 4th Flr. 1,598.00 M2 1,598.00 10.00 159.80 2.056 328.55 12 27.38 13.32
.056
Operator
1 Mason
Z2V33-4300 I. Internal Plaster Accessories & Rush @ 4L 72.00 M2 72.00 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-4310 I. Internal Plaster Works @ 4L 2,395.00 M2 2,395.00 20.00 119.75 2.000 239.50 10 23.95 11.98
1 Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1 Mason
1 Helper
Z2V33-4320 I. Glazed Ceramic Tile @ 4L 755 M2 755 12.00 62.92 2.056 129.36 12 10.78 5.24
.056
Operator

1 Mason
1 Helper
Z2V33-4330 I. Block Works For Ducts @ 4th Flr. 60 M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00
.056
Operator

1
Carpente
r1
Z2V33-4340 I. Install False Ceiling (Susp. + Boarding) @ 4L 400 M2 400 7.20 55.56 2.056 114.22 12 9.52 4.63
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-4350 I. Screed + Ceramic Tiles & Skirtings @ 4L 1268 M2 1268 12.00 105.67 2.056 217.25 12 18.10 8.81
.056
Operator

1 Mason
1 Helper
Z2V33-4360 I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L 218 M2 218 32.00 6.81 2.056 14.01 6 2.33 1.14
.056
Operator
4Waterpr
oofer
Z2V33-4370 I. Water Proofing + Screed on Wet Areas - 4L 547 M2 547 64.00 8.55 6.000 51.28 8 6.41
2
Helper

1
Carpente
r1
Z2V33-4380 I. Frames Installations @ 4L 62 Nos. 62 4.80 12.92 2.056 26.56 10 2.66 1.29
Helper .
056
Operator

1
Carpente
r1
Z2V33-4390 I. Doors w/ Ironmongery @ 4L 62 Nos. 62 4.80 12.92 2.056 26.56 8 3.32 1.61
Helper .
056
Operator

1
Carpente
r1
Z2V33-4400 I. Frames Installation Works @ 4L 119 M2 119 4.80 24.79 2.056 50.97 12 4.25 2.07
Helper .
056
Operator

1 Alum.
Tech 1
Z2V33-4410 I. Aluminum+Glass & Other Associated Works @ 4L 119 M2 119 1.60 74.38 2.056 Helper . 152.92 10 15.29
056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1
Carpente
r1
Z2V33-4420 I. Kitchen Cabinets @ 4L 17 Nos. 17 0.75 22.67 2.056 46.60 12 3.88 1.89
Helper .
056
Operator

1
Carpente
r1
Z2V33-4430 I. Wardrobes @ 4L 16 Nos. 16 0.60 26.67 2.056 54.83 12 4.57 2.22
Helper .
056
Operator

Z2V33-4440 I. Primer Application Works @ 4L 758.00 M2 758.00 54.60 13.88 1.000 1 Painter 13.88 10 1.39

Z2V33-4450 I. Stucco Installation Works @ 4L 758.00 M2 758.00 16.40 46.22 1.000 1 Painter 46.22 12 3.85

Z2V33-4460 I. Emulsion Paint Works @ 4L 1,356.00 M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 12 3.51

1 Mason
Z2V33-4470 O. Plaster Accessories & Rush @ 4L 72 M2 72 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-4480 O. Plaster Works @ 4L 397 M2 397 20.00 19.85 2.000 39.70 10 3.97 1.99
1 Helper

1 Mason
1 Helper
Z2V33-4490 O. Polished Marble & Ceramic for Wall @ 4L 56 M2 56 10.00 5.60 2.056 11.51 12 0.96 0.47
.056
Operator

1 Mason
1 Helper
Z2V33-4500 O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr. 14 M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70
.056
Operator

1
Carpente
r1
Z2V33-4510 O. Gypsum Board + Washable Paint @ 4L 68 M2 68 16.00 4.25 2.056 8.74 12 0.73 0.35
Helper .
056
Operator

1
Carpente
r1
Z2V33-4520 O. Semi Recessed G.R.G. Tiles @ 4L 51 M2 51 16.00 3.19 2.056 6.55 12 0.55 0.27
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-4530 O. Screed + Polished Marble & Skirtings @ 4L 453 M2 453 12.00 37.75 2.056 77.61 12 6.47 3.15
.056
Operator
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1 Mason
1 Helper
Z2V33-4540 O. Sreed + Graniti Tiles & Skirtings @ 4L 45 M2 50 12.00 4.17 2.056 8.57 12 0.71 0.35
.056
Operator

1 Alum.
Tech 1
Z2V33-4550 O. G.Steel, Powder coated Railin to Staircase@4L 26 LM 26 20.00 1.30 2.056 Helper . 2.67 8 0.33
056
Operator

Z2V33-4560 O. Primer Application Works @ 4L 119 M2 119 54.60 2.18 1.000 1 Painter 2.18 7 0.31

Z2V33-4570 O. Stucco Application Works @ 4L 119 M2 119 16.40 7.26 1.000 1 Painter 7.26 8 0.91

Z2V33-4580 O. Emulsion Paint Works @ 4L 55 M2 55 32.20 1.71 1.000 1 Painter 1.71 10 0.17

1 Mason
1 Helper
Z2V33-4590 I. Hollow Block Works + Lintels @ 5th Flr. M2 1,598.00 10.00 159.80 2.056 328.55 12 27.38 13.32
.056
Operator
1 Mason
Z2V33-4600 I. Internal Plaster Accessories & Rush @ 5L M2 72.00 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-4610 I. Internal Plaster Works @ 5L M2 2,395.00 20.00 119.75 2.000 239.50 10 23.95 11.98
1 Helper

1 Mason
1 Helper
Z2V33-4620 I. Glazed Ceramic Tile @ 5L M2 755 12.00 62.92 2.056 129.36 12 10.78 5.24
.056
Operator

1 Mason
1 Helper
Z2V33-4630 I. Block Works For Ducts @ 5th Flr. M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00
.056
Operator

1
Carpente
r1
Z2V33-4640 I. Install False Ceiling (Susp. + Boarding) @ 5L M2 400 7.20 55.56 2.056 114.22 12 9.52 4.63
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-4650 I. Screed + Ceramic Tiles & Skirtings @ 5L M2 1268 12.00 105.67 2.056 217.25 12 18.10 8.81
.056
Operator

1 Mason
1 Helper
Z2V33-4660 I. Screed + Non-Slip Ceramic Tiles &Skirtings@5L M2 218 32.00 6.81 2.056 14.01 6 2.33 1.14
.056
Operator
4Waterpr
oofer
Z2V33-4670 I. Water Proofing + Screed on Wet Areas - 5L M2 547 64.00 8.55 6.000 51.28 8 6.41
2
Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1
Carpente
r1
Z2V33-4680 I. Frames Installations @ 5L Nos. 62 4.80 12.92 2.056 26.56 10 2.66 1.29
Helper .
056
Operator

1
Carpente
r1
Z2V33-4690 I. Doors w/ Ironmongery @ 5L Nos. 62 4.80 12.92 2.056 26.56 8 3.32 1.61
Helper .
056
Operator

1
Carpente
r1
Z2V33-4700 I. Frames Installation Works @ 5L M2 119 4.80 24.79 2.056 50.97 12 4.25 2.07
Helper .
056
Operator

1 Alum.
Tech 1
Z2V33-4710 I. Aluminum+Glass & Other Associated Works @ 5L M2 119 1.60 74.38 2.056 Helper . 152.92 10 15.29
056
Operator

1
Carpente
r1
Z2V33-4720 I. Kitchen Cabinets @ 5L Nos. 17 0.75 22.67 2.056 46.60 12 3.88 1.89
Helper .
056
Operator

1
Carpente
r1
Z2V33-4730 I. Wardrobes @ 5L Nos. 16 0.60 26.67 2.056 54.83 12 4.57 2.22
Helper .
056
Operator

Z2V33-4740 I. Primer Application Works @ 5L M2 758.00 54.60 13.88 1.000 1 Painter 13.88 10 1.39

Z2V33-4750 I. Stucco Installation Works @ 5L M2 758.00 16.40 46.22 1.000 1 Painter 46.22 12 3.85

Z2V33-4760 I. Emulsion Paint Works @ 5L M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 12 3.51

1 Mason
Z2V33-4770 O. Plaster Accessories & Rush @ 5L M2 72 48.46 1.49 2.000 1 Helper 2.97 7 0.42 0.21

1 Mason
Z2V33-4780 O. Plaster Works @ 5L M2 397 20.00 19.85 2.000 39.70 10 3.97 1.99
1 Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1 Mason
1 Helper
Z2V33-4790 O. Polished Marble & Ceramic for Wall @ 5L M2 56 10.00 5.60 2.056 11.51 12 0.96 0.47
.056
Operator

1 Mason
1 Helper
Z2V33-4800 O. Blk Wks For Garbage Chutes+Plasters@ 5th Flr. M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70
.056
Operator

1
Carpente
r1
Z2V33-4810 O. Gypsum Board + Washable Paint @ 5L M2 68 16.00 4.25 2.056 8.74 12 0.73 0.35
Helper .
056
Operator

1
Carpente
r1
Z2V33-4820 O. Semi Recessed G.R.G. Tiles @ 5L M2 51 16.00 3.19 2.056 6.55 12 0.55 0.27
Helper .
056
Operator

1 Mason
1 Helper
Z2V33-4830 O. Screed + Polished Marble & Skirtings @ 5L M2 453 12.00 37.75 2.056 77.61 12 6.47 3.15
.056
Operator

1 Mason
1 Helper
Z2V33-4840 O. Sreed + Graniti Tiles & Skirtings @ 5L M2 50 12.00 4.17 2.056 8.57 12 0.71 0.35
.056
Operator

1 Alum.
Tech 1
Z2V33-4850 O. G.Steel, Powder coated Railin to Staircase@5L LM 26 20.00 1.30 2.056 Helper . 2.67 8 0.33
056
Operator

Z2V33-4860 O. Primer Application Works @ 5L M2 119 54.60 2.18 1.000 1 Painter 2.18 7 0.31

Z2V33-4870 O. Stucco Application Works @ 5L M2 119 16.40 7.26 1.000 1 Painter 7.26 8 0.91

Z2V33-4880 O. Emulsion Paint Works @ 5L M2 55 32.20 1.71 1.000 1 Painter 1.71 10 0.17

1 Mason
1 Helper
Z2V33-4890 Hollow Block Works + Lintels @ Roof Floor M2 307 10.00 30.70 2.056 63.12 10 6.31 3.07
.056
Operator
1 Mason
Z2V33-4900 Plaster Accessories & Rush @ Roof Floor M2 72 48.46 1.49 2.000 1 Helper 2.97 5 0.59 0.30

1 Mason
Z2V33-4910 Plastering Works @ Roof Deck Floor M2 339 20.00 16.95 2.000 33.90 8 4.24 2.12
1 Helper
Z2V33-4920 Roof Drain & Access.+ Lightweight Concrete M2 365.00 7
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer
Z2V33-4930 One Coat Cold Bituminous Primer M2 106.00 2
Z2V33-4940 2 Layers of SBS W.P. Membrane + Water Test M2 259.00 6
Z2V33-4950 Alum. Foil Covering Fixed to Upstand w/ Sealant LM 83 3
Z2V33-4960 50mm Thk. Extruded Polystyrene Insulation M2 259.00 2
Z2V33-4970 Protection Layer M2 259.00 2
Z2V33-4980 18mm-25mm Round Aggregates (50mm Thk.) M2 259.00 4
Z2V33-4990 1mm Thk. Alum. Flashing Fixed into Conc. Upstand M2 83 3
Z2V33-5000 Sealant Application Around top of Alum. Flashing M2 83 2
Z2V33-5010 Channel & Rails Installation for Lifts Items 2 14
Z2V33-5020 Cabin Assembly / Installation for lifts Items 2 10
Z2V33-5030 Machine Installation for lifts Items 2 7
Z2V33-5040 Doors Installation for lifts Items 2 10
Z2V33-5050 Connections To Ele + Finishing Touches for lifts Items 2 12
Z2V33-5060 Installation of Chute Tubes and Intake Throats Item 1 8
Z2V33-5070 Install Intake Doors, Chute Vent & Accessories Item 1 4
Z2V33-5080 Install Ground Floor Offset + Fire Shutter Door Item 1 2
Z2V33-5090 Install Compactor with MCP Item 1 1
Z2V33-5100 Installation of Garbage Container Item 1 1
Z2V33-5110 Final Test & Comm. Item 1 3
Z2V33-5120 Installation of Window Cleaning Eqmt. Item 1 14

Z2V33-5130 Primer Application Works @ Roof Deck M2 69 54.60 1.26 1.000 1 Painter 1.26 8 0.16

Z2V33-5140 Stucco Application Works @ Roof Deck M2 69 16.40 4.21 1.000 1 Painter 4.21 10 0.42

Z2V33-5150 Emulsion / Epoxy Paint Works @ Roof Deck M2 203 32.20 6.30 1.000 1 Painter 6.30 12 0.53

1
Z2V33-5160 Excavation Works External M3 6,887.67 315.00 21.87 2.000 Operator 43.73 5 8.75
1 Helper

2
Carpente
r 1
Z2V33-5170 RCC Manholes / Gully Traps Nos. 69 5.63 12.27 5.000 61.33 14 4.38 1.75 0.88
Mason 1
Helper 1
Operator

4Waterpr
oofer
Z2V33-5180 Water Proofing M2 124.30 76.00 1.64 6.000 9.81 12 0.82
2
Helper
1 Helper
Z2V33-5190 Sand Bedding M2 52.67 60.00 0.88 1.250 0.25 1.10 10 0.11
Operator

1.5
Operator
Z2V33-5200 Backfilling Works M3 6,834.67 601.00 11.37 7.500 85.29 14 6.09
3 Driver
3 Helper

Z2V33-5210 Instl Drainage Pipes &Con. To Existing Chambers Item 1 14


Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer
Z2V33-5220 Instl Water Supply Pipes&Con. To Existg Chambers Item 1 12
Z2V33-5230 Instl Chilled Water Pipes&Con. To Existg Chamber Item 1 14
Z2V33-5240 Instl Central Gas Pipes &Con. To Existg Chambers Item 1 12
Z2V33-5250 Instl Telephone Ducts &Con. To Existing Chambers Item 1 10
Z2V33-5260 Laying of Power cables (By Others) Item 1 7
Z2V33-5270 Hardscaping Works Item 1 14
Z2V33-5280 Landscaping Works Item 1 12
1 Mason
Z2V33-5290 Ext. Plaster Accessories & Rush on Front Elev. M2 1,865.00 48.46 38.49 2.000 1 Helper 76.97 2 38.49 19.24

1 Mason
Z2V33-5300 Ext. Plaster Works on Front Elevation M2 18.00 8.00 2.25 2.000 4.50 4 1.13 0.56
1 Helper

1 Mason
1 Helper
Z2V33-5310 Install Balcony Handrail on Front Elev. Nos. 19 15.00 1.27 2.250 2.85 12 0.24 0.11
.25
Operator

1
Carpente
Z2V33-5320 Decorative GRC Panels W/ Epoxy Paint @ F. Elev. Nos. 10 2.00 5.00 2.500 r1 12.50 10 1.25 0.50
Helper .5
Operator

1
Carpente
r1
Z2V33-5330 Wooden Pergola on Front Elev. @ (1st & 2nd) Flr. LM 5 8.00 0.63 2.500 1.56 12 0.13 0.05
Helper .
5
Operator

Z2V33-5340 External Painting Works on Front Elevation M2 1,883.00 32.20 58.48 3.000 3 Painter 175.43 14 12.53

1 Mason
Z2V33-5350 Ext. Plaster Access. & Rush on Leftside Elev. M2 688 48.46 14.20 2.000 1 Helper 28.39 2 14.20 7.10

1 Mason
Z2V33-5360 Ext. Plaster Works on Left Side Elevation M2 18 8.00 2.25 2.000 4.50 4 1.13 0.56
1 Helper

1 Mason
1 Helper
Z2V33-5370 Install Balcony Handrail on Leftside Elev. Nos. 15 15.00 1.00 2.250 2.25 10 0.23 0.10
.25
Operator

1
Carpente
Z2V33-5380 Decorative GRC Panels W/ Epoxy Paint @ LS. Elev. Nos. 1 2.00 0.50 2.500 r1 1.25 8 0.16 0.06
Helper .5
Operator

Z2V33-5390 External Painting Works on Left Side Elevation M2 706 32.20 21.93 3.000 3 Painter 65.78 12 5.48

1 Mason
Z2V33-5400 Ext. Plaster Accessories & Rush on Rear Elev. M2 1,417.00 48.46 29.24 2.000 1 Helper 58.48 2 29.24 14.62

1 Mason
Z2V33-5410 Ext. Plaster Works on Rear Elevation M2 18.00 8.00 2.25 2.000 4.50 4 1.13 0.56
1 Helper
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer

1 Mason
1 Helper
Z2V33-5420 Install Balcony Handrail on Rear Elev. Nos. 95 15.00 6.33 2.250 14.25 12 1.19 0.53
.25
Operator

1
Carpente
Z2V33-5430 Decorative GRC Panels W/ Epoxy Paint @ R. Elev. Nos. 22 2.00 11.00 2.500 r1 27.50 10 2.75 1.10
Helper .5
Operator

1
Carpente
r1
Z2V33-5440 Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr. LM 5 8.00 0.63 2.500 1.56 12 0.13 0.05
Helper .
5
Operator

Z2V33-5450 External Painting Works on Rear Elevation M2 1,435.00 32.20 44.57 3.000 3 Painter 133.70 14 9.55

1 Mason
Z2V33-5460 Ext. Plaster Access. & Rush on Rightside Elev. M2 688 48.46 14.20 2.000 1 Helper 28.39 2 14.20 7.10

1 Mason
Z2V33-5470 Ext. Plaster Works on Right Side Elevation M2 18 8.00 2.25 2.000 4.50 4 1.13 0.56
1 Helper

1 Mason
1 Helper
Z2V33-5480 Install Balcony Handrail on Rigthside Elev. Nos. 15 15.00 1.00 2.250 2.25 10 0.23 0.10
.25
Operator

1
Carpente
Z2V33-5490 Decorative GRC Panels W/ Epoxy Paint @ RS. Elev. Nos. 1 2.00 0.50 2.500 r1 1.25 8 0.16 0.06
Helper .5
Operator

Z2V33-5500 External Painting Works on Right Side Elevation M2 706 32.20 21.93 3.000 3 Painter 65.78 12 5.48

Z2V33-5510 Snagging & Desnagging For Finishes @ GF Item 1 30


Z2V33-5520 Handing-Over For Finishes @ GF Item 1 10
Z2V33-5530 Snagging & Desnagging For Finishes @ 1F Item 1 30
Z2V33-5540 Handing-Over For Finishes @ 1F Item 1 10
Z2V33-5550 Snagging & Desnagging For Finishes @ 2F Item 1 30
Z2V33-5560 Handing-Over For Finishes @ 2F Item 1 10
Z2V33-5570 Snagging & Desnagging For Finishes @ 3F Item 1 30
Z2V33-5580 Handing-Over For Finishes @ 3F Item 1 10
Z2V33-5590 Snagging & Desnagging For Finishes @ 4F Item 1 30
Z2V33-5600 Handing-Over For Finishes @ 4F Item 1 10
Z2V33-5610 Snagging & Desnagging For Finishes @ 5F Item 1 30
Z2V33-5620 Handing-Over For Finishes @ 5F Item 1 10
Z2V33-5630 Snagging & Desnagging For Finishes @ Roof Floor Item 1 1
Z2V33-5640 Handing-Over For Finishes @ Roof Floor Item 1 21
Z2V33-5650 Power On (By DEWA) 0 1
Z2V33-5660 Precommissioning & Startup 0 35
Tot. Man Crew Tot. M- Manpower
Activity Activity SUB Unit QTY (F) Prod. Rate (G) Days (H) OD (O)
(I) Desc. days (K) /day
Item
Steel
ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Carpenter Mason
Fixer
Z2V33-5670 Availability of Chilled Water (By Others) 0 12
Z2V33-5680 Testing & Final Commissioning 0 2
Z2V33-5690 Snagging & Desnagging For External Finishes Item 1 1
Z2V33-5700 Handing-Over For External Finishes Item 1 1
Z2V33-5710 Completion of Fdn./Superstructure -Building # 33 Item 1 1
Z2V33-5720 Completion of External Works for Building # 33 Item 1 1
Z2V33-5730 Completion of MEP Works for Building # 33 0
Z2V33-5740 Completion of Finishes for Building # 33 Item 1 0
Z2V33-5750 Completion of Fdn./SuperStruc. for Phase-2 BLDG. Item 1 0
Z2V33-5760 Completion of External Works for Phase-2 BLDG. Item 1 0
Z2V33-5770 Completion of MEP Works for Phase-2 BLDG. 0
Z2V33-5780 Completion of Finishes for Phase-2 BLDG. Item 1
Z2V33-5790 Completion Milestone for Phase-2 Buildings Item 1
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

0.38 0.38 1.000 1 Dozer 0.38 0.38

2.16

0.28 0.28 1.000 1 Dozer 1.41 0.28

0.75
0.25 0.13 1.00 6.750 Shovel 6 5.63 0.13 1.00
D. Truck

0.53 0.41 1.00 - - - - 0.28 0.13 1.00 - - - - - - -

0.5 Shovel
4 D.
0.58 0.29 1.54 4.750 3.66 0.19 1.54 0.10
Truck .25
B. Roller

3.11

0.5 Shovel
6 D.
0.24 0.12 0.97 6.750 7.66 0.12 0.92 0.06
Truck .25
B. Roller

0.23

0.5 Shovel
6 D.
2.84 1.42 11.36 6.750 38.33 1.34 10.76 0.67
Truck .25
B. Roller

4.55

13.17

40.91

0.500 .5 Vibrator 0.82 0.08


Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
9.87 0.55 0.056 5.53 0.55
Crane

.056 M.
21.31 1.19 0.056 11.93 1.19
Crane

.056 M.
3.38 0.19 0.056 1.89 0.19
Crane

34.56 1.94 - - - - - - - - - - - 1.94 0.08 - -

1.000 1 Vibrator 1.28 0.11

.056 M.
8.67 0.49 0.056 5.82 0.49
Crane

.056 M.
7.80 0.44 0.056 5.24 0.44
Crane

.056 M.
1.24 0.07 0.056 0.83 0.07
Crane

17.70 0.99 - - - - - - - - - - - 0.99 0.11 - -

1.00

3.09

0.500 .5 Vibrator 0.09 0.01


Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
3.20 0.18 0.056 1.79 0.18
Crane

.056 M.
2.30 0.13 0.056 1.29 0.13
Crane

.056 M.
0.46 0.03 0.056 0.26 0.03
Crane

5.96 0.33 - - - - - - - - - - - 0.33 0.01 - -

0.500 .5 Vibrator 0.00 0.001

.056 M.
0.25 0.01 0.056 0.06 0.01
Crane

.056 M.
0.18 0.01 0.056 0.04 0.01
Crane

.056 M.
0.04 0.00 0.056 0.01 0.00
Crane

0.47 0.03 0.02608 0.0006944

19.28

5.60 1.000 1 Vibrator 0.93 0.31

0.31
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

0.09 1.000 1 Vibrator 0.04 0.01

11.54 23.08 -

11.57 23.15 -

0.86 1.72 -

0.59 1.18 -

2.52 -

1.59 3.18 -

7.78 -

0.500 .5 Vibrator 0.11 0.03

.056 M.
3.25 0.18 0.056 0.73 0.18
Crane

.056 M.
7.02 0.39 0.056 1.57 0.39
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
1.11 0.06 0.056 0.25 0.06
Crane

11.38 0.64 - - - - - - - - - - - 0.64 0.03 - -

1.000 1 Vibrator 0.43 0.09

.056 M.
7.00 0.39 0.056 1.96 0.39
Crane

.056 M.
6.30 0.35 0.056 1.76 0.35
Crane

.056 M.
1.00 0.06 0.056 0.28 0.06
Crane

14.30 0.80 - - - - - - - - - - - 0.80 0.09 - -

1.000 1 Vibrator 0.04 0.01

.056 M.
0.50 0.03 0.056 0.14 0.03
Crane

.056 M.
1.44 0.08 0.056 0.40 0.08
Crane

.056 M.
0.25 0.01 0.056 0.07 0.01
Crane

2.19 0.12 - - - - - - - - - - - 0.12 0.01 - -


Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

1.55 3.09 -

2.30 4.61 -

0.5 Shovel
6 D.
0.01 0.01 0.06 6.750 0.19 0.01 0.05 0.00
Truck .25
B. Roller

4.20

1.11 -

0.71 1.42 -

3.48 -

0.500 .5 Vibrator 0.04 0.01

.056 M.
1.17 0.07 0.056 0.26 0.07
Crane

.056 M.
2.52 0.14 0.056 0.56 0.14
Crane

.056 M.
0.40 0.02 0.056 0.09 0.02
Crane

4.09 0.23 - - - - - - - - - - - 0.23 0.01 - -

1.000 1 Vibrator 0.07 0.01


Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
1.20 0.07 0.056 0.34 0.07
Crane

.056 M.
1.08 0.06 0.056 0.30 0.06
Crane

.056 M.
0.17 0.01 0.056 0.05 0.01
Crane

2.45 0.14 - - - - - - - - - - - 0.14 0.01 - -

2.29 4.58 -

0.33 0.66 -

0.5 Shovel
6 D.
0.01 0.01 0.06 6.750 0.19 0.01 0.05 0.00
Truck .25
B. Roller

1.000 1 Vibrator 3.02 0.25

.056 M.
20.42 1.14 0.056 13.72 1.14
Crane

.056 M.
18.38 1.03 0.056 12.35 1.03
Crane

.056 M.
2.92 0.16 0.056 1.96 0.16
Crane

41.71 2.34 - - - - - - - - - - - 2.34 0.25 - -


Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

1.000 1 Vibrator 0.01 0.00

.056 M.
0.17 0.01 0.056 0.06 0.01
Crane

.056 M.
0.15 0.01 0.056 0.05 0.01
Crane

.056 M.
0.02 0.00 0.056 0.01 0.00
Crane

0.34 0.02 - - - - - - - - - - - 0.02 0.00 - -

1.000 1 Vibrator 1.01 0.07

.056 M.
4.04 0.23 0.056 3.17 0.23
Crane

.056 M.
11.64 0.65 0.056 9.12 0.65
Crane

.056 M.
2.02 0.11 0.056 1.58 0.11
Crane

17.70 0.99 - - - - - - - - - - - 0.99 0.07 - -

1.000 1 Vibrator 0.11 0.01


Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
1.13 0.06 0.056 0.63 0.06
Crane

.056 M.
0.81 0.05 0.056 0.45 0.05
Crane

.056 M.
0.16 0.01 0.056 0.09 0.01
Crane

2.10 0.12 - - - - - - - - - - - 0.12 0.01 - -

1.000 1 Vibrator 0.04 0.00

.056 M.
0.28 0.02 0.056 0.14 0.02
Crane

.056 M.
0.80 0.04 0.056 0.40 0.04
Crane

.056 M.
0.14 0.01 0.056 0.07 0.01
Crane

1.22 0.07 - - - - - - - - - - - 0.07 0.00 - -

1.000 1 Vibrator 2.90 0.24

.056 M.
19.58 1.10 0.056 13.16 1.10
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
17.63 0.99 0.056 11.84 0.99
Crane

.056 M.
2.80 0.16 0.056 1.88 0.16
Crane

40.01 2.24 - - - - - - - - - - - 2.24 0.24 - -

1.000 1 Vibrator 0.99 0.07

.056 M.
3.97 0.22 0.056 3.12 0.22
Crane

.056 M.
11.44 0.64 0.056 8.97 0.64
Crane

.056 M.
1.99 0.11 0.056 1.56 0.11
Crane

17.40 0.97 - - - - - - - - - - - 0.97 0.07 - -

1.000 1 Vibrator 0.11 0.01

.056 M.
1.13 0.06 0.056 0.63 0.06
Crane

.056 M.
0.81 0.05 0.056 0.45 0.05
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
0.16 0.01 0.056 0.09 0.01
Crane

2.10 0.12 - - - - - - - - - - - 0.12 0.01 - -

1.000 1 Vibrator 2.93 0.24

.056 M.
19.75 1.11 0.056 13.27 1.11
Crane

.056 M.
17.78 1.00 0.056 11.94 1.00
Crane

.056 M.
2.82 0.16 0.056 1.90 0.16
Crane

40.35 2.26 - - - - - - - - - - - 2.26 0.24 - -

1.000 1 Vibrator 0.99 0.07

.056 M.
3.97 0.22 0.056 3.12 0.22
Crane

.056 M.
11.44 0.64 0.056 8.97 0.64
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
1.99 0.11 0.056 1.56 0.11
Crane

17.40 0.97 - - - - - - - - - - - 0.97 0.07 - -

1.000 1 Vibrator 2.90 0.29

.056 M.
23.50 1.32 0.056 13.16 1.32
Crane

.056 M.
21.15 1.18 0.056 11.84 1.18
Crane

.056 M.
3.36 0.19 0.056 1.88 0.19
Crane

48.01 2.69 - - - - - - - - - - - 2.69 0.29 - -

1.000 1 Vibrator 0.02 0.00

.056 M.
0.33 0.02 0.056 0.11 0.02
Crane

.056 M.
0.30 0.02 0.056 0.10 0.02
Crane

.056 M.
0.05 0.00 0.056 0.02 0.00
Crane

0.68 0.04 - - - - - - - - - - - 0.04 0.00 - -


Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

1.000 1 Vibrator 0.98 0.08

.056 M.
4.58 0.26 0.056 3.08 0.26
Crane

.056 M.
13.20 0.74 0.056 8.87 0.74
Crane

.056 M.
2.29 0.13 0.056 1.54 0.13
Crane

20.08 1.12 - - - - - - - - - - - 1.12 0.08 - -

1.000 1 Vibrator 0.11 0.01

.056 M.
1.41 0.08 0.056 0.63 0.08
Crane

.056 M.
1.01 0.06 0.056 0.45 0.06
Crane

.056 M.
0.20 0.01 0.056 0.09 0.01
Crane

2.62 0.15 - - - - - - - - - - - 0.15 0.01 - -

1.000 1 Vibrator 0.02 0.00


Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
0.18 0.01 0.056 0.07 0.01
Crane

.056 M.
0.51 0.03 0.056 0.20 0.03
Crane

.056 M.
0.09 0.01 0.056 0.04 0.01
Crane

0.78 0.04 - - - - - - - - - - - 0.04 0.00 - -

1.000 1 Vibrator 0.23 0.02

.056 M.
1.90 0.11 0.056 1.06 0.11
Crane

.056 M.
1.71 0.10 0.056 0.96 0.10
Crane

.056 M.
0.27 0.02 0.056 0.15 0.02
Crane

3.88 0.22 - - - - - - - - - - - 0.22 0.02 - -

1.000 1 Vibrator 0.41 0.07

.056 M.
5.50 0.31 0.056 1.85 0.31
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
4.95 0.28 0.056 1.66 0.28
Crane

.056 M.
0.79 0.04 0.056 0.26 0.04
Crane

11.24 0.63 - - - - - - - - - - - 0.63 0.07 - -

1.000 1 Vibrator 0.21 0.03

.056 M.
1.70 0.10 0.056 0.67 0.10
Crane

.056 M.
4.89 0.27 0.056 1.92 0.27
Crane

.056 M.
0.85 0.05 0.056 0.33 0.05
Crane

7.43 0.42 - - - - - - - - - - - 0.42 0.03 - -

1.000 1 Vibrator 0.30 0.04

.056 M.
3.00 0.17 0.056 1.34 0.17
Crane

.056 M.
2.70 0.15 0.056 1.21 0.15
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 M.
0.43 0.02 0.056 0.19 0.02
Crane

6.13 0.34 - - - - - - - - - - - 0.34 0.04 - -

0.500 .5 Vibrator 0.00 0.00

.056 M.
0.03 0.00 0.056 0.02 0.00
Crane

.056 M.
0.07 0.00 0.056 0.04 0.00
Crane

.056 M.
0.01 0.00 0.056 0.01 0.00
Crane

0.12 0.01 - - - - - - - - - - - 0.01 0.00 - -

.056 T.
10.80 0.60 0.056 8.47 0.60
Crane

0.21

10.15

.056 T.
4.24 0.24 0.056 3.32 0.24
Crane

.056 T.
2.70 0.15 0.056 0.30 0.15
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
3.70 0.21 0.056 2.90 0.21
Crane

.056 T.
7.21 0.40 0.056 5.66 0.40
Crane

.056 T.
0.70 0.04 0.056 0.55 0.04
Crane

2.13 4.27

.056 T.
0.80 0.05 0.056 0.63 0.05
Crane

.056 T.
0.94 0.05 0.056 0.63 0.05
Crane

.056 T.
2.72 0.15 0.056 2.14 0.15
Crane

.056 T.
9.53 0.53 9.53 0.056 6.41 0.53
Crane

.056 T.
1.31 0.07 0.056 1.03 0.07
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
1.33 0.07 0.056 1.05 0.07
Crane

1.44

3.43

2.51

0.21

1.54

.056 T.
2.51 0.14 0.056 1.97 0.14
Crane

.056 T.
1.35 0.08 0.056 0.15 0.08
Crane

.056 T.
0.27 0.02 0.056 0.21 0.02
Crane

.056 T.
0.22 0.01 0.056 0.18 0.01
Crane

.056 T.
2.54 0.14 0.056 1.99 0.14
Crane

.056 T.
1.17 0.07 0.056 0.91 0.07
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
0.12 0.01 0.12 0.056 0.07 0.01
Crane

0.25

0.56

0.15

.056 T.
11.41 0.64 0.056 8.95 0.64
Crane

0.21

9.98

.056 T.
4.49 0.25 0.056 3.52 0.25
Crane

.056 T.
3.00 0.17 0.056 0.34 0.17
Crane

.056 T.
3.97 0.22 0.056 3.11 0.22
Crane

.056 T.
7.55 0.42 0.056 5.92 0.42
Crane

.056 T.
0.85 0.05 0.056 0.38 0.05
Crane

1.71 3.42
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
0.92 0.05 0.056 0.72 0.05
Crane

.056 T.
1.08 0.06 0.056 0.72 0.06
Crane

.056 T.
1.77 0.10 0.056 1.39 0.10
Crane

.056 T.
6.20 0.35 6.20 0.056 4.17 0.35
Crane

.056 T.
1.62 0.09 0.056 1.27 0.09
Crane

.056 T.
1.90 0.11 0.056 1.49 0.11
Crane

1.16

3.30

3.01

0.21

1.65
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
0.40 0.02 0.056 0.31 0.02
Crane

.056 T.
0.70 0.04 0.056 0.08 0.04
Crane

.056 T.
0.30 0.02 0.056 0.24 0.02
Crane

.056 T.
0.23 0.01 0.056 0.18 0.01
Crane

.056 T.
2.70 0.15 0.056 2.11 0.15
Crane

.056 T.
0.30 0.02 0.056 0.23 0.02
Crane

.056 T.
0.13 0.01 0.13 0.056 0.07 0.01
Crane

0.27

0.73

0.14

.056 T.
11.41 0.64 0.056 8.95 0.64
Crane

0.21

9.98
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
4.49 0.25 0.056 3.52 0.25
Crane

.056 T.
3.00 0.17 0.056 0.34 0.17
Crane

.056 T.
3.97 0.22 0.056 3.11 0.22
Crane

.056 T.
7.55 0.42 0.056 5.92 0.42
Crane

.056 T.
0.85 0.05 0.056 0.38 0.05
Crane

1.71 3.42

.056 T.
0.92 0.05 0.056 0.72 0.05
Crane

.056 T.
1.08 0.06 0.056 0.72 0.06
Crane

.056 T.
1.77 0.10 0.056 1.39 0.10
Crane

.056 T.
6.20 0.35 6.20 0.056 4.17 0.35
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
1.62 0.09 0.056 1.27 0.09
Crane

.056 T.
1.90 0.11 0.056 1.49 0.11
Crane

1.16

3.30

3.01

0.21

1.65

.056 T.
0.40 0.02 0.056 0.31 0.02
Crane

.056 T.
0.70 0.04 0.056 0.08 0.04
Crane

.056 T.
0.30 0.02 0.056 0.24 0.02
Crane

.056 T.
0.23 0.01 0.056 0.18 0.01
Crane

.056 T.
2.70 0.15 0.056 2.11 0.15
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
0.30 0.02 0.056 0.23 0.02
Crane

.056 T.
0.13 0.01 0.13 0.056 0.07 0.01
Crane

0.27

0.73

0.14

.056 T.
11.41 0.64 0.056 8.95 0.64
Crane

0.21

9.98

.056 T.
4.38 0.25 0.056 3.43 0.25
Crane

.056 T.
3.00 0.17 0.056 0.34 0.17
Crane

.056 T.
3.97 0.22 0.056 3.11 0.22
Crane

.056 T.
7.55 0.42 0.056 5.92 0.42
Crane

.056 T.
0.85 0.05 0.056 0.38 0.05
Crane

1.71 3.42
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
0.92 0.05 0.056 0.72 0.05
Crane

.056 T.
1.08 0.06 0.056 0.72 0.06
Crane

.056 T.
1.77 0.10 0.056 1.39 0.10
Crane

.056 T.
6.20 0.35 6.20 0.056 4.17 0.35
Crane

.056 T.
1.62 0.09 0.056 1.27 0.09
Crane

.056 T.
1.90 0.11 0.056 1.49 0.11
Crane

1.16

3.30

3.01

0.21

1.65
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
0.40 0.02 0.056 0.31 0.02
Crane

.056 T.
0.70 0.04 0.056 0.08 0.04
Crane

.056 T.
0.30 0.02 0.056 0.24 0.02
Crane

.056 T.
0.23 0.01 0.056 0.18 0.01
Crane

.056 T.
2.70 0.15 0.056 2.11 0.15
Crane

.056 T.
0.30 0.02 0.056 0.23 0.02
Crane

.056 T.
0.13 0.01 0.13 0.056 0.07 0.01
Crane

0.27

0.73

0.14

.056 T.
13.32 0.75 0.056 8.95 0.75
Crane

0.21

11.98
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
5.24 0.29 0.056 3.52 0.29
Crane

.056 T.
3.00 0.17 0.056 0.34 0.17
Crane

.056 T.
4.63 0.26 0.056 3.11 0.26
Crane

.056 T.
8.81 0.49 0.056 5.92 0.49
Crane

.056 T.
1.14 0.06 0.056 0.38 0.06
Crane

2.14 4.27

.056 T.
1.29 0.07 0.056 0.72 0.07
Crane

.056 T.
1.61 0.09 0.056 0.72 0.09
Crane

.056 T.
2.07 0.12 0.056 1.39 0.12
Crane

.056 T.
7.44 0.42 7.44 0.056 4.17 0.42
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
1.89 0.11 0.056 1.27 0.11
Crane

.056 T.
2.22 0.12 0.056 1.49 0.12
Crane

1.39

3.85

3.51

0.21

1.99

.056 T.
0.47 0.03 0.056 0.31 0.03
Crane

.056 T.
0.70 0.04 0.056 0.08 0.04
Crane

.056 T.
0.35 0.02 0.056 0.24 0.02
Crane

.056 T.
0.27 0.01 0.056 0.18 0.01
Crane

.056 T.
3.15 0.18 0.056 2.11 0.18
Crane
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
0.35 0.02 0.056 0.23 0.02
Crane

.056 T.
0.16 0.01 0.16 0.056 0.07 0.01
Crane

0.31

0.91

0.17

.056 T.
13.32 0.75 0.056 8.95 0.75
Crane

0.21

11.98

.056 T.
5.24 0.29 0.056 3.52 0.29
Crane

.056 T.
3.00 0.17 0.056 0.34 0.17
Crane

.056 T.
4.63 0.26 0.056 3.11 0.26
Crane

.056 T.
8.81 0.49 0.056 5.92 0.49
Crane

.056 T.
1.14 0.06 0.056 0.38 0.06
Crane

2.14 4.27
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
1.29 0.07 0.056 0.72 0.07
Crane

.056 T.
1.61 0.09 0.056 0.72 0.09
Crane

.056 T.
2.07 0.12 0.056 1.39 0.12
Crane

.056 T.
7.44 0.42 7.44 0.056 4.17 0.42
Crane

.056 T.
1.89 0.11 0.056 1.27 0.11
Crane

.056 T.
2.22 0.12 0.056 1.49 0.12
Crane

1.39

3.85

3.51

0.21

1.99
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.056 T.
0.47 0.03 0.056 0.31 0.03
Crane

.056 T.
0.70 0.04 0.056 0.08 0.04
Crane

.056 T.
0.35 0.02 0.056 0.24 0.02
Crane

.056 T.
0.27 0.01 0.056 0.18 0.01
Crane

.056 T.
3.15 0.18 0.056 2.11 0.18
Crane

.056 T.
0.35 0.02 0.056 0.23 0.02
Crane

.056 T.
0.16 0.01 0.16 0.056 0.07 0.01
Crane

0.31

0.91

0.17

.056 T.
3.07 0.17 0.056 1.72 0.17
Crane

0.30

2.12
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

0.16

0.42

0.53

1
4.37 4.37 1.000 Excavato 21.87 4.37
r

1 M.
0.88 0.88 1.000 12.27 0.88
Crane

0.27 0.55

.25 Bob
0.09 0.02 0.250 0.22 0.02
Cat

0.5
Shovel 3
Dump
2.44 1.22 2.44 4.500 Truck .5 51.17 0.41 2.44 0.41 0.41
S.
Roller .5
Bob Cat
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

19.24

0.56

.25 M.
0.11 0.03 0.250 0.32 0.03
Crane

..5 M.
0.50 0.25 0.500 2.50 0.25
Crane

.5 M.
0.05 0.03 0.500 0.31 0.03
Crane

12.53

7.10

0.56

.25 M.
0.10 0.03 0.250 0.25 0.03
Crane

..5 M.
0.06 0.03 0.500 0.25 0.03
Crane

5.48

14.62

0.56
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

.25 M.
0.53 0.13 0.250 1.58 0.13
Crane

..5 M.
1.10 0.55 0.500 5.50 0.55
Crane

.5 M.
0.05 0.03 0.500 0.31 0.03
Crane

9.55

7.10

0.56

.25 M.
0.10 0.03 0.250 0.25 0.03
Crane

..5 M.
0.06 0.03 0.500 0.25 0.03
Crane

5.48
Tot. Eqmt Eqmt Tot. E-
M A N - D A Y S E Q M T - D A Y S
(X) Desc. days (Z)
Technicia Alum. Waterproo Tower
Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator Excavator
n Tech fer Crane

You might also like